Loading...
HomeMy WebLinkAboutHR Green Proposal to the City of Diamond Bar for Civil Engineering ServicesMAY 26, 2023 Professional On-Call Civil Engineering Services PROPOSAL FOR City of Diamond Bar Steve Loriso, PE, QSD/QSP 1260 Corona Pointe, Suite 305 Corona, CA 92879 Office 855.900.4742 + Mobile 909.630.2577 sloriso@hrgreen.com May 26, 2023 David Liu Director of Public Works/City Engineer City of Diamond Bar 2181 Copley Drive Diamond Bar, CA 91765 Re: Professional On-Call Civil Engineering Services Dear David and Other Selection Committee Members, The City of Diamond Bar has challenges like most agencies, including the need to maintain and upgrade the aging infrastructure with limited funding and resources and limited staff to perform crucial land development operations. The City requires a multi-faceted engineering firm that is responsive and prioritizes close communication, quality, integrity, detailed documentation, technical proficiency, and stewardship to protect your interests and realize your vision. HR Green Pacific, Inc. (HR Green) has been that team to the City since 2017. HR Green differentiates itself by exclusively serving public agencies, leveraging technology, demonstrating a successful track record delivering multi-faceted CIP projects and plan checking of private improvements, providing scalable solutions, and offering alternative service delivery options to maximize funding sources and efficiency. We have the staffing and ability to provide the necessary services identified in the RFP and will incorporate Dennis Janda, Inc. (DJI) for survey and map review services when necessary for the required scope of work. The remainder of the potential work will be managed and conducted by in-house HR Green staff. We are committed to the ongoing and successful implementation of providing the necessary engineering services to the City of Diamond Bar. HR Green’s staff is well-versed in the City’s land development and public works engineering needs having been one of the firms providing similar consultant services for the past six years. HR Green, as a company and its team members, has decades of experience providing on-call support for the specific services you are seeking for numerous Southern California agencies. With a national footprint, two local offices, over a century of history, and vast staffing resources of more than 650 employees, HR Green is uniquely qualified to deliver the services you are seeking for several key reasons. Our Differentiators ▪A track record of success. Our Program Manager and proposed personnel bring experience, innovation and knowledge that will directly benefit the City of Diamond Bar. ▪Proven best practices. HR Green invests in technology, and delivers a forward-thinking approach to meet your strategic goals, priorities, and performance metrics. HRGREEN.COM 1260 Corona Pointe Court | Suite 305 Corona, CA 92879 Main 855.900.4742 + Fax 713.965.0044 HR Green® | Building Communities. Improving Lives. ▪Scalable staffing and solutions. To deliver effective, cost-efficient services, we work to go beyond the assignment of staff that is requested in our contract. ▪We exclusively serve public agencies. With 110 years of experience, HR Green is known for a customized, innovative, and reliable approach to service and delivery as well as commitment to close communication. ▪Time and cost-savings. A successful track record providing an alternate GIS-based approach to traditional PS&E preparation for residential street rehabilitation that has saved our client agencies 20-30% in time and money. Past Success HR Green believes the true key indicator for future success is proven past performance. Our unmatched experience in providing engineering and staff augmentation services has been proven through our successful completion of similar work with other municipal clients. We invite you to contact the local representatives listed on each of our similar projects to hear first-hand the effectiveness of our Team. We will protect the City’s best interests by providing comprehensive, quality, responsive, technically proficient, and timely services in an on-call environment. You can have confidence that our staff will protect your interests, anticipate your needs, and proactively communicate with you throughout all phases and tasks of the work you assign to us. The Management Contact will be George Wentz, PE, who is authorized to sign an agreement for HR Green and can be reached out 951.475.3601 or via email at gwentz@hrgreen.com. The Program Manager will be Steve Loriso, PE, QSD/QSP who will be responsible for the day-to-day management of the contract, can be reached at 909.630.2577 or via email at sloriso@hrgreen.com. We look forward to continuing to help the City of Diamond Bar meet and exceed your objectives. Sincerely, HR GREEN PACIFIC, INC. Steve Loriso, PE, QSD/QSP George A. Wentz Program Manager Principal-in-Charge David Liu Page 2 of 2 May 26, 2023 HR Green® | Building Communities. Improving Lives. Cover Letter ...............................................................................................................Precedes This Page 1. Project Team ......................................................................................................................................2 2. Firm’s Experience/References ..........................................................................................................12 3. Project Understanding .....................................................................................................................18 4. Fee Schedule .....................................................................................................Under Separate Cover Appendix—W-9 ...................................................................................................................................32 Appendix—Exceptions and Considerations ..........................................................................................34 Table of Contents 1. Project Team Page 2 Professional On-Call Civil Engineering Services Z City of Diamond Bar HR Green Pacific, Inc. (HR Green) exclusively serves public agencies in California and we specialize in multi-faceted on-call engineering, design, and land development services. We have been providing services to the City of Diamond Bar for the past six years, which makes us unique compared to other providers in the region, with our: CITY FAMILIARITY: HR Green has a long history of facilitating engineering and civil plan/map review of land development projects for Diamond Bar for the past 6 years. Since 2017, our staff have worked to meet day-to-day and technical demands of City public works/engineering and community development departments. PROVEN APPROACH: We have provided an integrated approach and staffing plan that optimizes flexibility. The assigned individuals will continue to support the City, and can leverage a deep bench of personnel to quickly respond to your dynamic needs. DYNAMIC FLEXIBILITY: We understand that certain projects demand more commitment and attention, such as a shorter turnaround time for reviews and feedback. Our assigned staff possess not only the essential land development experience but also extensive knowledge of your city processes, and in managing capital improvement projects for various agencies. Unparalleled Knowledge of Diamond Bar, Your Needs, and Requirements Our staff have coordinated closely with your various City departments and applicable staff to become your trusted advisor for these services, including: Serving the City of Diamond Bar currently providing plan check and design services. Providing staff augmentation with an onsite Office Engineer responsible for project design drafting for as-builts and base maps, plan review, multi-agency coordination, and land development requirements. Coordinating with other City of Diamond Bar departments and divisions to facilitate design approval. Providing constructive feedback on complex reviews and engineering designs. Preparing design plans and specifications for ADA, street improvements, and drainage projects. Working with the City onsite providing staff augmentation to deliver capital improvement and land development projects. As the City of Diamond Bar knows, HR Green is a trusted advisor for clients from project inception to final completion, always seeking the most economical solutions and streamlined processes. We provide assistance in complying with emerging regulations and harmonize your growth and development with the environment. HR Green’s robust group of licensed professional engineers provide clients like Diamond Bar with the benefit of a diverse mix of experience. Our Engineering Management Capabilities CELEBRATING YEARS Proficiency Of: ▪Planning permitting process, improvement plan check, design, and inspection services ▪Local, State and Federal Laws ▪Information Technology including Electronic Plan Check Software, GIS, and more ▪Best practices and latest techniques, materials, and equipment in use Our Core Staff ▪Know and understand Diamond Bar ▪Local Program/Project Managers, Engineers and Support Staff Keys to Success ▪Prepare and review complex engineering designs ▪Perform technical research and analysis ▪Plan and organize activities ▪Understand, interpret, and explain laws and regulations ▪Proactive management ▪Quality project records ▪Clear communication ▪Proactive decisions/ recommendations ▪Open communications Page 3 Professional On-Call Civil Engineering Services Z City of Diamond Bar General Engineering Subconsultant Engineering and Land Development Services Land Development l Steve Loriso, PE, QSD/QSP Program Manager Principal-in-Charge QA/QC Manager LEGEND l HR Green Pacific, Inc. l Dennis Janda, Inc. l George A. Wentz, PE l Tina York, PE l Chase Keys, PE—Task Lead l Trent MacDonald l Art Casillas l Eric Lomeli l Derek Wieske, PE—Task Lead l Carolina Fernandez l Mike Myers, PE l Eric Lomeli Organization Chart and Resumes Your primary point of contact is Steve Loriso, PE, QSD/QSP, our assigned Program Manager. Steve will be Diamond Bar’s day-to-day contact and will see that all resources are allocated to your projects as needed, serve as part of our QA/QC team, and will be available for requested meetings with the City. Steve’s resume and work experience, along with that of the other key personnel, appear in the following pages. l Dennis Janda, PLS—Survey Additional specialty subconsultants can be added as-needed. 60+ Additional Support Staff Available As-Needed Page 4 Professional On-Call Civil Engineering Services Z City of Diamond Bar Steve Loriso, PE, QSD/QSP Program Manager Steve has more than 25 years of design, CIP program management, design management, plan review, NPDES/water quality compliance, and construction management experience of municipal public improvement projects. As City Engineer and Project/Program Manager for various Southern California municipalities, he has overseen a broad range of infrastructure improvement projects from planning and design, through construction and maintenance. Types of projects include roads, drainage, water, sewer, traffic, grading, and parking lots. Steve has managed the implementation of the Municipal Separate Storm Sewer System (MS4) Permit, performed review of compliance documents for private and public developments, and acted as the owner’s representative and liaison between design teams and general contractors on facility and infrastructure construction projects. Steve has served as City Engineer/Director of Public Works for several cities throughout Southern California and has provided On-Call Engineering to the City of Diamond Bar since 2017. SELECTED PROJECT EXPERIENCE Z On-Call Engineering Services, City of Diamond Bar Steve served as Project Manager for various staff augmentation, project management, design engineering, plan/map review, construction management, and inspection assignments. Z On-Call Engineering, City of Palos Verdes Estates City Engineer for the design and construction of CIP projects including: annual slurry seal, ADA sidewalk/curb ramp improvements, pavement rehabilitation projects, drainage improvements, and sanitary sewer upgrades. Also oversaw the plan review of various private development projects within the City. Z Municipal Engineering, City of Jurupa Valley City Engineer responsible for managing City’s Capital Improvement budget, plan checking of land development projects, overseeing the design and construction of all capital projects, facilitating the MS4 Permit and stormwater quality compliance requirements, and grant writing/administration. Some design projects have involved improvements to arterials/corridors and incorporation of Complete Streets elements. Coordinated the design and construction of Jurupa Community Services District $60 million water and sewer CIP Program, comprised mostly of water and sewer pipeline (new and replacement) within the City right-of-way. Project Manager for design and construction of nearly $750,000 worth of drainage improvements. Z City Engineering, City of Hemet Acting City Engineer responsible for managing the City’s Capital Improvement Program budget, land development plan checking, entitle reviews in conjunction with the Planning Department, and overseeing the construction of both City and private development projects. City projects included traffic signals, roadway widening, pavement maintenance/rehabilitation/reconstruction, drainage, sidewalks, water and sewer improvements. This role also involved coordinating with other utility purveyors in the City on their capital projects within City right-of-way. EXPERIENCE 25+ Years EDUCATION BS, Civil Engineer REGISTRATION / LICENSE Registered Civil Engineer, CA #64701 Qualified SWPPP Developer/Practitioner (QSD/QSP), CA #00503 PROGRAM MANAGEMENT Page 5 Professional On-Call Civil Engineering Services Z City of Diamond Bar EXPERIENCE 50 Years EDUCATION Master, Public Administration BS, Civil Engineering REGISTRATION / LICENSE Registered Civil Engineer, CA #43273 George Wentz, PE Principal-in-Charge George serves as Vice President in the Governmental Services Business Line of HR Green, which offers a comprehensive suite of services to help local agencies function more effectively and efficiently. He has overseen the provision of plan check services to more than 50 cities and counties throughout California, including the City of Diamond Bar, Moreno Valley, Chino Hills, Pomona, Jurupa Valley, Eastvale, and Corona. George has served as City Manager, Assistant City Manager, Public Works Director, City Engineer, Building Official, Planning Director, Traffic Engineer and Economic Development Manager. George has directed and administered projects which range from on-call support to full city contract services. His responsibilities have ranged from accountability for day-to-day completion of activities associated with a contract to Principal-in-Charge of particular projects. His managerial experience and high level of success is well documented and recognized by the cities he has served. He is recognized in the field as having a unique talent in working well with City Councils, boards, commissions, committees, ad-hoc groups, managers and staff to achieve desired agency results. He has focused on the master planning and implementation of high-profile, revenue-producing developments, golf courses, and mixed-use resort communities. EXPERIENCE 38 Years EDUCATION BS, Civil Engineering REGISTRATION / LICENSE Registered Civil Engineer, CA #46367 Tina York, PE QA/QC Manager Tina has 38 years of experience focusing on civil plan review, project management, civil engineering, site grading and drainage design, and review of hydrology and hydraulics studies and performed construction inspection for municipalities. Having overseen plan review services for 50+ agencies, she has customized plan review reports and tracking logs, checklists, and budgetary worksheets for tracking project costs. Tina has also managed a web-based plan review tracking system to give agency staff 24/7 project status and implemented electronic plan reviewing to enhance communication, reduce review times, and save money. She is proficient with many software applications, including: Accela, LMS, NewForma, BluBeam Revu, TRAKiT, Adobe, and e-PlanSoft. SELECTED PROJECT EXPERIENCE Z Engineering Plan Review, Cities of Diamond Bar, Moreno Valley, Chino Hills, Pomona, Jurupa Valley, Eastvale, Corona, Placentia, Anaheim, Hesperia, Lancaster, Palos Verdes Estates, Ontario, Rancho Santa Margarita; Counties of Orange, San Diego, and Imperial Z On Call Engineering Plan Review, Cities of: Oceanside, Carlsbad, Vista, San Marcos, Escondido, Poway, Santee, Port of San Diego, and Otay Water District Z Military Housing Plan Reviews - Fort Irwin, CA, Fort Carson, CO, Fort Belvoir, VA, Fort Hood, TX, and Fort Bragg, NC PROGRAM MANAGEMENT Page 6 Professional On-Call Civil Engineering Services Z City of Diamond Bar Derek Wieske, PE Land Development—Task Lead Derek has more than 32 years of civil engineering and land development review experience and has overseen the development review process in several cities. He has served not only as a city engineer for several agencies, but also as a planning director and building official in the past. Having begun his career in the land development sector in the late 1980’s, Derek developed an early appreciation for the land developers’ perspective, but since he also has over 30 years representing public agencies, has developed a good understanding of both perspectives. He has been involved in the development of a wide variety of residential, commercial and industrial projects during the entitlement, design and construction phases of the projects. Derek has extensive experience with reviewing grading and drainage plans, water, legal descriptions, tentative and final maps, lot line adjustments, and a wide variety of utilities (water, sewer, gas, cable, fiber, etc.). He has also developed plan preparation guidelines for other agencies that he has served in the past, as well as developed recommendations to streamline the development review process. As a former city engineer and public works director, Derek has gained a strong understanding of the importance of the development of high-quality plans during the design phase of every land development project. In addition, with over 15 years of experience working in several Orange County cities, and over seven years working in college towns, Derek has also gained a strong appreciation for the importance of the specific needs of cities like Diamond Bar. SELECTED PROJECT EXPERIENCE Z Acting City Engineer, City of Fullerton Responsible for entitlement, design review and construction inspection of a wide variety of residential, commercial and industrial projects, including oversight of the construction of the Goodman Logistics Center Project, the redevelopment of a 60-acre site with approximately 1.5 million square foot industrial logistics center consisting of four buildings. Z City Engineering and Plan Check, City of Hemet Derek served as the City Engineer for several months, where he dealt with multiple high-profile developments. He performed multiple plan reviews including grading plans, storm drain improvement plans and drainage reports. Z Plan Check, City of Jurupa Valley Performed multiple plan reviews, including grading plans, storm drain plans, street improvement plans, water and sewer plans and several drainage reports. Z Acting City Engineer, City of Long Beach Responsible for all engineering development reviews and worked closely with the City Planning Division on wide variety of land development projects, including multiple high-rise buildings. Z City Engineer, City of Rancho Santa Margarita Responsible for all engineering development reviews and oversight of in-house plan review staff for several residential subdivision projects. Z City Engineer, City of Laguna Beach Updated the City’s plan development guidelines, served on a regional committee to develop the Countywide Stormwater Manual, where he became extremely familiar with the requirements of the San Diego Water Quality Control Board. He also performed multiple plan reviews of storm drain water and sewer improvement projects. EXPERIENCE 30+ Years EDUCATION MBA MS, Civil Engineering BS, Engineering REGISTRATION / LICENSE Registered Civil Engineer, CA #49872 PUBLICATIONS Public Works Magazine, Laguna Beach Lifeguard Tower, Restoring a City Icon Civil Engineering Magazine, Storm-Water Strategy LAND DEVELOPMENT Page 7 Professional On-Call Civil Engineering Services Z City of Diamond Bar Carolina Fernandez Land Development Carolina brings diverse engineering and building and safety support services to public agencies. Carolina is bi-lingual (Spanish / English). She has served as an Office Engineer for the Cities of Hemet, Palos Verdes Estates, Beaumont, Palm Desert, Moreno Valley, and Jurupa Valley. In this role, she has been responsible for project review coordination, land development planning/entitlement review and project managing for engineering, engineering permit review and coordination, consultant and multi-agency coordination, field construction coordination, civil plan review, Engineering and Public Works counter support, special districts formations, and drafting of street improvements. She has managed the development review process through the engineering life cycle. This has involved performing the review of applications, coordinating with future developers, and drafting the conditions of approval for the Engineering/Public Works Department. She supervised the land development daily activities, such as overall project requirements, conditions of approval, and mitigation measures. Carolina has coordinated with inspectors for work performed and assessed field modifications. She has also reviewed encroachment permits, approved and released bonds, reviewed survey application reviews, and coordinated with other public agencies present and future City work/projects, including cooperative agreements. SELECTED PROJECT EXPERIENCE Z Engineering/Public Works Staff Augmentation and Support, Cities of Jurupa Valley, Hemet, Beaumont, Moreno Valley, Palm Desert, and Palos Verdes Estates. Z Plan Check Support, Cities of Chino Hills, Pomona, Moreno Valley, and Jurupa Valley EXPERIENCE 9 Years EDUCATION BS, Civil Engineer REGISTRATION / LICENSE Engineer-in-Training, CA #156004 Michael Myers, PE Land Development Mike has more than 40 years of public sector engineering experience. He possesses extensive development review, project design, and construction management knowledge coupled with strong interpersonal communication skills. Agencies served include many in Los Angeles, San Bernardino, and Riverside Counties. Mike has served as a Senior Project/ Program Manager handling a broad range of municipal consulting services such as review of maps and survey applications as an Acting City Surveyor for municipalities, improvement plan and subdivision map review, assessment district formation and engineering, CIP project design and public contract procurement management, and management of pavement programs. This experience includes attending Planning Commission meetings and serving as the primary City representative to facilitate the processing, approval, and construction of land development projects. He has also designed various road widening, pavement rehabilitation, site improvement, and wet utility projects throughout Southern California. SELECTED PROJECT EXPERIENCE Z City Surveyor/Acting City Surveyor, Cities of Pomona, Moreno Valley, and Jurupa Valley Z City Engineering, City of Hemet Z On-Site Project Management Staff Augmentation, City of Jurupa Valley EXPERIENCE 40 Years EDUCATION BS, Civil Engineer REGISTRATION / LICENSE Registered Civil Engineer, CA #30702 LAND DEVELOPMENT Page 8 Professional On-Call Civil Engineering Services Z City of Diamond Bar EXPERIENCE 10+ Years EDUCATION BS, Civil Engineering REGISTRATIONS Professional Engineer, CA #90593 Chase Keys, PE General Engineering—Task Lead Chase has 10 years of CIP Program Management, design management, plan review, and construction management experience of municipal public improvement projects. His experience includes a multi-faceted involvement with Engineering and Public Works Departments as well as NPDES compliance operations. Types of projects include roads, drainage, water, sewer, traffic, and parking lots throughout Southern California, including for the City of Pomona. Chase has also helped prepare grant applications for federal, state, and regional funding. Moreover, he has assisted in both the office and field on construction projects, and processed paperwork through Caltrans Local Assistance and regional transportation agencies. He has served as CIP Manager for the Cities of Jurupa Valley and Hemet and has also served on site at the Cities of Lake Elsinore, Palos Verdes Estates, and Beaumont in delivering a broad array of CIP and land development projects. Chase has served as CIP Program Manager for five Southern California cities to help deliver a broad array of CIP projects. SELECTED PROJECT EXPERIENCE Z Area 2 Curb Ramp Improvements, City of Diamond Bar Project Manager responsible for the design and reconstruction of 16 residential neighborhood ADA curb ramps. The City is naturally “hilly” which creates a big problem when trying to achieve ADA compliance at the corner of two very steep streets. The design team performed thorough field reviews of each ramp to identify existing grades and utilities and private improvements that could conflict with the construction of each ramp. A data table was then prepared which instructed the contractor which type of ramp to construct based on the Standard Plans for Public Works Construction (SPPWC) as well as any other improvements that would be required. Z On-Call Engineering, City of Hemet CIP Manager responsible for managing City’s Capital Improvement budget and overseeing the design and construction of all capital projects including grant writing/ administration. Chase is involved with the projects from conception and budgeting through construction management and close out. Manages a wide array of projects for both engineering and public works including the City’s water/sewer system. In this role Chase oversees all of the City’s annual neighborhood pavement rehabilitation projects. Z On-Call Engineering, City of Pomona Client/Project Manager responsible for overseeing a broad array of capital projects through both design and construction. Chase has managed projects from minor neighborhood pavement rehabilitation projects to multi-million dollar complete streets improvements projects including medians, streetscapes, street reconstruction, traffic signal modifications, storm drain designs, water/sewer improvements, hydrology/ hydraulic analysis and more. Z On-Call Engineering, City of Rancho Cucamonga Client/Project Manager responsible for overseeing a broad array of capital projects through the planning and design phase. Chase has managed several major arterial pavement rehabilitation projects, roadway widenings, ADA compliance, traffic signal modifications, and even a major complete streets project including medians, Class IV cycle track, wider pedestrian sidewalks, a new connector roadway and traffic signal, and new landscape and irrigation. GENERAL ENGINEERING Page 9 Professional On-Call Civil Engineering Services Z City of Diamond Bar GENERAL ENGINEERING EXPERIENCE 36 Years EDUCATION Continuous education through Autodesk training facilities, including Ketiv Trent MacDonald General Engineering Trent has 36 years of CAD design experience for agencies and developers throughout Southern California. He is proficient in AutoCAD and Civil3D. The last 14 years of his experience have been focused in designing municipal capital infrastructure projects, such as street improvements, pavement rehabilitation including the use of ARHM, rough and precise grading, storm drain, sewer, water, erosion control plans and exhibits as well as public facility improvements, planning studies, conceptual designs, libraries, equestrian parks, animal shelters, and parks. In this role he has provided technical and analytical support; created, reviewed and revised construction plans, documents, cost estimates and specifications; produced volume calculations and earthwork, technical reports, Water Quality Management Plans, and Storm Water Pollution Prevention Plans. SELECTED PROJECT EXPERIENCE Z Grand Avenue Drainage Improvements and Design Services, City of Diamond Bar Z ADA Ramp Replacements, City of Diamond Bar Z Civic Center and City Hall Parking Lot Restoration, City of Norco Z Pacific Avenue from Mission Boulevard to SR60, City of Jurupa Valley Z Hermosa Avenue Street Widening, City of Rancho Cucamonga Z Towne Avenue Complete Streets Project, City of Claremont EXPERIENCE 10 Years EDUCATION BS, Civil Engineering REGISTRATION / LICENSE Engineer-in-Training, CA #149135 Art Casillas, EIT General Engineering Art has more than 10 years of professional experience as a construction manager and project engineer. He has been involved with roadway pavement rehabilitation, traffic signal improvements, street widening, and ADA accessibility projects and worked with Caltrans for encroachment permits. He has managed several capital improvement projects and provided services to various public agencies including the Cities of Walnut, San Gabriel, Covina, La Verne, and Hemet. With the main goals of maintaining construction cost under budget and delivering the projects within the schedule. Experience with negotiating contract change orders with the interest of the customer in mind. Develop a working relationship with the agency and the contractors to facilitate smooth communication and construction progress. Comprehensive knowledge of contract documents including specifications, plans and State regulations. SELECTED PROJECT EXPERIENCE Z Grand Avenue Drainage Improvements, City of Diamond Bar Z 2017/18 Great Streets Improvement, Phase I, City of San Gabriel Z Traffic Signal Improvements at Citrus & Covina and Badillo & Hollenbeck, City of Covina Z Citywide Pavement Rehabilitation, City of Hemet Z CDBG Sidewalk Improvement Project, City of La Verne Page 10 Professional On-Call Civil Engineering Services Z City of Diamond Bar GENERAL ENGINEERING EXPERIENCE 42 Years EDUCATIONS Palomar College Surveying REGISTRATION/LICENSE Professional Land Surveyor, CA #6359 CERTIFICATIONS Certificate in GPS Survey Certificate in AutoCAD Certificate in Esri ArcGIS Software Dennis Janda, PLS Survey—Subconsultant Dennis offers 42 years of experience in the land surveying and mapping profession. Dennis is responsible for the scheduling, contract administration and final review of all mapping and surveying projects performed at Dennis Janda, Inc. He has served as City Surveyor and Map Check Consultant to various Southern California cities, including Menifee and Beaumont. Through HR Green he has provided map check and/or surveying to 10 agencies. He has overseen design and construction survey for a wide variety of infrastructure projects in Riverside County. As map checker, he has processed the review of dedications, easements, lot line adjustments, vacations, and certificates of compliance, together with the review and process of tentative maps, tract maps and parcel maps for diverse cities throughout Southern California. SELECTED PROJECT EXPERIENCE Z On-Call Survey and Mapping Services, City of Diamond Bar Z On-Call Field/Office Surveying and Mapping, City of Lake Elsinore Z Map Check (with HR Green), City of Corona Z Map Check (with HR Green), City of Placentia Z Map Check (with HR Green), City of Jurupa Valley Z Map Check (with HR Green), City of Moreno Valley Z Map Check (with HR Green), City of Pomona EXPERIENCE 22 Years REGISTRATION/LICENSE Class A CDL with Tanker Endorsement Heavy Equipment Operator Eric Lomeli General Engineering and Land Development - Lead Inspector Eric is an experienced public works and public utilities professional with 22 years of experience in both construction and maintenance. He has worked in a variety of roles across multiple cities and municipalities. He has inspected dry utilities projects throughout the city and became proficient in the City’s iTRAKiT system. He then moved on to the City of Jurupa Valley where he worked as a Construction Inspector on dozens of encroachment permits and housing tracts, which involved inspecting and observing dry utility projects. Eric also has experience in maintaining city streets, sidewalks, parkways and streetscape, gained during his time with the City of Buena Park. Additionally, he installed and maintained domestic water distribution mains, hydrants, valves, and meters. His work included upgrading pipelines from 4” to 12”, installing new systems, and chlorinating and flushing lines. He is skilled in troubleshooting water-related problems and has experience in traffic control around job sites. CERTIFICATIONS CVWD Landscape Certification Program | AQMD Coachella Valley Fugitive Dust Control (PM10) | SAR Construction Site Inspections | ATSSA Traffic Control Technician | SMR Municipal Facilities & Activities | SMR Construction Site Inspections | WWR Construction Site Inspections | Regionwide Industrial and Commercial Facility Inspection | Santa Ana Region Water Quality Management | Whitewater River Water Quality Management Plan (+5 more) SELECTED PROJECT EXPERIENCE Z CIP, Land Development, and Monument Inspections, City of Jurupa Valley Z Inspections for Various CIP Projects, City of Hemet Z CIP and Land Development Inspections, City of Palm Desert LAND DEVELOPMENT 2. Firm’s Experience/References Page 12 Professional On-Call Civil Engineering Services Z City of Diamond Bar REFERENCE Matt Pilarz Principal Engineer City of Pomona 505 South Garey Avenue, Pomona, CA 91766 P: 909.602.3652 E: matt.pilarz@pomonaca.gov Ronald Chan Principal Traffic Engineer City of Pomona 505 South Garey Avenue, Pomona, CA 91766 P: 909.620.2286 E: ronald.chan@pomonaca.gov “I want to say great work to . . . the HR Green Team for their hard earned work in getting us to this point with this Clean California Grant and our Holt project. I am very pleased with the team attitude and the respect, care, and loyalty that HR Green has shown through all our projects. Great work!” Arnold E. Dichosa, PE City Engineer Project Planning, Engineering, and Land Development City of Pomona, California Since 2013, HR Green has maintained various on-call civil engineering, design, plan check, and project management contracts with the City of Pomona. We have provided design engineering of various roadway, alley way, sidewalk, curb and gutter, and ADA compliance projects citywide. This includes Mission Boulevard construction management for the installation of ADA improvements, signal conduit, and minor drainage improvements. HR Green provides on-call project management, staff augmentation, and comprehensive review services include civil, traffic, railway, environmental and structural engineering, surveying, architecture, landscape, planning, CEQA/NEPA and related proposed work. Selected Projects Holt Avenue: The analysis and design of approximately 4 miles of new raised center median along the Holt Avenue Corridor as part of the City’s corridor specific plan. The project included a thorough traffic analysis of the corridor including taking 24-hour turning movement counts at 85 intersections and 60 private driveways, traffic forecasting, and traffic model development to document existing, future no-build, and build conditions. Prior to final design, four concepts were prepared and presented to the public and City Council. Final design included reconstruction of the existing pavement, new signing and striping, traffic signal modifications, street lighting, new median and parkway landscaping, trail design within an adjacent park including outdoor workout equipment, protection of the exiting sanitary sewer under the proposed median, water and sewer main improvements, and stormwater improvements. Comprehensive Review Services: We have established processes and checklists, and also implemented a paperless intake/routing/tracking system to accelerate turnaround review schedules. We have provided on-call project management, staff augmentation, and plan review for the Gold Line light rail project, including the extension of the Light Rail Transit line through the City, two bridges at Garey and Town Avenues, and a flyover heavy rail west of Towne Avenue. Comprehensive review services include civil, traffic, railway, environmental and structural engineering, surveying, architecture, landscape, planning, CEQA/NEPA and related proposed work. Survey Review Services: HR Green is engaged to provide technical review for a variety of survey-type applications, as well as provide City Surveyor support services. Among others, we provide review final maps, lot line adjustments, parcel mergers, easements, vacations documents, certificates of correction, and certificates of compliance for the City of Pomona. Our team has also prepared legal descriptions and supporting plats in behalf of the City. Page 13 Professional On-Call Civil Engineering Services Z City of Diamond Bar REFERENCE Anastasia Seims Public Works Director City of Palos Verde Estates 340 Palos Verdes Dr. West Palos Verdes Estates, CA 90274 P: 310.378.0383 E: aseims@pvestates.org Project Planning, Engineering, and Plan Check City of Palos Verdes Estates, California Since 2015, HR Green has provided full staffing services, including, but not limited to building and safety administration, construction and project management, inspection, building official, plan check, city engineering, public works engineering, transportation planning, traffic engineering, CIP program management, and grant writing/administration. Selected Services City Engineer: Our team has been actively involved in a wide range of projects and services to enhance the city’s infrastructure and operations. With on-site staff augmentation, we have successfully delivered a comprehensive Capital Improvement Program (CIP), pavement management, traffic operations, construction management, long-term planning, managed Building Safety, and provided plan check services to the both the Building and Engineering Departments. Design Engineering, Construction Management, and Inspection: We have provided intersection, road, drainage, and parking improvement projects. We initiated parking modifications, signage replacement, and coordinated work orders for modifications at the Malaga Cove Plaza, working closely with the City’s public works staff. We have also prepared a comprehensive Pavement Management Program, conducting a thorough assessment of 70 centerline miles of streets to prioritize future maintenance projects. Traffic Operations: Utilizing software such as AutoCAD with AutoTurn, we have provided modifications to enhance traffic operations and safety, including modifying stop sign turn radius enabling trucks to make turns onto the major street, Granvia Altamira, at the City limit entrance. We have also prepared ADA compliant striping plans and curb ramp plans, ensuring safe and accessible pedestrian pathways in the Via Corta/Malaga Cove area. Asset Inventory and Management: HR Green provided Geographic Information System (GIS) services for asset inventory and management including the implementation of GIS for project management of forcemains, for efficient and effective management of critical assets. “HR Green has provided a wide scope of resources, shown initiative to optimize a customer-centric service model, a capacity to identify and implement recommendations, leveraged new technologies to streamline operational efficiencies, and a strong commitment and ability to meet the City’s expectations.” Ken Rukavina Former Acting City Manager/Public Works Director/City Engineer (now retired) City of Palos Verdes Estates Page 14 Professional On-Call Civil Engineering Services Z City of Diamond Bar REFERENCE Masoud Sepahi, PE City Engineer City of Placentia 401 E. Chapman Avenue Placentia CA, 92870 714.993.8148 msepahi@placentia.org Civil Engineering, Project Planning, and Plan Check City of Placentia, California HR Green has provided long-term as-needed civil engineering, CIP project/program management, construction management, and plan review services. This has included overseeing the pavement management through bond funding and $6.5 million in street rehabilitation improvements; managing the planning, design, and construction as well as value engineering and plan check of the award-winning, $500 million OC Bridges Program; providing extensive value and design engineering input to save time and money, mitigate impacts, and enhance infrastructure improvements. We have collaborated with OCTA, OC Flood, multiple cities, utilities, and water agencies to facilitate permits and improvements. Selected Projects Richfield Road Widening/Drainage Improvement: Value engineering and plan review for the design of Richfield Road improvements that included drainage improvements into the County’s Atwood Channel, extending box culvert under Richfield Road, realigning storm drains. Placentia Avenue Undercrossing/Grade Separation: A roadway within the project area, Industrial Way, had very poor pavement conditions. HR Green’s Project Manager helped negotiate for OCTA to require the contractor to reconstruct the road at a cost of approximately $50,000 due to adverse impacts of construction. HR Green’s Project Manager negotiated with the contractor to incorporate sound attenuation elements and allow for nighttime construction adjacent to apartments. This mitigated community complaints and reduced the detour schedule by several months. Civil Plan Check: HR Green is under contract to provide on-call services. Over the years this has included plan check, city enginering, construction management, inspection, and project management services. Our interim City Engineer was certified QSD/QSP and coordinated stormwater compliance efforts for the City. Our staff continue to provide plan check and WQMP review, consistently meeting the City’s 15/10/5 working day turnaround review schedule. Our reviews for 35%, 65% and 100% PS&E submittals verify conformance with City standards for roadway geometrics, storm drain plan and profiles, hydrologic/hydraulic reports, sewer plans and profiles, street lights, signing and striping details, traffic control plans, water quality reports, landscape and irrigation, and bridge and retaining wall aesthetics. We also coordinated meetings with utility agencies, especially Golden State Water Company, relating to the construction of a new water well site and the abandonment of the existing site adjacent to the new station. One of our proposed WQMP reviewers and environmental engineer specialists, served as Environmental/Police Services Supervisor responsible for successfully managing the City’s Water Quality Program. He spearheaded all City CIP projects from inception to completion (establishing schedules and coordinating methods to meet target deadlines). He effectively performed all site inspections; implemented continuous improvement strategies that facilitated cost effective solutions, saving the City a significant amount of money and implemented “green” initiatives. Page 15 Professional On-Call Civil Engineering Services Z City of Diamond Bar REFERENCE Maria Tipping City Engineer City of Claremont 207 Harvard Avenue Claremont, CA 91711 P: 909.399.5474 E: mtipping@ci.claremont. ca.us Project Planning, Engineering, and Plan Check Services City of Claremont, California The City of Claremont is a suburban city on the eastern edge of Los Angeles County, California, and is known for its tree-lined streets with numerous historic buildings. The City desired on-call engineering, on-call plan review, project management, and roadway design. HR Green has provided design services and prepared improvement plans for several projects to better serve pedestrians and bicyclists and to improve the overall driveability of roadways. In addition, we have also provided plan and map check services to the City. Selected Projects Towne Avenue Street Improvements: HR Green provided design services for the Towne Avenue Street Improvements project in Claremont. The project aimed to create a “complete streets” concept by adding landscaped medians and tree wells, improving pedestrian safety with bulb outs, and enhancing road usability for motorists and bicyclists with Class IV bike lanes and bike boxes. The project also included traffic signal upgrades, pavement rehabilitation, landscape enhancements, and the incorporation of “green street” components such as Modular Wetland devices. Mt. Baldy Road Pavement Rehabilitation: In 2019 HR Green prepared improvement plans for Mt. Baldy Road between North Mills Avenue and Grand Avenue with plan view only GIS-based plans. HR Green prepared construction bid drawings for the cold mill and overlay, re-striping drawings, technical specifications, and an engineer’s estimate of probable construction costs. The GIS-based approach saved the City roughly 15% in engineering fees. On-Call Plan Review Services - Various Projects: HR Green was selected to provide engineering plan check services on an as-needed basis due to our demonstrated local experience as well as our experience in full service engineering plan check of diverse development projects. We have provided full-service civil plan check to meet the demand and provide the customers with prompt and thorough comments to allow swift and trouble-free approval. Our reviews have included precise grading and Water Quality Management Plans for some of the City’s most sensitive projects like Harvey Mudd and Baseline Road. Page 16 Professional On-Call Civil Engineering Services Z City of Diamond Bar REFERENCE Romeo David Associate Engineer City of Rancho Cucamonga 10500 Civic Center Drive Rancho Cucamonga, CA 91730 P: 909.774.4070 E: romeo-david@cityofrc.us Pavement Rehabilitation and Street Widening City of Rancho Cucamonga, California The City of Rancho Cucamonga is a city located in San Bernardino County, with an estimated population of 178,000 residents. The city’s Public Works Department plays a crucial role in maintaining and improving the infrastructure and services for various essential functions, including street maintenance, transportation planning, traffic engineering, water and wastewater services, stormwater management, and solid waste management. Since 2019, HR Green has provided design and engineering of public improvements to the City of Rancho Cucamonga. Selected Projects Foothill Boulevard Pavement Rehabilitation: HR Green provided improvement plans, including separate signing and striping plans with the addition of bikeways, specifications, and cost estimates for the rehabilitation of a 2.5 mile stretch of Foothill Boulevard between Milliken Avenue and East Avenue in the City of Rancho Cucamonga. This segment of Foothill was experiencing some minor distress, mainly longitudinal and block cracking of the existing wearing course with potholes throughout. The City’s preferred rehabilitation strategy was a 0”-2” edge grind and 2” overlay. The City was fine with the existing raised median losing 2” of curb face, but after a thorough field review, HR Green noted that the existing median had several curb cuts throughout the project limits carrying storm water from one side of the median to the other. The existing street was also in need of a full depth cold mill in several areas not previously identified. After further discussion with City staff, it was agreed to perform a uniform 2” cold mill and ARHM overlay. The replacement of 54 existing ADA facilities was also provided with a detailed survey and design of each individual access ramp. Hermosa Avenue Widening: HR Green designed the widening of Hermosa Avenue between Foothill Boulevard and Effen Street. The project widened the corridor to include two travel lanes in each direction as well as a center left turn lane, new curb and gutter, and sidewalk. Improvements at the Stafford street intersection were required to accommodate the widening, including ADA upgrades, utility coordination and relocation. A new development, recently built along the south end of the project, required extensive on-street parking. During the design phase the on-street parking was added, and in order to maximize spacing reverse back-in angled parking was the elected alternative. “I would like to express our sincere appreciation to HR Green for their contribution to delivering Civil Design project plans to our Engineering Department. We thank HR Green for their professionalism and experience in providing Civil Design for various projects. We highly recommended the HR Green team to anyone who looks for a guaranteed quality of service level.” Romeo David Associate Engineer City of Rancho Cucamonga 3. Project Understanding Page 18 Professional On-Call Civil Engineering Services Z City of Diamond Bar Civil Engineering Project Understanding – CIP Design Engineering HR Green has the qualified proposed staff, successful experience, and proven best practices to provide the services and produce the deliverables detailed in your RFP. Our primary goal for the City is to implement a management, staffing and resource plan, assign appropriate administrative services, and create best practices and a service delivery model for the City’s needs. We will not only align our services to your mission and expectations, but also provide the best value, quality, and operational efficiency by incorporating the latest technology, paperless processes, public outreach (as necessary) and streamlined communication amongst all parties. Given the size and complexity of the City of Diamond Bar’s robust Capital Improvement Program projects, the City needs a multi-faceted engineering firm to effectively complete the budgeted projects. To assist the City in completing these important public improvements, HR Green is proposing a full range of experienced staff members to help meet your current needs and future goals. Our proposed staff have successfully provided these services for municipal agencies throughout Los Angeles County and Southern California, including for the City of Diamond Bar. We will implement a plan that is responsive to your needs, will remain flexible to changing conditions, and match the right mix of staff. As the City identifies project needs, our Program Manager and appropriate Task Leader will meet with the City to clarify your scope requirements and schedule. To provide a comprehensive solution, they will coordinate with your staff to determine staff needs and validate we are mobilizing the best fit to meet your needs. These individuals will be supported by a cadre of multi-faceted personnel. Moreover, given our depth of staff, (60+ in Southern California / 650+ nationally) and specialized capabilities, we can seamlessly mobilize additional in-house resources to meet your needs. To maintain legacy knowledge and institutional continuity, we strive to assign and maintain the same staff to deliver continuity, consistency, responsiveness, and quality service. As more than 90% of our services are provided through multi-year, as-needed contracts, we have the ideal mix of multi-faceted staff and depth of technical capabilities to efficiently meet workload peaks and valleys. Our current and anticipated workload of our staff is moderate, allowing for rapid response to dynamically changing needs, unforeseen conditions, and/or priority issues. Project Understanding – CIP Inspection HR Green understands the extent of providing Construction Inspection services as outlined in your RFP. We have provided similar services to cities like Diamond Bar for years. The City’s expansive Capital Improvement Program covers various types of projects such as facilities and parks to street and sewer improvements. Given the size and complexity of the projects, the City needs a multi-faceted engineering firm to effectively complete the budgeted projects. To assist the City in completing these important public improvements, HR Green is proposing a full range of experienced staff members to help meet your current needs and future goals. Our proposed staff have successfully provided these services for municipal agencies throughout Southern California, including the City of Diamond Bar. We will implement a plan that is responsive to your needs, will remain flexible to changing conditions, and match the right mix of staff. We are proficient at providing full time construction inspector duties in accordance with the City of Diamond Bar Department of Public Works policies and procedures. Such work to include: ▪Inspection of Public Works Projects ▪Project Documentation ▪Construction Administration ▪Utility Coordination ▪Scheduling ▪Project Meetings ▪Public Contract Documentation ▪As-Built Documentation ▪Coordination with Surveying ▪The Inspectors shall be able to operate independently managing 2-3 projects within the City and duties as assigned by the City Engineer. ▪Documenting time spent on inspecting projects As Program Manager, Steve Loriso, PE, QSD/QSP, will manage HR Green’s construction inspection team, assign inspectors based on project needs and workload, and manage the budget. He will track the Inspection services Page 19 Professional On-Call Civil Engineering Services Z City of Diamond Bar budget to verify the appropriate staffing levels are in place for the construction work effort and to complete the project within budget. CIP Design Engineering Approach The list of project types/services identified within the RFP and from our research of the City’s CIP are all consistent with the successful services the HR Green team has provided for many other agencies. While the types of projects/services are broad, we have provided an overall approach to civil engineering projects that is typical for most projects. Kick-Off Meeting and Site Reconnaissance ▪Hold a kick-off meeting with City staff to discuss major features and details of design project. ▪Identify jurisdictional agency approval and/or permit requirements. ▪Establish clear lines of communication. ▪Gather background data available from the City. ▪Discuss any special requirements, constraints, and/or opportunities available that are in the best interest of the City to expedite the project in a cost-effective and timely manner. ▪Discuss project completion issues and milestones. ▪Perform field visit(s) to review and document field conditions, verify existing topographic data, and assess specific concerns/constraints and issues. Task Order Negotiation ▪Develop, submit, refine, and negotiate task order proposal with City that includes a detailed scope of work, identification of subcontract work, deliverables, project milestone schedule, resource requirements, documentation required from the Caltrans Local Assistance Procedures Manual (if necessary), and budget. Project Management/Meetings/Coordination ▪Prepare a project plan that includes scope of work, schedule, communication plan, project control, processing, and invoicing that will be submitted for City staff review and approval. ▪The project schedule will be detailed to include project details, milestones, reviews, deliverables, and community engagement. ▪Submit monthly progress reports, including items completed, items for the coming month, budget status, and key project issues. ▪HR Green will lead meetings and coordination efforts throughout the life of the project. Research and Review ▪Upon notice-to-proceed, further research and gather all available relevant information, data, and reports. ▪Obtain existing drawings files for topographic and base mapping, as-built data, survey control data, hydrology studies, geotechnical studies, right-of-way maps, and existing utility information from the City. ▪Research plans not available through City for existing roads, drainage facilities, and utilities. ▪Perform field reconnaissance to identify any potential issues and field truth previously obtained data. ▪Contact impacted utility agencies by registered mail to obtain existing plans or updated information. ▪Hold coordination meetings with utility agencies, as needed. Initial Evaluation/Agency Coordination ▪Identify alternative solutions for key elements of design task order and evaluate feasibility based on various factors (e.g., cost-effectiveness, constructability, utility impacts, safety, implementation, schedule, ease of operations and maintenance, sustainability, etc.). ▪Present findings to City and coordinate with other impacted agencies. Geotechnical Investigation If the specific project calls for it (i.e., pavement investigations, soil conditions for pipeline work, etc.), we will work with the City’s on-call geotechnical consultant to collect field data and conduct lab testing. HR Green also has partnered with local geotechnical firms on all project types should the City wish to keep these services under our on-call contract. Survey, Base Mapping, and Legal Descriptions Survey services for the City will be performed by our subconsultant, DJI. Page 20 Professional On-Call Civil Engineering Services Z City of Diamond Bar ▪Perform design survey within the total project limits as necessary locating features such as utility covers, catch basins, pavement limits, curb ramps, driveways, curb and gutters, sidewalks, streetlights, power poles, traffic signs and striping, fences/wall, gates, etc. ▪Topographic engineering base maps will be prepared identifying right-of-way, adjacent parcel lines, centerline and 1’ contours. ▪Prepare ROW requirements maps to be used in the ROW phase for projects which require permanent easements, construction easements, or right of entry. ▪Prepare legal descriptions and plat maps based on the ROW requirements identified to be used for ROW acquisitions. Environmental Documentation ▪Evaluate need for CEQA or NEPA documentation based on funding and specific project requirements. ▪Develop necessary documentation. ▪Obtain required permits from regulatory agencies, as needed, including U.S. Army Corps of Engineers, Air Quality Management Board, Regional Water Quality Control Board, California Department of Fish and Wildlife, Caltrans, etc. ▪Dependent on project type, limits of disturbance, and area of new imperviousness we will prepare any necessary WQMP or LID documentation required for the project. ▪Typically, the Storm Water Pollution Prevention Plan (SWPPP) is prepared by the contractor upon selection, however we are capable of preparing the SWPPP if requested by the City. The SWPPP will be prepared in compliance with the National Pollution Discharge Elimination System (NPDES) requirements. Deliverables to the City will include SWPPP and NOI. ▪Compliance with the Riverside County MS4 regulations regarding LID enhancements Hydrology and Hydraulic Analysis If the project calls for it (i.e., addition of new curb and gutter, roadway widening, complete streets, new storm drain infrastructure, etc.) HR Green can provide hydrologic, hydraulic and/or water quality modeling. Whether it is a 1D/2D XPSWMM, HEC-RAS, HEC-HMS or CUHP model of a flood-prone area, a P8 Urban Water Quality model of an urban subwatershed, or a HydroCAD model of a small site design, HR Green works with our clients to select the most appropriate and effective approach based on available data and output needs. With the current increase in data availability and quality, HR Green has worked to develop automated tools within GIS and XPSWMM to build models more efficiently and more accurately. HR Green recently partnered with Optimatics, an infrastructure optimizing software that analyzes hundreds of improvement options in XPSWMM based on the cost-to- benefit ratio as determined by the owner. Many of these programs are utilized on projects completed by HR Green. Design Development ▪Review existing studies and design documents for adequacy, value, completeness, assumptions, and compliance with required standards and criteria. ▪Complete preliminary design to effectively implement required infrastructure improvements. ▪Review documentation (e.g., existing geotechnical data and reports, sub-grade compaction records, traffic studies, and other design and master plan studies). ▪Preparation of design plans in compliance with City and local standards, including the American Disabilities Act requirements and project specifications; including plans for: roadway, storm drain, water, and sewer plans, signing and striping, street lighting, traffic signal, and traffic control; as applicable for the project. ▪Incorporate any comments or changes made during the City review process. Plans shall include title sheet, demolition plan, typical sections, details, improvement layout, profile, cross sections, erosion control plans, and water pollution presentation plan. Client / Agency Review ▪Present findings and recommendations to City for review and concurrence. ▪Coordinate with permitting agencies for plan check review and comments. ▪Submit construction plans, specifications, and engineer’s estimate to City at agreed upon milestones (hardcopy and digital formats conforming to City’s requirements). Page 21 Professional On-Call Civil Engineering Services Z City of Diamond Bar Project Finalization, Approvals, and Permit Processing ▪Compile input, concerns, and comments from permitting agencies and present them to City for resolution and direction to finalize plans. ▪Support City in obtaining all required approvals and permits from the permitting agencies. Bid / Construction Support ▪Assist City as needed in responding to RFIs, preparing addendums, evaluating revision requests, reviewing submittals, and developing ”as-built” plans. Key Issues Some key issues we regularly address on infrastructure projects are highlighted below: STORM DRAINAGE IMPROVEMENTS Avoid utility conflicts/Maintain adequate clearance Minimize community impacts Maintain ingress/egress Adequate capacity to accommodate 100-year storm event Comply with regulatory/water quality requirements Streamline right-of-way and permitting Sustainability/Low impact design/Hydromodification STREET IMPROVEMENTS Minimize community impacts Maintain ingress/egress Efficient traffic control Aesthetics On-street parking alternatives Optimize pavement rehabilitation methods Streamline right-of-way and permitting ADA compliant sidewalks/curb ramps TRAFFIC SIGNAL IMPROVEMENTS  Equipment reliability Service point connection SEWER IMPROVEMENTS Soil conditions Right-of-way clearance Utility conflict avoidance Multi-Agency/Community coordination Odor and traffic control Operations and maintenance/Accessibility Equipment reliability PARK IMPROVEMENTS  ADA paths of travel (esp. to and from parking lot and restrooms)  Strategic placement of restrooms and drink fountains  Sufficient lighting throughout the park  Required parking spaces, including ADA spaces  Not exceeding maximum grading requirements for fields and courts for adequate play  Meeting stormwater quality requirements for parking lots  Stormwater retention to make up for the changes in pervious surfaces  Avoid utility conflicts  Sight distance  Pedestrian visibility  ADA compliance throughout the intersection  Adequate turn pocket lengths  Protected vs. permissive left turns  Future development and improvements FACILITY IMPROVEMENTS Parking lot ADA access (spaces and path of travel) Accessibility of interior spaces (restrooms, counter heights, railings, etc.) Future proof space planning Functional design Proper community amenities Efficient wayfinding Page 22 Professional On-Call Civil Engineering Services Z City of Diamond Bar CIP Inspection Approach Operating independently inspecting up to three projects within the City at any given time. Our local construction inspection team operates across Southern California, and we will dedicate the appropriate resources to your projects to manage schedules and budgets. Based on the City’s CIP, we expect one inspector to be assigned to the City to assist in the successful implementation of your program. We understand this inspector may be assigned up to three projects at a time, and our entire team is experienced in operating independently across multiple project sites. Having an inspector work on multiple assignments creates efficiencies and helps to control costs. We have additional inspectors available to support or scale up as needed. Participating in pre-construction meetings, field meetings, and final project walk-throughs. HR Green will attend regular coordination meetings with City staff, contractor, utilities, and other stakeholders, as necessary. These meetings will include a pre-construction meeting that sets the stage for regular coordination and communication throughout the project. Our inspector will also coordinate weekly field meetings and final project walk-throughs. Reviewing project plans and performing on-site inspections to verify compliance with the approved project plans before, during, and/or after construction. HR Green will continuously monitor the project to address unexpected challenges and recommend innovative solutions to keep the project progressing. Our team will take the lead in addressing issues encountered on the project, develop recommendations, and present options for the City to consider. The recommendations are developed and evaluated to determine the most cost-effective solution for the City. Verifying projects are completed in conformance with Federal, State, and City statutes, regulations, ordinances, guidelines, applicable standards, specifications, and plans. HR Green and its inspection team are experienced in conforming with Federal, State, and local requirements. We will comply with applicable laws, ordinances, codes, and regulations, including Cal/OSHA requirements, ADA/ PROWAG compliance, Caltrans, DIR prevailing wages, DBE, labor compliance, traffic, SWPPP, and others. We will perform interviews of the contractor’s crews to verify compliance with Davis-Bacon requirements. On projects where Caltrans is involved, we have successfully implemented a Caltrans Local Area Assistance (LAA) compliant system that has passed Caltrans audits. Our system includes a record system template pre-loaded with all of the forms and required information to meet the LAA Manual requirements. This system has saved time and costs to our client cities. Our process also includes a strict regimen of on-going QA/QC using checklists and field verification. Due to our active relationship with Caltrans Local Association Program Representatives we request periodic reviews of our records. This periodic review has eliminated extensive audits mid-project and post project, so our team delivers records that are complete and compliant. Keeping proper inspection records and reports, photographs, and videos, including but not limited to, all load tickets, weight tickets, certifications of compliance, submittals, shop drawings, materials reports, daily reports, and other related documents received. Our team will maintain a daily log of construction and inspection activities, maintain progress photographs/ videos, record quantities of materials received and/or used, and measure and accurately record quantities for payment. Page 23 Professional On-Call Civil Engineering Services Z City of Diamond Bar HR Green recognizes the importance of maintaining detailed and accurate project records. On our projects, we provide the highest level of project documentation quality to our clients. HR Green has built an excellent reputation for providing clients with project records that are second to none. The project record audits conducted by our clients of our previous projects are continually documented with successful results. HR Green’s success with project documentation stems from our Quality Plan that provides the baseline for the team to monitor their performance during the project. By following these procedures, we can more effectively and efficiently closeout projects. At closeout, we will provide the City a well-organized electronic file of all project records. Providing daily reports to the Public Works Project Manager to be kept on file on the City’s computer system. Daily reports will be shared with the City’s Project Manager and kept on file with the City. Notifying the Public Works Project Manager of areas of non-compliance. Throughout the project, we will maintain consistent communication with the City’s Project Manager. When we identify an area of non-compliance during our inspections, we will immediately notify the Project Manager and work with him/her and the contractor towards a timely solution. Performing inspection of storm water management practices and storm water pollution prevention plan compliance during project inspections. HR Green is an industry leader in environmental protection and advocates strict procedures throughout the project to minimize surrounding area impacts. The HR Green team has always taken an aggressive preemptive approach to managing erosion control. HR Green will observe the contractor’s work area for compliance with the contract documents and notify the contractor if the erosion control measures are not in accordance with the SWPPP. Our staff will verify the contractor has implemented the corrective actions. HR Green has QSD/QSP certified staff with experience in entering and monitoring SWPPPs within the State Multiple Application Reporting and Tracking System (SMARTS). Verifying and inspecting for site safety traffic control including traffic control in the public right- of-way. HR Green is committed to safety. While job site safety is the contractor’s responsibility, HR Green utilizes a proactive approach of maintaining effective safety standards to guard against injuries and illnesses occurring on the job. Our team will actively monitor the daily construction activities and notify the contractor and the City of any deficiencies or imminent hazards or situations observed. We will follow up with the contractor to verity that corrective measures have been taken. HR Green staff is trained in traffic control inspection and has a keen understanding of CA MUTCD requirements. Our Inspector will continuously evaluate the effectiveness of the planned maintenance of traffic and make immediate improvement recommendations to the City Traffic Engineer, if warranted. HR Green will take immediate ownership of the project, which will provide safe and expedited travel through the work zone while also providing worker safety. HR Green will constantly search for innovative methods to expedite construction activities and evaluate planned maintenance of traffic stages in an effort to reduce the impacts to the traveling public and search for cost savings to the City. We will review the installation of traffic control devices of each construction stage or detour and then monitor the traffic control daily to verify compliance with the requirements of the contract documents. We immediately notify the contractor of any discrepancies between the traffic control setup and the approved plan. Page 24 Professional On-Call Civil Engineering Services Z City of Diamond Bar Development and Entitlement Application Review – Project Understanding Maintaining an effective entitlement process is critical to support a thoughtful community development process, HR Green’s staff is experienced working closely with Planning Department and other agencies, is committed to working and meeting with prospective developers and their engineers, and is available to participate in development review committees, community meetings, Planning Commission, City Council, and other meetings as requested by the City. The HR Green team is aware of the review and approval processes and has experience working collaboratively in order to shepherd projects through the entitlement review and planning permitting process. Most of our staff performing entitlement application reviews has hands-on experience serving as an extension of our clients’ staff providing key functions at Planning application stage of Land Development Projects. Key tasks provided by HR Green under the Land Development and entitlement application stage include: ▪Performed review of preliminary grading, site plan, storm drain, sewer, and street plans design review for project entitlement. ▪Performed entitlement application reviews as it relates to Planning Department permitting; such as site development and conditional use permits, specific plans, general plan amendments, and change of zones. ▪Performed review of tentative subdivision exhibits in conformance with local regulations and the Subdivision Map Act. ▪Performed review of preliminary drainage and hydrology reports, WQMP/LID reports, and other project-specific reports. ▪Performed review and provided recommendations for traffic scoping agreements, traffic reports, conceptual grading and site plans, preliminary drainage and hydrology reports, and other project-specific reports. ▪ Coordinated with various City departments, developers, Caltrans, adjacent cities, and County. ▪Drafted and presented recommended conditions of approval. ▪Held meetings with developers and stakeholders regarding project status and requirements. Civil & Survey Application Plan Check – Project Understanding Our hands-on Program Manager, Steve Loriso, PE, QSD/ QSP and Civil Plan Check Task Leader, Derek Wieske, PE, will be 100% available to the City of Diamond Bar during this contract. Derek actively monitors all services and has a goal to get plans approved at third submittal. He will confer and/or meet with the City, developers, engineers, surveyors, and contractors. He will prepare agendas and attend all coordination meetings, including meetings to discuss redlined comments for survey or plan reviews and other potential issues which may delay review projects or survey services’ timely completion. The HR Green team will provide you with the deliverables for review projects (transmittal, redlines, comment letter, checklists, or letter stating plans are technically correct) or for survey services (vertical/horizontal ties, benchmarks, topographic information, etc.) at or ahead of the required project schedule. For nearly two decades, the HR Green team has implemented proven electronic solutions that save time and costs of printing, delivering, handling, and storing copies of plans, documents, and survey records. Our team has the tools and experience receiving and processing electronic plan submittals via e-mail or alternate software, but we understand that the City may also receive and process submittal in hard copy format and will be able to pick up those within 24 hours of notification. Our plan review team has decades of experience providing plan review for grading (mass, rough, and precise), erosion control, WQMP, hydrology and hydraulic studies, soils reports, streets, street lights, signing and striping, traffic signals, storm drains, and fiber optics. Each plan is Land Development Page 25 Professional On-Call Civil Engineering Services Z City of Diamond Bar compared to the appropriate Specific Plan or Community Plan, the final map, and other improvement plans for the project to verify conformance and no conflicts. Utility plans are compared to the master plans. The plans also go through a thorough investigation for compliance to City standards, Municipal Codes, Ordinances, Resolutions, policies, procedures, checklists, and City approved format/ preferences. Our survey review team is conversant in the requirements of the California Subdivision Map Act. The review of each parcel or final tract map includes the coordination of the documents submitted for review (map, closure calculations, etc.) for compliance with the City’s Municipal Code, Resolutions, Specific Plans, Conditions of Approval, Tentative Map, checklists, and City approved format/ preferences. Our subconsultant, Dennis Janda, Inc. (DJI), has 40+ years of survey field experience and has a longstanding, 20+ years, relationship with the HR Green team. The HR Green team, through our survey application review services, has guided applicants and clients through the processing of applications affecting site boundary and understands the importance of appropriate record keeping and research. The HR Green team is experienced in performing different survey type of application reviews; such as easements, vacations, dedications, lot line adjustments and mergers, certificates of compliance. Land Development Inspection Services– Project Understanding Our inspectors have extensive experience working on diverse projects. They know community needs, safety requirements, and environmental characteristics, and provide inspection services for projects, regardless of their construction type or size. They handle various inspection services for Land Development and City projects, including grading, encroachment permits, overlay, construction, street maintenance, landscape, traffic signal, drainage, wet/ dry utilities, parks, water quality, and similar projects. Our staff is dedicated to providing the highest level of customer service and ensuring that all work is in conformance with City requirements and all other applicable design standards, water quality requirements, and codes with detailed daily reports and photographic documentation provided. We understand the impacts Land Development projects have to cities and understand the importance of keep projects moving smoothly and safely. HR Green will respond to the City’s request for inspection promptly and, within 48-hours of receiving the request, we’ll provide information of the HR Green inspection staff that will provide support. Our team is also capable of providing on-call inspection services to cover staff vacation time, peak workloads, specialized inspection activities and others as needed. These activities may include: ▪Next-day inspections ▪Same-day response to important/urgent requests ▪Inspections of a clearly urgent nature (emergencies, serious life-safety concerns, etc.) Development and Entitlement Application Review – Approach and Methods Our team is tailored to meet all aspects of the entitlement and planning application review process. The HR Green team will review for consistency and adeptness to local code, establish design restrictions and provide project constraints, analyze development impacts within and beyond the site, and ultimately provide project specific recommended conditions of approval. HR Green has developed a streamlined focused approach to our planning application review; upon receipt of a project we’ll notify the appropriate City staff of any additional documents/ reports to provide a comprehensive engineering review. Our first project review is a comprehensive take on project requirements inclusive of alternative scenarios considerations and constraints. The goal is to provide the developer adequate and sufficient information for a final resubmittal. At first project review, HR Green will provide the City with a list of comments and observations, and begin the draft of conditions of approval based on the available reports. Page 26 Professional On-Call Civil Engineering Services Z City of Diamond Bar Upon completion of the project review, HR Green will submit a final report to the City setting forth our findings and recommendations from an engineering perspective. The report will include final recommended conditions of approval and mitigation measures tied to the development. HR Green is available for project review meetings and presentations as requested by the City. All documents are turned around on-time or ahead of schedule. HR Green earnestly seeks to meet or beat your expectations. We are able to meet the most hard-hitting schedules with a near perfect track record. Our internal organization is key to provide flexibility and adaptability when performing entitlement reviews and respond swiftly when needs arise. Within the municipal arena, there are consistent, time sensitive deadlines; emergency issues requiring immediate response; diverse tasks; and potentially changing priorities. HR Green staff possess a diverse technical skillset; is nimble, quick, and flexible to embrace change; and possess the ability to effectively transition between such assorted tasks as reviewing plans, analyzing codes and situations to consider appropriateness of alternative materials and methods, writing reports, inspecting site conditions, and handling inquiries from the public. Our team is made up of multi-faceted staff who can wear many hats, transition between various roles, and easily transition between different tasks in order to maximize utilization. In order to maintain consistency of service, our designated project reviewers work closely with our Land Development Task Lead, Derek Wieske. Derek has been working with the development review staff for several years, coordinating efforts and providing insight on alternative approaches. He will be ready to step in for any of the review staff in the unforeseen case the designated reviewer is not able to participate in a meeting and/or is out of the office for personal reasons. Civil and Survey Application Plan Check – Approach and Methods Our plan check leaders are industry-recognized thought leaders in advancing the robustness of paperless solutions. Tina York, PE and other HR Green professionals have served as technical advisors to paperless data management/reporting software solution providers to incorporate new tools and refine electronic solutions. We leverage and are proficient with various software solutions (e.g., Bluebeam Revu, Adobe, TRAKiT, Accela, EnerGov, Agiline, ePlanSoft, etc.) to not only create a paperless environment, but also provide healthy reporting for smart decision-making. We are constantly implementing the latest tools available in software. For hard copy submittals of plans, HR Green will have designated staff responsible to pick-up submittals from City Hall 24-hours or sooner from receiving submittal notification from the City. Page 27 Professional On-Call Civil Engineering Services Z City of Diamond Bar “Leveling Up” the Review Process HR Green has a proven internal plan review coordination process, GreenTREx, to make certain that each plan received is properly processed and returned on time. Our GreenTREx development review process/program allows us to efficiently complete plan tasks concurrently. This is a formalized and integrated process whereby Technician data input and processing, Review, and Expert staff manage quality control functions that are consistently implemented on each and every project. Our map/plan checks are thoroughly reviewed. This allows multiple HR Green staff to assist at any phase of the processing, review, and approval process. While most processes represent the old guard and more of the same, HR Green is evolutionary, bringing fresh and new ideas, using the latest technology, advanced permitting, and project software. CIVIL PLAN AND MAP CHECK PROCESS City Receives Plans from Applicant + Assigns Project HR Green Receives PDF of Plan Submittal + Enters Information into system Submittal Intake Checklist. Notify City if Submittal is Complete. Discuss Key Issues with City + Project Manager Budget Hours Distribute Plan to Appropriate Plan Review Team Member(s) Parcel + Final Tract Maps Rough + Precise Grading Plans Sewer Plans + Calculations Storm Drain Plans Dry Utility Plans Signing + Striping Plans Street Lighting Plans Grading Plans Hydrology/Hydraulic Studies WQMPs + SWPPPs Prepare Corrections Memo Quality Reviews Finalize Correction/ Approval Memo Log Out Project City/ Design Engineer RESUBMITTAL Misc. Survey Documents Traffic/Signal Control Plans TECHNICIAN REVIEWER EXPERIENCED PROFESSIONAL T R EX Street Improvement Page 28 Professional On-Call Civil Engineering Services Z City of Diamond Bar Deliverables and Milestones Schedule TIMEFRAME FOR DELIVERY Service Description HR Green Commitment Diamond Bar Standard PLAN CHECK First Submittal 10 working days or less 10 working days Second Submittals 5 working days or less 10 working days Third Submittal 3 working days or less 10 working days FAST TRACK / EXPEDITED REVIEW First Submittal 5 working days or less 2nd I Subsequent Submittals 3 working days or less Land Development Inspection Services – Approach and Methods Our staff uses a Construction Management Plan (CMP) to manage projects. The CMP is a project-specific plan that serves as a guideline for the execution of all construction-related activities. The purpose of the plan is to facilitate smooth coordination and communication among parties involved, including the designers and the City staff, and to establish protocols for effective execution of the project requirements. The CMP is prepared immediately after our mobilization and updated continually as a project matures. A partial list of the activities and procedures covered in the CMP includes: Section One - Management Plan Section Two - Administrative Procedures (As-Applicable) Project Description Key Project Success Factors Directory of Participants Organization Chart Responsibility Assignment Matrix Emergency Response Plan Safety Plan QA/Inspection Plan Disputes/Claims Management Plan Records Management RFI Management Submittal Management Meeting Management Scheduling Change Orders Pay Applications Monthly Reports Correspondence Punch Lists Closeout HR Green’s inspection team has experience working closely with City representatives, contractors/superintendents, utility companies’ representatives, and project stakeholders. Our inspectors will keep City staff informed of project advancements, delays, and overall timelines. Record keeping and communication is strongly enforced by our field staff. In the unforeseen event that one of our inspectors is taken off an assignment (i.e. health or personal), HR Green will promptly notify the City of the succession plan. Page 29 Professional On-Call Civil Engineering Services Z City of Diamond Bar Quality Assurance and Quality Control HR Green understands that Quality Assurance (QA) and Quality Control (QC) rely on more than just a quality product; it relies on the processes and management that it takes to deliver that product. The benefit of this to the City is working with a consultant who has established a Quality Management Plan that is distributed company-wide, which streamlines processes and identifies roles on a project-by-project basis. Tina York, PE, will be the QA/QC Manager for this project with the responsibility for verifying that the QC processes outlined in the Quality Management Plan are adhered to by using an ongoing QA audit process. QA/QC Key Elements 1 2 34 5 6 QA/QC Program Elements 1. Quality Management Plan (QMP) − A QMP will be prepared by the Project Manager and approved by the Quality Manager for each project. It will be reviewed and adopted by the team at the kickoff meeting. This plan will set forth the quality control and assurance procedures to be used, key staff and their roles and schedules for the various reviews to be conducted. 2. Risk Management Plan − A Risk Management meeting will be held and a Risk Management Plan will be prepared. The purpose of this plan is to identify and mitigate technical risks which would endanger the project schedule or budget. This meeting is chaired by the Project Manager assisted by the QM and in-cludes all discipline leads. Example risks include determining acquisition needs, construction cost, and permitting. All three of these can delay the project, but early identification and mitiga-tion will help keep the project moving. 3. Intra-Discipline Check − Ongoing quality control checking of documents will be the responsibility of the Task Leaders in accordance with the project QMP. The Task Leader will perform the check or assign an experi-enced member of the designer’s discipline to complete the check. In addition, a QA review will take place prior to contract submittals to affirm the QC procedures have been followed. 4. Inter-Discipline Reviews − These reviews focus on coordination between disciplines, interference checks and systems inte-gration. This review would take place before each submittal and be performed by senior technical staff with experience in multiple disciplines. 5. Constructibility/Value Engineering Review − Prior to each contractual submittal, a Constructibility/ Value Engineering review will take place. This review is performed by construction staff and focuses on construction methods and techniques to identify problems and optimize schedule and cost. 6. Peer Reviews − Prior to the conceptual design completion submittal, a peer review will be performed by a senior engineer not previously involved with the project. The focus of this review will include key elements as well as mitigation issues from the Risk Management Plan. Each team member has specific quality assurance responsibilities; however, the primary responsibility for quality assurance rests with the Program/Project Manager. They are responsible for client communications, act as the liaison among the project team members, and are responsible for meeting the project schedule. Page 30 Professional On-Call Civil Engineering Services Z City of Diamond Bar Schedule Control Schedule Control HR Green employs proven best practices and a proactive plan to control project schedules. Utilizing Microsoft Project and Primavera P6 enterprise solutions, the schedule will specifically include QC deliverable milestones and critical path that list the significant QC activities, including task level reviews, project manager and constructability reviews, schedule reviews, budget reviews and, most importantly, construction document reviews. We will develop, resource load, baseline, and consistently monitor the progress of the project. Our schedule update is essential to give the City an overview of the project status, issues, budgets and, most importantly, delivery date. We consistently incorporate best practice tools (implementation of policies, procedures, and standards) in our assignments. This flexibility and adaptability adds great value in responding to changing needs without missing a beat. We maintain effective and open communication with stakeholders early on to ensure they understand the latest standards and requirements, and are receiving the requisite supporting data and documentation to expeditiously move forward with construction and compliance with design standards. One of the most helpful ways to keep projects on track is to establish open communication early and often (verbal and comprehensive written documentation/ correspondence) throughout the design and construction process. Establishing a positive rapport and working relationship at the initial and subsequent meetings will promote constructive dialogue between stakeholders. Mutual buy-in can be established on areas of concern, performance expectations, goals, action items, methods of construction, design standards, code interpretations, milestones, etc. Our staff will serve as a facilitator and problem-solver to maintain forward momentum. They will visit the site to determine the improvements are practicable to existing site conditions and will try to anticipate issues to avoid future disputes. HR Green also possesses a deep bench of in-house resources. We can call upon additional staff or specific technical proficiency from any of our offices across the nation to get your project back on schedule, if needed. As discussed earlier, HR Green will implement the most appropriate proven best practice tools and technologies to reduce paper, save time and money, enhance collaboration; and streamline communication and service delivery. Some of these items include, but will not be limited to:  Electronic plan check  Permitting software  Maximize usage of City’s mapping and integration platform and decision-making tool to track data and identify trends in CIP, permit, and maintenance activity; infrastructure assets; actions; and results  Tracking logs  Smartphone and tablet-based field applications  Monthly progress reports  GIS interface to track data and manage infrastructure assets Appendix—W-9 Page 32 Professional On-Call Civil Engineering Services Z City of Diamond Bar Form W-9 (Rev. October 2018) Department of the Treasury Internal Revenue Service Request for Taxpayer Identification Number and Certification a Go to www.irs.gov/FormW9 for instructions and the latest information. Give Form to the requester. Do not send to the IRS.Print or type. See Specific Instructions on page 3.1 Name (as shown on your income tax return). Name is required on this line; do not leave this line blank. 2 Business name/disregarded entity name, if different from above 3 Check appropriate box for federal tax classification of the person whose name is entered on line 1. Check only one of the following seven boxes. Individual/sole proprietor or single-member LLC C Corporation S Corporation Partnership Trust/estate Limited liability company. Enter the tax classification (C=C corporation, S=S corporation, P=Partnership) a Note: Check the appropriate box in the line above for the tax classification of the single-member owner. Do not check LLC if the LLC is classified as a single-member LLC that is disregarded from the owner unless the owner of the LLC is another LLC that is not disregarded from the owner for U.S. federal tax purposes. Otherwise, a single-member LLC that is disregarded from the owner should check the appropriate box for the tax classification of its owner. Other (see instructions) a 4 Exemptions (codes apply only to certain entities, not individuals; see instructions on page 3): Exempt payee code (if any) Exemption from FATCA reporting code (if any) (Applies to accounts maintained outside the U.S.) 5 Address ( Earhart LN SW Cedar Rapids, IA 52404 82 1518456 Appendix—Exceptions and Considerations Page 34 Professional On-Call Civil Engineering Services Z City of Diamond Bar Exceptions and Considerations The sample contract provided contains language that should be modified or clarified to be more specific to the services being delivered. If selected, HR Green would like the opportunity to work with the City to develop the proposed agreement and address very specific issues similar to the contract we currently hold with the City of Diamond Bar. We would be prepared to discuss these matters immediately upon selection to assure that no time is lost and that the proposed work can be carried out in a timely manner. Based on our review, we believe revisions will provide greater clarity as to contractual obligations as well as compliance with state law requirements, which will benefit both parties. Page 35 Professional On-Call Civil Engineering Services Z City of Diamond Bar Z HRGREEN.COM TRANSPORTATION + WATER + GOVERNMENTAL SERVICES + LAND DEVELOPMENT + ENVIRONMENTAL + CONSTRUCTION