RESOURCE REQUIREMENTS/FEE SCHEDULE
SCOPE OF WORK
A. Project Phases
1. Schematic Design/Design Development
2. Construction Documents
3. Permitting
4. Bidding and Award
5. Construction Administration
B. Project Area
EPTDESIGN shall provide Landscape Architectural (Area Development) services for the project
site as described in the RFP documents and the Project Exhibit. The proposed scope area for this
project is shown below.
C. Project Information
1. Client/Owner: City of Diamond Bar
2. Lead Consultant: EPTDESIGN
3. Site Area: Approximately 10,000 S.F.
4. Site Construction Budget: Unknown
5. Approximate Schedule: As defined in the RFP,
D. Project Schedule
The following is the expected schedule for the project:
Milestone Date
Pre-Proposal Meeting May 14, 2025
Proposals Due May 20, 2025
Award Design Contract June 2025
Design Completed July-August 2025
Construction Contract Award October 2025
Construction Begin February 2026 (upon weather condition)
Construction Completed April 2026
19
PROCESS
Based on the above schedule, EPTDESIGN assumes the
following submittal iterations, number of meetings, and design
presentations per phase.
A. Schematic Design/ Design Development (1 design
presentations, 2 team meetings)
1. Site Visit
2. Team Meeting (up to 2)
3. 100% SD/DD Presentation
4. 100% SD/DD Package Submittal
B. Construction Documentation (2 drawing submittals, 3 team
meetings)
1. Team Meeting
2. 50% CD Submittal
3. Receive Permitting/Approval Comments
4. Team Meetings (up to two)
6. 100% CD Package Complete (Bid Set)
C. Construction Administration (7 site visits)
1. RFI/Submittal Review
2. Site Observation (up to 4)
3. Punch Walks (up to 2)
4. Final Walk (one)
DELIVERABLES
EPTDESIGN will provide the following deliverables as the 100%
final product for each design phase. Refer to PROCESS which
describes the number of submittal iterations per phase.
A. Schematic Design/Design Development
1. Optional Service: Site Survey
2. Updated Site Analysis Plan showing existing
conditions.
3. Updated Concept Diagram defining proposed areas,
site circulation, and confirming site program.
4. Preliminary Hardscape Plan including location and
verbal description of all site hardscape elements
including paving, curbs, walls, fencing, and stairs.
5. Preliminary Hardscape Details for non-standard
hardscape design elements
B. Construction Documentation
1. Demolition Plans
2. Hardscape Plans
3. Master Construction Legend noting all materials,
colors, finishes, and sources.
4. Hardscape Details depicting all scope elements.
5. Technical Specifications for elements within
EPTDESIGN scope
6. Cost Estimate Rough Order of Magnitude
C. Permitting
1. Provide a final city submittal set of drawings for
submission to the City of Diamond Bar Building and
Safety Department
2. Provide comment responses to all permitting
comments
3. Provide addenda set of drawings for submittal
4. Optional Service: Categorical Exemption Memorandum
for CDFW and other agencies
D. Bidding and Award
1. Assist with bid RFI and issue addenda as required.
2. Attendance at one bid meeting.
E. Construction Administration
1. RFI and Submittal responses as needed.
2. Field Report or Punch List per each site visit, addressing
the following:
a. Review of hardscape formwork and installation for
quality and workmanship.
b. Review of irrigation installation and coverage tests,
if required.
c. Review and approval of plant material placement, if
required.
d. Coordination of field changes.
e. Inspect installation and prepare a ‘punch list’ to be
complied with prior to the maintenance period. At
the end of the maintenance period, EPTDESIGN
shall conduct a final inspection and upon finding
the project acceptable will recommend acceptance
of the landscape installation to the Client.
3. EPTDESIGN will create as built drawings of all site
elements including planting, irrigation, and site
hardscape. The contractor will provide drawings showing
precise measurements of as-built site conditions.
EPTDESIGN will not perform field measurements of as-
built conditions.
20
ASSUMPTIONS
The following items are assumed by EPTDESIGN under this
contract, modifications to these assumptions may require
additional services.
A. The following items will be provided by the Client, architect,
or lead consultant upon commencement of project:
1. Tree Survey and Arborist Report, if needed.
2. Documentation of Existing Conditions
3. Site Construction Budget
4. Desired Project Schedule
5. Project Design Program
6. Executed Contract for Services
B. All CAD base file information will be administered and
distributed by the architect or lead consultant in 2D
AutoCAD format. EPTDESIGN will provide 2D AutoCAD
files for team coordination. BIM software (Revit) will not be
used by EPTDESIGN for coordination or documentation.
C. EPTDESIGN will attend meetings in person pertinent to
site scope only, additional meetings will take place via
shared screen or conference calls. Additional meetings
not outlined in this fee proposal and approved by the lead
consultant will require an Add Service Contract.
D. Substantial site redesign (as determined by EPTDESIGN)
after completion of the Schematic Design phase may
require an Add Service Contract.
E. The project will not be broken down into separate phases
requiring reorganization of documents or additional CA
observation.
F. There will be no site lighting design and all existing lighting
is to be protected in place.
G. Stormwater LID is not required for this project. This service
can be provided with an additional service.
H. Hydrology and Hydraulics Report can be provided with an
additional service.
I. Civil Permitting Support can be provided with an additional
service.
EXCLUSIONS
The following items are excluded under this contract.
A. Tree survey or arborist reports, unless otherwise stated in
scope of work.
B. 3D Modeling or physical models.
C. The Municipal Design Review Process (i.e. Architectural
Commission or City Planning).
D. Plan check processing or fees.
E. LEED, CHPS, or similar certification program calculations
and documentation.
F. Separate Off-Site or B-Permit documentation.
G. Geotechnical or Fertility Soils Report.
H. Fire, Security or Communications Plans, including design
or documentation of gate hardware connecting to security
system.
I. Waterproofing details or specifications.
J. Utility drawings outside of Irrigation Plans.
K. Documentation of Site Graphics or Signage.
L. Legal Descriptions
M. Foundation/ Structural Design
N. Construction Staking Site Cleanup
O. Mitigation of contaminants resulting from unidentified
leaking above ground or underground storage tanks
P. Soils testing, remediation, removal, or
Q. cathodic protection design
R. Percolation tests
S. Hazardous Waste Remediation
T. Materials Testing and Inspection reports.
U. O&M plans for Mechanical systems
V. Building Waterproofing – other than items in scope
W. Utility demand engineering for electrical services, gas
services, telecommunication services, streetlights and
sidewalk lights
X. Connection location for buildings by others; electric meter
and gas meter layout by MEP consultant
Y. Traffic Engineering and Traffic Studies
Z. Verification or inspection of construction activities in the
field and Flow/pressure or hydrant flow test
21
PHASE FEE
Schematic Design/Design Development $9,760
Construction Documentation $18,220
Plan-Check $6,240
Bidding $4,160
Construction Administration/Close-Out $11,520
EPTDESIGN Fee $49,900
Team Reimbursable Expenses $2,000
Civil Engineer $60,000
Electrical Engineer $5,000
Subconsultant Fee Total $65,000
Optional Task One: Environmental Compliance $10,000
Optional Task Two: Land Surveying $8041.40
Subconsultant Allowance
EPTDESIGN recommends the following subconsultant services.
DESIGN FEE
EPTDESIGN will provide the following phases on a fixed fee basis as noted below.
Reimbursable Expenses
EPTDESIGN defines reimbursable expenses as additional compensation for basic services
including actual expenditures made by EPTDESIGN in the development of the project. These
expenses shall include, but not be limited to: printing, plotting and reproduction; overnight delivery
and messenger services; and travel expenses.
Additional Services
EPTDESIGN will provide to the Client such additional services as requested in writing by Client.
For additional services, compensation shall be on an hourly basis or negotiated lump-sum basis.
Hourly Rates
Principal $230.00
Senior Associate $180.00
Associate $160.00
Project Manager $130.00
Project Captain $115.00
Designer $ 105.00
Administrative $85.00
Rates are effective through 31 December 2025 and are subject to escalation each year thereafter.
Expenses
All expenses incurred during performance of the Services are included in compensation delineated
above unless otherwise authorized by the Client in writing.