HomeMy WebLinkAboutPR25-1423PERMIT #: PR20250001423
CITY OF DIAMOND BAR
COMMUNITY DEVELOPMENT DEPARTMENT
21810 Copley Drive, Diamond Bar, CA 91765
(909) 839-7020 Fax: (909) 861-3117 Building Inspection Hotline (909) 839-7027
BUILDING PERMIT APPLICATION www.cityofdiamondbar.com building@diamondbarca.gov
JOB SITE ADDRESS: 21535 CHIRPING SPARROW RD, DIAMOND BAR, CA 91765
APN:8714021022 LOT#:TRACT#:
OWNER NAME:QUI MINYING
ADDRESS:2424 VELLANO CUB DR
CITY:CHINO HILLS ZIP:91709 TEL:
APPLICANT NAME:TEL:
CONTRACTOR NAME:SONG N SONS GENERAL CONSTRUCTION INC
ADDRESS:119 S ATLANTIC BLVD # 307
CITY:MONTEREY PARK STATE:CA ZIP:91753 TEL:(213) 216-5775
ARCH/ENG/DES. NAME:
ADDRESS:
CITY:STATE:CA ZIP:TEL:
P/C DATE:09 Sep 2025 P/C#:PR20250001423
ISSUE DATE:PR#:
TYPE CONSTRUCTION:OCC GROUP:
SCOPE OF WORK:Code Case : Kitchen and (3) bathroom remodel (500 SF)
*Work Started Without Permit. Permit is valid for 90 days from permit issuance. Continuous work doesn't deem this permit valid
longer than the days listed*
#DWELL UNITS:0 #STORIES:#BEDROOMS:
BUILDING FEES
DESCRIPTION SQ. FT.FACTOR PSF ADJ AREA/VALUATION
SFR/ADD/REM 500.00
GARAGE/CARPORT
PATIO/DECK
POOL/SPA
RE-ROOF
COMMERCIAL
TOTAL VALUATION:TOTAL:$28,060.0000
Plumbing
TYPE QUANTITY AMOUNT TOTAL
Plumbing Fixture / Trap or Set of Fixtures 4 $25.56 $102.24
Dishwasher (Changeout Same Location)1 $25.56 $25.56
PLAN CHECK FEES PERMIT FEES
CONSTRUCTION:$650.22
PLAN REVIEW:$552.69
ELECTRICAL:
PLUMBING $255.60
MECHANICAL:
INSPECTION FEE:
ISSUANCE:$101.48
SMIP:$2.60
ENERGY:
RETENTION FEE:$66.53
PRE/ALT FEE:
BASF:$1.00
PLOT PLAN:
ZONING CLEARANCE:
RECYCLING AND WASTE DEPOSIT:
EROSION CONTROL PLAN CHECK FEE:
BUILDING ADMIN SPECIAL REVOLVING
FUND:
PERMIT SYSTEM REPLACMENT FEE:
$53.23
TOTAL FEES:$2,333.57
COMMENTS:
P/C RECEIPT #:PAY METHOD:VALIDATION:
PERMIT RECEIPT #:PAY METHOD:VALIDATION:
15 Jan 2026
73456 CC SJ
PERMIT #: PR20250001423
CITY OF DIAMOND BAR
INSPECTION RECORD
DATE:INSPECTOR:INSPECTION DATE:INSPECTOR:INSPECTION
SETBACK/LETTER
FOOTINGS FORMS
SLAB
UG. PLUMBING
UG. ELECTRICAL
UFER GROUND
SEWER LATERAL
SEWER CLEANOUT
MAIN WATER LINE
ROOF SHEATHING
FLOOR SHEATHING
SHEAR WALLS EXTERIOR
SHEAR WALLS INTERIOR
FRAMING/VENTING
RO. MECHANICAL
RO. ELECTRICAL W ()C()
RO. PLUMBING
INSULATION WALL
INSULATION CEILING
HOT MOP/SHOWERPAN
DRYWALL
LATH EXTERIOR
LATH INTERIOR
GAS TEST
TRACK AND LEDGER
T-BAR
POOL DEMOLITION
ROOF DRAINS
POOL/SPА:
GAS TEST, EL, PL, MЕ
PRE GUNITE
POOL PRE DECK BONDING
P-TRAP
FENCE/GATE/ALARM
FINAL POOL
WALLS:
WALL FOOTING/STEEL
WALL STEEL 15T() 2ND() LIFT
WALL DRAIN/SEAL
WALL FINAL
RO. FRAMING PLANNING
APPROVAL
ROUGH FIRE APPROVAL
FINAL FIRE DEPARTMENT
FINAL PLANNING
FINAL PW ENGINEERING
FINAL PW MAINTENANCE
FINAL HEALTH DEЕРТ.
FINAL INDUSTRIAL WASTE
FINAL BUILDING
FINAL MECHANICAL
SCRATCH COAT
ELECTRIC METER RELEASE
GAS METER RELEASE FINAL ELECTRICAL
SPECIAL INSPECTION
COMMENTS:
FINAL PLUMBING
SMOKE & CARBON
MONOXIDE DETECTORS
T.C. OF OCCUPANCY
CERT. OF OCCUPANCY
3/2/26 FS