Loading...
HomeMy WebLinkAboutPR25-0788PERMIT #: PR20250000788 CITY OF DIAMOND BAR COMMUNITY DEVELOPMENT DEPARTMENT 21810 Copley Drive, Diamond Bar, CA 91765 (909) 839-7020 Fax: (909) 861-3117 Building Inspection Hotline (909) 839-7027 BUILDING PERMIT APPLICATION www.cityofdiamondbar.com building@diamondbarca.gov JOB SITE ADDRESS: 22801 CHARDONNAY DR, Unit:4, DIAMOND BAR, CA 91765 APN:8293047047 LOT#:TRACT#: OWNER NAME:LEE YOON H ADDRESS:4499 VIA MARISOL #212 CITY:LOS ANGELES ZIP:90042 TEL: APPLICANT NAME:TEL: CONTRACTOR NAME:Forward Electrical ADDRESS:4503 N. Brightview Dr. CITY:Covina STATE:CA ZIP:91722 TEL:(626) 736-8851 ARCH/ENG/DES. NAME: ADDRESS: CITY:STATE:CA ZIP:TEL: P/C DATE:P/C#: ISSUE DATE:PR#: TYPE CONSTRUCTION:OCC GROUP: SCOPE OF WORK:Replace 100AMP subpanel for unit #4 #DWELL UNITS:#STORIES:#BEDROOMS: BUILDING FEES DESCRIPTION SQ. FT.FACTOR PSF ADJ AREA/VALUATION SFR/ADD/REM GARAGE/CARPORT PATIO/DECK POOL/SPA RE-ROOF COMMERCIAL TOTAL VALUATION:TOTAL: Electrical TYPE QUANTITY AMOUNT TOTAL Service, Subpanels, Switchboards or Section 1 $0.00 $0.00 PLAN CHECK FEES PERMIT FEES CONSTRUCTION: PLAN REVIEW: ELECTRICAL:$69.76 PLUMBING MECHANICAL: INSPECTION FEE: ISSUANCE:$56.31 SMIP: ENERGY: RETENTION FEE:$3.49 PRE/ALT FEE: BASF: PLOT PLAN: ZONING CLEARANCE: RECYCLING AND WASTE DEPOSIT: EROSION CONTROL PLAN CHECK FEE: BUILDING ADMIN SPECIAL REVOLVING FUND: PERMIT SYSTEM REPLACMENT FEE: $2.79 TOTAL FEES:$132.35 COMMENTS: P/C RECEIPT #:PAY METHOD:VALIDATION: PERMIT RECEIPT #:PAY METHOD:VALIDATION: 23 May 2025 EMCC70591 PERMIT #: PR20250000788 CITY OF DIAMOND BAR INSPECTION RECORD INSPECTION DATE:INSPECTOR:INSPECTION DATE:INSPECTOR: SETBACK / LETTER TRACK AND LEDGER FOOTINGS FORMS T-BAR SLAB POOL DEMOLITION UG. PLUMBING ROOF DRAINS UG. ELECTRICAL POOL/SPA: UFER GROUND GAS TEST, EL, PL, ME SEWER LATERAL PRE GUNITE SEWER CLEANOUT POOL PRE DECK BONDING MAIN WATER LINE P-TRAP ROOF SHEATHING FENCE / GATE / ALARM FLOOR SHEATHING FINAL POOL SHEAR WALLS EXTERIOR WALLS: SHEAR WALLS INTERIOR WALL FOOTING/STEEL FRAMING/VENTING WALL STEEL 1ST( ) 2ND( ) LIFT RO. MECHANICAL WALL DRAIN / SEAL RO. ELECTRICAL W ( ) C ( )WALL FINAL RO. PLUMBING RO. FRAMING PLANNING APPROVAL INSULATION WALL ROUGH FIRE APPROVAL INSULATION CEILING FINAL FIRE DEPARTMENT HOT MOP/SHOWERPAN FINAL PLANNING DRYWALL FINAL PW ENGINEERING LATH EXTERIOR FINAL PW MAINTENANCE LATH INTERIOR FINAL HEALTH DEPT. GAS TEST FINAL INDUSTRIAL WASTE SCRATCH COAT FINAL BUILDING ELECTRIC METER RELEASE FINAL MECHANICAL GAS METER RELEASE FINAL ELECTRICAL SPECIAL INSPECTION FINAL PLUMBING SMOKE & CARBON MONOXIDE DETECTORS T.C. OF OCCUPANCY CERT. OF OCCUPANCY COMMENTS: