Loading...
HomeMy WebLinkAboutPR25-1147PERMIT #: PR20250001147 CITY OF DIAMOND BAR COMMUNITY DEVELOPMENT DEPARTMENT 21810 Copley Drive, Diamond Bar, CA 91765 (909) 839-7020 Fax: (909) 861-3117 Building Inspection Hotline (909) 839-7027 BUILDING PERMIT APPLICATION www.cityofdiamondbar.com building@diamondbarca.gov JOB SITE ADDRESS: 2010 RUSTY SPUR RD, DIAMOND BAR, CA 91765 APN:8713031007 LOT#:TRACT#: OWNER NAME:KUMAR MANMOHAN & HYUN S ADDRESS:2010 RUSTY SPUR RD CITY:DIAMOND BAR ZIP:91765 TEL: APPLICANT NAME:TEL: CONTRACTOR NAME:HPM SOLAR INC. ADDRESS:1081 W. 9TH ST. CITY:UPLAND STATE:CA ZIP:91786 TEL:(909) 297-3284 ARCH/ENG/DES. NAME: ADDRESS: CITY:STATE:CA ZIP:TEL: P/C DATE:P/C#: ISSUE DATE:PR#: TYPE CONSTRUCTION:Type VB (Unprotected)OCC GROUP: SCOPE OF WORK:Photovoltaic: Roof mounted Solar 14.355 kW (33) modules (33)microinverters, 200A MPU, (2) ESS, (1) EV CHARGER #DWELL UNITS:#STORIES:#BEDROOMS: BUILDING FEES DESCRIPTION SQ. FT.FACTOR PSF ADJ AREA/VALUATION SFR/ADD/REM GARAGE/CARPORT PATIO/DECK POOL/SPA RE-ROOF COMMERCIAL TOTAL VALUATION:TOTAL:$48,297.0000 Electrical TYPE QUANTITY AMOUNT TOTAL Photovoltaic Systems 1 $92.84 $92.84 Panel Upgrade (200-1000 amps)1 $117.76 $117.76 Motors, Generators, Transformers, Rectifiers 3 $30.45 $91.35 PLAN CHECK FEES PERMIT FEES CONSTRUCTION:$132.95 PLAN REVIEW:$50.00 ELECTRICAL:$301.95 PLUMBING MECHANICAL: INSPECTION FEE: ISSUANCE:$98.42 SMIP:$1.90 ENERGY: RETENTION FEE:$12.00 PRE/ALT FEE: BASF:$1.00 PLOT PLAN: ZONING CLEARANCE: RECYCLING AND WASTE DEPOSIT: EROSION CONTROL PLAN CHECK FEE: BUILDING ADMIN SPECIAL REVOLVING FUND: PERMIT SYSTEM REPLACMENT FEE: $10.00 TOTAL FEES:$608.22 COMMENTS: P/C RECEIPT #:PAY METHOD:VALIDATION: PERMIT RECEIPT #:PAY METHOD:VALIDATION: 13 Aug 2025 71684 CC SJ PERMIT #: PR20250001147 CITY OF DIAMOND BAR INSPECTION RECORD INSPECTION DATE:INSPECTOR:INSPECTION DATE:INSPECTOR: SETBACK / LETTER TRACK AND LEDGER FOOTINGS FORMS T-BAR SLAB POOL DEMOLITION UG. PLUMBING ROOF DRAINS UG. ELECTRICAL POOL/SPA: UFER GROUND GAS TEST, EL, PL, ME SEWER LATERAL PRE GUNITE SEWER CLEANOUT POOL PRE DECK BONDING MAIN WATER LINE P-TRAP ROOF SHEATHING FENCE / GATE / ALARM FLOOR SHEATHING FINAL POOL SHEAR WALLS EXTERIOR WALLS: SHEAR WALLS INTERIOR WALL FOOTING/STEEL FRAMING/VENTING WALL STEEL 1ST( ) 2ND( ) LIFT RO. MECHANICAL WALL DRAIN / SEAL RO. ELECTRICAL W ( ) C ( )WALL FINAL RO. PLUMBING RO. FRAMING PLANNING APPROVAL INSULATION WALL ROUGH FIRE APPROVAL INSULATION CEILING FINAL FIRE DEPARTMENT HOT MOP/SHOWERPAN FINAL PLANNING DRYWALL FINAL PW ENGINEERING LATH EXTERIOR FINAL PW MAINTENANCE LATH INTERIOR FINAL HEALTH DEPT. GAS TEST FINAL INDUSTRIAL WASTE SCRATCH COAT FINAL BUILDING ELECTRIC METER RELEASE FINAL MECHANICAL GAS METER RELEASE FINAL ELECTRICAL SPECIAL INSPECTION FINAL PLUMBING SMOKE & CARBON MONOXIDE DETECTORS T.C. OF OCCUPANCY CERT. OF OCCUPANCY COMMENTS: 10/6/25 10/6/25 10/6/25 FS FS FS 10/27/25 10/27/25 FS FS 12/31/2026 X 9242220-24 12/01/2025