HomeMy WebLinkAbout10/08/2015 - AGENDA - Regular Meeting10,
October 8, 2015
7:00 P.M., Regular Meeting
Diamond Bar City Hall
Windmill Community Room
21810 Copley Drive
Diamond Bar, California
C
Ted
Carrera
/:
Surendra Mehta
Ed Pechy
1/
Written materials distributed to the Trak and Transportation Commission within 72 hours of the Traffic and Transportation Commission
meeting are available for public inspection immediately upon distribution in the City Clerk's office at 21810 Copley Drive, Diamond Bar,
California, during normal business hours.
Copies of staff reports or other written documentation relating to agenda items are on file in the Public Works Department located at
21810 Copley Drive, and are available for public inspection. If you have questions regarding an agenda item, please call (909) 839-
7040 during regular business hours.
In an effort to comply with the requirements of Title Hof the Americans with Disabilities Act of 1990, the City of Diamond Bar
requires that any person in need of any type of special equipment, assistance, or accommodation(s) in order to communicate at a City
public meeting must inform the Public Works Department at (909) 839-7040 a minimum of 72 hours prior to the scheduled meeting.
Please refrain from smoking, eating or drinking The City of Diamond Bar uses recycled paper
in the Community Room and encourages you to do the same
CITY • • BAR
TRAFFIC AND TRANSPORTATION COMMISSION
I�A
4GEVIRM"Im
October 8, 2015
DIAMOND BAR CITY HALL
WINDMILL COMMUNITY ROOM
21810 COPLEY DRIVE, DIAMOND BAR
CALL
PLEDGE OF ALLEGIANCE: Commissioner Sulakhe
ROLL CALL: Commissioners Mehta, Pechy, Sulakhe, Vice -Chair Mok, Chair
Carrera
I. APPROVAL OF MINUTES
A. Minutes of September 10, 2015
II. PUBLIC COMMENTS
This is the time and place for the general public to address the Commission.
Items to be discussed here are those which do not already appear on this
agenda.
Ill. ITEMS FROM STAFF
A. Traffic Enforcement Update
1. Citations: July, August & September 2015
2. Collisions: July, August & September 2015
3. Street Sweeping: July, August & September 2015
IV. OLD BUSINESS
V. NEW BUSINESS
VI. STATUS OF PREVIOUS ACTION ITEMS
VII. ITEMS FROM COMMISSIONERS
VIII. INFORMATIONAL ITEMS
A. Traffic Signal Infrastructure Upgrades Project
B. Comprehensive Groundwater Drainage Study
C. Diamond Bar Boulevard Circulation between Sunset Crossing Road
and Golden Springs Drive — No U -Turn request at Palomino Drive
D. Morning Canyon Road Rehabilitation Project
E. Area 3 Road Maintenance Project
F. Gas Company Upgrades on Golden Springs Drive
G. Willow Heights Construction Update
H. Reagan/Peterson Park Parking Lot Construction
I. Grand Avenue Beautification Project
J. Lemon Avenue Interchange Project
K. SR -57/60 Confluence Project
IX. SCHEDULE OF FUTURE CITY EVENTS
A. PLANNING COMMISSION MEETING — Tuesday, October 13, 2015 —
6:30 p.m., Diamond Bar City Hall Windmill Community Room, 21810
Copley Drive
B. CITY COUNCIL MEETING — Tuesday, October 20, 2015 — 6:30 p.m.,
AQMD/Government Center, 21865 Copley Drive, Auditorium
C. PARKS & RECREATION COMMISSION MEETING — Thursday,
October 22, 2015 — 7:00 p.m., Diamond Bar City Hall, Windmill
Community Room, 21810 Copley Drive
D. PLANNING COMMISSION MEETING — Tuesday, October 27, 2015 —
6:30 p.m., Diamond Bar City Hall Windmill Community Room, 21810
Copley Drive
E. HALLOWEEN HAUNTED HOUSE — Friday, October 30, 2015 and
Saturday, October 31, 2015 - 6:00 p.m. -9:00 p.m., Heritage Park, 2900
S. Brea Canyon Road
October -31, 2015- 4-:aO- p.m:-_ 8.30
F. FALL FUN FESTIVAL — Saturday,
p.m., Heritage Park, 2900 S. Brea Canyon Road
G. DAYLIGHT SAVINGS TIME ENDS — Sunday, November 1, 2015 —
Remember to "Fall Back"
H. ELECTION DAY — Tuesday, November 3, 2015
CITY COUNCIL MEETING — Tuesday, November 3, 2015 — 6:30 p.m.,
Diamond Bar City Hall, Windmill Community Room, 21810 Copley Drive
VETERANS' RECOGNITION CEREMONY 'Thursday, November 5,
2015 — Diamond Bar Center — Grandview Ballroom — 9:00a.m.
K. VETERAN'S DAY HOLIDAY — Wednesday, November 11, 2015 — City
Hall offices will be closed in observance of the holiday
L. TRAFFIC& TRANSPORTATION COMMISSION MEETING —Thursday,
November 12, 2015 — 7:00 p.m., Diamond Bar City Hall, Windmill
Community Room, 21810 Copley Drive
THIS INFORMATION WILL BE PROVIDED AT THE OCTOBER 8, 2015 MEETING
CITY OF DIAMOND BAR
MINUTES OF THE TRAFFIC AND TRANSPORTATION COMMISSION MEETING
SEPTEMBER 10, 2015
Chai r/Carrera -called- the-meeti ng -to -order -at -7:02 -p. m.--in-the.-Diamond- Bar -City -Hal I -Wind m i 11
Community Room, 21810 Copley Drive, Diamond Bar, California 91765.
PLEDGE OF ALLEGIANCE: Commissioner Pechy led the Pledge of Allegiance.
ROLL CALL: Commissioners Surendra Mehta, Ed Pechy, Vice
Chair Ken Mok, and Chair Ted Carrera
Also Present: David Liu, Public Works Director; Kimberly Young,
Senior Civil Engineer; Christian Malpica, Associate
Engineer; John Beshay, Associate Engineer; and
Marcy Hilario, Administrative Coordinator.
Absent: Commissioner Manisha Sulakhe
A. Minutes of the August 13, 2015 Regular Meeting.
C/Pechy moved, VC/Mok seconded, to approve the Minutes of the August 13,
2015 regular meeting as presented. Motion carried by the following Roll Call
vote:
AYES:
COMMISSIONERS:
NOES:
COMMISSIONERS:
ABSENT:
COMMISSIONERS:
PUBLIC COMMENTS: None
111111. ITEMS FROM STAFF:
Mehta, Pechy, VC/Mok, Chair/Carrera
None
Sulakhe
A. Receive and File Traffic Enforcement Updates for:
SEPTEMBER 10, 2015 PAGE 2 T&T COMMISSION
1. Citations: June, July and August 2015
2. Collisions: June, July and August 2015
3. Street Sweeping: June, July and August 2015
VC/Mok said it was nice to see that the total citations for June, July and August
had dropped from 2014 and wanted to believe that citizens are following the
VC/Mok moved, C/Mehta seconded, to receive and file the Traffic Enforcement
Update reports for June, July and August 2015. Motion carried by the following
Roll Call vote:
AYES: COMMISSIONERS: Mehta, Pechy, VC/Mok, Chair/Carrera
NOES: COMMISSIONERS: None
ABSENT: COMMISSIONERS: Sulakhe
IV. OLD BUSINESS: None
V. NEW BUSINESS: None
V11. STATUS OF PREVIOUS ACTION ITEMS:
SCE/Young indicated, with respect to C/Pechy's inquiry during the August 13th
meeting about work being done at Pantera Park, she was able to confirm with the
City's Community Services Department that reseeding was being done in the park
and temporary fencing was installed to keep user groups from utilizing the park until
the seed took hold.
SCE/Young reported to Chair/Carrera's comment about four street lights that were not
energized near the Willow Heights development. The developer confirmed that they
are having a problem with the light fixtures and hope to have them energized soon.
MPT/Lyons also informed staff that there were lights on the other side of the street
that were not functioning along Diamond Bar Boulevard. PWD/Liu explained that
once the time changes in November, the City's Street Maintenance Superintendent
will conduct a nighttime survey for all of the arterial roadways so that they can be
reported to Edison for repair.
C/Mehta stated there is a small section between Brea Canyon Road (Willow Heights)
and Cold Springs Lane where there are no lights. PWD/Liu responded there are
some dark spots throughout the City; however, in the near future there are
opportunities to install new street lights as part of the Rule 20A Utility Underground
Project.
SEPTEMBER 10, 2015 PAGE 3 T&T COMMISSION
VII. ITEMS FROM COMMISSIONERS:
VC/Mok commented on the progress of the Grand Avenue Beautification project. He
asked if the problems with the underground utilities had been rectified. AE/Beshay
responded that the underground utilities were completed and all traffic signal poles
have been installed. Within a few weeks, the new crosswalks will be installed.
VC/Mok asked for an update on the Armitos NTMP. He said he made a point of
traveling the area a couple of days after the last Commission meeting. He parked on
a side street during the day and during the five minutes he was there, he understood
why the residents are concerned. He observed that on the long downhill stretch,
vehicles pick up a lot of speed. SCENoung responded that during the NTMP
meeting, there was a suggestion that staff get additional counts between Darrin Drive
and Carpio Drive, which is scheduled to take place in the next couple of weeks. Once
staff has the counts, the entire stretch of Armitos Place between Carpio Drive and Top
Court will be studied for a proposed conceptual plan with the City's traffic consultant.
In addition, staff will be taking counts in front of Mrs. Payne's house, the original
requestor, who felt it would be a more appropriate location than the locations where
counts had been taken previously. SCENoung continued that she spoke with the
Sheriff's Department today and based on review of the speed counts staff has on
hand, much of the speeding was prominent during evening rush hours. As a result,
she asked for enforcement during that time along Armitos Place and she was told that
a deputy would be assigned to the area by next week.
Chair/Carrera asked if parents new to schools are provided information about
respective school circulation. PWD/Liu responded that typically, parents are provided
that information in the school packet.
VIII. INFORMATIONAL ITEMS:
A. Traffic Signal Infrastructure Upgrades Project — AE/Malpica reported that
staff is reviewing design plans and estimates. Final plans and specifications
are scheduled to be completed prior to the end of September, with PS&E
advertising by October followed by construction and completion by the end of
the calendar year or shortly thereafter.
B. Comprehensive Groundwater Drainage Study — AE/Malpica stated that
staff's review of the report is scheduled to be completed by the end of
September.
C. Morning Canyon Rehabilitation Project — AE/Malpica indicated that the
Community Services Department has removed two of the three trees
scheduled for removal. The third tree, located above Stonepine Drive, has
been rescheduled and should be removed within the next two to three weeks.
SEPTEMBER 10, 2015 PAGE 4
T&T COMMISSION
Chair/Carrera asked how many trees are scheduled to be removed.
SCE/Young explained that two additional trees may be impacted because of
the catch basins.
D. Area 3 Road Maintenance Project — AE/Malpica reported all road work has
been completed. Once the manhole covers are adjusted, staff will develop a
punch list of items to be addressed prior to closing the project.
-E-.----G-a-s-C-ompany-Upgrades-on--Golden Sp ri n gs-D rive—AE/M a I pica- stated-th at------ -----
the
t—
the upgrades have been completed and restoration has been performed along
Golden Springs Drive at Grand Avenue. Staff is reviewing the field work for
conformance prior to proceeding with striping.
F. Willow Heights Construction Update — AE/Beshay reported that Lennar is
awaiting the L.A. County Flood Control Permit to reconstruct the channel's
driveway approach at the intersection of Brea Canyon Road and Diamond Bar
Boulevard. Once the permit is obtained, construction of the driveway
approach, curb ramps and three decorative traffic signal poles will commence.
G. Reagan/Peterson Park Parking Lot Construction — AE/Beshay indicated
that the new irrigation lines and control valves have been installed. The prime
contractor continues with the grading operations for the new curb and gutter
and sidewalk. Demolition of the round -a -bout has been completed while the
new curb and gutter and walkways for the parking lot will be poured next week.
Due to lead time for the infiltration unit, full completion is scheduled for late
September.
H. Grand Avenue Beautification Project — AE/Beshay shared that installation of
the new traffic signal poles has been completed at both intersections. The
electrical subcontractor completed the rewiring of the traffic signal light at the
Diamond Bar Boulevard/Grand Avenue intersection. Installation of the
monument sign at the intersection of Grand Avenue/Longview Drive is near
completion. The contractor excavated the north side of Grand Avenue at both
intersections and is currently installing new irrigation and new electrical
systems for accent lighting and landscape areas. Project completion is
anticipated in October.
Chair/Carrera said it appeared the new signal standards were lower in height.
AE/Malpica responded that the traffic signals and poles meet Caltrans
standards.
Lemon Avenue Interchange Project — SCE/Young reported that staff is
finalizing utility plans to submit to Caltrans to get the Utility Certification. Staff
is finalizing the Edison plans that Caltrans design oversight requires (meters,
irrigation and new traffic signal interchange) and the Verizon concept plans
needed for relocation of the Verizon vault. Also, staff is still waiting on the
Walnut Valley Water District to complete their encasement plans for waterlines
SEPTEMBER 10, 2015 PAGE 5 T&T COMMISSION
that will be going under the overpass. As a result, the project listing target date
of September 25th will not be met at this time.
J. SR -57/60 Confluence Project — SCE/Young stated that the westbound on-
ramp phase of the project was advertised for bids beginning September 8th
with a bid opening date of October 30th, barring any addenda. Caltrans' policy
states that if an addendum is issued within 48 hours of the bid opening, it
automatically requires them to extend the bid opening. Staff hopes to maintain
-------the—bid--op—eniiig -of-0-ctober 30th -a n -d -commence --co nstructio n-before-th e -en d of ------
the calendar year. The westbound off -ramp phase of the project is targeted for
construction in June 2016.
K. Diamond Bar Boulevard Circulation between Sunset Crossing Road and
Golden Springs Drive — No U -Turn Request at Palomino Drive -
AE/Malpica reported that staff contacted Caltrans' requesting timing
modification of their signal with the other signals along Golden Springs Drive at
Kmart and Palomino Drive. Caltrans indicated that they have a fixed cycle
length at the on and off ramp signals and they believe that those ramp meters
cause delays. Staff has been monitoring the right -turn lane from Golden
Springs Drive to the on/off ramp intersection and staff has observed
congestion. The three signals are fairly close in proximity, which is why cycling
is important when it comes to traffic flow. Staff will continue to work with
Caltrans in an effort to have them adjust their timing. In addition, staff will be
doing citywide counts and once completed, those counts will be included for a
warrant analysis for the possibility of a No U-turn at Palomino Drive.
C/Pechy asked that if Caltrans is unwilling to change the synchronization of
their signals, what would prevent the City from synchronizing the City's signals
to match Caltrans. AE/Malpica explained that Diamond Bar adjusts its timing
to coordinate with Caltrans timing. As previously mentioned, once Caltrans
decides to change their cycle, they are not obligated to advise the City and
when staff learns about the change, the City's signals are adjusted accordingly.
In this particular area, the intersections are too close and there is only so much
cycling that can be done. If staff were to adjust the cycling any longer, there
would be more back-up past Golden Springs Drive. Therefore, if the cycling is
increased it will cause conflict with the Caltrans signal.
IX. SCHEDULE OF FUTURE CITY EVENTS:
As listed in the agenda with the addition of Diamond Bar Day at the L.A. County Fair
on September 24, 2015. A schedule of events has been mailed to all Commissioners.
SEPTEMBER 10, 2015 PAGE 6
T&T COMMISSION
ADJOURNMENT: There being no further business to come before the Traffic and
Transportation Commission, Chair/Carrera adjourned the meeting at 7:48 p.m.
The foregoing minutes are hereby approved this day of 2015.
Respectfully Submitted,
David G. Liu, Secretary
Attest:
Chair Ted Carrera