Loading...
HomeMy WebLinkAboutDiamondBar_SteepCanyon Q3FeePrepared by: JASON WILLIAMS CITY OF DIAMOND BAR DEPARTMENT OF PUBLIC WORKS 21810 East Copley Drive Diamond Bar, CA 91765-4178 July 26, 2023 PROPOSAL FOR STEEP CANYON ROAD EROSION CONTROL AND SEDIMENTATION PREVENTION AT CLEAR CREEK CANYON DRIVE PW24401 Prepared for: Project Team Role:Project Director Senior Engineer Design Engineer Billable Rate :$245 $202 $146 Field Investigations and Feasibility 8 3 32 43 $100.00 $7,338.00 Desktop Survey 1 1 16 18 $2,783.00 PS&E (65%, 90%, and 100%) 18 18 86 122 $250.00 $20,852.00 Bid Phase Support (T&M) 4 4 8 $1,392.00 Construction Phase Support (T&M) 4 12 16 $2,560.00 Total Professional Fee 27 30 150 207 $350.00 $34,925.00 Notes: and Sedimentation Prevention at Clear Creek Canyon Drive (PW24401) Task 1 July 27, 2023 Task 2 Task 3 Task 5 City of Diamond Bar - Steep Canyon Road Erosion Control Labor Hours and Rates TOTAL HOURS OTHER DIRECT COSTS (ODC's)TOTAL FEE Task 4 200 S. Main Street, Ste 300 Corona, CA 92882 951.280.3300 | Q3consulting.net