HomeMy WebLinkAbout01/14/2016 Minutes - Regular MeetingCITY OF DIAMOND BAR
MINUTES OF THE TRAFF.11C AND TRANSPORTATION COMMISSION MEETING
JANUARY 14, 2016
Vice -Chairman Mok called the meeting to order at 7:02 p.m. in the Diamond Bar City Hall
Windmill Community Room, 21810 Copley Drive, Diamond Bar, California 91765.
PLEDGE OF ALLEGIANCE: Vice -Chair Mok led the Pledge of Allegiance.
ROLL CALL: Commissioners Surendra Mehta, Ed Pechy, Vice
Chair Ken Mok
Absent: Commissioners Shokoufeh Mirzaei and Manisha
Sulakhe were excused.
Also Present: David Liu, Public Works Director; Kimberly Young,
Senior Civil Engineer; Christian Malpica, Associate
Engineer; John Beshay, Associate Engineer; and
Marcy Hilario Administrative Coordinator.
A. Minutes of the November 12, 2015 Regular Meeting.
C/Pechy moved, VC/Mok seconded, to approve the Minutes of the November
12, 2015 regular meeting as presented. Motion carried by the following Roll
Call vote:
AYES: COMMISSIONERS:
Pechy, VC/Mok,
NOES: COMMISSIONERS:
None
ABSTAIN: COMMISSIONERS:
Mehta
ABSENT: COMMISSIONERS:
Mirzaei, Sulakhe
II. PUBLIC COMMENTS: None
Ill. ITEMS FROM STAFF:
A. Receive and File Traffic Enforcement Updates for:
1. Citations: October, November and December 2015
2. Collisions: October, November and December 2015
3. Street Sweeping: October, November and December 2015
JANUARY 14, 2016 PAGE 2 T&T COMMISSION
W
a
V1.
V11.
C/Pechy moved, C/Mehta seconded, to receive and file the Traffic
Enforcement Update reports for October, November and December 2015.
Motion carried by the following Roll Call vote:
AYES:
COMMISSIONERS:
NOES:
COMMISSIONERS:
ABSENT:
COMMISSIONERS:
• BUSINESS: N o
NEW BUSINESS: None
STATUS OF PREVIOUS ACTION ITEMS:
ITEMS FROM COMMISSIONERS:
Mehta, Pechy, VC/Mok,
None
Mirzaei, Sulakhe
I=
C/Pechy passed photographs to staff showing pavement damage on northbound
Diamond Bar Boulevard from the Haggan 'Shopping Center 'entrance to the
westbound SR -60 off -ramp. He inquired about what caused the damage and what
staff planned for remediation. PWD/Liu responded that staff is aware of the peeling
slurry seal condition, and indicated that slurry seal was done in 2014. A
comprehensive repair plan will be developed and scheduled.
Vill. INFORMATIONAL ITEMS:
A. Traffic Signal Infrastructure Upgrades Project — AE/Malpica reported that
the project to enhance the overall communication network to obtain a higher
bandwidth capacity is being advertised with a bid opening date of February V.
The project includes rewiring of three intersections and replacement of 50
traffic signal controllers.
B. Comprehensive Groundwater Drainage Study — AE/Malpica stated that the
report was completed and the City will move forward with two project locations;
one along Golden Springs Drive west of Platina Drive and one at Brea Canyon
Road north of Sapphire Lane. Cost of construction will be in excess of
$200,000.
C. Morning Canyon Roadway Rehabilitation Project— SCE/Young relayed that
this project is nearing final design, with plans under review by L.A. County.
This project incorporates the relocation of county -owned catch basins along
Morning Canyon to accommodate a larger parkway for the existing trees.
Once staff obtains sign -off of the .plans, the project will go out to bid.
JANUARY 14, 2016 PAGE 3
T&T COMMISSION
VC/Mok asked if staff had heard from the arborist. SCE/Young responded no,
the trees have been cut down and any additional trees that may need to be
removed will have the root structures examined by the arborist when
construction commences.
D. Area 4 Road Maintenance Project — SCE/Young reported that an RFP was
sent to design firms for design and construction management ' services.
Proposals are due on January 25th. Area 4 encompasses the entire
neighborhood north of Pathfinder Road to the city limits and east of Brea
Canyon Road'(Lycoming and Washington Streets).
E. Willow Heights Construction Update — AE/Beshay conveyed that three
traffic signal pole foundations were poured today and poles will be installed
shortly. The color concrete for the sidewalks has been poured along Brea
Canyon ' Road and pavers will be installed next week. The up -lighting and pre-
cast posts have been installed on Brea Canyon Road and the wood rails will be
installed next week.
F., South Point Residential Development — Prior to the meeting, SCE/Young
provided to the Commission a copy of a letter that was mailed out to
approximately 600 residents last week notifying them of the South Point
Development. The development was approved in 2007 and consists of 99 -unit
residential detached condominiums. Due to the recession, the state granted
automatic extensions of approved Tentative Maps which allowed the Map to
remain valid until March 6, 2017. In 2015, Lennar Homes purchased the
project from Lewis Operating Companies and commenced grading activities
this week. Grading is expected to take three months, barring weather with full
project buildout expected by August 2017. Main access to this project will be
from Larkstone Drive and there will be an access -only point off of Morning Sun
Avenue, which lays within the County of Los Angeles unincorporated area.
Construction hours are permitted from 7:00 a.m. to 6:00 p.m. and, because this
project is located directly across from South Point Middle School, the
contractor is working closely with the school principal to ensure the safety of
school aged children.
G. Grand Avenue Beautification Project — AE/Besbay stated that staff
conducted a walk-thru last Wednesday with the project construction manager
and contractor to review the completed punch list items. This included
adjusting up -lighting for sidewalk trees and repair of concrete work.
VC/Mok asked if the pavers had been replaced at Longview Drive and Grand
Avenue. AE/Beshay responded affirmatively that they were replaced the week
of December 28th.
H. Lemon Avenue Interchange Project — SCE/Young reported that the
consultant designer (Jacobs) is working out final design details with Caltrans.
Staff expects approval with a ready -to -list date in February, which will allow
construction to commence by late summer.
JANUARY 14, 2016 PAGE 4
T&T COMMISSION
I. SR -57/60 Confluence Project — SCE/Young relayed that construction of the
first phase of this project (westbound on-ramp adjacent to the vacant Honda
parcel) is expected to begin in March. Phase 11, relocation of the westbound off
ramp, 400 feet north of its current location, will commence six months following
Phase I.
VC/Mok asked if either of the two buildings in close proximity to the project
would be razed during construction of the on-ramp. PWD/Liu responded that
demolition of those buildings, clean-up of the property and fencing off of the
prope . rty is scheduled to take place prior to construction.
IX. SCHEDULE OF FUTURE CITY EVENTS:
As listed in the agenda.
ADJOURNMENT: There being no further business to come before the Traffic and
Transportation Commission, Vice -Chair Mok adjourned the meeting at 7:25 p.m.
The foregoing minutes are hereby approved this 1Y14 day of APNL, _, 2016.
Respectfully Submitted,
David '6_.Lru, Secretary
Attest:
K
ice -Chairman e�ok