Loading...
HomeMy WebLinkAboutFee Proposal - OnCall Traffic and Transportation Engineering ServicesCity of Diamond Bar Proposal for: Professional On-Call Traffic and Transportaion Engineering Services March 17, 2026 Submitted to Attention: Christian Malpica Associate Engineer/Project Manager City of Diamond Bar 21810 Copley Drive Diamond Bar, California 91765 Submitted by RKA Consulting Group 398 Lemon Creek Drive, Suite E Walnut, CA 91789 www.rkagroup.com (909) 594-9702 Design Services Position/Title in Company Hourly Rate Engineering Technician I $100 Engineering Technician II $105 Engineering Technician III $110 Assistant Engineer I $135 Assistant Engineer II $140 Assistant Engineer III $145 Assistant Engineer IV $150 Assistant Engineer V $155 Associate Engineer I $160 Associate Engineer II $165 Associate Engineer III $170 Associate Engineer IV $175 Associate Engineer V $180 Senior Engineer I $190 Senior Engineer II $195 Senior Engineer III $200 Project Manager I $190 Project Manager II $195 Project Manager III $200 Senior Project Manager I $210 Senior Project Manager II $215 Senior Project Manager III $220 Principal Engineer $250 Inspection Services Position/Title in Company Hourly Rate Public Works Inspector I $110 Public Works Inspector II $115 Public Works Inspector III $120 Senior Public Works Inspector I $150 Senior Public Works Inspector II $155 Senior Public Works Inspector III $160 Plan Checking Services Position/Title in Company Hourly Rate Plans Examiner I $135 Plans Examiner II $140 Plans Examiner III $145 Senior Plans Examiner I $160 Senior Plans Examiner II $170 Senior Plans Examiner III $180 Plan Check Engineer I $190 Plan Check Engineer II $200 Plan Check Engineer III $210 Senior Plan Check Engineer I $225 Senior Plan Check Engineer II $240 Senior Plan Check Engineer III $250 Rate and Fee Schedule RKA Consulting Group is pleased to provide this Rates and Fee Schedule for Professional On-Call Traffic and Transportaion Engineering Services. Subconsultants: All charges for subcontracted services shall be in the same amounts as actually invoiced to and paid by the engineer plus an allowable percentage markup of fifteen percent (15%). Annual Rate Adjustment: These rates will remain in effect for the first 3 years of the contract period. Annually thereafter if the contract is extended, the rates may be adjusted based on the Los Angeles-Long Beach-Anaheim Consumer Price Index (CPI), with any increase not to exceed 5% annually. In the event the CPI for a particular year is negative, compensation shall remain at the then-current rates. FEE SCHEDULE