Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Cost Proposal Onward Engineering Proposal
Project Description Design Fee Project 1 ADA Curb Ramp Improvement Project (Area 6) Project 2 Arterial Street Rehabilitation: ● Brea Canyon Rd: Diamond Bar Blvd. to Pathfinder Rd. ● Brea Canyon Rd: Pathfinder Rd. to Washington Ave. ● Diamond Bar Blvd: SR-60 Off-Ramp to City Limit Project 3 ADA Curb Ramp Improvement Project (Area 7) Project 4 Residential & Collector Streets Rehabilitation (Area 5) Project 5 Arterial Street Rehabilitation: ● Pathfinder Rd: Diamond Bar Blvd. to City Limits. Total Amount Base Bid Items Optional Items Project 6 ADA Curb Ramp Improvement Project (Area 1) Project 7 Residential & Collector Streets Rehabilitation (Area 6) Project 8 Arterial Street Rehabilitation: ● Grand Ave: Diamond Bar Blvd. to Lavender Dr. ● Diamond Bar Blvd: Clear Creek Canyon Dr. to Golden Springs Dr. Project 9 Arterial Street Rehabilitation: ● Temple Ave/Avenida Rancheros: Diamond Bar Blvd. to City Limits $ Base Fee Schedule (Revised) Project 10 Arterial Street Rehabilitation: ● Diamond Bar Blvd.: Pathfinder Rd. to South of Fallow Field Dr. ● Brea Canyon Road: Diamond Bar Blvd. to city limits. Total Amount Optional Items $ ONWaRD eNGINeeRING pROject eNGiNeeRS $140.00 h O u RLY Oe tOtaL hOuRS GRAND GRAND Oe Sub-tOtaL cOSt Q a /Q c maNaGeR $200.00 h O u RLY pROject maNaGeR $180.00 h O u RLY pa R t Y chIeF $220.00 h O u RLY chaIN/ ROD maN $180.00 h O u RLY phaSe 1 phaSe 1 1 Meetings 5 9 6 20 $3,460.00 $3,460.00 2 Data Research and Review 4 4 8 $1,280.00 $1,280.00 3 Utility Research and Notification 8 30 38 $5,640.00 $5,640.00 SUB-TOTAL 5 21 40 66 $10,380.00 $10,380.00 phaSe 2 phaSe 2 4 Ramp Location Determination 2 12 14 $2,040.00 $2,040.00 5 Ramp Evaluation 10 10 $1,400.00 $1,400.00 6 Base Maps 2 20 22 $3,160.00 $3,160.00 7 30% Plans and Estimate 4 12 22 38 $6,040.00 $6,040.00 SUB-TOTAL 4 16 64 84 $12,640.00 $12,640.00 phaSe 3 phaSe 3 8 60% PS&E 2 32 16 50 $8,400.00 $8,400.00 9 90% PS&E 2 4 8 14 $2,240.00 $2,240.00 10 100% PS&E 2 4 6 $920.00 $920.00 SUB-TOTAL 4 38 28 70 $11,560.00 $11,560.00 phaSe 4 phaSe 4 11 Bid Support 6 4 10 $1,640.00 $1,640.00 12 Construction Support 23 6 29 $4,980.00 $4,980.00 SUB-TOTAL 29 10 39 $6,620.00 $6,620.00 tOtaL hOuRS aND cOStS 13 104 142 259 $41,200.00 $41,200.00 OptIONaL OptIONaL 13 Utility Potholing (Per Day)8 8 16 $2,560.00 $9,775.00 $9,775.00 $12,335.00 14 Laser Scanning 4 5 9 $1,660.00 $1,660.00 15 Custom Ramp Details (Per Ramp)1 2 9 12 $1,820.00 $1,820.00 SubcONSuLtaNt cOSt Sub- cONS u Lta N t Sub-tOtaL cOSt NOORZ aY Lump Sum ceRteRRa Lump Sum Cost Proposal 300 S. Harbor Blvd. Suite 814 Anaheim, CA. 92805Onward Engineering | Design Smarter. Build Better.| Request For Proposal, for the City of Diamond Bar, for the FY 25/26 Civil Engineering Design Services, Project No. SI261 OSt pROpOSaL pROject 1c ONWaRD eNGINeeRING pROject eNGiNeeRS $140.00 h O u RLY Oe tOtaL hOuRS GRAND Oe Sub-tOtaL cOSt Q a /Q c maNaGeR $200.00 h O u RLY pROject maNaGeR $180.00 h O u RLY pa R t Y chIeF $220.00 h O u RLY chaIN/ ROD maN $180.00 h O u RLY phaSe 1 phaSe 1 1 Meetings 4 14 8 26 $4,440.00 $4,440.00 2 Data Research and Review 8 8 16 $2,560.00 $2,560.00 3 Utility Research and Notification 8 30 38 $5,640.00 $5,640.00 4 Geotechnical Investigation 8 8 16 $2,560.00 $33,465.00 $33,465.00 $36,025.00 SUB-TOTAL 4 38 54 96 $15,200.00 $33,465.00 $33,465.00 $48,665.00 phaSe 2 phaSe 2 5 Drone Mapping 2 8 24 34 $6,760.00 $6,760.00 6 Topographic Survey 8 24 192 192 416 $81,600.00 $81,600.00 7 Base Maps 8 316 324 $45,680.00 $45,680.00 8 Site Evaluation 8 42 50 $7,320.00 $7,320.00 9 30% Plans and Estimate 18 80 144 242 $38,160.00 $38,160.00 SUB-TOTAL 18 106 534 216 192 1066 $179,520.00 $179,520.00 phaSe 3 phaSe 3 10 60% PS&E 18 140 490 648 $97,400.00 $97,400.00 11 Traffic Control Plans 10 206 216 $30,640.00 $30,640.00 12 Caltrans Permit 4 32 42 78 $12,440.00 $12,440.00 13 90% PS&E 10 52 182 244 $36,840.00 $36,840.00 14 100% PS&E 24 88 112 $16,640.00 $16,640.00 SUB-TOTAL 32 258 1008 1298 $193,960.00 $193,960.00 phaSe 4 phaSe 4 15 Bid Support 6 4 10 $1,640.00 $1,640.00 16 Construction Support 23 6 29 $4,980.00 $4,980.00 SUB-TOTAL 29 10 39 $6,620.00 $6,620.00 tOtaL hOuRS aND cOStS 54 431 1606 216 192 2499 $395,300.00 $33,465.00 $33,465.00 $428,765.00 OptIONaL OptIONaL 17 Utility Potholing (Per Day)8 8 16 $2,560.00 $9,775.00 $9,775.00 $12,335.00 18 Custom Ramp Details (Per Ramp)1 2 9 12 $1,820.00 $1,820.00 SubcONSuLtaNt cOSt Sub- cONS u Lta N t Sub-tOtaL cOSt NOORZ aY Lump Sum ceRteRRa Lump Sum Cost Proposal 300 S. Harbor Blvd. Suite 814 Anaheim, CA. 92805Onward Engineering | Design Smarter. Build Better.| Request For Proposal, for the City of Diamond Bar, for the FY 25/26 Civil Engineering Design Services, Project No. SI261 OSt pROpOSaL pROject 2c ONWaRD eNGINeeRING pROject eNGiNeeRS $140.00 h O u RLY Oe tOtaL hOuRS GRAND Oe Sub-tOtaL cOSt Q a /Q c maNaGeR $200.00 h O u RLY pROject maNaGeR $180.00 h O u RLY pa R t Y chIeF $220.00 h O u RLY chaIN/ ROD maN $180.00 h O u RLY phaSe 1 phaSe 1 1 Meetings 5 9 6 20 $3,460.00 $3,460.00 2 Data Research and Review 4 4 8 $1,280.00 $1,280.00 3 Utility Research and Notification 8 30 38 $5,640.00 $5,640.00 SUB-TOTAL 5 21 40 66 $10,380.00 $10,380.00 phaSe 2 phaSe 2 4 Ramp Location Determination 2 12 14 $2,040.00 $2,040.00 5 Ramp Evaluation 10 10 $1,400.00 $1,400.00 6 Base Maps 2 20 22 $3,160.00 $3,160.00 7 30% Plans and Estimate 4 12 22 38 $6,040.00 $6,040.00 SUB-TOTAL 4 16 64 84 $12,640.00 $12,640.00 phaSe 3 phaSe 3 8 60% PS&E 2 32 16 50 $8,400.00 $8,400.00 9 90% PS&E 2 4 8 14 $2,240.00 $2,240.00 10 100% PS&E 2 4 6 $920.00 $920.00 SUB-TOTAL 4 38 28 70 $11,560.00 $11,560.00 phaSe 4 phaSe 4 11 Bid Support 6 4 10 $1,640.00 $1,640.00 12 Construction Support 23 6 29 $4,980.00 $4,980.00 SUB-TOTAL 29 10 39 $6,620.00 $6,620.00 tOtaL hOuRS aND cOStS 13 104 142 259 $41,200.00 $41,200.00 OptIONaL OptIONaL 13 Utility Potholing (Per Day)8 8 16 $2,560.00 $9,775.00 $9,775.00 $12,335.00 14 Laser Scanning 4 5 9 $1,660.00 $1,660.00 15 Custom Ramp Details (Per Ramp)1 2 9 12 $1,820.00 $1,820.00 SubcONSuLtaNt cOSt Sub- cONS u Lta N t Sub-tOtaL cOSt NOORZ aY Lump Sum ceRteRRa Lump Sum Cost Proposal 300 S. Harbor Blvd. Suite 814 Anaheim, CA. 92805Onward Engineering | Design Smarter. Build Better.| Request For Proposal, for the City of Diamond Bar, for the FY 25/26 Civil Engineering Design Services, Project No. SI261 OSt pROpOSaL pROject 3c ONWaRD eNGINeeRING pROject eNGiNeeRS $140.00 h O u RLY Oe tOtaL hOuRS GRAND Oe Sub-tOtaL cOSt Q a /Q c maNaGeR $200.00 h O u RLY pROject maNaGeR $180.00 h O u RLY pa R t Y chIeF $220.00 h O u RLY chaIN/ ROD maN $180.00 h O u RLY phaSe 1 phaSe 1 1 Meetings 4 14 8 26 $4,440.00 $4,440.00 2 Data Research and Review 8 8 16 $2,560.00 $2,560.00 3 Utility Research and Notification 8 30 38 $5,640.00 $5,640.00 4 Geotechnical Investigation 10 8 18 $2,920.00 $43,125.00 $43,125.00 $46,045.00 SUB-TOTAL 4 40 54 98 $15,560.00 $43,125.00 $43,125.00 $58,685.00 phaSe 2 phaSe 2 5 Drone Mapping 4 16 92 112 $23,200.00 $23,200.00 6 Base Maps 4 176 180 $25,360.00 $25,360.00 7 Site Evaluation 4 42 46 $6,600.00 $6,600.00 8 30% Plans and Estimate 10 36 108 154 $23,600.00 $23,600.00 SUB-TOTAL 10 48 342 92 492 $78,760.00 $78,760.00 phaSe 3 phaSe 3 9 60% PS&E 10 60 94 164 $25,960.00 $25,960.00 10 90% PS&E 6 24 54 84 $13,080.00 $13,080.00 11 100% PS&E 8 24 32 $4,800.00 $4,800.00 SUB-TOTAL 16 92 172 280 $43,840.00 $43,840.00 phaSe 4 phaSe 4 12 Bid Support 6 4 10 $1,640.00 $1,640.00 13 Construction Support 23 6 29 $4,980.00 $4,980.00 SUB-TOTAL 29 10 39 $6,620.00 $6,620.00 tOtaL hOuRS aND cOStS 30 209 578 92 909 $144,780.00 $43,125.00 $43,125.00 $187,905.00 OptIONaL OptIONaL 14 Utility Potholing (Per Day)8 8 16 $2,560.00 $9,775.00 $9,775.00 $12,335.00 15 Custom Ramp Details (Per Ramp)1 2 9 12 $1,820.00 $1,820.00 SubcONSuLtaNt cOSt Sub- cONS u Lta N t Sub-tOtaL cOSt NOORZ aY Lump Sum ceRteRRa Lump Sum Cost Proposal 300 S. Harbor Blvd. Suite 814 Anaheim, CA. 92805Onward Engineering | Design Smarter. Build Better.| Request For Proposal, for the City of Diamond Bar, for the FY 25/26 Civil Engineering Design Services, Project No. SI261 OSt pROpOSaL pROject 4c ONWaRD eNGINeeRING pROject eNGiNeeRS $140.00 h O u RLY Oe tOtaL hOuRS GRAND Oe Sub-tOtaL cOSt Q a /Q c maNaGeR $200.00 h O u RLY pROject maNaGeR $180.00 h O u RLY pa R t Y chIeF $220.00 h O u RLY chaIN/ ROD maN $180.00 h O u RLY phaSe 1 phaSe 1 1 Meetings 4 14 8 26 $4,440.00 $4,440.00 2 Data Research and Review 8 8 16 $2,560.00 $2,560.00 3 Utility Research and Notification 8 30 38 $5,640.00 $5,640.00 4 Geotechnical Investigation 8 8 16 $2,560.00 $15,870.00 $15,870.00 $18,430.00 SUB-TOTAL 4 38 54 96 $15,200.00 $15,870.00 $15,870.00 $31,070.00 phaSe 2 phaSe 2 5 Drone Mapping 1 2 6 9 $1,780.00 $1,780.00 6 Topographic Survey 2 4 72 72 150 $29,720.00 $29,720.00 7 Base Maps 8 208 216 $30,560.00 $30,560.00 8 Site Evaluation 4 22 26 $3,800.00 $3,800.00 9 30% Plans and Estimate 10 36 96 142 $21,920.00 $21,920.00 SUB-TOTAL 10 51 332 78 72 543 $87,780.00 $87,780.00 phaSe 3 phaSe 3 10 60% PS&E 10 112 256 378 $58,000.00 $58,000.00 11 Traffic Control Plans 10 106 116 $16,640.00 $16,640.00 12 Caltrans Permit 4 32 42 78 $12,440.00 $12,440.00 13 90% PS&E 10 36 102 148 $22,760.00 $22,760.00 14 100% PS&E 16 48 64 $9,600.00 $9,600.00 SUB-TOTAL 24 206 554 784 $119,440.00 $119,440.00 phaSe 4 phaSe 4 15 Bid Support 6 4 10 $1,640.00 $1,640.00 16 Construction Support 23 6 29 $4,980.00 $4,980.00 SUB-TOTAL 29 10 39 $6,620.00 $6,620.00 tOtaL hOuRS aND cOStS 38 324 950 78 72 1462 $229,040.00 $15,870.00 $15,870.00 $244,910.00 OptIONaL OptIONaL 17 Utility Potholing (Per Day)8 8 16 $2,560.00 $9,775.00 $9,775.00 $12,335.00 18 Custom Ramp Details (Per Ramp)1 2 9 12 $1,820.00 $1,820.00 SubcONSuLtaNt cOSt Sub- cONS u Lta N t Sub-tOtaL cOSt NOORZ aY Lump Sum ceRteRRa Lump Sum Cost Proposal 300 S. Harbor Blvd. Suite 814 Anaheim, CA. 92805Onward Engineering | Design Smarter. Build Better.| Request For Proposal, for the City of Diamond Bar, for the FY 25/26 Civil Engineering Design Services, Project No. SI261 OSt pROpOSaL pROject 5c ONWaRD eNGINeeRING pROject eNGiNeeRS $140.00 h O u RLY Oe tOtaL hOuRS GRAND Oe Sub-tOtaL cOSt Q a /Q c maNaGeR $200.00 h O u RLY pROject maNaGeR $180.00 h O u RLY pa R t Y chIeF $220.00 h O u RLY chaIN/ ROD maN $180.00 h O u RLY phaSe 1 phaSe 1 1 Meetings 5 9 6 20 $3,460.00 $3,460.00 2 Data Research and Review 4 4 8 $1,280.00 $1,280.00 3 Utility Research and Notification 8 30 38 $5,640.00 $5,640.00 SUB-TOTAL 5 21 40 66 $10,380.00 $10,380.00 phaSe 2 phaSe 2 4 Ramp Location Determination 2 12 14 $2,040.00 $2,040.00 5 Ramp Evaluation 10 10 $1,400.00 $1,400.00 6 Base Maps 2 20 22 $3,160.00 $3,160.00 7 30% Plans and Estimate 4 12 22 38 $6,040.00 $6,040.00 SUB-TOTAL 4 16 64 84 $12,640.00 $12,640.00 phaSe 3 phaSe 3 8 60% PS&E 2 32 16 50 $8,400.00 $8,400.00 9 90% PS&E 2 4 8 14 $2,240.00 $2,240.00 10 100% PS&E 2 4 6 $920.00 $920.00 SUB-TOTAL 4 38 28 70 $11,560.00 $11,560.00 phaSe 4 phaSe 4 11 Bid Support 6 4 10 $1,640.00 $1,640.00 12 Construction Support 23 6 29 $4,980.00 $4,980.00 SUB-TOTAL 29 10 39 $6,620.00 $6,620.00 tOtaL hOuRS aND cOStS 13 104 142 259 $41,200.00 $41,200.00 OptIONaL OptIONaL 13 Utility Potholing (Per Day)8 8 16 $2,560.00 $9,775.00 $9,775.00 $12,335.00 14 Laser Scanning 4 5 9 $1,660.00 $1,660.00 15 Custom Ramp Details (Per Ramp)1 2 9 12 $1,820.00 $1,820.00 SubcONSuLtaNt cOSt Sub- cONS u Lta N t Sub-tOtaL cOSt NOORZ aY Lump Sum ceRteRRa Lump Sum Cost Proposal 300 S. Harbor Blvd. Suite 814 Anaheim, CA. 92805Onward Engineering | Design Smarter. Build Better.| Request For Proposal, for the City of Diamond Bar, for the FY 25/26 Civil Engineering Design Services, Project No. SI261 OSt pROpOSaL pROject 6c ONWaRD eNGINeeRING pROject eNGiNeeRS $140.00 h O u RLY Oe tOtaL hOuRS GRAND Oe Sub-tOtaL cOSt Q a /Q c maNaGeR $200.00 h O u RLY pROject maNaGeR $180.00 h O u RLY pa R t Y chIeF $220.00 h O u RLY chaIN/ ROD maN $180.00 h O u RLY phaSe 1 phaSe 1 1 Meetings 4 14 8 26 $4,440.00 $4,440.00 2 Data Research and Review 8 8 16 $2,560.00 $2,560.00 3 Utility Research and Notification 8 30 38 $5,640.00 $5,640.00 4 Geotechnical Investigation 10 8 18 $2,920.00 $43,125.00 $43,125.00 $46,045.00 SUB-TOTAL 4 40 54 98 $15,560.00 $43,125.00 $43,125.00 $58,685.00 phaSe 2 phaSe 2 5 Drone Mapping 4 16 92 112 $23,200.00 $23,200.00 6 Base Maps 4 176 180 $25,360.00 $25,360.00 7 Site Evaluation 4 42 46 $6,600.00 $6,600.00 8 30% Plans and Estimate 10 36 108 154 $23,600.00 $23,600.00 SUB-TOTAL 10 48 342 92 492 $78,760.00 $78,760.00 phaSe 3 phaSe 3 9 60% PS&E 10 60 94 164 $25,960.00 $25,960.00 10 90% PS&E 6 24 54 84 $13,080.00 $13,080.00 11 100% PS&E 8 24 32 $4,800.00 $4,800.00 SUB-TOTAL 16 92 172 280 $43,840.00 $43,840.00 phaSe 4 phaSe 4 12 Bid Support 6 4 10 $1,640.00 $1,640.00 13 Construction Support 23 6 29 $4,980.00 $4,980.00 SUB-TOTAL 29 10 39 $6,620.00 $6,620.00 tOtaL hOuRS aND cOStS 30 209 578 92 909 $144,780.00 $43,125.00 $43,125.00 $187,905.00 OptIONaL OptIONaL 14 Utility Potholing (Per Day)8 8 16 $2,560.00 $9,775.00 $9,775.00 $12,335.00 15 Custom Ramp Details (Per Ramp)1 2 9 12 $1,820.00 $1,820.00 SubcONSuLtaNt cOSt Sub- cONS u Lta N t Sub-tOtaL cOSt NOORZ aY Lump Sum ceRteRRa Lump Sum Cost Proposal 300 S. Harbor Blvd. Suite 814 Anaheim, CA. 92805Onward Engineering | Design Smarter. Build Better.| Request For Proposal, for the City of Diamond Bar, for the FY 25/26 Civil Engineering Design Services, Project No. SI261 OSt pROpOSaL pROject 7c ONWaRD eNGINeeRING pROject eNGiNeeRS $140.00 h O u RLY Oe tOtaL hOuRS GRAND Oe Sub-tOtaL cOSt Q a /Q c maNaGeR $200.00 h O u RLY pROject maNaGeR $180.00 h O u RLY pa R t Y chIeF $220.00 h O u RLY chaIN/ ROD maN $180.00 h O u RLY phaSe 1 phaSe 1 1 Meetings 4 14 8 26 $4,440.00 $4,440.00 2 Data Research and Review 8 8 16 $2,560.00 $2,560.00 3 Utility Research and Notification 8 30 38 $5,640.00 $5,640.00 4 Geotechnical Investigation 8 8 16 $2,560.00 $17,135.00 $17,135.00 $19,695.00 SUB-TOTAL 4 38 54 96 $15,200.00 $17,135.00 $17,135.00 $32,335.00 phaSe 2 phaSe 2 5 Drone Mapping 1 2 8 11 $2,220.00 $2,220.00 6 Topographic Survey 8 80 80 168 $33,120.00 $33,120.00 7 Base Maps 8 248 256 $36,160.00 $36,160.00 8 Site Evaluation 4 22 26 $3,800.00 $3,800.00 9 30% Plans and Estimate 10 36 114 160 $24,440.00 $24,440.00 SUB-TOTAL 10 49 394 88 80 621 $99,740.00 $99,740.00 phaSe 3 phaSe 3 10 60% PS&E 10 112 296 418 $63,600.00 $63,600.00 11 90% PS&E 10 36 110 156 $23,880.00 $23,880.00 12 100% PS&E 16 56 72 $10,720.00 $10,720.00 SUB-TOTAL 20 164 462 646 $98,200.00 $98,200.00 phaSe 4 phaSe 4 13 Bid Support 6 4 10 $1,640.00 $1,640.00 14 Construction Support 23 6 29 $4,980.00 $4,980.00 SUB-TOTAL 29 10 39 $6,620.00 $6,620.00 tOtaL hOuRS aND cOStS 34 280 920 88 80 1402 $219,760.00 $17,135.00 $17,135.00 $236,895.00 OptIONaL OptIONaL 15 Utility Potholing (Per Day)8 8 16 $2,560.00 $9,775.00 $9,775.00 $12,335.00 16 Custom Ramp Details (Per Ramp)1 2 9 12 $1,820.00 $1,820.00 SubcONSuLtaNt cOSt Sub- cONS u Lta N t Sub-tOtaL cOSt NOORZ aY Lump Sum ceRteRRa Lump Sum Cost Proposal 300 S. Harbor Blvd. Suite 814 Anaheim, CA. 92805Onward Engineering | Design Smarter. Build Better.| Request For Proposal, for the City of Diamond Bar, for the FY 25/26 Civil Engineering Design Services, Project No. SI261 OSt pROpOSaL pROject 8c ONWaRD eNGINeeRING pROject eNGiNeeRS $140.00 h O u RLY Oe tOtaL hOuRS GRAND Oe Sub-tOtaL cOSt Q a /Q c maNaGeR $200.00 h O u RLY pROject maNaGeR $180.00 h O u RLY pa R t Y chIeF $220.00 h O u RLY chaIN/ ROD maN $180.00 h O u RLY phaSe 1 phaSe 1 1 Meetings 4 14 8 26 $4,440.00 $4,440.00 2 Data Research and Review 8 8 16 $2,560.00 $2,560.00 3 Utility Research and Notification 8 30 38 $5,640.00 $5,640.00 4 Geotechnical Investigation 8 8 16 $2,560.00 $10,235.00 $10,235.00 $12,795.00 SUB-TOTAL 4 38 54 96 $15,200.00 $10,235.00 $10,235.00 $25,435.00 phaSe 2 phaSe 2 5 Drone Mapping 1 2 4 7 $1,340.00 $1,340.00 6 Topographic Survey 2 4 26 26 58 $11,320.00 $11,320.00 7 Base Maps 4 84 88 $12,480.00 $12,480.00 8 Site Evaluation 4 14 18 $2,680.00 $2,680.00 9 30% Plans and Estimate 6 24 44 74 $11,680.00 $11,680.00 SUB-TOTAL 6 35 148 30 26 245 $39,500.00 $39,500.00 phaSe 3 phaSe 3 10 60% PS&E 10 84 132 226 $35,600.00 $35,600.00 11 Traffic Control Plans 10 106 116 $16,640.00 $16,640.00 12 Caltrans Permit 4 32 42 78 $12,440.00 $12,440.00 13 90% PS&E 6 24 76 106 $16,160.00 $16,160.00 14 100% PS&E 8 40 48 $7,040.00 $7,040.00 SUB-TOTAL 20 158 396 574 $87,880.00 $87,880.00 phaSe 4 phaSe 4 15 Bid Support 6 4 10 $1,640.00 $1,640.00 16 Construction Support 23 6 29 $4,980.00 $4,980.00 SUB-TOTAL 29 10 39 $6,620.00 $6,620.00 tOtaL hOuRS aND cOStS 30 260 608 30 26 954 $149,200.00 $10,235.00 $10,235.00 $159,435.00 OptIONaL OptIONaL 17 Utility Potholing (Per Day)8 8 16 $2,560.00 $9,775.00 $9,775.00 $12,335.00 18 Custom Ramp Details (Per Ramp)1 2 9 12 $1,820.00 $1,820.00 SubcONSuLtaNt cOSt Sub- cONS u Lta N t Sub-tOtaL cOSt NOORZ aY Lump Sum ceRteRRa Lump Sum Cost Proposal 300 S. Harbor Blvd. Suite 814 Anaheim, CA. 92805Onward Engineering | Design Smarter. Build Better.| Request For Proposal, for the City of Diamond Bar, for the FY 25/26 Civil Engineering Design Services, Project No. SI261 OSt pROpOSaL pROject 9c ONWaRD eNGINeeRING pROject eNGiNeeRS $140.00 h O u RLY Oe tOtaL hOuRS GRAND Oe Sub-tOtaL cOSt Q a /Q c maNaGeR $200.00 h O u RLY pROject maNaGeR $180.00 h O u RLY pa R t Y chIeF $220.00 h O u RLY chaIN/ ROD maN $180.00 h O u RLY phaSe 1 phaSe 1 1 Meetings 4 14 8 26 $4,440.00 $4,440.00 2 Data Research and Review 8 8 16 $2,560.00 $2,560.00 3 Utility Research and Notification 8 30 38 $5,640.00 $5,640.00 4 Geotechnical Investigation 8 8 16 $2,560.00 $19,780.00 $19,780.00 $22,340.00 SUB-TOTAL 4 38 54 96 $15,200.00 $19,780.00 $19,780.00 $34,980.00 phaSe 2 phaSe 2 5 Drone Mapping 2 4 16 22 $4,440.00 $4,440.00 6 Topographic Survey 4 16 106 106 232 $45,360.00 $45,360.00 7 Base Maps 8 308 316 $44,560.00 $44,560.00 8 Site Evaluation 4 30 34 $4,920.00 $4,920.00 9 30% Plans and Estimate 14 56 150 220 $33,880.00 $33,880.00 SUB-TOTAL 14 74 508 122 106 824 $133,160.00 $133,160.00 phaSe 3 phaSe 3 10 60% PS&E 14 136 362 512 $77,960.00 $77,960.00 11 90% PS&E 10 44 142 196 $29,800.00 $29,800.00 12 100% PS&E 16 68 84 $12,400.00 $12,400.00 SUB-TOTAL 24 196 572 792 $120,160.00 $120,160.00 phaSe 4 phaSe 4 13 Bid Support 6 4 10 $1,640.00 $1,640.00 14 Construction Support 23 6 29 $4,980.00 $4,980.00 SUB-TOTAL 29 10 39 $6,620.00 $6,620.00 tOtaL hOuRS aND cOStS 42 337 1144 122 106 1751 $275,140.00 $19,780.00 $19,780.00 $294,920.00 OptIONaL OptIONaL 15 Utility Potholing (Per Day)8 8 16 $2,560.00 $9,775.00 $9,775.00 $12,335.00 16 Custom Ramp Details (Per Ramp)1 2 9 12 $1,820.00 $1,820.00 SubcONSuLtaNt cOSt Sub- cONS u Lta N t Sub-tOtaL cOSt NOORZ aY Lump Sum ceRteRRa Lump Sum Cost Proposal 300 S. Harbor Blvd. Suite 814 Anaheim, CA. 92805Onward Engineering | Design Smarter. Build Better.| Request For Proposal, for the City of Diamond Bar, for the FY 25/26 Civil Engineering Design Services, Project No. SI261 OSt pROpOSaL pROject 10c