HomeMy WebLinkAboutPC 2015-16IN:oMEMO
A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF
DIAMOND BAR, CALIFORNIA, APPROVING DEVELOPMENT REVIEW
NO. PL2015-48 TO REMODEL THE FACADE OF AN EXISTING,
8,912 SQUARE -FOOT, TWO-STORY COMMERCIAL BUILDING WITH ON-SITE
IMPROVEMENTS ON A 27,440 GROSS SQUARE -FOOT (0.63 GROSS ACRES)
LOT LOCATED AT 21450 GOLDEN SPRINGS DRIVE, DIAMOND BAR, CA
91765 (APN 8763-041-038).
A. RECITALS
1. The property owner, 21450 Golden Springs, LLC, and applicant, Drafting and
Design, LTD, have filed an application for Development Review
No. PL2015-48 to remodel the fapade of an existing 8,912 square -foot, two-
story commercial building with on-site improvements located at
21450 Golden Springs Drive, Di.amond Bar, County of Los Angeles,
California.
2. The subject property is made up of one parcel totaling 27,440 gross square
feet (0.63 gross acres). It is located in the Commercial Office (CO) zone with
a consistent underlying General Plan land use designation of Commercial
Office.
3. The legal description of the subject property is POR of NW'/4 of SEC 16 T2S
R9W. The Assessor's Parcel Number is 8763-001-038.
4. On July 16, 2015, public hearing notices were mailed to property owners
within a 500 -foot radius of the Project site. Public notices were posted at the
project site and the City'.s three designated community posting sites. On
July 17, 2015, notification of the public hearing for this project was published
in the San Gabriel Valley Tribune and the Inland Valley Daily Bulletin
newspapers.
5. On July 28, 2015, the Planning Commission of the City of Diamond Bar
conducted a duly noticed public hearing, solicited. testimony from all
interested individuals, and concluded said hearing on that date.
B. RESOLUTION
NOW, THEREFORE, it is found, determined and resolved by the Planning
Commission of the City of Diamond Bar as follows:
1. The Planning Commission hereby specifically finds that all of the facts set
forth in the Recitals, Part A, of this Resolution are true and correct; and
C.
2. The Planning Commission hereby determines the
Exempt from the provisions of the California
(CEQA) pursuant to the provisions of Article 1
Facilities) of the CEQA Guidelines. Therefore,
review is required.
FINDINGS OF FACT
Project to be Categorically
Environmental Quality Act
9, Section 15301 (Existing
no further environmental
Based on the findings and conclusions set forth herein and as prescribed under
Diamond Bar Municipal Code (DBMC) Section 22.48, this Planning Commission
hereby finds as follows:
Development Review Findings DBMC Section 22.48.040
The design and layout of the proposed development is consistent with the
applicable elements of the City's General Plan, City Design Guidelines, and
development standards of the applicable district, design guidelines, and
architectural criteria for special areas (e.g., theme areas, specific plans,
community plans, boulevards or planned developments):
The proposed exterior fagade remodel is consistent with the applicable
elements of the City's General Plan, City Design Guidelines and
development standards by complying with all of the required setbacks and
regulations. The proposed facade changes are designed in a contemporary
architectural style, with Italian influences, and incorporates architectural
details such as decorative wrought iron grilles, corbel moldings underneath
the cornice of parapet walls at the building focal points, and wall sconces
throughout the street facing elevations. In addition, the massing of the focal
points project outward from the building walls to create changes in plane and
add architectural interest to the facade. The fenestration will consist of
bronze anodized frames for doors and windows. The building will be finished
with a textured stucco material in a three toned color palette and cultured
stone veneer on vertical support columns. The fagade remodel is also
consistent with the City's Commercial Design Guidelines Pages 5-93, which
incorporates the following principles:
➢ Monotony of building design as well as busyness is avoided. Variation in
wall place, roof line, finish materials are used to prevent monotonous
appearance in buildings,-
The
uildings,
The exterior building design, including roof style, color, materials,
architectural form and detailing is consistent on all elevations of each
building to achieve design harmony and continuity within itself,
➢ Articulation and accent color for identity and interest is provided for the
building entrances,
7
Planning Commission Resolution No. 2015-16
Introduction of elements which transition to the human scale, particularly
near the ground; and
Landscaping is used to enhance architectural design and soften hard
building edges as well as to separate parking areas and buildings from
the street and other land uses.
The project site is not a part of any theme areas, specific plans, community
plans, boulevards or planned developments.
2. The design and layout of the proposed development will not interfere with the
use and enjoyment of neighboring existing or future developments, and will
not create traffic or pedestrian hazards;
The proposed improvements will not interfere with the use or enjoyment of
neighboring existing or, future developments because the use of the project
site is designated for commercial office uses and is relatively isolated from
other similar uses. The adjoining Caltrans yard and further west located self -
storage facility are the nearest land uses in close proximity to the subject
property.
3. The architectural design of the proposed development is compatible with the
character of the surrounding neighborhood and will maintain and enhance
the harmonious, orderly and attractive development contemplated by
Chapter 22.48: Development Review Standards, the City's Design
Guidelines, the City's General Plan, or any applicable specific plan;
The building facade is designed in a contemporary architectural style with
earth -tone textured stucco shades for the exterior wall finish and cultured
stone veneer on vertical columns supporting parapet walls at focal points of
the building to soften the building's visual impact, therefore, is compatible
with the recently renovated commercial buildings in the vicinity. There is no
specific plan for the project area.
4. The design of the proposed development will provide a desirable
environment for its occupants and visiting public as well as its neighbors
through good aesthetic 'use of materials, texture, color, and will remain
aesthetically appealing;
The proposed building changes have been designed in a contemporary
architectural style, with Italian influences, and incorporates architectural
details such as decorative wrought iron grilles, corbel moldings underneath
the cornice of parapet walls at the building focal points, and wall sconces
throughout the street facing elevations. in addition, the massing of the focal
points project outward from the building walls to create changes in plane and
add architectural interest to the facade. The fenestration will consist of
bronze anodized frames for doors and windows. The building will be finished
3
Planning Commission Resolution No. 2015-1e
with a textured stucco material in a three toned color palette and cultured
stone veneer an vertical support columns.
5. The proposed development will not be detrimental to public health, safety or
welfare or materially injurious (e.g., negative effect on property values or
resale(s) of property) to the properties or improvements in the vicinity; and
Before the issuance of any City permits, the proposed project is required to
comply with all conditions within the approved resolution, and the Building
and Safety Division and Public Works Departments requirements.
Through the permit and inspection process, the referenced agencies will
ensure that the proposed project is not detrimental to the public health, safety
or welfare or materially injurious to the properties or improvements in the
vicinity.
6. The proposed project has been reviewed in compliance with the provisions of
the California Environmental Quality Act (CEQA).
The proposed project is categorically exempt from the provisions of the
California Environmental Quality Act (CEQA) as set forth under Article 19
Section 15301 (Existing Facilities) of the CEQA Guidelines.
Based upon the findings and conclusion set forth above, the Planning Commission hereby
approves this Application, subject to the following conditions:
1. Development shall substantially comply with the plans and documents
presented to the Planning Commission at the public hearing.
2. Prior to building permit issuance, landscape and irrigation plans shall be
reviewed and approved by the City's Consulting Landscape Architect and
shall comply with the Water Conservation Landscaping Ordinance.
3. Prior to installation of any new signs on the property, with the exception of
regulatory, wayfinding, directional, traffic, and parking signs, a
Comprehensive Sign Program (CSP) shall -be reviewed and approved by the
Planning Commission.
4. Prior to the issuance of a building permit, the existing pole sign structure
shall be removed.
5. Standard Conditions. The applicant shall comply with the standard
development conditions attached hereto.
4
Planning Commission Resolution No. 2015-16
The Planning Commission shall:
a. Certify to the adoption of this Resolution; and
b. Forthwith transmit a certified copy of this Resolution, by certified mail
to the property. owner, 21450 Golden Springs, LLC, 774 Pinefalls
Avenue, Walnut, CA 91789, and applicant, Drafting and Design, LTD,
158 W. Orange Street, Covina, CA 91723.
APPROVED AND ADOPTED THIS 28th -DAY OF JULY 2015, BY THE PLANNING
COMMISSION OF -THE CITY OF DIAMOND BAR.
By: _ t�
Rut6 Low, Chairperson
I, Greg Gubman, Planning Commission Secretary, do hereby certify that the foregoing
Resolution was duly introduced, passed, and adopted, at a regular meeting of the Planning
Commission held on the 28th day of July, 2015, by the following vote:
AYES: Commissioners: Farago, Mahl.ke, Nishimura, Chair/Low
NOES` Commissioners: None
ABSENT: Commissioners: None
ABSTAIN: Commissioners: None
ATTEST:
Greg Gubman, Secretary
5
DR No. PL2015-48
COMMUNITY DEVELOPMENT DEPARTMENT
__ryaq
STANDARD CONDITIONS
USE PERMITS, COMMERCIAL AND RESIDENTIAL NEW AND
REMODELED STRUCTURES
PROJECT #: Development Review No. PL 2015-48
SUBJECT: To remodel the facade of an existing 8,912 square -foot, two-story
commercial buildinq with on-site improvements.
PROPERTY 21450 Golden Springs, LLC
OWNER: 774 Pinefalls Avenue
Walnut, CA 91789
APPLICANT: Drafting and Design, LTD
158 W. Orange Street
Covina, CA 91723
LOCATION: 21450 Golden S�rin s Drive Diamond Bar CA 91765
ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT.
APPLICANT SHALL CONTACT THE PLANNING DIVISION AT (909) 839-7030, FOR
COMPLIANCE WITH THE FOLLOWING CONDITIONS:
A. GENERAL REQUIREMENTS
1. The applicant shall defend, indemnify, -and hold harmless the City, and its
officers, agents and employees, from any claim, action, or proceeding to attack,
set-aside, void or annul, the approval of Development Review No. PL2015-48
brought within the time period provided by Government Code Section 66499.37.
In the event the city and/or its officers, agents and employees are made a party
of any such action:
(a) Applicant shall provide a defense to the City defendants or at the City's
option reimburse the City its costs of defense, including reasonable
attorneys fees, incurred in defense of such claims.
6
Planning Commission Resolution No. 201 5-9 6
(b) Applicant shall promptly pay any final judgment rendered against the City
defendants. The City shall promptly notify the applicant of any claim,
action of proceeding, and shall cooperate fully in the defense thereof.
2. This approval shall not be effective for any purpose until the applicant and
owner of the property involved have filed, within twenty-one (21) days of
approval of this Development Review No. PL2015-48, at the City of Diamond
Bar Community Development Department, their affidavit stating that they are
aware of and agree to accept all the conditions of this approval. Further, this
approval shall not be effective until the applicants pay remaining City
processing fees, school fees and fees for the review of submitted reports.
3. All designers, architects, engineers, and contractors associated with this project
shall obtain a Diamond Bar Business License; and a zoning approval for those
businesses located in Diamond Bar.
4. Signed copies of Planning Commission Resolution No. 2015-16, Standard
Conditions, and all environmental mitigations shall be included on the plans (full
size). The sheet(s) are for information only to all parties involved in the
construction/grading activities and are not required to be wet sealed/stamped
by a licensed Engineer/Architect.
5. Prior to the plan check, revised site plans and building elevations incorporating
all Conditions of Approval shall be submitted for Planning. Division review and
approval.
6. Prior to any use of the project site or business activity being commenced
thereon, all conditions of approval shall be completed. ,
7. The project site shall be maintained and operated in full compliance with the
conditions of approval and all laws, or other applicable regulations.
8. Approval of this request shall not waive compliance with all sections of the
Development Code, all other applicable City Ordinances, and any applicable
Specific Plan in effect at the time of building permit issuance.
9. All site, grading, landscapelirrigation, and roof plans, and elevation plans shall
be coordinated for consistency prior to issuance of City permits (such as
grading, tree removal, encroachment, building, etc.,) or approved use has
commenced, whichever comes first.
10. The property owner/applicant shall remove the public hearing notice board
within three days of this project's approval.
11. The applicant shall comply with the requirements of Planning and Building and
Safety Divisions, Public Works/Engineering Department, and the Los Angeles
County Fire Department.
7
Planning Commission Resolution No. 2015-16
B. FEESIDEPOSITS
1. Applicant shall pay development fees (including but not limited to Planning,
Building and Safety Divisions, Public Works Department and Mitigation
Monitoring) at the established rates, prior to issuance of building or grading
permit (whichever comes first), as required by the City. School fees as required
shall be paid prior to the issuance of building permit. In addition, the applicant
shall pay all remaining prorated City project review and processing fees prior to
issuance of grading or building permit, whichever comes first.
2. Prior to any plan check, all deposit accounts for the processing of this project
shall have no deficits.
C. TIME LIMITS
1. The approval of Development Review No. PL2015-48 expires within two years
from the date of approval if the use has not been exercised as defined per
Diamond Bar Municipal Code (DBMC) Section 22.66.050 (b)(1). In accordance
with DBMC Section 22.60.050(c), the applicant may request, in writing, a one-
year time extension for Planning Commission consideration. Such a request
must be submitted to the Planning Division prior to the expiration date and be
accompanied by the review fee in accordance with the fee schedule in effect at
the time of submittal.
D. SITE DEVELOPMENT
1. The project site shall be developed and maintained in substantial conformance
with the approved plans submitted to, approved, and amended herein by the
City Council, on file with the Planning Division, the conditions contained herein,
and the Development Code regulations.
2. All ground -mounted utility appurtenances such as transformers, air conditioning
condensers, etc., shall be located out of public view and adequately screened
through the use of a combination of concrete or masonry walls, berms, and/or
landscaping to the satisfaction of the Planning Division.
3. All roof -mounted equipment shall be screened from public view.
4. All structures, including walls, trash enclosures, canopies, etc., shall be
maintained in a structurally sound, safe manner with a clean, orderly
appearance. All graffiti shall be removed within 72 hours by the property
ownersloccupant.
5. No occupancy permit can be granted, until all improvements required by this
approval have been properly constructed, inspected, and approved, except as
otherwise permitted by the Building Official.
8
Planning Commission Resolution No. 2015-16
6. Prior -to issuance of a building permit, the location, size, and screening of all
building utility service connections, including water, gas, and electric service,
fire service, and irrigation connections shall be approved by the Community
Development Director. All changes to building utility connections shall be
approved by the Community Development Director prior to construction.
Building utility connections shall be located, sized and screened in such a
manner that they have the least possible impact on the design of the building
and site. The architect of record shall be directly involved in the design and
placement of all site and building service connections and shall sign all plans
submitted to the City which locate, size and/or screen utility connections.
7. Additional plant materials may be required by the Community Development
Director and shall be planted prior to final occupancy in order to screen utility
connections, valves, backflow devices, and all above ground appurtenances,
etc., to the satisfaction of the Community Development Director. This
determination shall be made in the field after all screen utility connections,
valves, backflow devices, and all above ground appurtenances, etc. have been
installed and inspected.
Tel 9 FOX a sV 2
1. The site shall be maintained in a condition, which is free of debris both during
and after the construction, addition, or implementation of the entitlement
approved herein. The removal of all trash, debris, and refuse, whether during
or subsequent to construction shall be done only by the property owner,
applicant or by a duly permitted waste contractor, who has been authorized by
the City to provide collection, transportation, and disposal of solid waste from
residential, commercial, construction, and industrial areas within the City. It
shall be the applicant's obligation to insure that the waste contractor used has
obtained permits from the City of Diamond Bar to provide such services.
2. Mandatory solid waste disposal services shall be provided by the City
franchised waste hauler to all parcels/lots or uses affected by approval of this
project.
APPLICANT SHALL CONTACT THE PUBLIC WORKS DEPARTMENT, (909) 839-7040,
FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS:
l�e�'�►f`�7s1
1. An Erosion Control Plan shall be submitted concurrently with the grading plan
clearly detailing erosion control measures. These measures shall be
implemented during construction. The erosion control plan shall conform to
national Pollutant Discharge Elimination System (NPDES) standards and
incorporate the appropriate Best Management Practices (BMP's) as specified in
the Storm Water BMP Certification. For construction activity which disturbs one
acre or greater soil a Storm Water Pollution Prevention Pian (SWPPP) will be
needed.
9
Planning Commission Resolution No. 2015-16
B. DRAINAGE
1. Detailed drainage system information of the lot with careful attention to any
flood hazard area shall be submitted. All drainage/runoff from the development
shall be conveyed from the site to the natural drainage course. No on-site
drainage shall be conveyed to adjacent parcels, unless that is the natural
drainage course.
2. Prior to the issuance of a grading permit, a complete hydrology and hydraulic
study shall be prepared by a Civil Engineer registered in the State of California
to the satisfaction of the City Engineer and Los Angeles Public Works
Department.
C. OFF-SITE STREET IMPROVEMENTS
1. Applicant shall construct a five-foot wide sidewalk (the length of the subject
property's frontage) behind the existing curb and a new driveway approach in
accordance with current American Public Works Association (APWA)
standards. All public improvement shall be approved by the City Engineer,
constructed with an encroachment permit and completed prior to final
inspection/certificate of occupancy issuance.
2. The applicant shall replace and record any centerline ties and monuments that
are removed as part of this construction with the Los Angeles County Public
Works Survey Division.
3. Prior to the issuance of any permits, the applicant shall provide written
permission to the satisfaction of the City from any property owners which will be
affected by offsite grading.
4. Street improvement plans in a 24" x 36" sheet format, prepared by a registered
Civil Engineer, shall be submitted to and approved by the City Engineer.
Streets shall not exceed a maximum slope of 12 percent.
APPLICANT SHALL CONTACT THE BUILDING AND SAFETY DIVISION, (909) 839-7020,
FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS:
A. GENERAL CONDITIONS
1. At the time of plan check submittal, plans and construction shall conform to
current State and Local Building Code (i.e., 2013 California Building Code
series will apply) requirements and all other applicable construction codes,
ordinances and regulations in effect.
B. PLAN CHECK — ITEMS TO BE ADDRESSED PRIOR TO PLAN APPROVAL
1. The minimum design load for wind in this area is 110 M.P.H. exposures "C" and
the site is within seismic zone D or E. The applicant shall submit drawings and
10
Planning Commission Resolution No. 2915-16
calculations prepared by a California State licensed Architect/Engineer with wet
stamp and signature.
2. This project shall comply with the energy conservation requirements of the
State of California Energy Commission. All lighting shall be high efficacy or
equivalent per the current California Energy Code 119 and 150(k).
3. Public Works/Engineering Department is required to review and approve
grading plans that clearly show all finish elevations, drainage, and retaining
wall(s) locations. These plans shall be consistent with the site plan submitted to
the Building and Safety Division.
4. "Separate permit shall be required for all wall and monument signs" and shall
be noted on plans.
5. Number of plumbing fixtures shall be in compliance with CPC T-4=1.
6. Provide at least one bathroom for each sex per CBC 412.3.
7. All easements shall be shown on the site plan.
8. Ail new openings in the exterior facade shall be clearly identified and
structurally designed to be retrofitted by a registered professional engineer.
9. The north door shall not be utilized as an entry door and shall be shown as not
a required exit for plan check.
10. The ADA entry ramp at the street shall provide handrails, guide rails, slip -
resistant surface, rail extensions, and a slope no more than 1:12. Truncated
domes shall be provided where entering vehicular paths.
11. The existing west roofs shall not be extended any closer than existing
conditions. All eaves in this area shall be fire protected.
12. The adequacy of the electrical service shall be justified in plan check.
C. PERMIT — ITEMS REQUIRED PRIOR TO BUILDING PERMIT ISSUANCE
1. Solid waste management of construction material shall incorporate recycling
material collection per Diamond Bar Municipal Code 8.16 of Title 8. The
contractor shall complete all required forms and pay applicable deposits prior to
permit.
2. AQMD notification is required at least 10 days prior to any demolition. Proof of
notification is required at permit issuance.
11
Planning Commission Resolution No. 2015-16
3. All workers on the job shall be covered by workman's compensation insurance
under a licensed general contractor. Any changes to the contractor shall be
updated on the building permit.
D. CONSTRUCTION — CONDITIONS REQUIRED DURING CONSTRUCTION
1. Occupancy of the facilities shall not commence until all California Building Code
and State Fire Marshal regulations have been met. The buildings shall be
inspected for compliance prior to occupancy.
2. The building permit shall be valid for 90 -days consistent with CBC 105.5.1 as
adopted by DBMC 15.00.120. An extension may be granted with approval by
the Building Official.
3. The project shall be protected by a construction fence to the satisfaction of the
Building Official. All fencing shall be view obstructing with opaque surfaces.
4. All structures and property shall be maintained in a safe and clean manner
during construction. The property shall be free of debris, trash, and weeds.
5. All equipment staging areas shall be maintained in an orderly manner and
screened behind a minimum 6' high fence.
6. The project shall be protected by a construction fence and shall comply with the
NPDES & BMP requirements (sand bags, etc.).
i. The location of property lines and building pad may require a survey to be
determined by the building inspection during foundation and/or frame
inspection.
8. The applicant shall contact Dig Alert and have underground utility locations
marked by the utility companies prior to any excavation. Contact Dig Alert by
dialing 811 or their website at www.digalert.org.
9. Any changes or deviation from approved plans during the course of
construction shall be approved by the City prior to proceeding with any work.
10. All glazing in hazardous locations shall be labeled as safety glass. The labeling
shall be visible for inspection.
11. Drainage patterns shall match the approved grading/drainage plan from the
Public Works/Engineering Department. Surface water shall drain away from the
building at a 2% minimum slope. The final as -built conditions shall match the
grading/drainage plan or otherwise approved as -built grading/drainage plan.
12. Decks, roofs, and other flat surfaces shall slope at least 1/4"/ft with approved
and listed water proofing material. Guardrails shall be provided for these
12
Planning Commission Resolution No. 2015-16
surfaces at least 42" minimum in height, 4" maximum spacing between rails,
and capable of resisting at least 20 pounds per lineal foot of lateral load.
13. Special inspections and structural observation will be required in conformance
to CBC 1704 to 1709.
14. All plumbing fixtures including existing areas shall have low flow type fixtures
installed consistent with California Civil Code Section 1101.1 to 1101.8.
15. Occupancy of the previously permitted tenant improvement may not occur until
a staging plan showing how occupants will be protected during construction is
approved by Building & Safety.
4MD
13
Planning Commission Resolution No. 2015-16