Loading...
HomeMy WebLinkAboutCost Proposal Onward Engineering ProposalProject Description Design Fee Project 1 ADA Curb Ramp Improvement Project (Area 6) Project 2 Arterial Street Rehabilitation: ● Brea Canyon Rd: Diamond Bar Blvd. to Pathfinder Rd. ● Brea Canyon Rd: Pathfinder Rd. to Washington Ave. ● Diamond Bar Blvd: SR-60 Off-Ramp to City Limit Project 3 ADA Curb Ramp Improvement Project (Area 7) Project 4 Residential & Collector Streets Rehabilitation (Area 5) Project 5 Arterial Street Rehabilitation: ● Pathfinder Rd: Diamond Bar Blvd. to City Limits. Total Amount Base Bid Items Optional Items Project 6 ADA Curb Ramp Improvement Project (Area 1) Project 7 Residential & Collector Streets Rehabilitation (Area 6) Project 8 Arterial Street Rehabilitation: ● Grand Ave: Diamond Bar Blvd. to Lavender Dr. ● Diamond Bar Blvd: Clear Creek Canyon Dr. to Golden Springs Dr. Project 9 Arterial Street Rehabilitation: ● Temple Ave/Avenida Rancheros: Diamond Bar Blvd. to City Limits $ Base Fee Schedule (Revised) Project 10 Arterial Street Rehabilitation: ● Diamond Bar Blvd.: Pathfinder Rd. to South of Fallow Field Dr. ● Brea Canyon Road: Diamond Bar Blvd. to city limits. Total Amount Optional Items $ ONWaRD eNGINeeRING pROject eNGiNeeRS $140.00 h O u RLY Oe tOtaL hOuRS GRAND GRAND Oe Sub-tOtaL cOSt Q a /Q c maNaGeR $200.00 h O u RLY pROject maNaGeR $180.00 h O u RLY pa R t Y chIeF $220.00 h O u RLY chaIN/ ROD maN $180.00 h O u RLY phaSe 1 phaSe 1 1 Meetings 5 9 6 20 $3,460.00 $3,460.00 2 Data Research and Review 4 4 8 $1,280.00 $1,280.00 3 Utility Research and Notification 8 30 38 $5,640.00 $5,640.00 SUB-TOTAL 5 21 40 66 $10,380.00 $10,380.00 phaSe 2 phaSe 2 4 Ramp Location Determination 2 12 14 $2,040.00 $2,040.00 5 Ramp Evaluation 10 10 $1,400.00 $1,400.00 6 Base Maps 2 20 22 $3,160.00 $3,160.00 7 30% Plans and Estimate 4 12 22 38 $6,040.00 $6,040.00 SUB-TOTAL 4 16 64 84 $12,640.00 $12,640.00 phaSe 3 phaSe 3 8 60% PS&E 2 32 16 50 $8,400.00 $8,400.00 9 90% PS&E 2 4 8 14 $2,240.00 $2,240.00 10 100% PS&E 2 4 6 $920.00 $920.00 SUB-TOTAL 4 38 28 70 $11,560.00 $11,560.00 phaSe 4 phaSe 4 11 Bid Support 6 4 10 $1,640.00 $1,640.00 12 Construction Support 23 6 29 $4,980.00 $4,980.00 SUB-TOTAL 29 10 39 $6,620.00 $6,620.00 tOtaL hOuRS aND cOStS 13 104 142 259 $41,200.00 $41,200.00 OptIONaL OptIONaL 13 Utility Potholing (Per Day)8 8 16 $2,560.00 $9,775.00 $9,775.00 $12,335.00 14 Laser Scanning 4 5 9 $1,660.00 $1,660.00 15 Custom Ramp Details (Per Ramp)1 2 9 12 $1,820.00 $1,820.00 SubcONSuLtaNt cOSt Sub- cONS u Lta N t Sub-tOtaL cOSt NOORZ aY Lump Sum ceRteRRa Lump Sum Cost Proposal 300 S. Harbor Blvd. Suite 814 Anaheim, CA. 92805Onward Engineering | Design Smarter. Build Better.| Request For Proposal, for the City of Diamond Bar, for the FY 25/26 Civil Engineering Design Services, Project No. SI261 OSt pROpOSaL pROject 1c ONWaRD eNGINeeRING pROject eNGiNeeRS $140.00 h O u RLY Oe tOtaL hOuRS GRAND Oe Sub-tOtaL cOSt Q a /Q c maNaGeR $200.00 h O u RLY pROject maNaGeR $180.00 h O u RLY pa R t Y chIeF $220.00 h O u RLY chaIN/ ROD maN $180.00 h O u RLY phaSe 1 phaSe 1 1 Meetings 4 14 8 26 $4,440.00 $4,440.00 2 Data Research and Review 8 8 16 $2,560.00 $2,560.00 3 Utility Research and Notification 8 30 38 $5,640.00 $5,640.00 4 Geotechnical Investigation 8 8 16 $2,560.00 $33,465.00 $33,465.00 $36,025.00 SUB-TOTAL 4 38 54 96 $15,200.00 $33,465.00 $33,465.00 $48,665.00 phaSe 2 phaSe 2 5 Drone Mapping 2 8 24 34 $6,760.00 $6,760.00 6 Topographic Survey 8 24 192 192 416 $81,600.00 $81,600.00 7 Base Maps 8 316 324 $45,680.00 $45,680.00 8 Site Evaluation 8 42 50 $7,320.00 $7,320.00 9 30% Plans and Estimate 18 80 144 242 $38,160.00 $38,160.00 SUB-TOTAL 18 106 534 216 192 1066 $179,520.00 $179,520.00 phaSe 3 phaSe 3 10 60% PS&E 18 140 490 648 $97,400.00 $97,400.00 11 Traffic Control Plans 10 206 216 $30,640.00 $30,640.00 12 Caltrans Permit 4 32 42 78 $12,440.00 $12,440.00 13 90% PS&E 10 52 182 244 $36,840.00 $36,840.00 14 100% PS&E 24 88 112 $16,640.00 $16,640.00 SUB-TOTAL 32 258 1008 1298 $193,960.00 $193,960.00 phaSe 4 phaSe 4 15 Bid Support 6 4 10 $1,640.00 $1,640.00 16 Construction Support 23 6 29 $4,980.00 $4,980.00 SUB-TOTAL 29 10 39 $6,620.00 $6,620.00 tOtaL hOuRS aND cOStS 54 431 1606 216 192 2499 $395,300.00 $33,465.00 $33,465.00 $428,765.00 OptIONaL OptIONaL 17 Utility Potholing (Per Day)8 8 16 $2,560.00 $9,775.00 $9,775.00 $12,335.00 18 Custom Ramp Details (Per Ramp)1 2 9 12 $1,820.00 $1,820.00 SubcONSuLtaNt cOSt Sub- cONS u Lta N t Sub-tOtaL cOSt NOORZ aY Lump Sum ceRteRRa Lump Sum Cost Proposal 300 S. Harbor Blvd. Suite 814 Anaheim, CA. 92805Onward Engineering | Design Smarter. Build Better.| Request For Proposal, for the City of Diamond Bar, for the FY 25/26 Civil Engineering Design Services, Project No. SI261 OSt pROpOSaL pROject 2c ONWaRD eNGINeeRING pROject eNGiNeeRS $140.00 h O u RLY Oe tOtaL hOuRS GRAND Oe Sub-tOtaL cOSt Q a /Q c maNaGeR $200.00 h O u RLY pROject maNaGeR $180.00 h O u RLY pa R t Y chIeF $220.00 h O u RLY chaIN/ ROD maN $180.00 h O u RLY phaSe 1 phaSe 1 1 Meetings 5 9 6 20 $3,460.00 $3,460.00 2 Data Research and Review 4 4 8 $1,280.00 $1,280.00 3 Utility Research and Notification 8 30 38 $5,640.00 $5,640.00 SUB-TOTAL 5 21 40 66 $10,380.00 $10,380.00 phaSe 2 phaSe 2 4 Ramp Location Determination 2 12 14 $2,040.00 $2,040.00 5 Ramp Evaluation 10 10 $1,400.00 $1,400.00 6 Base Maps 2 20 22 $3,160.00 $3,160.00 7 30% Plans and Estimate 4 12 22 38 $6,040.00 $6,040.00 SUB-TOTAL 4 16 64 84 $12,640.00 $12,640.00 phaSe 3 phaSe 3 8 60% PS&E 2 32 16 50 $8,400.00 $8,400.00 9 90% PS&E 2 4 8 14 $2,240.00 $2,240.00 10 100% PS&E 2 4 6 $920.00 $920.00 SUB-TOTAL 4 38 28 70 $11,560.00 $11,560.00 phaSe 4 phaSe 4 11 Bid Support 6 4 10 $1,640.00 $1,640.00 12 Construction Support 23 6 29 $4,980.00 $4,980.00 SUB-TOTAL 29 10 39 $6,620.00 $6,620.00 tOtaL hOuRS aND cOStS 13 104 142 259 $41,200.00 $41,200.00 OptIONaL OptIONaL 13 Utility Potholing (Per Day)8 8 16 $2,560.00 $9,775.00 $9,775.00 $12,335.00 14 Laser Scanning 4 5 9 $1,660.00 $1,660.00 15 Custom Ramp Details (Per Ramp)1 2 9 12 $1,820.00 $1,820.00 SubcONSuLtaNt cOSt Sub- cONS u Lta N t Sub-tOtaL cOSt NOORZ aY Lump Sum ceRteRRa Lump Sum Cost Proposal 300 S. Harbor Blvd. Suite 814 Anaheim, CA. 92805Onward Engineering | Design Smarter. Build Better.| Request For Proposal, for the City of Diamond Bar, for the FY 25/26 Civil Engineering Design Services, Project No. SI261 OSt pROpOSaL pROject 3c ONWaRD eNGINeeRING pROject eNGiNeeRS $140.00 h O u RLY Oe tOtaL hOuRS GRAND Oe Sub-tOtaL cOSt Q a /Q c maNaGeR $200.00 h O u RLY pROject maNaGeR $180.00 h O u RLY pa R t Y chIeF $220.00 h O u RLY chaIN/ ROD maN $180.00 h O u RLY phaSe 1 phaSe 1 1 Meetings 4 14 8 26 $4,440.00 $4,440.00 2 Data Research and Review 8 8 16 $2,560.00 $2,560.00 3 Utility Research and Notification 8 30 38 $5,640.00 $5,640.00 4 Geotechnical Investigation 10 8 18 $2,920.00 $43,125.00 $43,125.00 $46,045.00 SUB-TOTAL 4 40 54 98 $15,560.00 $43,125.00 $43,125.00 $58,685.00 phaSe 2 phaSe 2 5 Drone Mapping 4 16 92 112 $23,200.00 $23,200.00 6 Base Maps 4 176 180 $25,360.00 $25,360.00 7 Site Evaluation 4 42 46 $6,600.00 $6,600.00 8 30% Plans and Estimate 10 36 108 154 $23,600.00 $23,600.00 SUB-TOTAL 10 48 342 92 492 $78,760.00 $78,760.00 phaSe 3 phaSe 3 9 60% PS&E 10 60 94 164 $25,960.00 $25,960.00 10 90% PS&E 6 24 54 84 $13,080.00 $13,080.00 11 100% PS&E 8 24 32 $4,800.00 $4,800.00 SUB-TOTAL 16 92 172 280 $43,840.00 $43,840.00 phaSe 4 phaSe 4 12 Bid Support 6 4 10 $1,640.00 $1,640.00 13 Construction Support 23 6 29 $4,980.00 $4,980.00 SUB-TOTAL 29 10 39 $6,620.00 $6,620.00 tOtaL hOuRS aND cOStS 30 209 578 92 909 $144,780.00 $43,125.00 $43,125.00 $187,905.00 OptIONaL OptIONaL 14 Utility Potholing (Per Day)8 8 16 $2,560.00 $9,775.00 $9,775.00 $12,335.00 15 Custom Ramp Details (Per Ramp)1 2 9 12 $1,820.00 $1,820.00 SubcONSuLtaNt cOSt Sub- cONS u Lta N t Sub-tOtaL cOSt NOORZ aY Lump Sum ceRteRRa Lump Sum Cost Proposal 300 S. Harbor Blvd. Suite 814 Anaheim, CA. 92805Onward Engineering | Design Smarter. Build Better.| Request For Proposal, for the City of Diamond Bar, for the FY 25/26 Civil Engineering Design Services, Project No. SI261 OSt pROpOSaL pROject 4c ONWaRD eNGINeeRING pROject eNGiNeeRS $140.00 h O u RLY Oe tOtaL hOuRS GRAND Oe Sub-tOtaL cOSt Q a /Q c maNaGeR $200.00 h O u RLY pROject maNaGeR $180.00 h O u RLY pa R t Y chIeF $220.00 h O u RLY chaIN/ ROD maN $180.00 h O u RLY phaSe 1 phaSe 1 1 Meetings 4 14 8 26 $4,440.00 $4,440.00 2 Data Research and Review 8 8 16 $2,560.00 $2,560.00 3 Utility Research and Notification 8 30 38 $5,640.00 $5,640.00 4 Geotechnical Investigation 8 8 16 $2,560.00 $15,870.00 $15,870.00 $18,430.00 SUB-TOTAL 4 38 54 96 $15,200.00 $15,870.00 $15,870.00 $31,070.00 phaSe 2 phaSe 2 5 Drone Mapping 1 2 6 9 $1,780.00 $1,780.00 6 Topographic Survey 2 4 72 72 150 $29,720.00 $29,720.00 7 Base Maps 8 208 216 $30,560.00 $30,560.00 8 Site Evaluation 4 22 26 $3,800.00 $3,800.00 9 30% Plans and Estimate 10 36 96 142 $21,920.00 $21,920.00 SUB-TOTAL 10 51 332 78 72 543 $87,780.00 $87,780.00 phaSe 3 phaSe 3 10 60% PS&E 10 112 256 378 $58,000.00 $58,000.00 11 Traffic Control Plans 10 106 116 $16,640.00 $16,640.00 12 Caltrans Permit 4 32 42 78 $12,440.00 $12,440.00 13 90% PS&E 10 36 102 148 $22,760.00 $22,760.00 14 100% PS&E 16 48 64 $9,600.00 $9,600.00 SUB-TOTAL 24 206 554 784 $119,440.00 $119,440.00 phaSe 4 phaSe 4 15 Bid Support 6 4 10 $1,640.00 $1,640.00 16 Construction Support 23 6 29 $4,980.00 $4,980.00 SUB-TOTAL 29 10 39 $6,620.00 $6,620.00 tOtaL hOuRS aND cOStS 38 324 950 78 72 1462 $229,040.00 $15,870.00 $15,870.00 $244,910.00 OptIONaL OptIONaL 17 Utility Potholing (Per Day)8 8 16 $2,560.00 $9,775.00 $9,775.00 $12,335.00 18 Custom Ramp Details (Per Ramp)1 2 9 12 $1,820.00 $1,820.00 SubcONSuLtaNt cOSt Sub- cONS u Lta N t Sub-tOtaL cOSt NOORZ aY Lump Sum ceRteRRa Lump Sum Cost Proposal 300 S. Harbor Blvd. Suite 814 Anaheim, CA. 92805Onward Engineering | Design Smarter. Build Better.| Request For Proposal, for the City of Diamond Bar, for the FY 25/26 Civil Engineering Design Services, Project No. SI261 OSt pROpOSaL pROject 5c ONWaRD eNGINeeRING pROject eNGiNeeRS $140.00 h O u RLY Oe tOtaL hOuRS GRAND Oe Sub-tOtaL cOSt Q a /Q c maNaGeR $200.00 h O u RLY pROject maNaGeR $180.00 h O u RLY pa R t Y chIeF $220.00 h O u RLY chaIN/ ROD maN $180.00 h O u RLY phaSe 1 phaSe 1 1 Meetings 5 9 6 20 $3,460.00 $3,460.00 2 Data Research and Review 4 4 8 $1,280.00 $1,280.00 3 Utility Research and Notification 8 30 38 $5,640.00 $5,640.00 SUB-TOTAL 5 21 40 66 $10,380.00 $10,380.00 phaSe 2 phaSe 2 4 Ramp Location Determination 2 12 14 $2,040.00 $2,040.00 5 Ramp Evaluation 10 10 $1,400.00 $1,400.00 6 Base Maps 2 20 22 $3,160.00 $3,160.00 7 30% Plans and Estimate 4 12 22 38 $6,040.00 $6,040.00 SUB-TOTAL 4 16 64 84 $12,640.00 $12,640.00 phaSe 3 phaSe 3 8 60% PS&E 2 32 16 50 $8,400.00 $8,400.00 9 90% PS&E 2 4 8 14 $2,240.00 $2,240.00 10 100% PS&E 2 4 6 $920.00 $920.00 SUB-TOTAL 4 38 28 70 $11,560.00 $11,560.00 phaSe 4 phaSe 4 11 Bid Support 6 4 10 $1,640.00 $1,640.00 12 Construction Support 23 6 29 $4,980.00 $4,980.00 SUB-TOTAL 29 10 39 $6,620.00 $6,620.00 tOtaL hOuRS aND cOStS 13 104 142 259 $41,200.00 $41,200.00 OptIONaL OptIONaL 13 Utility Potholing (Per Day)8 8 16 $2,560.00 $9,775.00 $9,775.00 $12,335.00 14 Laser Scanning 4 5 9 $1,660.00 $1,660.00 15 Custom Ramp Details (Per Ramp)1 2 9 12 $1,820.00 $1,820.00 SubcONSuLtaNt cOSt Sub- cONS u Lta N t Sub-tOtaL cOSt NOORZ aY Lump Sum ceRteRRa Lump Sum Cost Proposal 300 S. Harbor Blvd. Suite 814 Anaheim, CA. 92805Onward Engineering | Design Smarter. Build Better.| Request For Proposal, for the City of Diamond Bar, for the FY 25/26 Civil Engineering Design Services, Project No. SI261 OSt pROpOSaL pROject 6c ONWaRD eNGINeeRING pROject eNGiNeeRS $140.00 h O u RLY Oe tOtaL hOuRS GRAND Oe Sub-tOtaL cOSt Q a /Q c maNaGeR $200.00 h O u RLY pROject maNaGeR $180.00 h O u RLY pa R t Y chIeF $220.00 h O u RLY chaIN/ ROD maN $180.00 h O u RLY phaSe 1 phaSe 1 1 Meetings 4 14 8 26 $4,440.00 $4,440.00 2 Data Research and Review 8 8 16 $2,560.00 $2,560.00 3 Utility Research and Notification 8 30 38 $5,640.00 $5,640.00 4 Geotechnical Investigation 10 8 18 $2,920.00 $43,125.00 $43,125.00 $46,045.00 SUB-TOTAL 4 40 54 98 $15,560.00 $43,125.00 $43,125.00 $58,685.00 phaSe 2 phaSe 2 5 Drone Mapping 4 16 92 112 $23,200.00 $23,200.00 6 Base Maps 4 176 180 $25,360.00 $25,360.00 7 Site Evaluation 4 42 46 $6,600.00 $6,600.00 8 30% Plans and Estimate 10 36 108 154 $23,600.00 $23,600.00 SUB-TOTAL 10 48 342 92 492 $78,760.00 $78,760.00 phaSe 3 phaSe 3 9 60% PS&E 10 60 94 164 $25,960.00 $25,960.00 10 90% PS&E 6 24 54 84 $13,080.00 $13,080.00 11 100% PS&E 8 24 32 $4,800.00 $4,800.00 SUB-TOTAL 16 92 172 280 $43,840.00 $43,840.00 phaSe 4 phaSe 4 12 Bid Support 6 4 10 $1,640.00 $1,640.00 13 Construction Support 23 6 29 $4,980.00 $4,980.00 SUB-TOTAL 29 10 39 $6,620.00 $6,620.00 tOtaL hOuRS aND cOStS 30 209 578 92 909 $144,780.00 $43,125.00 $43,125.00 $187,905.00 OptIONaL OptIONaL 14 Utility Potholing (Per Day)8 8 16 $2,560.00 $9,775.00 $9,775.00 $12,335.00 15 Custom Ramp Details (Per Ramp)1 2 9 12 $1,820.00 $1,820.00 SubcONSuLtaNt cOSt Sub- cONS u Lta N t Sub-tOtaL cOSt NOORZ aY Lump Sum ceRteRRa Lump Sum Cost Proposal 300 S. Harbor Blvd. Suite 814 Anaheim, CA. 92805Onward Engineering | Design Smarter. Build Better.| Request For Proposal, for the City of Diamond Bar, for the FY 25/26 Civil Engineering Design Services, Project No. SI261 OSt pROpOSaL pROject 7c ONWaRD eNGINeeRING pROject eNGiNeeRS $140.00 h O u RLY Oe tOtaL hOuRS GRAND Oe Sub-tOtaL cOSt Q a /Q c maNaGeR $200.00 h O u RLY pROject maNaGeR $180.00 h O u RLY pa R t Y chIeF $220.00 h O u RLY chaIN/ ROD maN $180.00 h O u RLY phaSe 1 phaSe 1 1 Meetings 4 14 8 26 $4,440.00 $4,440.00 2 Data Research and Review 8 8 16 $2,560.00 $2,560.00 3 Utility Research and Notification 8 30 38 $5,640.00 $5,640.00 4 Geotechnical Investigation 8 8 16 $2,560.00 $17,135.00 $17,135.00 $19,695.00 SUB-TOTAL 4 38 54 96 $15,200.00 $17,135.00 $17,135.00 $32,335.00 phaSe 2 phaSe 2 5 Drone Mapping 1 2 8 11 $2,220.00 $2,220.00 6 Topographic Survey 8 80 80 168 $33,120.00 $33,120.00 7 Base Maps 8 248 256 $36,160.00 $36,160.00 8 Site Evaluation 4 22 26 $3,800.00 $3,800.00 9 30% Plans and Estimate 10 36 114 160 $24,440.00 $24,440.00 SUB-TOTAL 10 49 394 88 80 621 $99,740.00 $99,740.00 phaSe 3 phaSe 3 10 60% PS&E 10 112 296 418 $63,600.00 $63,600.00 11 90% PS&E 10 36 110 156 $23,880.00 $23,880.00 12 100% PS&E 16 56 72 $10,720.00 $10,720.00 SUB-TOTAL 20 164 462 646 $98,200.00 $98,200.00 phaSe 4 phaSe 4 13 Bid Support 6 4 10 $1,640.00 $1,640.00 14 Construction Support 23 6 29 $4,980.00 $4,980.00 SUB-TOTAL 29 10 39 $6,620.00 $6,620.00 tOtaL hOuRS aND cOStS 34 280 920 88 80 1402 $219,760.00 $17,135.00 $17,135.00 $236,895.00 OptIONaL OptIONaL 15 Utility Potholing (Per Day)8 8 16 $2,560.00 $9,775.00 $9,775.00 $12,335.00 16 Custom Ramp Details (Per Ramp)1 2 9 12 $1,820.00 $1,820.00 SubcONSuLtaNt cOSt Sub- cONS u Lta N t Sub-tOtaL cOSt NOORZ aY Lump Sum ceRteRRa Lump Sum Cost Proposal 300 S. Harbor Blvd. Suite 814 Anaheim, CA. 92805Onward Engineering | Design Smarter. Build Better.| Request For Proposal, for the City of Diamond Bar, for the FY 25/26 Civil Engineering Design Services, Project No. SI261 OSt pROpOSaL pROject 8c ONWaRD eNGINeeRING pROject eNGiNeeRS $140.00 h O u RLY Oe tOtaL hOuRS GRAND Oe Sub-tOtaL cOSt Q a /Q c maNaGeR $200.00 h O u RLY pROject maNaGeR $180.00 h O u RLY pa R t Y chIeF $220.00 h O u RLY chaIN/ ROD maN $180.00 h O u RLY phaSe 1 phaSe 1 1 Meetings 4 14 8 26 $4,440.00 $4,440.00 2 Data Research and Review 8 8 16 $2,560.00 $2,560.00 3 Utility Research and Notification 8 30 38 $5,640.00 $5,640.00 4 Geotechnical Investigation 8 8 16 $2,560.00 $10,235.00 $10,235.00 $12,795.00 SUB-TOTAL 4 38 54 96 $15,200.00 $10,235.00 $10,235.00 $25,435.00 phaSe 2 phaSe 2 5 Drone Mapping 1 2 4 7 $1,340.00 $1,340.00 6 Topographic Survey 2 4 26 26 58 $11,320.00 $11,320.00 7 Base Maps 4 84 88 $12,480.00 $12,480.00 8 Site Evaluation 4 14 18 $2,680.00 $2,680.00 9 30% Plans and Estimate 6 24 44 74 $11,680.00 $11,680.00 SUB-TOTAL 6 35 148 30 26 245 $39,500.00 $39,500.00 phaSe 3 phaSe 3 10 60% PS&E 10 84 132 226 $35,600.00 $35,600.00 11 Traffic Control Plans 10 106 116 $16,640.00 $16,640.00 12 Caltrans Permit 4 32 42 78 $12,440.00 $12,440.00 13 90% PS&E 6 24 76 106 $16,160.00 $16,160.00 14 100% PS&E 8 40 48 $7,040.00 $7,040.00 SUB-TOTAL 20 158 396 574 $87,880.00 $87,880.00 phaSe 4 phaSe 4 15 Bid Support 6 4 10 $1,640.00 $1,640.00 16 Construction Support 23 6 29 $4,980.00 $4,980.00 SUB-TOTAL 29 10 39 $6,620.00 $6,620.00 tOtaL hOuRS aND cOStS 30 260 608 30 26 954 $149,200.00 $10,235.00 $10,235.00 $159,435.00 OptIONaL OptIONaL 17 Utility Potholing (Per Day)8 8 16 $2,560.00 $9,775.00 $9,775.00 $12,335.00 18 Custom Ramp Details (Per Ramp)1 2 9 12 $1,820.00 $1,820.00 SubcONSuLtaNt cOSt Sub- cONS u Lta N t Sub-tOtaL cOSt NOORZ aY Lump Sum ceRteRRa Lump Sum Cost Proposal 300 S. Harbor Blvd. Suite 814 Anaheim, CA. 92805Onward Engineering | Design Smarter. Build Better.| Request For Proposal, for the City of Diamond Bar, for the FY 25/26 Civil Engineering Design Services, Project No. SI261 OSt pROpOSaL pROject 9c ONWaRD eNGINeeRING pROject eNGiNeeRS $140.00 h O u RLY Oe tOtaL hOuRS GRAND Oe Sub-tOtaL cOSt Q a /Q c maNaGeR $200.00 h O u RLY pROject maNaGeR $180.00 h O u RLY pa R t Y chIeF $220.00 h O u RLY chaIN/ ROD maN $180.00 h O u RLY phaSe 1 phaSe 1 1 Meetings 4 14 8 26 $4,440.00 $4,440.00 2 Data Research and Review 8 8 16 $2,560.00 $2,560.00 3 Utility Research and Notification 8 30 38 $5,640.00 $5,640.00 4 Geotechnical Investigation 8 8 16 $2,560.00 $19,780.00 $19,780.00 $22,340.00 SUB-TOTAL 4 38 54 96 $15,200.00 $19,780.00 $19,780.00 $34,980.00 phaSe 2 phaSe 2 5 Drone Mapping 2 4 16 22 $4,440.00 $4,440.00 6 Topographic Survey 4 16 106 106 232 $45,360.00 $45,360.00 7 Base Maps 8 308 316 $44,560.00 $44,560.00 8 Site Evaluation 4 30 34 $4,920.00 $4,920.00 9 30% Plans and Estimate 14 56 150 220 $33,880.00 $33,880.00 SUB-TOTAL 14 74 508 122 106 824 $133,160.00 $133,160.00 phaSe 3 phaSe 3 10 60% PS&E 14 136 362 512 $77,960.00 $77,960.00 11 90% PS&E 10 44 142 196 $29,800.00 $29,800.00 12 100% PS&E 16 68 84 $12,400.00 $12,400.00 SUB-TOTAL 24 196 572 792 $120,160.00 $120,160.00 phaSe 4 phaSe 4 13 Bid Support 6 4 10 $1,640.00 $1,640.00 14 Construction Support 23 6 29 $4,980.00 $4,980.00 SUB-TOTAL 29 10 39 $6,620.00 $6,620.00 tOtaL hOuRS aND cOStS 42 337 1144 122 106 1751 $275,140.00 $19,780.00 $19,780.00 $294,920.00 OptIONaL OptIONaL 15 Utility Potholing (Per Day)8 8 16 $2,560.00 $9,775.00 $9,775.00 $12,335.00 16 Custom Ramp Details (Per Ramp)1 2 9 12 $1,820.00 $1,820.00 SubcONSuLtaNt cOSt Sub- cONS u Lta N t Sub-tOtaL cOSt NOORZ aY Lump Sum ceRteRRa Lump Sum Cost Proposal 300 S. Harbor Blvd. Suite 814 Anaheim, CA. 92805Onward Engineering | Design Smarter. Build Better.| Request For Proposal, for the City of Diamond Bar, for the FY 25/26 Civil Engineering Design Services, Project No. SI261 OSt pROpOSaL pROject 10c