Loading...
HomeMy WebLinkAboutSWCA_Canyon Loop Fee Proposal October 17, 2023 Ryan Wright, Parks and Recreation Director City of Diamond Bar Re: Canyon Loop Trail Improvement Project City of Diamond Bar – Fee Proposal Dear Ryan Wright: SWCA Environmental Consultants (SWCA) appreciates the opportunity to submit our fee proposal to provide restoration contractor services for the Canyon Loop Trail Improvement – Habitat Mitigation and Monitoring Program Project (project) for the City of Diamond Bar (City). We understand that this trail is a priority project for the City, and our team is thrilled to have this opportunity to provide creative and efficient solutions to help you realize this important regional vision and meet the growing environmental compliance needs of the City. Thank you for providing us with the opportunity to work with you. Should you have any questions regarding fee our proposal please contact me at (626) 240-0587 or marcus.goncalves@swca.com if you have any questions regarding this proposal. Sincerely, Marcus Goncalves Project Manager Canyon Loop Trail Improvement Project City of Diamond Bar – Fee Proposal Page | 1 COST ESTIMATE AND ASSUMPTIONS Based on thoughtful consideration of the project requirements and a thorough estimate of the required labor and direct costs, SWCA proposes a not-to-exceed budget of $313,825 to complete the project as presented in the table below. To accommodate project changes and scheduling, it is assumed that SWCA will be able to use the overall project funding and will not be held to phase and task limits so long as the overall budget is not exceeded. SWCA will submit a budget summary with each invoice to provide visibility and track monthly spending.] Rates are subject to a [3%] increase no more than once every 12 months after project kickoff. This cost estimate is valid for [ninety (90) days] from the date of the proposal. Table 1. Cost Estimate PHASE/TASK SWCA LABOR EXPENSES NOT-TO- EXCEED TOTAL Phase 1. Implementation Task 1. Preconstruction Tasks $3,166 – $3,166 Task 2. Site Fencing and Buffer Flagging $16,234 $930 $17,164 Task 3. Nesting Bird Surveys and Prework Surveys $7,100 $930 $8,030 Task 4. Clearing, Grubbing, and Weed Abatement $20,604 $930 $21,534 Task 5. Installation and Seeding $20,254 $1,861 $22,115 Task 6. Irrigation Plan and Year 1 Irrigation Costs $26,486 $586 $27,072 Task 7. Signage $2,325 – $2,325 Task 8. As-Built Report $8,940 – $8,940 Phase 2. Maintenance and Monitoring Task 1. 5-Year Maintenance and Qualitative Monitoring $202,447 – $202,447 Task 2. Performance Standards and Sign-Off $1,032 – $1,032 PROJECT TOTAL $308,588 $5,237 $313,825 ASSUMPTIONS • Costs do not include fees, testing, permits, or engineering. • Plants and seed will be purchased by the SWCA team. • No traffic control will be needed. • The handling of utilities buried underground, removal of asphalt, concrete, and rock are not included. • Seed collection is not included. • All costs include labor and ODCs associated with implementing the HMMP as described in the scope of work. • No automated irrigation system has been included