HomeMy WebLinkAboutDiamond Bar Blvd Damage Repair_IDS Gr. Cost FileCITY OF DIAMOND BAR Department of Public Works Diamond Bar Boulevard Damage Repair at Mapache Drive May 15, 2025 COST FILE 28CITY OF DIAMOND BAR Public Works Diamond Bar Boulevard Damage Repair at Mapache Drive FEE PROPOSAL Diamond Bar Slope Stabilization 5/14/2025 Staff Allocations per Discipline: Role/Classifications:Hours Fees Senior Land Arch Designer Assoc. Principal Senior Eng Proj. Eng BIM Assoc. Principal Senior Assoc Senior Eng Designer Senior Surveyor Designer (Survey) 2-Man Survey Crew Senior Cost Est. Cost Est. Hushmand Associates, Inc. Hourly Rate:196$ 140$ Hrs Fees 233$ 196$ 175$ 147$ Hrs Fees 225$ 200$ 190$ 160$ 200$ 160$ 310$ Hrs Fees 175$ 170$ Hrs Fees (NTE) Task 1.0 - Project Administration & Coordination 38 $9,762 Kick-Off Meeting (1)6 $1,944 0 $0 4 4 $784 2 4 6 $1,160 0 $0 Field Visit (1)8 $3,088 0 $0 8 8 $1,568 8 8 $1,520 0 $0 Project Administration, Monthly meeting 24 $4,730 0 $0 0 $0 2 10 12 24 $4,730 0 $0 Task 2.0 - Research 29 $4,942 Utility notifications, as-built review, record data review 25 $4,160 0 $0 4 4 $784 1 4 20 25 $4,160 0 $0 Geotechnical Report review 4 $782 0 $0 2 2 $392 1 1 2 $390 0 $0 Task 3.0 - Topographic Survey and Construction Documents 673 $118,199 Conduct Topographic Survey of Public and Private R/W 82 $18,640 0 $0 0 $0 2 16 32 32 82 $18,640 0 $0 60% CDs (Plans, Specifications, Cost Estimates)288 $48,272 4 10 14 $2,184 2 8 40 32 82 $13,738 6 10 24 140 180 $30,310 12 12 $2,040 90% CDs (Plans, Specifications, Cost Estimates)186 $31,246 4 10 14 $2,184 2 8 24 24 58 $9,762 4 6 16 80 106 $17,940 8 8 $1,360 100% CDs (Plans, Specifications, Cost Estimates)78 $13,364 2 4 6 $952 2 4 16 16 38 $6,402 2 4 8 16 30 $5,330 4 4 $680 Plan Check 39 $6,677 2 4 6 $952 2 8 4 14 $2,380 1 2 4 8 15 $2,665 4 4 $680 Task 4.0 - Additional Geotechnical Support 4 $4,792 Additional Geotechical Support (Not-to-Exceed)4 $4,792 0 $0 2 2 $392 2 2 $400 0 $0 4,000$ Task 5.0 - Bid Support 22 $4,044 Respond to bidder RFCs, updates to CDs for errors/omissions (excludes design changes during bid)22 $4,044 0 $0 4 4 8 $1,484 2 8 4 14 $2,560 0 $0 Task 6.0 - Construction Support 89 $16,045 RFI and Submittal Reviews, Coordination Meetings (up to 4), updates to CDs (excludes design changes during construction) 89 $16,045 0 $0 2 16 24 4 46 $8,390 1 8 12 20 41 $7,305 2 2 $350 Task 7.0 - As-Built Plans 0 $7,368 As-Built Plans 44 $7,368 2 4 6 $952 8 8 16 $2,576 2 8 12 22 $3,840 0 $0 TOTAL - Hours 855 14 32 46 8 62 124 88 282 16 52 109 300 16 32 32 557 2 28 30 Total Fees $165,936 $7,224 $48,652 $100,950 $5,110 $4,000 Grand Total $165,936 Task 8.0 - Easement Documents (Optional) Prepare Easement Documents for wall and TCE during construction 0 $0 0 $0 0 $0 0 $0 0 $0 0 $0 0 $0 0 $0 0 $0 0 $0 Optional Tasks Total $50,000 FEE SCHEDULE SubconsultantTOTALLandscape Arch Structural SubtotalSubtotal EstimationCivil/Survey Subtotal Subtotal 5/14/2025 1 S O L U T I O N S t h r o u g h i n t e g r a t e d d e s i g n 1 P e t e r s C a n y o n R d . S t e . 1 3 0 , I r v i n e , C A 9 2 6 0 6 T : 9 4 9 .3 8 7 .8 4 0 0    F : 9 4 9 .3 8 7 .0 8 0 0 w w w .i d s g i .c o m