HomeMy WebLinkAboutCIP FP23506D - Bid Protest Response Letter Stan Liu Chia Yu Teng Andrew Chou Ruth M. Low Steve Tye Mayor Mayor Pro Tem Council Member Council Member Council Member At-Large District 4 District 3 At-Large District 1 City of Diamond Bar I 21810 Copley Drive Diamond Bar CA 91765-4178 www.DiamondBarCA.gov I (909) 839-7000 July 19, 2024 Mr. Hector Zavala KASA Construction Inc. 15148 Sierra Bonita Lane Chino, CA 91710 RE: City of Diamond Bar Maple Hill Park Improvement Project – Bid Protest Dear Mr. Zavala: Thank you for your bid protest letter of July 15, 2024, and raising a number of issues with the bid that was submitted by Siterep Construction Services Inc. (Siterep) for the Maple Hill Park Improvement (project). We have closely examined the items you have pointed out and determined that they are minor irregularities that do not affect the bid price and can be waived by the City Council. The City’s legal department has also reviewed your letter, objections, and staff’s determination and concurred with our findings. I will respond to the main issues you have raised as follows: 1. Statement of experience and qualifications by Siterep Siterep has completed similar projects in the last few years and possesses the requisite experience to undertake this project. 2. Notary acknowledgment on the bid bond The bid bond is valid. 3. Equal Opportunity Clause The required information is provided, but the signature is missing. 4. Addendum 1 Siterep had stated in PlanetBid that they had seen Addendum 1, and their bid was inclusive of the stipulations in said addendum. KASA Construction Inc. 2 July 19, 2024 5. Building Installation The manufacturer of the bathroom structure will provide its installation. Siterep will construct the foundation and utility stubs. 6. Sports Court Surfacing Siterep has installed sports courts surfacing on past projects in other cities, and will perform the work on this project. If you have questions or need further information, please feel free to contact Mr. Hal Ghafari, P.E., Public Works Manager/Assistant City Engineer at 909/839-7040. Sincerely, David G. Liu, P.E. Public Works Director/City Engineer RMRA Measure M R Local Return Gas Tax eet Rehab.- Area 1a, 1b, 2 (Design) n) ntain Laurel) anyon to Lemon) to BCY) 82,779$ 82,779$ om Pathfinder to Mountain Laurel Way) (Const.)1,200,000$ 1,200,000$ eet Rehab - Area 1 (Const.)2,000,000$ 925,000$ 850,000$ 89,0$ en Springs from Brea Canyon to Lemon Ave.) (Const.)900,000$ 500,000$ mp Project (Const.)177,855$ nt Projects 4,360,634$ 1,700,000$ 1,007,779$ 850,000$ 89,0$ 250-5510-46412) Project Description Total FY Budget (109) Measure M (111) Gas Tax (112) Prop A (113) Prop C Sign and HSL Replacement (Design)50,000$ 50,000$ Sign and HSL Replacement (Construction)350,000$ 350,000$ al 11 Locations (Design and Construction)380,000$ 90,000$ 100,000$ 190,0$ 780,000$ 350,000$ 140,000$ 100,000$ 190,0$ ments (250-5510-46413) Project Description Total FY Budget (113) Prop C Foothill Transit Grant 60,000$ 60,000$ SD/Calbourne 40,000$ 40,000$ nfrastructure Improvements 100,000$ 60,000$ 40,000$ 0-5510-46420) Project Description Total FY Budget (107) Measure W (108) RMRA (109) Measure M (113) Prop C ovements-Phase 3 (Flapjack-Design)65,000$ 65,000$