HomeMy WebLinkAboutRES 2011-20RESOLUTION 2011- 20
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DIAMOND BAR
ESTABLISHING AND ADOPTING SCHEDULES OF RATES, FEES, AND CHARGES
FOR SERVICES PROVIDED BY THE COMMUNITY DEVELOPMENT AND PUBLIC
WORKS/ENGINEERING DEPARTMENTS OF THE CITY OF DIAMOND BAR
A. RECITALS
WHEREAS, pursuant to the Constitution and state laws of the State of California, the City of
Diamond Bar is authorized to adopt and implement rates, fees, and charges for municipal services
provided the rates, fees, and charges do not exceed the estimated reasonable cost of providing such
services; and
WHEREAS, at the September 21, 2010 Public Hearing, the City Council of the City of Diamond
Bar established a three-year phased adjustment of various schedules of rates, fees, and charges for
the processing of applications, permits, and other municipal services (approved user fee adjustments);
and
WHEREAS, prior to the implementation of the City Council's approved user fee adjustments,
user fees had remained largely unchanged since 1998; and
WHEREAS, the user fee adjustments reflected in Exhibit A of this Resolution represent the
- second of the three phased adjustments; and
WHEREAS, the City Council's approved user fee adjustments established a not -to -exceed
increase of 29.4%, based on the sum of the federally reported March -to -March annual Consumer Price
Index for Urban Wage Earners & Clerical Workers — Los Angeles/Orange Counties (CPI) from 1998-
2009, for all Community Development/Planning, Public Works/Engineering, and Building &
Safety/Electrical, Plumbing, & Mechanical (EP&M) user fees; and
WHEREAS, the prescribed increases for all Community Development/Planning, Public
Works/Engineering, and Building & Safety/Electrical, Plumbing, & Mechanical (EP&M) user fees shall
be phased in equal increments over three years (FY 2010-11, FY 2011-12, and FY 2012-13); and
WHEREAS, the City Council's publicly approved user fee adjustment terms prescribe that all
Community Development/Planning, Public Works/Engineering, and Building & Safety/Electrical,
Plumbing, & Mechanical (EP&M) user fees shall be increased annually by the Consumer Price Index
(CPI) for Urban Wage Earners & Clerical Workers — Los Angeles/Orange Counties for the twelve
month period from March to March; and
WHEREAS, the City Council desires to implement rates, fees, and charges for various municipal
services provided by the City of Diamond Bar as set forth in the publicly approved user fee
adjustments.
2011--20
B. RESOLUTION
THEREFORE, BE IT RESOLVED that the City Council of the City of Diamond Bar as follows:
SECTION 1. The City Council hereby finds and determines that, based upon the data----
information,
ata___information, analyses, and testimony presented at the September 21, 2010 Public Hearing and
corresponding staff reports, concerning the rates, fees, and charges described in Exhibit A attached
hereto and by this reference incorporated herein, the rates, fees, and charges set forth in said Exhibit A
meet the terms of the Council's approved user fee adjustments and do not exceed the estimated
reasonable cost of providing the service for which it is levied.
SECTION 2. The rates, fees, and charges set forth in Exhibit A are hereby adopted and
approved as the rates, fees, and charges for the services identified.
SECTION 3. All fees and charges set forth in Exhibit A shall be administratively adjusted
annually on July 1 of each year by the Consumer Price Index (CPI) for Urban Wage Earners & Clerical
Workers — Los Angeles/Orange Counties for the twelve month period from March to March.
SECTION 4. If any part or provision of this Resolution or the application of the user fees
contained in Exhibit A to any person or circumstance is held invalid, the remainder of this Resolution
and the user fees contained in Exhibit A adopted hereby, including the application of such part of
provision to other persons or circumstances, shall not be affected and shall continue in full force and
effect. To this end, the provisions of this Resolution are severable.
SECTION 5. The rates, fees, and charges set forth in Exhibit A shall supersede the previousl,
established rates for Community Development/PIan ning, Public Works/Engineering, and Building t
Safety/Electrical, Plumbing, & Mechanical (EP&M) user fees contained in Resolution 2010-33.
SECTION 6. The rates, fees, and charges set forth in Exhibit A shall become effective and
implemented on July 1, 2011, except those for the Planning Division, which shall become effective
sixty (60) days from the adoption of this Resolution to satisfy the requirements of Government Code
Section 66017 regarding the fees imposed on development projects.
PASSED, APPROVED, AND ADOPTED this 7th day of June, 2011.
Ste ye, Ma or
2011--20
I, Tommye A. Cribbins, City Clerk of the City of Diamond Bar, California, do hereby certify that the
foregoing Resolution No. 2011-20 was duly and regularly passed and adopted by the City Council of
the City of Diamond Bar, California, at its adjourned regular meeting held on the 7 h day of June, 2011,
by the following vote, to wit:
AYES: COUNCILMEMBERS: Everett, Herrera, Tanaka,
MPT/Chang, M/Tye
NOES: COUNCILMEMBERS: None
ABSENT: COUNCILMEMBERS: None
ABSTAIN: COUNCILMEMBERS: None
r,4
Tom ye A. Cribbins, City Clerk
City of Diamond Bar
2011-20
EXHIBIT A
C1T.Y0FD14M0ND 13911
COMMUNITYAND DEVELOPMENT SERVICES DEPARTMENT
i
j PLANNING DIVISION '
FEE SCHEDULE 2011-12 i
A(7110N FEE
Advance Planning
Annexation
$4,976.14
Deposit
Development (Zoning) Code Amendment
$4,976.14
Deposit
Development Agreement
$3,732.10
Deposit
General Plan Amendment
$5,403.35
Deposit
Specific Plan
$4,976.14
Deposit
Zone Change/Map Amendment
$4,976.14
Deposit
Current Planning (Discretionart)
Administrative Development Review
$1,244.03
i
i
Deposit
Adult Oriented Business/Entertainer Permit
$2,301.17
Deposit
Animal Permit
$211.49
$870.82
No public hearing
Deposit — With public hearing
Comprehensive Sign Program
$872.82
Deposit
Conditional Use Permit
$1,244.03
$2,488.07
Minor, Deposit
Major, Deposit
Development Review
$2,488.07
Deposit
Extension of Time
$105.74
$870.82
No public hearing
With public hearing
Large Family Daycare Permit
$1,756.15
$3,738.90
No public hearing
With public hearing
Miscellaneous/Special Studies
Actual Cost of
providing document plus City overhead
Parcel Map Waiver
$1,226.06
Deposit
Parking Permit
$528.71
$1,244.03
Deposit — No public hearing
Deposit — With public hearing
Revision after TTM or TPM is approved
$2,488.07
Deposit
Temporary Use Permit
$211.49
$870.82
No public hearing
Deposit - With public hearing
Tentative Parcel Ma (TPM)
$3,732.10
Deposit
Tentative Tract Ma (TTM)
$6,220.17
Deposit
Tree Permit
$528.71
$870.82
No public hearing
Deposit - With public hearing
201120
Variance $528.71 Minor, Project
$2,488.07 Major, Deposit
Environmental
California Department of Fish and Game
$31.10 City processing fee
Plot Plan Review
$75.00 County processing fee
Project
$2,792.25 CDFG EIR review
$1,244.03
$2,010.25 CDFG Neg. Dec. review
Environmental Analysis
Actual cost including all City staff and processing costs
(i. e.,Environmental Impact Report (EIR) or
plus consultant costs including City overhead to be paid
Negative Declaration preparation)
by applicant. Deposit to be determined by Community
Zoning Clearance
Development Direct
Environmental Mitigation Monitoring Program
Cost to be determined as part of the EIR or Negative
$544.81 Project
Declaration Mitigation Monitoring program to be
$622.02 Deposit
included as a project condition of approval. Includes
$1.00 Per sheet of plans collected at the time
Consultant, staff, etc.
1in.isterial Nei4ery
Code Enforcement
$105.74
$422.97
Simple Plot Plan
Plot Plan
Plot Plan Review
$211.49
Project
Preliminary Project Review
$1,244.03
Deposit
Sign Review
$62.20
Project
Temporary Sign Review
$31.10 plus
$100.00 refundable deposit when sign
is removed
Zoning Clearance
$37.32
$0.25 Per co (5 page or less = No charge)
Miscellaneous/Other
Appeals $622.02 If more money is required to process
an appeal, fee shall be determined by
the Community Development Director
CC&Rs Review
$1,866.05 Initial Deposit; (Actual cost based on
City's Attorney's fees for review)
Certificate of Compliance
$530.31
Concurrent filed applications
One deposit shall be accepted (the largest deposit listed)
and all applicants shall be processed as actual cost
charged against the one deposit
Copying
$0.25 Per co (5 page or less = No charge)
Film Permits
$544.81 Project
Interpretation
$622.02 Deposit
Permanent Record Retention
$1.00 Per sheet of plans collected at the time
of submittal
Projects for which there is no fee category
Actual cost deposit to be determined by the Community
Development Director
Public Convenience & Necessity (ABC)
$211.49 Project
2011-20
Quimby Fees (In -Lieu Park Fees) Fees determined during discretionary review for
residential projects and are based upon an appraisal of
_ the land
Research Actual cost deposit to be determined by the Community
Development Director
I SEATAC Review I Add 50% to the deposit for concurrent application
2011-20
CITY 0I- /)1A?V1U,VD Lail R i
PUBLIC WORKS & ENGINEERING DEPARTMENT
FEE SCHEDULE 2011-12
I ,
1 ACTION FEE'
As-Builts
$2488.07
Minimum Deposit
Minor Amendments/Revisions To
Improvement Plans
Certificate of Correction
$2,282.41
Minimum Deposit
For Any Changes To Final Recorded Maps
Change of Address
$348.87
Each
Changes of Individual Addresses, Assigning
of New Addresses (New Subdivision)
Change of Improvement Plans
$2,488.07
Minimum Deposit
Changes Made Prior To City Approval
Construction/Demolition
$181.28
Each
Monitoring Such Activities to Ensure Proper
I Diversion of Recyclables
Curb & Gutter, Plan Check
$105.74
Minimum
Installation in Public Right -of -Way
$0.57/L.F.
Curb & Gutter, Inspection
$242.59
Minimum
Installation in Public Right -of -Way
$0.57/L.F.
Curb Core Inspection
$110.00
Parkway Drain Inspection
$317.23
DedicationNacation
$1,555.04
1-10,000 S.F.
Residential (One Lot) & All Others_
$3,732.10
10,000+ S.F.
Drainage/Parking Lots
$211.49
Projects with 50 CY of Grading or Less
Require Drainage Plan Approval
Quantity Calculated = Cut + Fill
Drainage Inspection (Rip -Rap)
$2,184.14
Minimum Deposit
For Hillside Drainage Projects
Driveway Approach, Plan Check
$105.74
For Residential or Commercial Access
Driveway Approach, Inspection
$348.33
For Residential or Commercial Access
Dumpsters
$55.98
Per Day
Use of Trash Dumpsters in Public ROW
$76.93
Per Week
I Easement Checking
$1,555.04
1-10,000 S.F.
Residential (One Lot)
$3,732.10
10,000+ S.F.
Subdivisions (Tract/Parcel)
2011-20
Engineering Review
$2,488.07
Minimum Deposit
Any Plan Check/Inspection Not Listed
Supplemental Submittals (After 3 Submittals)
$2,134.49
Minimum Deposit
Each Submittal of Unresolved Plan Checks
Geotechnical & Geological Reports
$2,488.07
Minimum Deposit
For All Grading/Subdivision Projects and
Construction in Restricted Use Area
Geotechnical Observation
$2,266.00
Minimum Deposit
Observation by Geotechnical Engineer of
Grading Activities
Grading, Plan Check
$268.71
50-100CY
Projects with 51 CY or Greater Require
Grading Plan Approval & Permit
$237.61
101-1,000 CY
Quantity Calculated = Cut + Fill
+$67.62
Per 100 CY in excess of 101
$967.36
1,001-10,000 CY
+$67.05
Per 1,000 CY in excess of 1,001
$1,570.84
10,001-100,000 CY
+$39.81
Per 1,000 CY in excess of 10,001
$4,437.73
100,001-500,000 CY
+$109.60
Per 10,000 CY in excess of 100,001
$5793.08
500,001 or more CY
$109.60
Per 10,000 CY in excess of 500,001
Grading, Inspection
$211.49
50-100CY
Projects with 51 CY or Greater Require
Grading Plan Approval & Permit
$230.77
101-1,000 CY
Quantity Calculated = Cut + Fill
+S67.68
Per 100 CY in excess of 101
$840.47
1,001-10,000 CY
+$56.73
Per 1,000 CY in excess of 1,001
$1,350.27
10,001-100,000 CY
+$36.20
Per 1,000 CY in excess of 10,001
$2,422.88
100,001 or more CY
+$90.32
Per 10,000 CY in excess of 100,001
House Numbering
$1,000
Deposit
Painting House Numbers on Public Curbs
Hydrology & Hydraulic Reports
$2,488.07
Minimum Deposit
For All Major Grading/Subdivision Projects
And Construction in Flood Control Area
Subdivision Agreement Review/Preparation
$317.23
Each
Review of Subdivision Agreements Prior to
Final Map Approval
2011--20
Improvement/Security Agreement
$317.23
Each
Review Engineer's Estimates for Bonding
Purposes of Grading, Sewer, Storm Drain
Street, Landscape, & Monumentation
Other Field Inspection
$696.53
Minimum Deposit
Any Field Inspections Not Previously Listed
Lane Closures
$217.71
Per Week
Work on Private Property, Block Parties
Any private use
Traffic Control, Plan Check
$2,732.33
Minimum Deposit
For Projects Requiring Traffic Control Plans
For Public Street Closures
Traffic Control, Inspection
$2,266.00
Minimum Deposit
For Projects Requiring Traffic Control Plans
For Public Street Closures
Map Analysis, Plan Check
$1,244.03
1-5 Lots/Parcels
Tract & Parcel Maps
$1,617.24
6-10 Lots/Parcels
$2,177.06
11-25 Lots/Parcels
$3,483.30
26-50 Lots/Parcels
$5,411.55
51-100 Lots/Parcels
$8,086.22
101-150 Lots/Parcels
$ 8,086.22
151+Lots/Parcels
+$43.54
Per Lot/Parcel Over 151
Minor Lot Line Adjustment, Plan Check
$2,488.07
Minimum Deposit
Monitoring Well
$181.28
Quarterly
Lane Closure Permits for Public Streets
$242.59
Semi -Annual
$348.33
Annual
Other Engineering Reports, Plan Check
$2,334.37
Minimum Deposit
Any Engineering Reports Not Listed
Re -Inspection Fee
$564.49
Minimum Deposit
Re -Inspection Due to Failed Inspections,
Corrections Required, Premature Inspections,
Or Other Additional Requests
Septic Tank, Plan Check
$747.31
Minimum Deposit
Review of Conformance With State
Guidelines. Permits Issued by B&S
Sewer Plans, Plan Check
$317.23
Minimum
Sewer Work, Public/Private Mainline/Lateral
$2.11/L.F.
Sewer Plans, Inspection
$454.07
Minimum
Sewer Work, Public/Private Mainline/Lateral
$3.23/L.F.
Sewer Saddle/Lateral
$348.33
Project
Installation of Sewer Laterals Only
Sewer System Overflow
$362.56
_
Project
Enforcement of Sewer System Overflows
Reported by L.A. County
Sidewalk, Plan Check
$105.74
Minimum
Cuts, Removal/Replacement
$0.57/S.F.
i Residential or Commercial
2011-20
Sidewalk, Inspection
$242.59
Minimum
Cuts, Removal/Replacement
$0.62/S.F.
Residential or Commercial
Street Plans, Plan Check
$634.46
Minimum
For All New Public/Private Streets
$0.15/S.F.
Street Plans, Inspection
$665.56
Minimum
For All New Public/Private Streets
$0.06/S.F.
Stock Piling, Plan Check
$242.59
Retention of Dirt For Established Period
of Time
Stock Piling, Inspection
$204.01
Retention of Dirt For Established Period
of Time
Storm Drain, Plan Check
$279.91
Minimum
For All Storm Drain Work, Public/Private
$2.11/S.F.
Mainline, Laterals
Storm Drain, Inspection
$404.31
Minimum
For All Storm Drain Work, Public/Private
$3.23/S.F.
Mainline, Laterals
Storm Drain Transfer to County
$870.82
Each
Storm Drain/Sewer Structure Review/Inspect.
$136.84
Each
Any Storm Drain/Sewer-Related Junction
Standard Urban Stormwater Mitigation Plan
$2,488.07
Minimum Deposit
SUSMP
Time Extension, Improvement Agreement
$348.33
Each
Time Extension, Unexpired Plan
$136.84
Each
Checks/Permits
Traffic Studies & Mitigation Reports
$2,488.07
Minimum Deposit
Transportation Permits
$16.00
Oversize Load, Weight, Width, Length,
Height, Etc.
Utilities
$242.59
1-150 S.F. Cut
$348.33
151-500 S.F. Cut
$454.07
501-1,000 S.F. Cut
2011-20
('17'1' OF Dlfl A10AD BAR �
COMMUNITYAND DEVELOPMENT SERVICES DEPARTMENT
BUILDING & SAFETY DIVISION 1
ELECTRICAL, PLUMBING, & MECHANICAL FEE SCHEDULE 2011.-12
ACTION FEI.'
Athninistratine ci Miscellaneous Fees
Permit Issuance $31.10
Supplemental Permit Issuance $23.26
Standard Retention Fee $2.00
Mechanical Permit Fees
Minimum Inspection Fee: Mechanical
$52.87
Unit Fees•
AJC, Residential (Each)
Up to 100,000 BTUs
$22.39
100,001-500,000 BTUs
$42.30
500,001+ BTUs
$108.60
Furnace (F.A.U., Floor)
Up to 100,000 BTUs
$22.39
100,001-500,000 BTUs
$42.30
500,001+ BTUs
$108.60
Heater (Wall)
Up to 100,000 BTUs
$22.39
100,001-500,000 BTUs
$42.30
500,001+ BTUs
$108.60
Refrigeration Compressor
Up to 100,000 BTUs
$22.39
100,001-500,000 BTUs
$42.30
500,001+ BTUs
$108.60
Boiler
Up to 100,000 BTUs
$22.39
100,001-500,000 BTUs
$42.30
500,001+ BTUs
$108.60
Chiller
Up to 100,000 BTUs
$22.39
100,001-500,000 BTUs
$42.30
500,001+ BTUs
$108.60
011—
Heat Pump (Package Unit)
Up to 100,000 BTUs
$22.39
.100,001-500,000 BTUs
$42.30
500,001+ BTUs
$108.60
Heater (Unit, Radiant, Etc.)
Up to 100,000 BTUs
$22.39
100,001-500,000 BTUs
$42.30
500,001+ BTUs
$108.60
Air Handler (Each)
2000 CFMs
$10.57
2001-3,999 CFMs
$31.23
4000-10,000 CFMs
$31.23
10,001+ CFMs
$54.12
Duct Work (Only, New)
1-10 Registers
$36.08
11-30 Registers
$108.23
31-50 Registers
$164.29
51+ Registers
$167.57
Alterations
1-10 Registers
$36.08
11-30 Registers
$108.23
31-50 Registers
$164.29
51+ Registers
$167.57
Evaporative Cooler
1-12,000 BTUs
$18.16
12,001-24,000 BTUs
$18.16
24,001-36,000 BTUs
$18.16
36,001-48,000 BTUs
$18.16
48,001+ BTUs
$18.16
Inlet & Outlet Served by AC System
$3.61
(Register, Each
Moisture Exhaust Duct Clothes Dryer, Each
$28.12
Ventilation Fan Connected to a Single Duct
$13.19
Each
Vent System Each
$28.12
Exhaust Hood/Fan/Duct Residential, Each
$54.12
Exhaust Hood, Type 1
$54.12
(Commercial Grease Hood, Each
Exhaust Hood, Type 2
$54.12
Commercial Steam Hood, Each
Spray Booth Served By Mechanical Exhaust,
$54.12
Including Fans & Ducts attached Thereto
Refrigerator Condenser Remote
Up to 100,000 BTUs
$22.39
100,001-500,000 BTUs
$42.30
500,001+ BTUs
$108.60
2011-20
Walk-in Box/Refrigerator Coil
$51.63
Up to 100,000 BTUs
$22.39
100,001-500,000 BTUs
$42.30
500,001+ BTUs
$108.60
Install/Relocate Forced Air or Gravity -Type
Furnace or Burner (Including Attached Ducts
$67.80
$3.48
& Vents)
$13.56
Up to 100,000 BTUs
$22.39
100,001-500,000 BTUs
$42.30
500,001+ BTUs
$108.60
InstalURelocate Suspended Heater, Recessed
_
Wall Heater, or Floor Mounted Unit Heater
(Each)
Up to 100,000 BTUs
$22.39
100,001-500,000 BTUs
$42.30
500,001+ BTUs
$108.60
Repair/Alter/Add Heating Appliance,
Refrigeration Unit, Cooling Unit, Absorption
Unit, or Each Heating, Cooling, Absorption,
or Evaporative Cooling System, Including
Installation of Controls (Each)
Up to 100,000 BTUs
$22.39
100,001-500,000 BTUs
$42.30
500,001+ BTUs
$108.60
Fire Damper (Each)
$8.83
Garage Ventilation System Each
$28.12
Product Conveying System Each
$28.12
Appliance or Piece of Equipment Not Classed
$28.12
in Other Appliance Categories, or For Which
No Other Fee Is Listed
Fire Suppression System
$8.83
Other Mechanical Inspections Per Hour
$105.74
Plumbing & Gas Permit Fees
Minimum Inspection Fee: Plumbing & Gas
$51.63
Stand Alone Plumbin Plan Check(Hourly)
$105.74
Unit Fees:
Gas Piping System
First 5
After First 5 (Each)
$67.80
$3.48
Gas Meter Each
$13.56
Gas Pressure Regulator(Each)
$13.56
Building Sewer Connection Each
$38.94
Future House Sewer Section
$25.13
2011--20
Private Sewage Disposal System
$79.74
(Septic Tank & Seepage Pit/Connection to
House, Each)_
Disconnection, Abandonment, Alteration, or
$27.37
Repair of Any House Sewer or Private
Sewage Disposal System or Part Thereof
Each
Backflow Preventer
First 5
$13.56
After First 5 (Each)
$5.60
Water Heater and/or Vent Each
$13.56
Water Softener Each
$13.56
Dishwasher, Permanent Each
$13.56
Water Pipe Re air/Re lacement
$13.56
Drainage or Vent Piping Repair/Alterations
$13.56
Each
Drinking Fountain Each
_
$13.56
Solar Water SystemFixtures (Solar Panels,
$45.16
Tanks, Water Treatment Equipment, Each
Swimming Pool Drainage Trap & Receptor
$13.56
(Water Supply for Pool Not Included, Each
Medical Gas System(Each)
$13.56
Plumbing Fixture/Trap or Set of Fixtures on
$13.56
One Trap, Including Water, Drainage Piping,
Hose Bibs, and Backflow Protection each
Building Drain (w/o Accompanying
$13.56
Plumbing, Each
Cesspool, Overflow Seepage Pit, Percolation
$38.94
Test Pit, Swimming Pool Drywell, or
Drainfield Extension or Replacement (Each)
Private Sewage Disposal System (each)
$201.53
Industrial Waste Grease Trap, Pretreatment
$13.56
Interceptor, Including Trap & Vent (Each)
Water Treating Equipment and/or Water
$13.56
Piping Installed/Altered/Re aired (Each)
Lawn Sprinkler System On any one Meter,
$13.56
Including Backflow Protection Devices
Therefore Each
Backflow Devices Not Included in Other Fee
$13.56
Services e.g., Building/Trailer Sewer Each
Electrical tric al Permit 1ees
Minimum Inspection Fee: Plumbing & Gas $50.38
stem Fees:
2011--20
Service, Subpanels, Switchboards or Section,
Motor -Controlled Centers, and Panel Boards
Up to 200 Amps
$32.22
201-1000 Amps
$63.07
1001+ Amps
$134.85
New Single & Two -Family Residential
$0.09
Buildings (Per Sq. Ft.)
Multifamily Residential Buildings (Per Sq.
$0.07
Ft.
Temporary Service Power Pole or Pedestal,
$36.08
Including All Pole or Pedestal Mounted
Receptacle Outlets and Appurtenances
Temporary Distribution System &
$17.91
Temporary Lighting & Receptacle Outlets
Each
Pre -Inspection Per -Hour
$105.74
Private/Residential In -Ground Swimming
$67.30
Pools, Spas, Therapeutic Whirlpools, Hot
Tubs, New/Repairs (Each)
* *Includes Complete System of Necessary
Branch Wiring, Bonding, Grounding,
Underwater Lighting, Water Pumping, and Other
Similar Electrical Equipment Directly Related to
the Operation of a Swimming Pool
Carnivals, Circuses, or other Traveling Shows
$36.70
or Exhibitions Utilizing Transportable Rides,
Booths, Displays, and Attractions With
Lighting
'Temporary Distribution System and
$13.56
Temporary Lighting and Receptacle Outlets
For Construction Sites, Decorative Lights,
Christmas Tree Sales Lots, Fireworks Stands,
Etc. Each
Unit Fees:
Receptacle, Switch, & Lighting Outlets
Receptacle, Switch, Lighting, or Other Outlets
at Which Current is Used or Controlled,
Except Services, Feeders, & Meters
First 20 (Or Portion Thereof)
$1.62
Each Additional
$1.12
Li hting Fixtures
Lighting Fixtures, Sockets, or Other Lamp -
Holding Devices
First 20 (Or Portion Thereof)
$1.62
Each Additional
$1.12
Pole or Platform Mounted Lighting Fixtures
$1.87
(Each)
2011--20
Theatrical -type Lighting Fixtures or
$1.87
Assemblies (Each)
Residential Appliances
Fixed Residential Appliances or Receptacle
$8.96
Outlets For Same, Including Wall -Mounted
Electric Ovens, Counter Mounted Cooking
Tops, Electric Ranges, Self-contained Room
Console, or Through Wall Air Conditioners,
Space Heaters, Food Waste Grinders,
Dishwashers (Each)
"For Other Types of Air Conditioners, and
Motor -Driven Appliances Having Larger
Electrical Ratings, See Power Apparatus
Nonresidential Appliances
Residential Appliances and Self-contained
$8.96
Factory -Wired Non -Residential Appliances,
Including Medical and Dental Services, Food,
Beverage, and Ice Cream Cabinets,
Illuminated Show Cases, Drinking Fountains,
Vending Machines, Laundry Machines, etc.
Each
Residential Appliances and Self-contained
$8.96
Factory -Wired Non -Residential Appliances
Not Exceeding One Horsepower (HP),
Kilowatt (kW), or Kilovolt -ampere (kVA) in
rating, including medical and dental devices,
food, beverage, and ice cream cabinets, etc.
"For Other Types of Air Conditioners, and
Motor -Driven Appliances Having Larger
Electrical Ratings, See Power Apparatus
Power Apparatus
Motors, Generators, Transformers, Rectifiers,
Synchronous Converters, Capacitors,
Industrial Heating, Air Conditioners, and
Heat Pumps, Cooking & Baking Equipment
and Other Apparatus Rating in Horsepower
(HP), Kilowatts (kW), or Kilovolt -amperes
(kVA)
$16.30
Over 3-10
$38.19
Over 11-50
$71.66
Over 51-100
$118.06
Over 101
Busways
2011-20
Trolley and Plug -In Type Busways
(Each 100 Ft. or Fraction Thereof)
$21.65
* *An Additional Fee Will Be Required For
Lighting Fixtures, Motors, and Other Appliances
That Are Connected To Trolley and Plug -In
Type Busways. No Fee is Required For Portable
Tools
Other Electrical
Signs, Outline Lighting, or Marquees (Each)
$32.22
Signs, Outline Lighting, or Marquees
$10.57
Supplied From One Branch Circuit Each
Additional Branch Circuits Within The Same
$10.57
Sign, Outline Lighting System, Or Marquee
Each
Miscellaneous Apparatus, Conduits, and
$53.99
Conductors(Each)
Electrical Apparatus, Conduits, and
$53.99
Conductors For Which a Permit is Required,
But For Which No Fee is Herein Set Forth
(Each)
**Not Applicable When a Fee is Paid For One or
More Services, Outlets, Fixtures, Appliances,
Power Apparatus, Busways, Signs, or Other
Equipment
Photovoltaic Systems (Each)
$50.38
Other Electrical Inspections Per Hour
$105.74
Inspections Outside Normal Business Hours
0-2 Hours (Minimum Fee)
$176.82
Each Additional Hour or Portion Thereof
$176.82
Reinspection Fee (Each)
$42.50
Inspections For Which No Fee is Indicated
Per Hour, Minimum Charge of '/z Hour
$84.99
Electrical Plans Over 2000 Sq. Ft.
2000-4000 (2 Hrs.)
$169.98
4001-6000 (3 Hrs.)
$254.97
6001-8000 (4 Hrs.)
$339.96
8001-10,000 (5 Hrs.)
$424.95
10,001-14,000 (6 Hrs.)
$509.93
14,001-18,000 (8 Hrs.)
$679.91
18,001-22,000 (9 Hrs.)
$736.58
22,001+ (10 Hrs.)
$849.89
2011-20
(7 TY Ot'DIA.-WOND 13A R
MISCELLANEOUS GENERAL FEES
2011-1.2 FEE SCHEDULE
Actual Cost Fees
$105.74
Per Hour
Copying
$0.25
$5.00
$1.25
Per Page After First 5 Pages
Microfiche, First Page
Microfiche, Each Page After First
General Research
$105.74
Per Hour
Projects For Which There is No Fee Category
$105.74
Per Hour
2011-20