HomeMy WebLinkAboutPR25-1559PERMIT #: PR20250001559
CITY OF DIAMOND BAR
COMMUNITY DEVELOPMENT DEPARTMENT
21810 Copley Drive, Diamond Bar, CA 91765
(909) 839-7020 Fax: (909) 861-3117 Building Inspection Hotline (909) 839-7027
BUILDING PERMIT APPLICATION www.cityofdiamondbar.com building@diamondbarca.gov
JOB SITE ADDRESS: 21377 RUNNING BRANCH RD, DIAMOND BAR, CA 91765
APN:8714010032 LOT#:TRACT#:
OWNER NAME:DOONG MICHAEL AND HSING LOUISE
ADDRESS:21377 RUNNING BRANCH RD
CITY:DIAMOND BAR ZIP:91765 TEL:
APPLICANT NAME:TEL:
CONTRACTOR NAME:MARCO ANTONIO RANGEL CASTILLO
ADDRESS:780 N EUCLID ST STE 201
CITY:ANAHEIM STATE:CA ZIP:92801 TEL:(714) 865-3755
ARCH/ENG/DES. NAME:
ADDRESS:
CITY:STATE:CA ZIP:TEL:
P/C DATE:P/C#:
ISSUE DATE:PR#:
TYPE CONSTRUCTION:OCC GROUP:
SCOPE OF WORK:Reroof: Remove and Install (40) Squares of Tile over house and attached garage (New color & New material CRRC Hershey Blend -
Appd by Rudy verbal 9.29.2025) with Painting and, (1) waterline, and (1) duct for mechanical
NEEDS C&D FORM - IF SELF HAUL NEEDS TO TURN IN - NEEDS TO PAY PERMIT AND BL
#DWELL UNITS:0 #STORIES:#BEDROOMS:
BUILDING FEES
DESCRIPTION SQ. FT.FACTOR PSF ADJ AREA/VALUATION
SFR/ADD/REM
GARAGE/CARPORT
PATIO/DECK
POOL/SPA
RE-ROOF 2,700.00 $9,500.00
COMMERCIAL
TOTAL VALUATION:TOTAL:$9,500.0000
Mechanical
TYPE QUANTITY AMOUNT TOTAL
Duct Work (New)1 $0.00 $0.00
Plumbing
TYPE QUANTITY AMOUNT TOTAL
Water Pipe Repair / Replacement 1 $0.00 $0.00
PLAN CHECK FEES PERMIT FEES
CONSTRUCTION:$735.51
PLAN REVIEW:
ELECTRICAL:
PLUMBING $71.92
MECHANICAL:$99.50
INSPECTION FEE:
ISSUANCE:$144.90
SMIP:$2.99
ENERGY:
RETENTION FEE:$45.35
PRE/ALT FEE:
BASF:$1.00
PLOT PLAN:
ZONING CLEARANCE:
RECYCLING AND WASTE DEPOSIT:$250.00
EROSION CONTROL PLAN CHECK FEE:
BUILDING ADMIN SPECIAL REVOLVING
FUND:
PERMIT SYSTEM REPLACMENT FEE:
$36.28
TOTAL FEES:$1,387.45
COMMENTS:
P/C RECEIPT #:PAY METHOD:VALIDATION:
PERMIT RECEIPT #:PAY METHOD:VALIDATION:
14 Oct 2025
72317 CC SJ
PERMIT #: PR20250001559
CITY OF DIAMOND BAR
INSPECTION RECORD
INSPECTION DATE:INSPECTOR:INSPECTION DATE:INSPECTOR:
SETBACK / LETTER TRACK AND LEDGER
FOOTINGS FORMS T-BAR
SLAB POOL DEMOLITION
UG. PLUMBING ROOF DRAINS
UG. ELECTRICAL POOL/SPA:
UFER GROUND GAS TEST, EL, PL, ME
SEWER LATERAL PRE GUNITE
SEWER CLEANOUT POOL PRE DECK BONDING
MAIN WATER LINE P-TRAP
ROOF SHEATHING FENCE / GATE / ALARM
FLOOR SHEATHING FINAL POOL
SHEAR WALLS EXTERIOR WALLS:
SHEAR WALLS INTERIOR WALL FOOTING/STEEL
FRAMING/VENTING WALL STEEL 1ST( ) 2ND( ) LIFT
RO. MECHANICAL WALL DRAIN / SEAL
RO. ELECTRICAL W ( ) C ( )WALL FINAL
RO. PLUMBING RO. FRAMING PLANNING
APPROVAL
INSULATION WALL ROUGH FIRE APPROVAL
INSULATION CEILING FINAL FIRE DEPARTMENT
HOT MOP/SHOWERPAN FINAL PLANNING
DRYWALL FINAL PW ENGINEERING
LATH EXTERIOR FINAL PW MAINTENANCE
LATH INTERIOR FINAL HEALTH DEPT.
GAS TEST FINAL INDUSTRIAL WASTE
SCRATCH COAT FINAL BUILDING
ELECTRIC METER RELEASE FINAL MECHANICAL
GAS METER RELEASE FINAL ELECTRICAL
SPECIAL INSPECTION FINAL PLUMBING
SMOKE & CARBON
MONOXIDE DETECTORS
T.C. OF OCCUPANCY
CERT. OF OCCUPANCY
COMMENTS:
10/22/25 FS
Roof 11/6/25 FS
11/6/25 FS