Loading...
HomeMy WebLinkAboutPR25-1529PERMIT #: PR20250001529 CITY OF DIAMOND BAR COMMUNITY DEVELOPMENT DEPARTMENT 21810 Copley Drive, Diamond Bar, CA 91765 (909) 839-7020 Fax: (909) 861-3117 Building Inspection Hotline (909) 839-7027 BUILDING PERMIT APPLICATION www.cityofdiamondbar.com building@diamondbarca.gov JOB SITE ADDRESS: 20323 DAMIETTA DR, DIAMOND BAR, CA 91765 APN:8762032041 LOT#:TRACT#: OWNER NAME:YANG HEATHER H & HAN ADDRESS:20323 DAMIETTA DR CITY:WALNUT ZIP:91789 TEL: APPLICANT NAME:TEL: CONTRACTOR NAME:TIMAX ELECTRIC INC ADDRESS:2165 AVENIDA HACIENDA CITY:CHINO HILLS STATE:CA ZIP:91709 TEL:(909) 575-7298 ARCH/ENG/DES. NAME: ADDRESS: CITY:STATE:CA ZIP:TEL: P/C DATE:P/C#: ISSUE DATE:PR#: TYPE CONSTRUCTION:OCC GROUP: SCOPE OF WORK:Electrical for Main Panel Upgrade 200amps (MAIN HOUSE ONLY) NOTE: SCE SPOTTED METER ORANGE TAGGED - SERVICE REQUEST NO. 20323 #DWELL UNITS:#STORIES:#BEDROOMS: BUILDING FEES DESCRIPTION SQ. FT.FACTOR PSF ADJ AREA/VALUATION SFR/ADD/REM GARAGE/CARPORT PATIO/DECK POOL/SPA RE-ROOF COMMERCIAL TOTAL VALUATION:TOTAL: Electrical TYPE QUANTITY AMOUNT TOTAL Panel Upgrade (less than 200 amps)$50.25 $50.25 PLAN CHECK FEES PERMIT FEES CONSTRUCTION: PLAN REVIEW: ELECTRICAL:$71.92 PLUMBING MECHANICAL: INSPECTION FEE: ISSUANCE:$58.06 SMIP: ENERGY: RETENTION FEE:$3.60 PRE/ALT FEE: BASF: PLOT PLAN: ZONING CLEARANCE: RECYCLING AND WASTE DEPOSIT: EROSION CONTROL PLAN CHECK FEE: BUILDING ADMIN SPECIAL REVOLVING FUND: PERMIT SYSTEM REPLACMENT FEE: $2.88 TOTAL FEES:$136.46 COMMENTS: P/C RECEIPT #:PAY METHOD:VALIDATION: PERMIT RECEIPT #:PAY METHOD:VALIDATION:CC TB2025072214 09.25.2025 Walnut, CA 91789 PERMIT #: PR20250001529 CITY OF DIAMOND BAR INSPECTION RECORD INSPECTION DATE:INSPECTOR:INSPECTION DATE:INSPECTOR: SETBACK / LETTER TRACK AND LEDGER FOOTINGS FORMS T-BAR SLAB POOL DEMOLITION UG. PLUMBING ROOF DRAINS UG. ELECTRICAL POOL/SPA: UFER GROUND GAS TEST, EL, PL, ME SEWER LATERAL PRE GUNITE SEWER CLEANOUT POOL PRE DECK BONDING MAIN WATER LINE P-TRAP ROOF SHEATHING FENCE / GATE / ALARM FLOOR SHEATHING FINAL POOL SHEAR WALLS EXTERIOR WALLS: SHEAR WALLS INTERIOR WALL FOOTING/STEEL FRAMING/VENTING WALL STEEL 1ST( ) 2ND( ) LIFT RO. MECHANICAL WALL DRAIN / SEAL RO. ELECTRICAL W ( ) C ( )WALL FINAL RO. PLUMBING RO. FRAMING PLANNING APPROVAL INSULATION WALL ROUGH FIRE APPROVAL INSULATION CEILING FINAL FIRE DEPARTMENT HOT MOP/SHOWERPAN FINAL PLANNING DRYWALL FINAL PW ENGINEERING LATH EXTERIOR FINAL PW MAINTENANCE LATH INTERIOR FINAL HEALTH DEPT. GAS TEST FINAL INDUSTRIAL WASTE SCRATCH COAT FINAL BUILDING ELECTRIC METER RELEASE FINAL MECHANICAL GAS METER RELEASE FINAL ELECTRICAL SPECIAL INSPECTION FINAL PLUMBING SMOKE & CARBON MONOXIDE DETECTORS T.C. OF OCCUPANCY CERT. OF OCCUPANCY COMMENTS: 9/30/25 9/30/25 9/30/25 MP MP MP