HomeMy WebLinkAboutLPA Design Studios_Diamond Bar Civic Center Sustainability Study_Fee Proposal_05.15.25REQUEST FOR PROPOSALS (RFP)
DIAMOND BAR CIVIC CENTER
SUSTAINABILITY STUDY
MAY 15, 2025
FEE PROPOSAL
2
FEE PROPOSAL
The City of Diamond Bar | Diamond Bar Civic Center Sustainability Study
Q. A fee proposal shall be submitted separately, including a detailed schedule with all proposed
staff, the hours each person will devote to a given task, and all reimbursable services to complete
work described in the proposed Scope of Service. The fee proposal(s) shall be uploaded on
PlanetBids separately bearing the name, address, and telephone number of the individual or
entity submitting the proposal.
TASKS
TASK 1. Electrical Infrastructure Evaluation $12,800
TASK 2. Forecast of Future Electrical Demand $14,880
TASK 3. EV Charging Infrastructure Planning $18,000
TASK 4. Sustainability Enhancements $20,480
TASK 5. Infrastructure Recommendations $20,720
TASK 6. Conceptual Plan and Deliverables $23,240
TOTAL FEE $110,120
Based on our understanding of the project scope (as outlined in the RFP) and required schedule to meet
City planning and budgeting requirements, LPA proposes a not-to-exceed fee of $110,120 to complete
the base project tasks as outlined in the Project Understanding section of this proposal. We anticipate the
scope of services to be complete by the end of 2025. On the following page, please refer to a detailed cost
breakdown by tasks and key personnel hours.
BASIC HOURLY RATES
TECHNICAL ROLE RATE
Principal $280.00
Discipline Director $260.00
Project Director $250.00
Project Leader $200.00
Design Coordinator II $170.00
Design Coordinator I $145.00
Designer III $135.00
Designer II $120.00
Designer I $110.00
Intern $75.00
SUPPORT ROLE RATE
Director $240.00
Manager $165.00
Senior Specialist $140.00
Specialist III $110.00
Specialist II $95.00
Specialist I $85.00
5 | FEE PROPOSAL
5301 California Avenue. Suite 100. Irvine, CA 92617
P. 949.261.1001 | www.LPADesignStudios.com
Erik Ring PE, LEED FELLOW
Director of Engineering, MEP Engineer
E. ERing@LPADesignStudios.com | P. 949.701.4198
SUBMITTED BY:
5 | FEE PROPOSAL
James Wirick Erik Ring Aldo Bacuzzi Maureen McShane Kristy Nelson Apoorva Pradhan Additional
Support Staff
$280 $280 $250 $200 $200 $140 $110
Task 1. Electrical Infrastructure Evaluation 4 8 16 16 4 4 8 $12,800
Task 2. Forecast of Future Electrical Demand 4 16 8 4 0 40 8 $14,880
Task 3. EV Charging Infrastructure Planning 4 16 16 32 0 8 8 $18,000
Task 4. Sustainability Enhancements 4 16 8 24 8 40 8 $20,480
Task 5. Infrastructure Recommendations 4 8 16 32 8 32 8 $20,720
Task 6. Conceptual Plan and Deliverables 8 16 16 16 8 8 60 $23,240
TOTAL 28 80 80 124 28 132 100 $110,120
3
FEE PROPOSAL
The City of Diamond Bar | Diamond Bar Civic Center Sustainability Study
IRVINE
SAN JOSE
SACRAMENTO
SAN DIEGO
AUSTIN
DALLAS
SAN ANTONIO
949.261.1001
LPADesignStudios.com