HomeMy WebLinkAboutPR23-1194PERMIT #: PR20230001194
CITY OF DIAMOND BAR
COMMUNITY DEVELOPMENT DEPARTMENT
21810 Copley Drive, Diamond Bar, CA 91765
(909) 839-7020 Fax: (909) 861-3117 Building Inspection Hotline (909) 839-7027
BUILDING PERMIT APPLICATION www.cityofdiamondbar.com building@diamondbarca.gov
JOB SITE ADDRESS: 1638 MAPLE HILL RD, DIAMOND BAR, CA 91765
APN:8293016016 LOT#:TRACT#:
OWNER NAME:DEMONTEVERDE IAN D & CECILE
ADDRESS:1638 MAPLE HILL RD
CITY:DIAMOND BAR ZIP:91765 TEL:<NO PRIMARY PHONE>
APPLICANT NAME:TEL:
CONTRACTOR NAME:ALWAYS RELIABLE ROOFING
ADDRESS:14410 CRYSTAL LANTERN DR
CITY:HACIENDA HEIGHTS STATE:CA ZIP:91745 TEL:(626) 723-9536
ARCH/ENG/DES. NAME:
ADDRESS:
CITY:STATE:CA ZIP:TEL:
P/C DATE:P/C#:
ISSUE DATE:23 Jun 2023 PR#:PR20230001194
TYPE CONSTRUCTION:OCC GROUP:
SCOPE OF WORK:Tear off cal shake and re-roof with tile under 6lbs (28sqrs) and partial torch down of (5sqrs).
#DWELL UNITS:0 #STORIES:#BEDROOMS:
BUILDING FEES
DESCRIPTION SQ. FT.FACTOR PSF ADJ AREA/VALUATION
SFR/ADD/REM
GARAGE/CARPORT
PATIO/DECK
POOL/SPA
RE-ROOF 28.00 $26,000.00
COMMERCIAL
TOTAL VALUATION:TOTAL:$26,000.0000
PLAN CHECK FEES PERMIT FEES
CONSTRUCTION:$739.13
PLAN REVIEW:
ELECTRICAL:
PLUMBING
MECHANICAL:
INSPECTION FEE:
ISSUANCE:$52.71
SMIP:$3.38
ENERGY:
RETENTION FEE:$36.96
PRE/ALT FEE:
BASF:$2.00
PLOT PLAN:
ZONING CLEARANCE:
RECYCLING AND WASTE DEPOSIT:$250.00
EROSION CONTROL PLAN CHECK FEE:
BUILDING ADMIN SPECIAL REVOLVING
FUND:
PERMIT SYSTEM REPLACMENT FEE:
$29.57
TOTAL FEES:$1,113.75
COMMENTS:
P/C RECEIPT #:PAY METHOD:VALIDATION:
PERMIT RECEIPT #:PAY METHOD:VALIDATION:2522 CK7331 AV
PERMIT #: PR20230001194
CITY OF DIAMOND BAR
INSPECTION RECORD
INSPECTION DATE:INSPECTOR:INSPECTION DATE:INSPECTOR:
SETBACK / LETTER TRACK AND LEDGER
FOOTINGS FORMS T-BAR
SLAB POOL DEMOLITION
UG. PLUMBING ROOF DRAINS
UG. ELECTRICAL POOL/SPA:
UFER GROUND GAS TEST, EL, PL, ME
SEWER LATERAL PRE GUNITE
SEWER CLEANOUT POOL PRE DECK BONDING
MAIN WATER LINE P-TRAP
ROOF SHEATHING FENCE / GATE / ALARM
FLOOR SHEATHING FINAL POOL
SHEAR WALLS EXTERIOR WALLS:
SHEAR WALLS INTERIOR WALL FOOTING/STEEL
FRAMING/VENTING WALL STEEL 1ST( ) 2ND( ) LIFT
RO. MECHANICAL WALL DRAIN / SEAL
RO. ELECTRICAL W ( ) C ( )WALL FINAL
RO. PLUMBING RO. FRAMING PLANNING
APPROVAL
INSULATION WALL ROUGH FIRE APPROVAL
INSULATION CEILING FINAL FIRE DEPARTMENT
HOT MOP/SHOWERPAN FINAL PLANNING
DRYWALL FINAL PW ENGINEERING
LATH EXTERIOR FINAL PW MAINTENANCE
LATH INTERIOR FINAL HEALTH DEPT.
GAS TEST FINAL INDUSTRIAL WASTE
SCRATCH COAT FINAL BUILDING
ELECTRIC METER RELEASE FINAL MECHANICAL
GAS METER RELEASE FINAL ELECTRICAL
SPECIAL INSPECTION FINAL PLUMBING
SMOKE & CARBON
MONOXIDE DETECTORS
T.C. OF OCCUPANCY
CERT. OF OCCUPANCY
COMMENTS:
Roof 8/17/23 F.S.
8/8/23 F.S.