Loading...
HomeMy WebLinkAboutBid Tabulation Sheet_ Contractor1Item No. Bid Item Description Unit Estimated Quantity Unit Price Cost Unit Price Cost Unit Price Cost Unit Price Cost Unit Price Cost Unit Price Cost Unit Price Cost Unit Price Cost 1 Mobilization and Demobilization LS 1 $578,000.00 $578,000.00 $ 120,000.00 $ 120,000.00 $ 350,000.00 $ 350,000.00 $494,811.50 $494,811.50 $830,000.00 $830,000.00 $950,000.00 $950,000.00 $500,000.00 $500,000.00 $554,000.00 $554,000.00 2 Traffic Control LS 1 $400,000.00 $400,000.00 $ 75,000.00 $ 75,000.00 $ 570,000.00 $ 570,000.00 $400,000.00 $400,000.00 $298,000.00 $298,000.00 $600,000.00 $600,000.00 $300,000.00 $300,000.00 $518,115.21 $518,115.21 3 Stormwater Pollution Control LS 1 $64,000.00 $64,000.00 $ 35,000.00 $ 35,000.00 $ 35,000.00 $ 35,000.00 $40,000.00 $40,000.00 $35,000.00 $35,000.00 $50,000.00 $50,000.00 $50,000.00 $50,000.00 $44,585.10 $44,585.10 4 Signing and Striping LS 1 $45,000.00 $45,000.00 $ 70,000.00 $ 70,000.00 $ 65,000.00 $ 65,000.00 $160,000.00 $160,000.00 $148,000.00 $148,000.00 $150,000.00 $150,000.00 $80,000.00 $80,000.00 $156,250.00 $156,250.00 5 Clearing and Grubbing LS 1 $25,000.00 $25,000.00 $ 50,000.00 $ 50,000.00 $ 110,000.00 $ 110,000.00 $30,000.00 $30,000.00 $50,000.00 $50,000.00 $255,000.00 $255,000.00 $300,000.00 $300,000.00 $97,643.55 $97,643.55 6 Replace Private Landscaping and Irrigation LS 1 $12,000.00 $12,000.00 $ 30,000.00 $ 30,000.00 $ 26,000.00 $ 26,000.00 $20,000.00 $20,000.00 $24,154.00 $24,154.00 $50,000.00 $50,000.00 $25,000.00 $25,000.00 $43,145.31 $43,145.31 7 Remove Existing Tree EA 19 $1,600.00 $30,400.00 $ 2,200.00 $ 41,800.00 $ 2,300.00 $ 43,700.00 $2,000.00 $38,000.00 $2,000.00 $38,000.00 $3,000.00 $57,000.00 $1,800.00 $34,200.00 $1,687.50 $32,062.50 8 Monument Preservation LS 1 $10,000.00 $10,000.00 $ 40,000.00 $ 40,000.00 $ 13,000.00 $ 13,000.00 $7,500.00 $7,500.00 $4,000.00 $4,000.00 $250,000.00 $250,000.00 $25,000.00 $25,000.00 $40,260.00 $40,260.00 9 Remove Existing Asphalt Concrete Pavement SF 62,270 $3.00 $186,810.00 $ 3.00 $ 186,810.00 $ 2.00 $ 124,540.00 $3.00 $186,810.00 $3.00 $186,810.00 $7.50 $467,025.00 $5.00 $311,350.00 $4.36 $271,497.20 10 Remove Existing Concrete Facility SF 45,630 $4.00 $182,520.00 $ 3.00 $ 136,890.00 $ 6.00 $ 273,780.00 $4.50 $205,335.00 $3.00 $136,890.00 $6.00 $273,780.00 $5.00 $228,150.00 $3.00 $136,890.00 11 Remove Existing Stairs and Handrail SF 90 $10.00 $900.00 $ 25.00 $ 2,250.00 $ 26.00 $ 2,340.00 $40.00 $3,600.00 $30.00 $2,700.00 $50.00 $4,500.00 $10.00 $900.00 $10.01 $900.90 12 Remove Existing Street Light and Foundation EA 17 $1,500.00 $25,500.00 $ 3,000.00 $ 51,000.00 $ 1,300.00 $ 22,100.00 $2,200.00 $37,400.00 $2,500.00 $42,500.00 $3,000.00 $51,000.00 $3,500.00 $59,500.00 $2,269.20 $38,576.40 13 Remove Existing Catch Basin EA 2 $3,000.00 $6,000.00 $ 2,000.00 $ 4,000.00 $ 8,450.00 $ 16,900.00 $5,500.00 $11,000.00 $2,000.00 $4,000.00 $5,000.00 $10,000.00 $2,500.00 $5,000.00 $7,102.99 $14,205.98 14 Adjust to Grade Existing Storm Drain Manhole EA 2 $2,000.00 $4,000.00 $ 2,500.00 $ 5,000.00 $ 850.00 $ 1,700.00 $3,500.00 $7,000.00 $550.00 $1,100.00 $2,500.00 $5,000.00 $950.00 $1,900.00 $2,835.00 $5,670.00 15 Adjust to Grade Existing Sewer Manhole EA 6 $2,000.00 $12,000.00 $ 2,500.00 $ 15,000.00 $ 850.00 $ 5,100.00 $3,500.00 $21,000.00 $550.00 $3,300.00 $2,500.00 $15,000.00 $950.00 $5,700.00 $2,835.00 $17,010.00 16 Watertight Sewer Manhole Cover EA 1 $1,000.00 $1,000.00 $ 5,000.00 $ 5,000.00 $ 1,600.00 $ 1,600.00 $3,000.00 $3,000.00 $2,000.00 $2,000.00 $5,000.00 $5,000.00 $2,000.00 $2,000.00 $5,670.00 $5,670.00 17 Relocate Existing Bus Shelter EA 5 $2,500.00 $12,500.00 $ 4,200.00 $ 21,000.00 $ 2,800.00 $ 14,000.00 $4,000.00 $20,000.00 $6,500.00 $32,500.00 $10,000.00 $50,000.00 $5,000.00 $25,000.00 $34,022.76 $170,113.80 18 Relocate Existing Backflow Prevention Assembly EA 10 $3,000.00 $30,000.00 $ 1,600.00 $ 16,000.00 $ 3,250.00 $ 32,500.00 $25,000.00 $250,000.00 $2,700.00 $27,000.00 $8,000.00 $80,000.00 $10,000.00 $100,000.00 $8,925.00 $89,250.00 19 Cold Mill (2" thick)SF 68,130 $3.00 $204,390.00 $ 0.80 $ 54,504.00 $ 0.70 $ 47,691.00 $0.70 $47,691.00 $0.50 $34,065.00 $0.50 $34,065.00 $2.00 $136,260.00 $66.00 $4,496,580.00 20 Unclassified Excavation CY 790 $120.00 $94,800.00 $ 120.00 $ 94,800.00 $ 120.00 $ 94,800.00 $200.00 $158,000.00 $375.00 $296,250.00 $230.00 $181,700.00 $200.00 $158,000.00 $64.91 $51,278.90 21 Asphalt Concrete TN 1,340 $150.00 $201,000.00 $ 200.00 $ 268,000.00 $ 100.00 $ 134,000.00 $190.00 $254,600.00 $225.00 $301,500.00 $210.00 $281,400.00 $200.00 $268,000.00 $202.33 $271,122.20 22 Asphalt Rubber Hot Mix TN 1,240 $180.00 $223,200.00 $ 175.00 $ 217,000.00 $ 135.00 $ 167,400.00 $190.00 $235,600.00 $165.00 $204,600.00 $155.00 $192,200.00 $220.00 $272,800.00 $176.00 $218,240.00 23 Concrete Bus Pad SF 3,080 $35.00 $107,800.00 $ 30.00 $ 92,400.00 $ 18.00 $ 55,440.00 $40.00 $123,200.00 $28.00 $86,240.00 $19.00 $58,520.00 $30.00 $92,400.00 $19.12 $58,889.60 24 Curb and Gutter (Type A2)LF 2,930 $40.00 $117,200.00 $ 85.00 $ 249,050.00 $ 90.00 $ 263,700.00 $85.00 $249,050.00 $50.00 $146,500.00 $85.00 $249,050.00 $200.00 $586,000.00 $38.38 $112,453.40 25 Curb and Gutter (Type A3-6) LF 2,250 $30.00 $67,500.00 $ 85.00 $ 191,250.00 $ 95.00 $ 213,750.00 $85.00 $191,250.00 $32.00 $72,000.00 $60.00 $135,000.00 $200.00 $450,000.00 $40.77 $91,732.50 26 Curb (Type A1)LF 310 $20.00 $6,200.00 $ 60.00 $ 18,600.00 $ 65.00 $ 20,150.00 $75.00 $23,250.00 $22.00 $6,820.00 $40.00 $12,400.00 $100.00 $31,000.00 $35.64 $11,048.40 27 Concrete Flatwork (Pathway) SF 24,340 $20.00 $486,800.00 $ 15.00 $ 365,100.00 $ 12.00 $ 292,080.00 $20.00 $486,800.00 $14.00 $340,760.00 $12.00 $292,080.00 $30.00 $730,200.00 $14.44 $351,469.60 28 Concrete Flatwork (Colored; Median)SF 860 $25.00 $21,500.00 $ 30.00 $ 25,800.00 $ 14.00 $ 12,040.00 $30.00 $25,800.00 $15.00 $12,900.00 $19.00 $16,340.00 $35.00 $30,100.00 $18.33 $15,763.80 29 Concrete Flatwork (Colored; Bus Stops, Ramps, Curb Returns)SF 5,120 $32.00 $163,840.00 $ 32.00 $ 163,840.00 $ 45.50 $ 232,960.00 $30.00 $153,600.00 $16.00 $81,920.00 $24.00 $122,880.00 $35.00 $179,200.00 $24.57 $125,798.40 30 Jointed Plain Concrete Pavement Driveway SF 1,230 $40.00 $49,200.00 $ 21.00 $ 25,830.00 $ 14.00 $ 17,220.00 $40.00 $49,200.00 $17.00 $20,910.00 $18.00 $22,140.00 $50.00 $61,500.00 $18.09 $22,250.70 31 Concrete Driveway Approach (Uncolored)SF 4,000 $25.00 $100,000.00 $ 21.00 $ 84,000.00 $ 14.00 $ 56,000.00 $30.00 $120,000.00 $18.00 $72,000.00 $16.00 $64,000.00 $35.00 $140,000.00 $19.10 $76,400.00 32 Concrete Driveway Approach (Colored)SF 5,940 $35.00 $207,900.00 $ 32.00 $ 190,080.00 $ 18.00 $ 106,920.00 $35.00 $207,900.00 $21.00 $124,740.00 $21.00 $124,740.00 $35.00 $207,900.00 $22.12 $131,392.80 33 Crosswalk (Colored Concrete Band)LF 1,140 $35.00 $39,900.00 $ 32.00 $ 36,480.00 $ 26.00 $ 29,640.00 $65.00 $74,100.00 $188.00 $214,320.00 $85.00 $96,900.00 $35.00 $39,900.00 $95.75 $109,155.00 34 Crosswalk (Colored Concrete Flatwork)SF 2,720 $30.00 $81,600.00 $ 25.00 $ 68,000.00 $ 18.00 $ 48,960.00 $40.00 $108,800.00 $65.00 $176,800.00 $30.00 $81,600.00 $35.00 $95,200.00 $19.93 $54,209.60 35 Crosswalk (Jointed Plain Concrete Pavement Base)SF 6,820 $40.00 $272,800.00 $ 25.00 $ 170,500.00 $ 28.00 $ 190,960.00 $35.00 $238,700.00 $38.00 $259,160.00 $24.00 $163,680.00 $35.00 $238,700.00 $21.03 $143,424.60 36 Concrete Paver pathway SF 4,560 $25.00 $114,000.00 $ 32.00 $ 145,920.00 $ 55.00 $ 250,800.00 $62.00 $282,720.00 $95.00 $433,200.00 $45.00 $205,200.00 $35.00 $159,600.00 $209.05 $953,268.00 37 Crosswalk (Concrete Pavers, 8cm) SF 150 $15.00 $2,250.00 $ 25.00 $ 3,750.00 $ 385.00 $ 57,750.00 $475.00 $71,250.00 $230.00 $34,500.00 $450.00 $67,500.00 $40.00 $6,000.00 $385.00 $57,750.00 GMZ Engineering, Inc. CT&T Concrete Paving Inc. Bid Opening date: 2:00 P.M. Oct. 21, 2025 Anticipated Award date: Nov. 4, 2025 Sequel Contractors, Inc.Los Angeles Engineering, Inc.Gentry Brothers Inc. Vido Samarzich, Inc.Towo Enterprise Inc.Engineer's Estimate 38 Crosswalk (Concrete Pavers, 10cm)SF 6,820 $20.00 $136,400.00 $ 35.00 $ 238,700.00 $ 65.00 $ 443,300.00 $42.00 $286,440.00 $75.00 $511,500.00 $40.00 $272,800.00 $45.00 $306,900.00 $39.82 $271,572.40 39 Detectable Warning Surface SF 550 $20.00 $11,000.00 $ 25.00 $ 13,750.00 $ 35.00 $ 19,250.00 $35.00 $19,250.00 $45.00 $24,750.00 $55.00 $30,250.00 $125.00 $68,750.00 $26.96 $14,828.00 40 Tactile Directional Indicator LF 290 $50.00 $14,500.00 $ 50.00 $ 14,500.00 $ 20.00 $ 5,800.00 $60.00 $17,400.00 $55.00 $15,950.00 $60.00 $17,400.00 $120.00 $34,800.00 $46.00 $13,340.00 41 Curb Drain LF 550 $50.00 $27,500.00 $ 50.00 $ 27,500.00 $ 80.00 $ 44,000.00 $75.00 $41,250.00 $16.00 $8,800.00 $35.00 $19,250.00 $100.00 $55,000.00 $147.28 $81,004.00 42 Drop Inlet Catch Basin for Curb Drain EA 5 $1,500.00 $7,500.00 $ 15,000.00 $ 75,000.00 $ 4,800.00 $ 24,000.00 $3,000.00 $15,000.00 $2,800.00 $14,000.00 $3,000.00 $15,000.00 $15,000.00 $75,000.00 $816.65 $4,083.25 43 Parkway Drain SF 308 $500.00 $154,000.00 $ 150.00 $ 46,200.00 $ 28.00 $ 8,624.00 $100.00 $30,800.00 $125.00 $38,500.00 $50.00 $15,400.00 $45.00 $13,860.00 $112.34 $34,600.72 44 Concrete Slough Wall LF 300 $280.00 $84,000.00 $ 60.00 $ 18,000.00 $ 23.00 $ 6,900.00 $350.00 $105,000.00 $300.00 $90,000.00 $300.00 $90,000.00 $400.00 $120,000.00 $47.67 $14,301.00 45 Wall Underdrain LF 90 $50.00 $4,500.00 $ 120.00 $ 10,800.00 $ 28.00 $ 2,520.00 $100.00 $9,000.00 $55.00 $4,950.00 $150.00 $13,500.00 $200.00 $18,000.00 $135.35 $12,181.50 46 Concrete Reinforced Stairs SF 90 $250.00 $22,500.00 $ 120.00 $ 10,800.00 $ 260.00 $ 23,400.00 $300.00 $27,000.00 $150.00 $13,500.00 $80.00 $7,200.00 $45.00 $4,050.00 $19.48 $1,753.20 47 Metal Handrailing LF 28 $400.00 $11,200.00 $ 200.00 $ 5,600.00 $ 600.00 $ 16,800.00 $350.00 $9,800.00 $600.00 $16,800.00 $250.00 $7,000.00 $400.00 $11,200.00 $640.80 $17,942.40 48 Catch Basin (W=7')EA 2 $10,000.00 $20,000.00 $ 18,000.00 $ 36,000.00 $ 15,000.00 $ 30,000.00 $16,000.00 $32,000.00 $18,000.00 $36,000.00 $18,000.00 $36,000.00 $25,000.00 $50,000.00 $20,442.40 $40,884.80 49 Reinforced Concrete Pipe (15") LF 10 $500.00 $5,000.00 $ 1,000.00 $ 10,000.00 $ 365.00 $ 3,650.00 $1,500.00 $15,000.00 $1,000.00 $10,000.00 $1,500.00 $15,000.00 $500.00 $5,000.00 $841.70 $8,417.00 50 Parkway Bioretention SF 2,760 $25.00 $69,000.00 $ 40.00 $ 110,400.00 $ 55.00 $ 151,800.00 $100.00 $276,000.00 $80.00 $220,800.00 $130.00 $358,800.00 $75.00 $207,000.00 $16.65 $45,954.00 51 Tree Grate and Frame EA 33 $2,200.00 $72,600.00 $ 3,000.00 $ 99,000.00 $ 3,700.00 $ 122,100.00 $3,750.00 $123,750.00 $3,800.00 $125,400.00 $4,000.00 $132,000.00 $4,000.00 $132,000.00 $2,976.15 $98,212.95 52 Lighted Bollard EA 177 $400.00 $70,800.00 $ 1,600.00 $ 283,200.00 $ 2,420.00 $ 428,340.00 $2,500.00 $442,500.00 $2,800.00 $495,600.00 $2,300.00 $407,100.00 $2,500.00 $442,500.00 $2,500.96 $442,669.92 53 Traffic Signal Improvements - Diamond Bar Blvd. and Golden Springs Dr. LS 1 $380,000.00 $380,000.00 $ 460,000.00 $ 460,000.00 $ 494,015.00 $ 494,015.00 $550,000.00 $550,000.00 $600,000.00 $600,000.00 $500,000.00 $500,000.00 $500,000.00 $500,000.00 $572,114.65 $572,114.65 54 Traffic Signal Improvements - Diamond Bar Blvd. and Palomino Dr. LS 1 $380,000.00 $380,000.00 $ 490,000.00 $ 490,000.00 $ 525,170.00 $ 525,170.00 $478,500.00 $478,500.00 $540,000.00 $540,000.00 $450,000.00 $450,000.00 $500,000.00 $500,000.00 $525,195.00 $525,195.00 55 Traffic Signal Improvements - Diamond Bar Blvd. at Commercial Driveways LS 1 $300,000.00 $300,000.00 $ 460,000.00 $ 460,000.00 $ 490,450.00 $ 490,450.00 $475,000.00 $475,000.00 $530,000.00 $530,000.00 $450,000.00 $450,000.00 $500,000.00 $500,000.00 $489,500.00 $489,500.00 56 Relocate Existing Electrical Controller and Meters LS 1 $8,000.00 $8,000.00 $ 50,000.00 $ 50,000.00 $ 111,220.00 $ 111,220.00 $11,000.00 $11,000.00 $11,500.00 $11,500.00 $125,000.00 $125,000.00 $100,000.00 $100,000.00 $11,121.60 $11,121.60 57 Street Light (Single Mast Arm) EA 13 $12,000.00 $156,000.00 $ 16,500.00 $ 214,500.00 $ 18,095.00 $ 235,235.00 $15,000.00 $195,000.00 $17,000.00 $221,000.00 $18,000.00 $234,000.00 $20,000.00 $260,000.00 $18,149.32 $235,941.16 58 Street Light (Dual Mast Arm)EA 2 $15,000.00 $30,000.00 $ 25,000.00 $ 50,000.00 $ 41,800.00 $ 83,600.00 $22,000.00 $44,000.00 $25,000.00 $50,000.00 $40,000.00 $80,000.00 $45,000.00 $90,000.00 $25,421.25 $50,842.50 59 Bollard Light Fixture EA 177 $90.00 $15,930.00 $ 1,600.00 $ 283,200.00 $ 264.00 $ 46,728.00 $125.00 $22,125.00 $100.00 $17,700.00 $240.00 $42,480.00 $250.00 $44,250.00 $94.80 $16,779.60 60 Hardscape Uplighting LS 1 $6,000.00 $6,000.00 $ 50,000.00 $ 50,000.00 $ 38,522.00 $ 38,522.00 $15,000.00 $15,000.00 $20,000.00 $20,000.00 $40,000.00 $40,000.00 $40,000.00 $40,000.00 $16,363.20 $16,363.20 61 Lighting Conduit, Wiring, and Appurtenances (Street Lighting)LS 1 $100,000.00 $100,000.00 $ 30,000.00 $ 30,000.00 $ 102,212.00 $ 102,212.00 $77,000.00 $77,000.00 $88,000.00 $88,000.00 $100,000.00 $100,000.00 $100,000.00 $100,000.00 $102,212.00 $102,212.00 62 Lighting Conduit, Wiring, and Appurtenances (Bollard, Hardscape lighting) LS 1 $130,000.00 $130,000.00 $ 160,000.00 $ 160,000.00 $ 188,480.00 $ 188,480.00 $116,000.00 $116,000.00 $130,000.00 $130,000.00 $180,000.00 $180,000.00 $300,000.00 $300,000.00 $126,655.20 $126,655.20 63 Decorative Post and Rail EA 11 $4,000.00 $44,000.00 $ 25,000.00 $ 275,000.00 $ 25,080.00 $ 275,880.00 $28,000.00 $308,000.00 $25,000.00 $275,000.00 $13,000.00 $143,000.00 $25,000.00 $275,000.00 $25,536.00 $280,896.00 64 Decorative Post and Rail with Steel panel EA 3 $8,500.00 $25,500.00 $ 50,000.00 $ 150,000.00 $ 52,800.00 $ 158,400.00 $60,000.00 $180,000.00 $53,000.00 $159,000.00 $60,000.00 $180,000.00 $50,000.00 $150,000.00 $53,280.00 $159,840.00 65 Topsoil CY 450 $50.00 $22,500.00 $ 85.00 $ 38,250.00 $ 71.50 $ 32,175.00 $90.00 $40,500.00 $130.00 $58,500.00 $90.00 $40,500.00 $125.00 $56,250.00 $268.80 $120,960.00 66 Soil Preparation and fine Grading SF 13,125 $0.60 $7,875.00 $ 1.40 $ 18,375.00 $ 0.60 $ 7,875.00 $1.50 $19,687.50 $4.00 $52,500.00 $1.40 $18,375.00 $10.00 $131,250.00 $1.57 $20,606.25 67 Irrigation System LS 1 $347,000.00 $347,000.00 $ 278,000.00 $ 278,000.00 $ 421,798.00 $ 421,798.00 $350,000.00 $350,000.00 $350,000.00 $350,000.00 $300,000.00 $300,000.00 $300,000.00 $300,000.00 $311,360.00 $311,360.00 68 Deeproot barrier (24" x 24")EA 336 $12.00 $4,032.00 $ 20.00 $ 6,720.00 $ 15.50 $ 5,208.00 $20.00 $6,720.00 $40.00 $13,440.00 $20.00 $6,720.00 $25.00 $8,400.00 $22.40 $7,526.40 69 36" Box Tree EA 6 $1,000.00 $6,000.00 $ 1,200.00 $ 7,200.00 $ 1,100.00 $ 6,600.00 $1,000.00 $6,000.00 $1,100.00 $6,600.00 $1,100.00 $6,600.00 $1,200.00 $7,200.00 $1,176.00 $7,056.00 70 24" Box Tree EA 33 $400.00 $13,200.00 $ 500.00 $ 16,500.00 $ 660.00 $ 21,780.00 $400.00 $13,200.00 $600.00 $19,800.00 $425.00 $14,025.00 $450.00 $14,850.00 $459.20 $15,153.60 71 5 Gallon Shrub/ Groundcover EA 453 $35.00 $15,855.00 $ 50.00 $ 22,650.00 $ 33.00 $ 14,949.00 $50.00 $22,650.00 $48.00 $21,744.00 $50.00 $22,650.00 $75.00 $33,975.00 $51.52 $23,338.56 72 1 Gallon Shrub/ Groundcover EA 3,014 $15.00 $45,210.00 $ 20.00 $ 60,280.00 $ 11.00 $ 33,154.00 $20.00 $60,280.00 $13.00 $39,182.00 $20.00 $60,280.00 $50.00 $150,700.00 $20.90 $62,992.60 73 Mulch CY 45 $40.00 $1,800.00 $ 120.00 $ 5,400.00 $ 115.00 $ 5,175.00 $100.00 $4,500.00 $115.00 $5,175.00 $125.00 $5,625.00 $100.00 $4,500.00 $112.00 $5,040.00 74 Rock Cobble (3" to 8" Angular) SF 995 $6.00 $5,970.00 $ 15.00 $ 14,925.00 $ 5.00 $ 4,975.00 $16.00 $15,920.00 $36.00 $35,820.00 $15.00 $14,925.00 $30.00 $29,850.00 $16.58 $16,497.10 75 Rock Cobble (2" to 8" Round) SF 6,730 $5.00 $33,650.00 $ 12.00 $ 80,760.00 $ 6.00 $ 40,380.00 $12.00 $80,760.00 $30.00 $201,900.00 $12.00 $80,760.00 $15.00 $100,950.00 $12.88 $86,682.40 76 18" Dia. Boulder (1.5' x 1.5' x 2') EA 9 $75.00 $675.00 $ 550.00 $ 4,950.00 $ 1,265.00 $ 11,385.00 $600.00 $5,400.00 $650.00 $5,850.00 $600.00 $5,400.00 $600.00 $5,400.00 $616.00 $5,544.00 77 24" Dia. Boulder (2' x 2' x3')EA 36 $100.00 $3,600.00 $ 1,000.00 $ 36,000.00 $ 1,265.00 $ 45,540.00 $900.00 $32,400.00 $1,300.00 $46,800.00 $1,000.00 $36,000.00 $1,250.00 $45,000.00 $1,120.00 $40,320.00 78 24" Dia. Boulder (3'x 2' x 2')EA 16 $100.00 $1,600.00 $ 1,200.00 $ 19,200.00 $ 1,375.00 $ 22,000.00 $950.00 $15,200.00 $1,250.00 $20,000.00 $1,200.00 $19,200.00 $1,250.00 $20,000.00 $1,288.00 $20,608.00 79 36" Dia. Boulder (4' x 3' x3')EA 19 $125.00 $2,375.00 $ 3,000.00 $ 57,000.00 $ 2,200.00 $ 41,800.00 $2,000.00 $38,000.00 $2,700.00 $51,300.00 $3,000.00 $57,000.00 $3,000.00 $57,000.00 $3,276.00 $62,244.00 80 90 Day Landscape and irrigation maintenance Period.LS 1 $30,000.00 $30,000.00 $ 10,000.00 $ 10,000.00 $ 10,450.00 $ 10,450.00 $6,000.00 $6,000.00 $7,500.00 $7,500.00 $7,000.00 $7,000.00 $10,000.00 $10,000.00 $8,400.00 $8,400.00 AS SUBMITTED Subtotal:$7,014,782.00 $7,718,014.00 $ 8,880,401.00 $9,676,000.00 $9,990,000.00 $10,419,940.00 $11,415,095.00 $14,091,608.41 CORRECTED $8,805,161.00 $10,380,940.00 $11,315,095.00