Loading...
HomeMy WebLinkAboutTAIT-Diamond Bar On-Call Fee Schedule Schedule of Fees Employee Classification Hourly Rate 06 - Engineering Assistant ........................................................................................................................ 90.00 18 – Project Administrator ......................................................................................................................... 120.00 04 - Engineering Designer I ...................................................................................................................... 155.00 10 - Engineering Designer II ..................................................................................................................... 180.00 03 - Project Engineer I .............................................................................................................................. 205.00 25 – Project Engineer II ............................................................................................................................ 215.00 117 – Senior Project Engineer .................................................................................................................. 225.00 02 - Professional Engineer/Licensed Surveyor ........................................................................................ 245.00 17 - Senior Professional Engineer/Surveyor ............................................................................................ 260.00 52 - Principal II………………………………………………………………………………………………….300.00 01 - Principal ............................................................................................................................................. 275.00 15 - Structural Engineer ............................................................................................................................ 270.00 05 - Permit Expediter I .............................................................................................................................. 120.00 11 - Permit Expediter II ............................................................................................................................. 140.00 09 – Project Coordinator ........................................................................................................................... 165.00 07 - Surveyor ............................................................................................................................................. 145.00 07 – Surveyor (Prevailing Wage) .............................................................................................................. 160.00 08 - Senior Survey Specialist/ Party Chief ................................................................................................ 190.00 08 – Senior Survey Specialist/ Party Chief (Prevailing Wage) ................................................................. 205.00 00 - Two man survey crew ........................................................................................................................ 330.00 22 - One Man Survey Crew with Robotics ............................................................................................... 210.00 13 - Project Manager I .............................................................................................................................. 180.00 54 - Entitlement Director ……………………………………………………………………………............. 215.00 125 - Assistant Project Manager…………………………………………………………………………… .. 165.00 90 - Project Manager II………………………………………………………………………………………...205.00 The hourly rate for client authorized overtime and for representation at hearings and meetings after 6:00 p.m. will be invoiced at 1.5 times the posted rate. The above rates are inclusive of phone charges, fax charges, software and licensing fees, and photocopying charges. All rates will remain the same for the first three (3) years of the contract, then are subject to annual CPI increases on January 1st in year four (4) and year five (5), if a contract extension is awarded. 2. Mileage, Travel and Per Diem Auto Mileage: IRS Rate plus 15 percent Air Travel and Auto Rental: Actual cost plus 15 percent Per Diem: Actual cost of lodging and meals, plus 15 percent 3. Materials and Supplies Office and CADD supplies are included in the hourly rates. Prints, plots and reproductions are charged at cost plus 15 percent from commercial blueprint companies. In-house reproduction charges are as follows: Prints Plots Color Plots Bond $ .95/s.f. $.95/s.f. $6.00/s.f. Vellum 1.35/s.f. 1.65/s.f. 7.50/s.f. 4. Reimbursable Expenses Will be billed at cost plus 15 percent. Client will pay directly for all permit and agency fees; otherwise cost plus 15%. Subconsultant invoices will be billed at cost plus 15%. 5. Insurance Coverage General Liability: $2,000,000 Errors/Omissions: $1,000,000 California Workers' Compensation - Statutory Certificates of insurance coverage will be provided upon request. Rate Schedule conceptual design & planning company  landscape architecture & land planning Role Rate Managing Principal $180.00 Jim Baldovin RLA 4176 Associate Principal $170.00 MaƩ Kohlenberger RLA 2207 Director of Design $160.00 Jennifer Frederick Associate Landscape Architect $150.00 Senior Landscape Architect $140.00 Masumi Ozawa RLA 3667 Gary Glandon RLA 3791 Landscape Architect $130.00 Arborist $130.00 Senior Project Manager $120.00 Erik Peterson Janet Mountcastle Richard Ramirez Project Manager $110.00 Vianney Minjarez Michael Aguas Vincent Rojas Job Captain $100.00 Kathleen Canta Senior DraŌ sperson $ 95.00 Marc Escobar DraŌ sperson $ 90.00 Jr. DraŌ sperson $ 80.00 Clerical $ 70.00 Denise Riches Sandra Milligan Sarah Strasner All rates are effective to December 31, 2022 and are subject to change at any time without prior notice. EXHIBIT A 2023 HOURLY CHARGE RATE AND EXPENSE REIMBURSEMENT SCHEDULE General Services Charge Rates: Principal ..................................................................................... $ 240.00 Associate .................................................................................... $ 200.00 Project Engineer II ......................................................................... $ 175.00 Project Engineer I .......................................................................... $ 160.00 Design Engineer II .......................................................................... $ 145.00 Design Engineer I ........................................................................... $ 135.00 BIM/CAD Manager .......................................................................... $ 165.00 Assistant BIM/CAD Manager ............................................................... $ 150.00 BIM/CAD Designer II ........................................................................ $ 125.00 BIM/CAD Designer I ........................................................................ $ 105.00 Administrative Support .................................................................... $ 90.00 Reimbursable Expenses: Reproduction, special photography, delivery services, express mail, printing, plotting, and any other services performed by a subcontractor, will be billed at cost plus 15%. Vehicle mileage, between KNA’s office and project site and/or client office, will be billed at $0.60 per mile. Travel expenses (air, taxi, parking, etc.) are at cost. 3220 E 2022 Standard Hourly Billing Rates The following are our standard billing rates for additional services, change orders, and time and materials agreements: Principal $ 275 Associate / Supervising Engineer $ 220 Commissioning Engineer $ 210 Project Engineer $ 200 Project Manager $ 190 Senior Designer $ 180 Designer $ 160 Commissioning Specialist $ 150 BIM / Revit $ 130 Drafter $ 120 Clerical $ 100