Loading...
HomeMy WebLinkAbout15-1520R; DLl�Il1�D BAR CITY OF DIAMOND I AR ..- , DEPARTMENT OF COMMUNITY & DEVELOPMENT SERVICES 21810 Copley Drive, Diamond Bar, CA 91765 . (909) 839-7020 Fax: (909) 861-3117 Building Inspection Hotline (909) 839-7027 BUILDING PERMIT APPLICATION JOB SITE ADDRESS APN 16703dIllG3 LOT TRACT OWNER ADDRESS i,2 0 CITY ZIP _q0 qgq TEL �G9. APPLICANT A/-'11Ar ,l `L. TEL. i�y �Iy3 R6G� CONTRACTOR r� % %� 1��Y1uc"^ ADDRESS L S_ /r /^� CITYk-) W ZIP C \ TEL. 101 ARCHCG/DESIGNER . / rr ' IT N ADDRESS 1, -'YO Al !%a,✓ 1302,_-n/ sf CITY A /.4NF_/m ZIP 9_'7f�7TTEL. �9• '�$I • .'�17� 0 OWNER -BUILDER DECLARATION I hereby affirm under penalty of perjury that I am exempt from the Contractor's State License Law for the reason(s) indicated below by the checkmark(s), I have placed next to the applicable item(s) [Section 7031.5, Business and Professions Code: Any city or county that requires a permit to construct, alter, Improve, demolish, or repair, any structure, prior to its issuance, also requires the applicant for the permit to file a signed statement that he or she is licensed pursuant to the provisions of the Contractor's State License Law (Chapter 9) Commencing with Section 7000 of Division 3 of the Business and Professions Code] or that he or she is exempt from licensure and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars ($500). (J I, as owner of the property, or my employees with wages as their sole compensation, will do (, all of or (_) portions of the work, and the structure is not intended or offered for sale (Section 7044, Business and Professions Code: The Contractors' State License Law does not apply to an owner of property who, through employees' or personal effort, builds or improves the property, provided that the improvements are not intended or offered for sale. If however, the building or improvement is sold within one year of completion, the Owner -Builder will have the burden of proving that it was not built or improved for the purpose of sale.). U I, as owner of the property, am exclusively contracting with licensed Contractors to construct the project (Section 7044, Business and Professions Cade: The Contractors' State License Law does not apply to an owner of property who builds or improves thereon, and who contracts for the projects with a licensed Contractor pursuant to the Contractors' State License Law.). PRESS FIRMLY APPLICATION DATE: ".5- P/C#ter /, �a ISSUE DATE: -3 /� � S ill PERMIT# /,5__/5_a10 TYPE CONST. (f -e-11 c] iAt MIJI,/ OCC GROUP: ZONING SETBACKS FRONT REAR SIDE/SIDE STREET SIDE PW ❑ ❑ RW ❑ ❑ PROPOSED USE �e s On A Cvlc/ l� R2uS nn�) # DWEL. UNITS If STORIES l,' j MCnnPo1� # BEDROOMS DESCRIPTION SQ. FT. FACTOR PSF ADJ. AREA/VALUATION SFR/ADD/REM Garage/Carport rn W Patio/Deck LL Pool/Spa ZRe -Roof o Commercial m Valuation: t2$� UG o Adj. Area: QUANTITY DESCRIPTION FEE J U U J W C7 J Q UZ Q Cld �I CONSTRUCTION' • PLAN REVIEW: a—• y ELECTRIC: PLUMBING: MECHANICAL: INSPECTION FEE: ISSUANCE: SMTP: ENERGY P/C: ENERGY PERMIT: RETENTION FEE: PRE -ALT FEE: BSAF: Piat &A FOL"'11N!, Irel TOTAL FEES COMMENTS, u i r Z 1?p 1p. 12 g,�7 00 YiJJ✓' V' RECEIPT # 313o V PAID BY: V (02:1 VALIDATION:__�y ;FOOTINGS FORMSm 'SLAB UG. PLUMBING UG. ELECTRICAL ,UFER,GROUND SEWER LATERAL MAIN WATER LINE SEWER CLEANOUT ROOF SHEATHING FLOOR SHEATHING SHEAR WALLS EXTERIOR, CITY OF DIAIVIOIyD BAR INSPECTION RECORD 3 :ROUGH ELECTRICAL W,( } C ROUGH PLUMBING— a INSULATION WALL ROUGKPLUMBING INSULATION CEILING .�b�. DRYWALL ROUGH ELECTRICAL LATH (PRE) LATH EXTERIOR ROUGH MECHANICAL; LATH INTERIOR GAS TEST GAS TEST_>; SCRATCH COAT ELECTRIC METER RELEASE PRE GUNITE GAS METER RELEASE SPECIAL INSPECTION PobL'PRE DECK BONDING - FINAL BUILDING L J FINAL MECHANICAL". �jINAL ELECTRICAL FINALS UMBING ^ PANCY i ;ERT, of OibbV 0 COMMENTS: Z f n e- /J�®►n� A TRACT AND LEDGER SWITCH GEAR COMMERCIAL HOOD T -BAR INTERCEPTER HOT MOP/SHOWERPAN SEPTIC/CESSPOOL HERS REPORT RECEIVED DEMOLITION ROOF DRAINS ROUGH CONDUIT WALLS: WALL FOOTING/STEEL WALL STEEL 1S'( ) 2ND( ) LIFT WALL BOND BEAM WALL DRAIN/ SEAL _ WALL FINAL R0. FRAMINGPLANNING APPROVAL ROUGH FIRE APPROVAL v FINAL FIRE DEPARTMENT FINAL PLANNING i ! FINAL ENGINEERING/ PW- FINAL COMMUNITY SERVICES FINAL,HEAL'TH DEPT, FINAL INDUSTRIAL WASTE., ROUGKPLUMBING ';.. .�b�. ROUGH ELECTRICAL ROUGH MECHANICAL; GAS TEST_>; PRE GUNITE PobL'PRE DECK BONDING - FENCE,ftGATE/ALARM � FINAL POOL' WALLS: WALL FOOTING/STEEL WALL STEEL 1S'( ) 2ND( ) LIFT WALL BOND BEAM WALL DRAIN/ SEAL _ WALL FINAL R0. FRAMINGPLANNING APPROVAL ROUGH FIRE APPROVAL v FINAL FIRE DEPARTMENT FINAL PLANNING i ! FINAL ENGINEERING/ PW- FINAL COMMUNITY SERVICES FINAL,HEAL'TH DEPT, FINAL INDUSTRIAL WASTE., CITY OF DIAMOND BAR 10 ' BUILDING AND SAFETY DIVISION ROUTING SHEET `\,yy To: Planning / Grace Lee Date: February 2, 2017 Project PRI 5 - 1520 From: Lauren Catron B&S The project located at 2.1450 Golden Springs — Veriozon cell tower has requested: F-1 Building Permit Issuance ❑Rough Framing ® Final Inspection ❑Others To be performed by the City's Building & Safety Division. The Building Division will not allow the project to proceed or be finalized until all the following department(s) have reviewed the project for completeness. ® Planning Division ❑ Engineering Department ❑ Building & Safety ❑ Others Comments I1 ' Corrections Contact: Noy — 909-702-3409 IS( 10R.Q_, OK to Proceed [V Yes s - Lee ❑ No Sern-at Name Title Date o z10, -i 2-01-f— If comments are not received by February 9, 2017 the Building Division will assume there are no comments from your office/department. Should you require further information regarding this project, please contact Lauren Catron. d:/stella/tonns/b&s routing sheet.doc DIAMOND BAR �mj% µ, To: Planning / Kimberl From: Lauren Catron B&S CITY OF DIAMOND BAR BUILDING AND SAFETY DIVISION ROUTING SHEET Date: February 2, 2017 Project PR15 - 1520 ol The project located at 21450 Golden Sprinl4s — Veriozon cell tower has requested: ❑ Building Permit Issuance ❑Rough Framing ® Final Inspection ❑Others To be performed by the City's Building & Safety Division. The Building Division will not allow the project to proceed or be finalized until all the following department(s) have reviewed the project for completeness. ❑ Planning Division ❑ Others ® Engineering Department ❑ Building & Safety Comments ❑ Corrections ❑ Contact: Noy — 909-702-3409 This was originally assigned to Sterling Mosley OK to Proceed] Yes ❑ No Name Title Date If comments are not received by February 9, 2017 the Building Division will assume there are no comments from your office/department. Should you require further information regarding this project, please contact Lauren Catron. d1stelkAbrms/Us routing sheet.doc