HomeMy WebLinkAboutBid PacketAndre Ortiz
Andre Ortiz
President
Siterep Construction
Bid Bond 10%
BID SCHEDULE
CITY OF DIAMOND BAR
CONTRACT DOCUMENTS AND SPECIFICATIONS
STEEP CANYON ROAD EROSION CONTROL AND SEDIMENTATION PREVENTION AT
CLEAR CREEK CANYON DRIVE PROJECT
CITY PROJECT NO. PW 24401
ITEM ESTIMATED
QUANTITY
DESCRIPTION
WRITTEN IN WORDS
UNIT
PRICENO.UNIT AMOUNT
General
Mobilization, Demobilization, Clearing and
Grubbing, and Miscellaneous Items of
Work (Not to Exceed 5% of Total
Construction Cost)
1 LS1
Construction Surveying/Staking,
Monument Preservation, Reset Disturbed
Monuments
2 LS1
3 1 LS Sheeting, Shoring, and Bracing
Work Area Traffic Control and Public
Notification (Includes Fencing and
Security)
4 LS1
Implementation of Erosion Control
Measures5LS1
Implementation of Temporary Drainage
Provisions and Dewatering61LS
Drainage Improvements
Construct Detention Basin Complete-in-
Place (Includes French Drain, ABS Drain
Pipe, Structures, Rip Rap Blanket, and
Appurtenances)
7 1 LS
Construct Parkway Drain, W = 4’ per
Standard Plan No. 151-3, SPPWC, 2021
Edition
8 LS1
Construct Curb Drain per Standard Plan
No. 150-4, SPPWC, 2021 Edition91LS
Street Improvements
14
1293492.1
Demo Existing Sidewalk and Reconstruct
Joint to Joint per Standard Plan No. 113-
2, SPPWC, 2021 Edition
10 60 SF
Construct Curb and Gutter - Mountable
per Case B2-6(150), Standard Plan No.
121-3, SPPWC, 2021 Edition
11 10 LF
Construct 4” Broom Finish PCC
Pavement over 6” Class II Base1256 SF
Construct 4” Grooved Finished PCC
Pavement over 6” Class II Base13SF54
Construct 3-1/2” O.D. Cast-in-Place
Removable Pipe bollard, Galvanized
Finish
14 EA2
Construct 3/4” Crushed Rock Granular
Backing150.68 TON
MANDATORY BID SCHEDULE ITEMS:
TOTAL AMOUNT BID (IN FIGURESp
TOTAL AMOUNT BID, SCHEDULE (WRITTEN IN WORDS):
Bid Schedule Note: Bid Price indicated refers to all items illustrated on the plans and details,
and delineated within the specifications installed and completely in place with all applicable
portions of the construction documents and include all costs connected with such items
including, but to necessarily limited to, materials, transportation, taxes, insurance, labor,
overhead, and profit, for General Contractor and Subcontractors.
All work called for on the construction documents are to provide a completed project with all
systems operating properly and ready for use.
Award will be based on the items of Bid Schedule. Therefore, Contractor shall completely fill out
Bid Schedule.
Accompanying this proposal is
(Insert "$cash", "cashier's check", "certified check", or
"bidder's bond" as the case may be) in the amount equal to at least ten percent
(10%) of the total bid.
The undersigned further agrees that in case of default in executing the required
contract, with necessary bond, within ten (10) days, not including Sundays and
15
1293492.1
BID BOND
10%