Loading...
HomeMy WebLinkAboutPR25-1909PERMIT #: PR20250001909 CITY OF DIAMOND BAR COMMUNITY DEVELOPMENT DEPARTMENT 21810 Copley Drive, Diamond Bar, CA 91765 (909) 839-7020 Fax: (909) 861-3117 Building Inspection Hotline (909) 839-7027 BUILDING PERMIT APPLICATION www.cityofdiamondbar.com building@diamondbarca.gov JOB SITE ADDRESS: 21496 COLD SPRING LN, DIAMOND BAR, CA 91765 APN:8714002006 LOT#:TRACT#: OWNER NAME:MEJIA REBECCA E TRUST ADDRESS:21496 COLD SPRING LN CITY:DIAMOND BAR ZIP:91765 TEL: APPLICANT NAME:TEL: CONTRACTOR NAME:JMA Patio & Construction ADDRESS:19100 Friar St CITY:Tarzana STATE:CA ZIP:91335 TEL:(818) 425-4730 ARCH/ENG/DES. NAME: ADDRESS: CITY:STATE:CA ZIP:TEL: P/C DATE:02 Dec 2025 P/C#:PR20250001909 ISSUE DATE:PR#: TYPE CONSTRUCTION:OCC GROUP: SCOPE OF WORK:New attached aluminum patio (264 sf), new open trellis (60sf) on the side of the house, and new open trellis (144sf) #DWELL UNITS:#STORIES:#BEDROOMS: BUILDING FEES DESCRIPTION SQ. FT.FACTOR PSF ADJ AREA/VALUATION SFR/ADD/REM GARAGE/CARPORT PATIO/DECK POOL/SPA RE-ROOF COMMERCIAL TOTAL VALUATION:TOTAL:$0.0000 Electrical TYPE QUANTITY AMOUNT TOTAL Lighting Fixtures, Sockets, or Other Lamp Holding Devices 9 $2.75 $2.75 Receptacle, Switch, Lighting or other Outlets 4 $3.03 $3.03 PLAN CHECK FEES PERMIT FEES CONSTRUCTION:$365.92 PLAN REVIEW:$311.03 ELECTRICAL:$71.92 PLUMBING MECHANICAL: INSPECTION FEE: ISSUANCE:$101.48 SMIP:$1.24 ENERGY: RETENTION FEE:$37.44 PRE/ALT FEE: BASF:$1.00 PLOT PLAN: ZONING CLEARANCE:$100.48 RECYCLING AND WASTE DEPOSIT: EROSION CONTROL PLAN CHECK FEE: BUILDING ADMIN SPECIAL REVOLVING FUND: PERMIT SYSTEM REPLACMENT FEE: $29.95 TOTAL FEES:$1,020.46 COMMENTS: P/C RECEIPT #:PAY METHOD:VALIDATION: PERMIT RECEIPT #:PAY METHOD:VALIDATION: 15 Dec 2025 73176 CC SJ PERMIT #: PR20250001909 CITY OF DIAMOND BAR INSPECTION RECORD INSPECTION DATE:INSPECTOR:INSPECTION DATE:INSPECTOR: SETBACK / LETTER TRACK AND LEDGER FOOTINGS FORMS T-BAR SLAB POOL DEMOLITION UG. PLUMBING ROOF DRAINS UG. ELECTRICAL POOL/SPA: UFER GROUND GAS TEST, EL, PL, ME SEWER LATERAL PRE GUNITE SEWER CLEANOUT POOL PRE DECK BONDING MAIN WATER LINE P-TRAP ROOF SHEATHING FENCE / GATE / ALARM FLOOR SHEATHING FINAL POOL SHEAR WALLS EXTERIOR WALLS: SHEAR WALLS INTERIOR WALL FOOTING/STEEL FRAMING/VENTING WALL STEEL 1ST( ) 2ND( ) LIFT RO. MECHANICAL WALL DRAIN / SEAL RO. ELECTRICAL W ( ) C ( )WALL FINAL RO. PLUMBING RO. FRAMING PLANNING APPROVAL INSULATION WALL ROUGH FIRE APPROVAL INSULATION CEILING FINAL FIRE DEPARTMENT HOT MOP/SHOWERPAN FINAL PLANNING DRYWALL FINAL PW ENGINEERING LATH EXTERIOR FINAL PW MAINTENANCE LATH INTERIOR FINAL HEALTH DEPT. GAS TEST FINAL INDUSTRIAL WASTE SCRATCH COAT FINAL BUILDING ELECTRIC METER RELEASE FINAL MECHANICAL GAS METER RELEASE FINAL ELECTRICAL SPECIAL INSPECTION FINAL PLUMBING SMOKE & CARBON MONOXIDE DETECTORS T.C. OF OCCUPANCY CERT. OF OCCUPANCY COMMENTS: 1/14/26 1/14/26 FS FS 1/27/26 FS