Loading...
HomeMy WebLinkAboutBid PacketAndre Ortiz Andre Ortiz President Siterep Construction Bid Bond 10% BID SCHEDULE CITY OF DIAMOND BAR CONTRACT DOCUMENTS AND SPECIFICATIONS STEEP CANYON ROAD EROSION CONTROL AND SEDIMENTATION PREVENTION AT CLEAR CREEK CANYON DRIVE PROJECT CITY PROJECT NO. PW 24401 ITEM ESTIMATED QUANTITY DESCRIPTION WRITTEN IN WORDS UNIT PRICENO.UNIT AMOUNT General Mobilization, Demobilization, Clearing and Grubbing, and Miscellaneous Items of Work (Not to Exceed 5% of Total Construction Cost) 1 LS1 Construction Surveying/Staking, Monument Preservation, Reset Disturbed Monuments 2 LS1 3 1 LS Sheeting, Shoring, and Bracing Work Area Traffic Control and Public Notification (Includes Fencing and Security) 4 LS1 Implementation of Erosion Control Measures5LS1 Implementation of Temporary Drainage Provisions and Dewatering61LS Drainage Improvements Construct Detention Basin Complete-in- Place (Includes French Drain, ABS Drain Pipe, Structures, Rip Rap Blanket, and Appurtenances) 7 1 LS Construct Parkway Drain, W = 4’ per Standard Plan No. 151-3, SPPWC, 2021 Edition 8 LS1 Construct Curb Drain per Standard Plan No. 150-4, SPPWC, 2021 Edition91LS Street Improvements 14 1293492.1 Demo Existing Sidewalk and Reconstruct Joint to Joint per Standard Plan No. 113- 2, SPPWC, 2021 Edition 10 60 SF Construct Curb and Gutter - Mountable per Case B2-6(150), Standard Plan No. 121-3, SPPWC, 2021 Edition 11 10 LF Construct 4” Broom Finish PCC Pavement over 6” Class II Base1256 SF Construct 4” Grooved Finished PCC Pavement over 6” Class II Base13SF54 Construct 3-1/2” O.D. Cast-in-Place Removable Pipe bollard, Galvanized Finish 14 EA2 Construct 3/4” Crushed Rock Granular Backing150.68 TON MANDATORY BID SCHEDULE ITEMS: TOTAL AMOUNT BID (IN FIGURESp TOTAL AMOUNT BID, SCHEDULE (WRITTEN IN WORDS): Bid Schedule Note: Bid Price indicated refers to all items illustrated on the plans and details, and delineated within the specifications installed and completely in place with all applicable portions of the construction documents and include all costs connected with such items including, but to necessarily limited to, materials, transportation, taxes, insurance, labor, overhead, and profit, for General Contractor and Subcontractors. All work called for on the construction documents are to provide a completed project with all systems operating properly and ready for use. Award will be based on the items of Bid Schedule. Therefore, Contractor shall completely fill out Bid Schedule. Accompanying this proposal is (Insert "$cash", "cashier's check", "certified check", or "bidder's bond" as the case may be) in the amount equal to at least ten percent (10%) of the total bid. The undersigned further agrees that in case of default in executing the required contract, with necessary bond, within ten (10) days, not including Sundays and 15 1293492.1 BID BOND 10%