Loading...
HomeMy WebLinkAboutProfessional On-Call Civil Engineering and Architectural Services RFP Cost ProposalSCHEDULE OF CHARGES PROFESSIONAL SERVICES Principal (Franz Haidinger, James Signore, Matthew Gaber) $284/hour Associate (Vivek Jha) ..................................................... $243/hour Senior II (Jim B) ............................................................ $214/hour Senior I ........................ ............................................... $197/hour Project II (Pedro Sanchez) .............................................. $185/hour Project I (Mahmoud Samara) .......................................... $180/hour Staff II ......................................................................... $168/hour Staff I .......................................................................... $162/hour TECHNICAL SERVICES Senior Construction Manager* ......................................... $185/hour Construction Inspector* ................................................. $162/hour Senior Designer ............................................................. $197/hour CADD Designer ............................................................. $174/hour CADD Technician ........................................................... $151/hour Senior Field Scientist...................................................... $156/hour Field Scientist ............................................................... $133/hour Senior Technician* ....................................................... $125/hour Field/Engineering Technician* ......................................... $110/hour Project Administrator ..................................................... $120/hour Technical Editor ............................................................. $130/hour Clerical ......................................................................... $100/hour CONTRACT LABOR From time to time, NCE retains outside professional and technical labor on a temporary basis to meet peak workload demands. Such contract labor will be charged at regular Schedule charges. LITIGATION SUPPORT Engineer/Scientist ......................................................... $440/hour Court Appearances & Depositions .................................... $670/hour EQUIPMENT Plotter Usage .............................................. (separate fee schedule) Truck ............................................................................ $135/day Automobile ................................... IRS Standard Mileage Rate+10% Falling Weight Deflectometer Testing ............................. $4,700/Day Coring ........................................................................ $5,800/Day Environmental Equipment ............................. (separate fee schedule) OUTSIDE SERVICES Rental of equipment not ordinarily furnished by NCE and all other costs such as special printing, photographic work, travel by common carrier, subsistence, subcontractors, etc. ................................... cost + 10% COMMUNICATION/ REPRODUCTION In-house costs for postage, printing and copying .. ........................... ............................................................ project labor charges x 5% TERMS Billings are payable upon presentation and are past due 30 days from invoice date. A finance charge of 1.5% per month, or the maximum amount allowable by law, will be charged on past-due accounts. NCE makes no warranty, either expressed or implied, as to its findings, recommendations, specifications, or professional advice except that they are prepared and issued in accordance with generally accepted professional practice. *A surcharge of $25/hour applied for technicians and construction inspectors to comply with Prevailing Wage (PW) per requirements of California Department of Industrial Relations. 17991 Fitch • Irvine, California 92614 • PHONE (949) 442-2442 • FAX (949) 476-8322 • www.nmggeotechnical.com PROFESSIONAL FEE SCHEDULE ON-CALL ENGINEERING AND PROFESSIONAL SERVICES HOURLY RATES BY STAFF CATEGORY Principal and Associate Engineer/Geologist (Karlos).................................................................................................... $226 Project Engineer/Geologist (Ryan)................................................................................................................................. $180 Senior Staff Engineer/Geologist ................................................................................................................................... $140 Supervisory Technician ................................................................................................................................................. $1 40 Staff Engineer/Geologist ............................................................................................................................................... $1 30 Senior Project Technician ............................................................................................................................................. $130 Project Technician ........................................................................................................................................................ $118 Staff Technician ........................................................................................................................................................... $ 108 Special Inspector .......................................................................................................................................................... $ 108 Soil Technician/Special Inspection Services – Prevailing Wage ................................................................................... $153 CAD Drafter/Technical Illustrator ................................................................................................................................. $1 18 Administrative Assistant/Word Processor .................................................................................................................... $ 97 Technical Assistant ....................................................................................................................................................... $ 80 LABORATORY TESTING Moisture Content – ASTM D2166...................................... $ 23 Moisture Content & Density ......................................... $ 35 Atterberg Limits – ASTM D4318 ................................... $191 Particle-Size Sieve Analysis – ASTM D422 ....................... $122 Finer than No. 200 Sieve – ASTM D1140 ........................ $ 86 Hydrometer Analysis – ASTM D422 ................................ $145 Maximum Dry Density – ASTM D1557 ............................ $260 Maximum Dry Density with Oversize Particle – ASTM D1557 ............................................ $295 Caltrans 216 Maximum Density .................................... $237 Sand Equivalent – ASTM D2419 .................................... $ 109 Soluble Sulfate Content ................................................ $ 80 Expansion Index – ASTM D4829 ...................................... $194 Consolidation – ASTM D2435 ......................................... $241 -For time-rate, add $38/increment -For remolded, add $54/specimen -For reload, add $105/cycle Hydroconsolidation/Collapse – ASTM D5333 .................$155 Undisturbed Direct Shear – ASTM D3080 .......................$236 Undisturbed Direct Shear – Slow – ASTM D3080 ............$295 Remolded Direct Shear – ASTM D3080 ...........................$341 Remolded Direct Shear – Slow – ASTM D3080 ...............$294 Residual Direct Shear – ASTM D3080 ..............................$677 R-Value – CT301/ASTM D2844 .........................................$295 Asphalt Maximum Density – CT308 ...............................$295 Concrete, Mortar or Grout Compression (per cylinder/cube/prism) ....................................... $ 35 CMU Grouted Prisms - Compression Test ≤8" x 8" x 16" ......................... $ 232 - Compression Test >8" x 8" x 16" .......................... $ 324 Gunite/Shotcrete Panel Coring & Testing .....................$130 NOTES 1.No additional charges for field vehicle usage or nuclear gauge. 2.Heavy equipment (i.e. drill rig, backhoe, CPT) charges will be invoiced at cost. 3.Delivery and outside reproduction charges will be invoiced at cost. 4.Outside laboratory test charges will be invoiced at cost. 5.Prevailing wage rate may be adjusted based on determination by the Director of Industrial Relations/Project Content COAST SURVEYING, INC. 15031 PARKWAY LOOP, SUITE B, TUSTIN, CA 92780-6527 • (714) 918-6266 • FAX (714) 918-6277 Schedule of Hourly Rates for Survey Services SCHEDULE OF HOURLY RA TES Principal-in-Charge, PLS Survey Manager, PLS Project Surveyor, PLS (Kurt Hoehn) Field Coordinator Survey Technician 2 Person Survey Party w/Equipment $315.00 $250.00 $215.00 $197.00 $166.00 $375.00 Coast is signatory with Local 12, Operating Engineers, and will follow the Union rules concerning the payment of Regular Rates, Overtime Rates, and Double Time Rates. Overtime rates are payable at 1.25 times the regular rate in effect at that time. Double time rates are payable at 1.50 times the regular rate in effect at that time. Costs for monuments, prints, research materials, and other incidental or special supplies will be billed at cost. Standard Fee Schedule LIN Consulting, Inc. HOURLY RATE $ 249 STAFF LEVEL Principal Senior Project Manager (John & Ray) $ 237 Project Manager $ 226 Senior Engineer $ 215 Assistant Project Manager $ 197 Project Engineer $ 168 Assistant Engineer $ 139 Technical Support $ 115 Administrative Support $ 75 The cost of printing, mileage, mailing and other expenses incidental to the performance of the services are not included in the hourly rates of above listed hourly rate schedule.