HomeMy WebLinkAbout06/11/2015 Minutes - Regular MeetingCITY OF DIAMOND BAR
MINUTES OF THE TRAFFIC AND TRANSPORTATION COMMISSION MEETING
JUNE 11, 2015
GALL TO ORDER:
,Chair/Carrera called the meeting to order at 7:00 p.m. in the Diamond Bar City Hall Windmill
Community Room, 21810 Copley Drive, Diamond Bar, California 91765.
'PLEDGE OF ALLEGIANCE: Chair Carrera led the Pledge of Allegiance.
ROLL CALL: Commissioners Surendra Mehta, Ed .-Pechy,
Manisha Sulakhe, Vice Chair Ken Mok, and Chair
Ted Carrera
C/Sulakhe arrived shortly after roll call at 7:03 p.m.
Also Present: David Liu, Public Works Director; Christian
Malpica,' Associate Engineer; John Beshay,
Associate Engineer; Sterling Mosley, Assistant
Engineer; and Marcy Hilario, Administrative
Coordinator.
I. APPROVAL OF MINUTES:
A. Minutes of the May 1.4, 2015 Regular Meeting.
VC/Mok moved, C/Pechy seconded, to approve the Minutes of the May 14,
2015 regular meeting as corrected by PWD/Liu. Motion carried by the
following Roll Call vote:
AYES: COMMISSIONERS: Mehta, Pechy, Sulakhe, VC/Mok,
Chair/Carrera
NOES: COMMISSIONERS: None
ABSENT: COMMISSIONERS: None
11. PUBLIC COMMENTS: None
Ill. ITEMS FROM STAFF:
A. Receive and File Traffic Enforcement Updates for:
1. Citations: March, April and May 2015
2. Collisions: March, April and May 2015
3. Street Sweeping: March, April and May 2015
June 11, 2015
[a
LVA
up
MH
T&T COMMISSION
C/Pechy moved, C/Mehta seconded, to receive and file the Traffic
Enforcement Update reports for March, April and May 2015. Motion carried by
the following Roll Call vote:
AYES: COMMISSIONERS: Mehta, Pechy, Sulakhe, VC/Mok,
Chair/Carrera
NOES: COMMISSIONERS: None
ABSENT: COMMISSIONERS: None
OLD BUSINESS:
PWD/Liu stated that at the last meeting, VC/Mok asked about the traffic conditions
along Grand Avenue. AE/Malpica indicated that he checked the logs and found
nothing unusual; however, staff believes there was an accident or a funeral
procession exiting The Country Estates that may have caused temporary traffic
congestion in the area.
NEW BUSINESS: None
STATUS OF PREVIOUS ACTION ITEMS: None
ITEMS FROM COMMISSIONERS:
C/Pechy commented on the intersection of Diamond Bar Boulevard and Palomino
Drive, which is the last intersection on northbound Diamond Bar Boulevard before the
SR -60 freeway entrance. Palomino Drive, which is a busy intersection, is the main
street into a large residential area, as well as having an access driveway to the
Haggen Shopping Center, with Carl's Jr. and McDonald's restaurants across the
street. During rush hour traffic, a large number of vehicles exit the southbound SR -57
freeway at Sunset Crossing Road and proceed south on Diamond Bar Boulevard to
transition onto the SR -60 freeway eastbound. Some of the drivers try to avoid the
long line by driving down to the Palomino Drive intersection, which is only about 100
feet past the SR -60 eastbound freeway on-ramp. There is a left turn lane at Palomino
Drive with a traffic light that has ei left -turn green arrow. On the green arrow, drivers
make a U-turn, often filling up the lanes on Diamond Bar Boulevard between
Palomino Drive and the SR -60 eastbound freeway on-ramp. Some drivers even block
the #2 and #3 lanes on the northbound Diamond Bar Boulevard side trying to squeeze
in. When doing this, two things happen: 1) when the light turns green for Palomino
Drive, the drivers are unable to turn right onto Diamond Bar Boulevard because the
intersection is blocked. It sometimes takes two or three signal cycles for a driver to
make a right -hand -turn onto Diamond Bar Boulevard; 2) when the light turns green for
northbound traffic on Diamond Bar Boulevard, drivers must wait for the congestion to
clear before proceeding, which sometimes creates a backup to Golden Springs Drive.
Furthermore, Diamond Bar residents exiting the SR -60 freeway at Diamond Bar
Boulevard have to deal with this additional traffic. C/Pechy suggested putting a "No
U -Turn" sign in the southbound Diamond Bar Boulevard turn lane at Palomino Drive.
June 11, 2015 PAGE 3
IWAINGIMURM001M
In his opinion, this would discourage cut -through traffic because the only reason for
anyone to make a U -Turn at that intersection is to cutback to the eastbound SR -60
freeway.
Chair/Carrera added that he also noticed that the turn pocket for southbound Diamond
Bar Boulevard fills up rather quickly and spills over into the driving lanes; however, he
was not aware of the U-turn issue. If a U-turn was to be prohibited on Palomino Drive,
it would not stop people from making U-turns at the Kmart entrance or even further
down Diamond Bar Boulevard.
PWD/Liu explained the reported conditions and said that staff would work with the
City's Traffic Engineer to look again at the conditions on Diamond Bar Boulevard, from
Sunset Crossing Road to Golden Springs Drive, to make sure that if the
Commissioner's recommendation were implemented for example, there would be no
unintended consequences that might impact other intersections.
C/Mehta asked that staff also look at the short left turn pocket where vehicles turn
onto Sunset Crossing Road traveling south from Diamond Bar Boulevard.
VIII. INFORMATIONAL ITEMS:
A. Traffic Signal Infrastructure Upgrades Project — AE/Malpica reported that
the consultant will begin the design process in a week or so. Completion is
anticipated for mid-July, followed by the bid opening in August and construction
to commence by September. This project is part of the Master Plan to upgrade
several units in the intersections, including fiber optic and IT communication
units.
B. Comprehensive Groundwater Drainage Study — AE/Malpica stated that staff
received the final report which is under review for staff's comments back to the
consultant. The purpose of this project is to develop a priority list to address
some drainage issues at 11 locations.
C. Willow Heights Construction Update — AE/Malpica indicated that today, staff
met with the developer and their contractor to turn on the traffic signal at
Diamond Bar Boulevard and Cherrydale Drive. The traffic signal is now fully
functional and although there are some punch -list items to be completed at the
intersection, it does not affect its functionality.
C/Mehta asked if the new traffic signal was interactive. AE/Malpica responded
yes, the intersection is programmed to run under a "free mode" operation that
will accommodate traffic demand from all directions.
Chair/Carrera asked if there would be a left turn arrow only in the left turn
pockets on Diamond Bar Boulevard or if it would be a flashing yellow light
(yield). AE/Malpica responded that the signals are left -turn and flashing yellow
light protected.
June 11, 2015
PAGE 4 T&T COMMISSION
D. Morning Canyon Rehabilitation Project—AE/Mosley reported that at the last
Commission meeting, staff stated that we had received a letter from the
Diamond Bar United Church of Christ requesting that all of the existing stone
pine trees be saved and that the existing pedestrian path be relocated further
south. This would require the City to acquire private property to allow
additional room for the tree roots. During staff's community outreach, this was
an option that was presented to*staff. Staff researched the matter; however,
due to lengthy negotiations, as well as associated costs, that option was
deemed unfeasible. Furthermore, the City Council directed staff to move
forward with the current redesign of the project, which would reduce the
roadway width by eight feet and increase the parkway to allow room for the
tree roots to thrive without damaging the surrounding infrastructure.
C/Pechy asked if staff had been able to determine whether there would be
adequate parking available for residents living in the nearby condominium
complex. AE/Mosley replied that there will be a reduction in the existing
parking spaces by virtually half.
Chair/Carrera asked if acquisition of private property would be church property.
AE/Mosley responded that it would have been church property. Chair/Carrera
asked if the church offered to deed the property to the City. AE/Mosley said
that it was not offered in their letter', however, it was stated that they would be
willing to work with the City. CSD/Rose wrote a response to the Diamond Bar
United Church of Christ to let them know about the Council's direction.
E. Area 3 Road Maintenance Project — AE/Mosley indicated that the pre -
construction meeting was held last Week which included staff, the City's
inspector and All American Asphalt to discuss project details and expectations.
Notices have been prepared and will be sent to all stakeholders beginning
tomorrow, June 12th. The .project consists of localized removal and
replacement of asphalt, chip seal, edge grind overlays and slurry applications.
F. Gas Company Upgrades on Golden Springs Drive — AE/Mosley reported
that last week he met with Gas Company officials and their contractor,
Southwest Administration, to discuss the project. The three phased project
intends to upgrade the existing three inch (Y) main to a four inch (4") main
along Golden Springs Drive to help accommodate increased demand for
AQIVID. Phase I involves cuffing and boring in the #2 lane in the northbound
direction and Phase 11 involves 'cutting and boring in the #1 lane north of
Lavender Drive in the northbound direction... 'Phase III is the tie-in, which
includes excavation that will be done during nighttime hours at the intersection
of Golden Springs Drive and Grand Avenue. The project, including restoration,
is expected to take six weeks with a start date of late June.
C/Mehta shared that for the past four days, he has noticed the traffic on
Golden Springs Drive has been moving very slowly. Today it took him 26
minutes to travel from Brea Canyon Road to Grand Avenue. AE/Malpica
explained that staff has been monitoring the situation and believes there are a
June 11, 2015 PAGE 5
T&T COMMISSION
couple of possibilities including the fact that the traffic response system was
activated, which has affected the southbound left turn signal timing turning onto
Grand Avenue toward the SR -60 freeway. Today, he was able to confirm that
was the cause and he was able to adjust the timing. The situation should now
be resolved.
G. Reagan/Peterson Park Parking Lot Construction — AE/Beshay stated that
this project was advertised on May 291h, with bid opening to take place on June
16th. Council award of contract is scheduled for the July 21st meeting, with
construction slated to begin early to mid-August. The Engineer's estimate is
$335,000 for Peterson Park and $115,000 for Reagan Park.
H. Grand Avenue Beautification Project —AE/Beshay reported that mobilization
of equipment began on May 20th for clearing and grubbing and the contractor
removed the existing sidewalk at the intersection of Longview Drive and Grand
Avenue and at two corners of the Grand Avenue and Diamond Bar Boulevard
intersection. Following removal, the contractor installed the new electrical
system and electrical conduits and prepared the sub -grades for the new
sidewalk and pavers. Foundations for the new traffic signal poles are
scheduled to be installed within the next two weeks and installation of signal
light poles to follow shortly thereafter. The contractor is working to minimize
the impacts to traffic as much as possible. Full project completion is scheduled
for late August.
PWD/Liu asked if the contractor intends to provide nighttime paving.
AE/Beshay responded that this matter is under discussion; however, the
schedule has not yet been confirmed. Staff asked for a schedule two weeks
ahead of construction and, once confirmed, the Commission will be notified.
Chair/Carrera asked if the nighttime work provision was included in the
contract or if it was within the contingency. AE/Beshay replied if the contractor
wants to work at night, it will be included in their request. PWD/Liu added that
the City wants to make sure that there are minimum impacts to the traveling
public as well as, making sure the final product is one of a kind and meets
City's expectations because this is a precedent setting project. Chair/Carrera
said he believed there would be minimal impact due to the short duration of the
project.
AE/Beshay reminded the Commission that the curing time of one week is
required for the pavers, which will prevent left turns at the intersection during
that week.
C/Mehta said he believed that the planning for this project should be
complimented because there will be a minimum impact while contractors are
working. One day he noticed a little congestion, but for the most part
everything is moving forward very smoothly.
June 11, 2015
PAGE 6
T&T COMMISSION
VC/Mok asked if it was more expensive (for the City) for the contractor to work
at night. PWD/Liu responded absolutely, because the contractor would have to
make sure the asphalt plant was ready to mix the order to keep the contractor
going through the nighttime hours. Staff made it clear to the contractor that
Diamond Bar wants a top quality project with minimal impacts to the public.
Nighttime paving is better from staff's point of view because no matter what
happens, there will still be a fair amount of traffic even though schools are out.
Grand Avenue and Diamond Bar Boulevard is a "choke point" during school
and summer months as well.
Lemon Avenue Interchange Project — AE/Beshay indicated that the right-of-
way phase continues with two parcels remaining for the partial -take acquisition.
One parcel is scheduled for an Order of Possession Hearing on June 25th and
the other for July 1 st. The right-of-way certification is anticipated for July, 2015
with the Office of the Engineer. approval scheduled for August. Construction is
slated to commence by late March, 2016.
J. SR -57/60 Confluence Project — AE/Beshay reported that the westbound on-
ramp phase of this project is progressing quickly. Plans have been submitted
to the Office of the Engineer .with ' a "ready to list" date of July, 2015.
Construction of this phase is expected to take place in February or March,
2016. The westbound off -ramp phase is still in design, with completion
expected by the end of this calendar year.
K. Grand Avenue/Golden Springs Drive — AE/Beshay stated that the
intersection improvement phase has been revived due to an award of the
TIGER Grant in the amount of $10 million and is being used on the westbound
on-ramp phase. This made it possible to redirect some of City of Industry's
funds from that phase to the Golden Springs Drive and Grand Avenue phase.
Staff has met twice with the City of Industry and their design will include the
widening of Grand Avenue, north of Golden Springs Drive, and the widening of
Golden Springs Drive, along the golf course property. Right-of-way will be
acquired from the golf course only and not from the businesses on the other
two corners (Chili's and the Mobil gas station). The design for this phase is
expected to be completed by the end of this calendar year with construction
slated to begin summer 2016. Since this project does not involve Caltrans, the
advertising and awarding of this project will be handled by the City of Industry,
with encroachment permits issued by the City of Diamond Bar.
PWD/Liu further stated that as mentioned, this project is part of the Confluence
Project and the reasons that this intersection is slated for the improvements is
that as part of the .upcoming on and off ramp work, there is an existing tunnel
under Grand Avenue that connects the two sides of the golf course. The
tunnel will have to be relocated further south, closer to the Grand Avenue and
Golden Springs Drive intersection. In order to accommodate the realigned and
modified on and off ramps, Grand Avenue will have to be widened which will
impact the intersection of Grand Avenue and Golden Springs Drive. Staff is
working closely with the City of Industry to address this very important on/off
June 11, 2015 PAGE 7 T&T COMMISSION
ramp area. The City has an opportunity to look at some streetscape/entry
statements for the section between Golden Springs Drive and the freeway on
and off ramps as well as, the off ramp areas and the bridge that will ultimately
be widened. Staff also believes there is an opportunity for entry and
streetscape statements for the area in front of the future hotel property (former
Honda dealership) from the on/off ramps of southbound SR -57 at Grand
Avenue. Staff is working with the City of Industry to better understand the
timing for including those improvements as part of the intersection project or
whether it might entail a subsequent project.
IX. SCHEDULE OF FUTURE CITY EVENTS: As stated in the agenda.
Chair/Carrera wished his colleagues a Happy 4th of July and said he looked forward to
the 4th of July Blast, which has turned out to be one of the better events in the area.
ADJOURNMENT: There being no further business to come before the Traffic and
Transportation Commission, Chair/Carrera adjourned the meeting at 7:46 p.m.
The foregoing minutes are hereby approved this day of 2015.
Respectfully Submitted,
t>Elavid G. Liu, -Se"e ry
Attest:
Chair Ted Carrera