Loading...
HomeMy WebLinkAboutVEI COST PROPOSALCOST PROPOSAL Cost Proposal Diamond Bar Boulevard Sidewalk Improvement Diamond Bar, CA Task DesignationTask DescriptionPrinciple Licensed Engineer, CEO(Jeff Meiter)Senior Civil Engineer(Kent Walton)Lead Civil EngineerDesign Engineer(Josh Hernandez)Senior CAD Drafter / DesignerJunior EngineerQA / QC(Matthew Addington)Senior Administrative Assistant(Belinda Meiter)Administrative Assistant(Kim Gonzales)Two-man Survey CrewTotal HoursODC Total Costs#REF!$190 $145 $135 $120 $110 $90 $120 $95 $60 $275 1 SRTS Design 47 11 26 18 44 90 8 6 98 10 358 39,900.00$ 1.01 Project coordination, administration & meetings 4 4 8 16 100.00$1,720.00$ 1.02 Prepare design topographic survey 3 1 4 6 2 10 26 4,735.00$ 1.03 As-built utility research 2 6 8 16 125.00$1,525.00$ 1.05 Prepare structural wall plans 4 8 12 2 4 20 4 20 74 7,700.00$ 1.06 Prepare 60%, 90% & 100% PS&E 6 2 10 16 40 50 4 20 148 15,280.00$ 1.07 Process plans with City of Diamond Bar 8 8 10 26 2,840.00$ 1.08 Bid Assistance, Process RFI's / Submittals 16 28 44 280.00$5,000.00$ 1.09 Prepare as-built plans 4 4 8 100.00$1,100.00$ Total 47 11 26 18 44 90 8 6 98 10 358 TOTAL 39,900.00$ Note: Listing of Reimbursable Items (in ODC column) Vehicle mileage As-built plans Plan copies ** NOTE: The above listed amount is all-inclusive and includes all direct and indirect costs as well as out-of-pocket expenses Commercial Hourly Rate Sheet Effective July 1, 2025 Staff Member Rate per hour Principle Licensed Engineer/Surveyor, CEO $190 Jeff Meiter Senior Civil Engineer $145 Kent Walton Lead Civil Engineer $135 Staff Inspector $125 Senior Plan Checker $125 Matthew Addington Senior Design Engineer $120 Joshua Hernandez Design Engineer $110 Senior CAD Drafter $100 Senior Administrative Assistant $95 CADD Drafter / Junior Design Engineer $90 Administrative Assistant $60 Two-man Survey Party $275 Two-man Survey Party (Prevailing Wage)$300 ** All rates are subject to a 3% COLA beginning July 1, 2026