Loading...
HomeMy WebLinkAboutPR25-0764PERMIT #: PR20250000764 CITY OF DIAMOND BAR COMMUNITY DEVELOPMENT DEPARTMENT 21810 Copley Drive, Diamond Bar, CA 91765 (909) 839-7020 Fax: (909) 861-3117 Building Inspection Hotline (909) 839-7027 BUILDING PERMIT APPLICATION www.cityofdiamondbar.com building@diamondbarca.gov JOB SITE ADDRESS: 22935 HAPPY HOLLOW RD, DIAMOND BAR, CA 91765 APN:8718001017 LOT#:TRACT#: OWNER NAME:KIM JEUNGHOAN & JUNG HYUN ADDRESS:22935 HAPPY HOLLOW RD CITY:DIAMOND BAR ZIP:91765 TEL: APPLICANT NAME:TEL: CONTRACTOR NAME: ADDRESS: CITY:STATE:ZIP:TEL: ARCH/ENG/DES. NAME:Sung Ko ADDRESS:3183 Wilshire Blvd #810 CITY:STATE:ZIP:TEL:(213) 700-5823 P/C DATE:13 May 2025 P/C#:PR20250000764 ISSUE DATE:PR#: TYPE CONSTRUCTION:Type VB (Unprotected)OCC GROUP:R3 SCOPE OF WORK:Residential Care Facility conversion and installing patio door on existing window. #DWELL UNITS:0 #STORIES:#BEDROOMS: BUILDING FEES DESCRIPTION SQ. FT.FACTOR PSF ADJ AREA/VALUATION SFR/ADD/REM 155.00 GARAGE/CARPORT PATIO/DECK POOL/SPA RE-ROOF COMMERCIAL TOTAL VALUATION:TOTAL:$8,459.9000 Electrical TYPE QUANTITY AMOUNT TOTAL Lighting Fixtures, Sockets, or Other Lamp Holding Devices 8 $0.00 $0.00 Receptacle, Switch, Lighting or other Outlets 11 $0.00 $0.00 Plumbing TYPE QUANTITY AMOUNT TOTAL Plumbing Fixture / Trap or Set of Fixtures 8 $0.00 $0.00 Disconnection, Abandonment, Alteration, or Repair of any House Sewer... 2 $0.00 $0.00 PLAN CHECK FEES PERMIT FEES CONSTRUCTION:$322.05 PLAN REVIEW:$322.05 ELECTRICAL:$69.76 PLUMBING $298.44 MECHANICAL: INSPECTION FEE: ISSUANCE:$140.53 SMIP: ENERGY: RETENTION FEE:$50.62 PRE/ALT FEE: BASF: PLOT PLAN: ZONING CLEARANCE: RECYCLING AND WASTE DEPOSIT: EROSION CONTROL PLAN CHECK FEE: BUILDING ADMIN SPECIAL REVOLVING FUND: PERMIT SYSTEM REPLACMENT FEE: $40.49 TOTAL FEES:$1,243.94 COMMENTS: P/C RECEIPT #:PAY METHOD:VALIDATION: PERMIT RECEIPT #:PAY METHOD:VALIDATION: 22 Oct 2025 72523 CC SJ PERMIT #: PR20250000764 CITY OF DIAMOND BAR INSPECTION RECORD INSPECTION DATE:INSPECTOR:INSPECTION DATE:INSPECTOR: SETBACK / LETTER TRACK AND LEDGER FOOTINGS FORMS T-BAR SLAB POOL DEMOLITION UG. PLUMBING ROOF DRAINS UG. ELECTRICAL POOL/SPA: UFER GROUND GAS TEST, EL, PL, ME SEWER LATERAL PRE GUNITE SEWER CLEANOUT POOL PRE DECK BONDING MAIN WATER LINE P-TRAP ROOF SHEATHING FENCE / GATE / ALARM FLOOR SHEATHING FINAL POOL SHEAR WALLS EXTERIOR WALLS: SHEAR WALLS INTERIOR WALL FOOTING/STEEL FRAMING/VENTING WALL STEEL 1ST( ) 2ND( ) LIFT RO. MECHANICAL WALL DRAIN / SEAL RO. ELECTRICAL W ( ) C ( )WALL FINAL RO. PLUMBING RO. FRAMING PLANNING APPROVAL INSULATION WALL ROUGH FIRE APPROVAL INSULATION CEILING FINAL FIRE DEPARTMENT HOT MOP/SHOWERPAN FINAL PLANNING DRYWALL FINAL PW ENGINEERING LATH EXTERIOR FINAL PW MAINTENANCE LATH INTERIOR FINAL HEALTH DEPT. GAS TEST FINAL INDUSTRIAL WASTE SCRATCH COAT FINAL BUILDING ELECTRIC METER RELEASE FINAL MECHANICAL GAS METER RELEASE FINAL ELECTRICAL SPECIAL INSPECTION FINAL PLUMBING SMOKE & CARBON MONOXIDE DETECTORS T.C. OF OCCUPANCY CERT. OF OCCUPANCY COMMENTS: 12/30/25 FS