Loading...
HomeMy WebLinkAboutCost Proposal City of Diamond Bar 2026-2029 Schedule of Rates CLASSIFICATION HOURLY BILLING Raw/ Actual/ Effective date of hourly rate* RATE Payroll RATE From To 1 Principal-in-Charge $243.25 $87.27 01/01/2026 12/31/2029 2 Project Director $243.25 $87.27 01/01/2025 12/31/2029 3 Principal Engineer $243.25 $87.27 01/01/2025 12/31/2029 4 Senior Project Manager $205.82 $73.84 01/01/2025 12/31/2029 5 Field Manager/ Construction Manager $131.18 $47.06 01/01/2025 12/31/2029 6 City Traffic Engineer $185.19 $66.44 01/01/2025 12/31/2029 7 Principal Systems/ Electrical Engineer $186.03 $66.74 01/01/2025 12/31/2029 8 Senior Designer/Engineer/Planner $172.26 $61.80 01/01/2025 12/31/2029 9 Project Engineer/Planner $102.94 $36.93 01/01/2025 12/31/2029 10 Traffic/Transportation Engineer $77.52 $27.81 01/01/2025 12/31/2029 11 Assistant Traffic/Transp. Engineer $73.17 $26.25 01/01/2025 12/31/2029 12 Engineering Assistant $64.61 $23.18 01/01/2025 12/31/2029 13 Planning Assistant $58.53 $21.00 01/01/2025 12/31/2029 14 Admin Assistant/Intern $58.53 $21.00 01/01/2025 12/31/2029 Updated Jan. 1, 2026 NOTES: • Non-commuter Mileage is per Current IRS Annual Mileage Rate. • Telephone & Equipment are included in the above Hourly Costs. • No cost escalation • Project Reimbursable Expenses are billed at Cost. • Direct Costs are billed at Cost Plus 5%. 23282 Mill Creek Drive, East Tower, Suite 120, Laguna Hills, CA 92653 Tel: (949) 707-1199 Web: www.minagarinc.comu