Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Cost File
Efficient and specialized erosion and sediment management solutions from a local business © Watearth, Inc. 2023. Do Not Copy. Proposal Diamond Bar Erosion and Sedimentation July 27, 2023 E. Resource Requirements Total Number of Man Hours: 521.00 Total Overall Fee Cost: 80,100.00 * It is assumed that these values are based on Section C. Project Understanding of our Proposal. F. Fee Schedule Principal/Project Manager Water Resources Engineer/Deuty PMField SupportSr. DesignerGIS Specialist 310.00$ 140.00$ 105.00$ 135.00$ 125.00$ Task 1: Kick-off meeting a Kick-off meeting (in-person/virtual)6.0 4.0 0.0 4.0 2.0 16.0 3,210.00$ Task 2: Data Collection and Review a Data Collection and Review (desktop)2.0 22.0 0.0 0.0 0.0 24.0 3,700.00$ Task 3: Field Review a Field Data Collection and DRI testing 3.0 10.0 12.0 0.0 0.0 25.0 3,590.00$ Task 4: Preliminary Utility Search/Notices a Preliminary Utility Search/Notices 1.0 0.0 8.0 0.0 8.0 17.0 2,150.00$ Task 5: Conceptual 60% Solution Meeting a Preliminary 60% Solution Meeting (in-person/virtual)4.0 30.0 0.0 8.0 4.0 46.0 7,020.00$ Task 6: Draft 60% Plans and Specifications a Draft 60% Plans 6.0 24.0 0.0 160.0 8.0 198.0 27,820.00$ b Draft 60% Specifications 4.0 18.0 0.0 0.0 4.0 26.0 4,260.00$ Task 7: Draft Cost Estimate a Draft Cost Estimate 2.0 14.0 0.0 4.0 0.0 20.0 3,120.00$ Task 8: 60% Plans and Specifications Presentation Meeting a 60% Plans and Specifications Meeting (in-person/virtual)6.0 4.0 0.0 4.0 0.0 14.0 2,960.00$ Task 9: Permitting a City, SCAQMD, adnd CARB Permitting (as needed )8.0 12.0 0.0 0.0 6.0 30.0 5,630.00$ Task 10: Final Plans and Specifications a Final Plans and Specifications Preparation/Finalize 2.0 0.0 0.0 2.0 0.0 4.0 890.00$ Task 11: Bid Phase Services a Bid Phase Services 6.0 18.0 0.0 12.0 0.0 36.0 6,000.00$ Task 12: Construction Phase Services a Construction Phase Services 2.0 20.0 8.0 12.0 0.0 42.0 5,880.00$ Task 13: As-Built Drawings a As-Built Drawings 1.0 0.0 0.0 8.0 0.0 9.0 1,390.00$ Task 14: Project Management and Controls a Project Controls and Invoicing 4.0 12.0 0.0 0.0 0.0 16.0 2,920.00$ OVERALL TOTAL 57.0 190.0 28.0 214.0 32.0 521.0 80,100.00$ EXPENSES Mileage (5 trips @ 60mi RT @ $0.655/mi) 196.50$ Subtotal Expenses 196.50$ OPTIONAL/IF NEEDED Subconsultants BSK (Geotechnical) 16,060.00$ Permit/Review Fees (Up to the budgeted amount) 3,500.00$ Subtotal OPTIONAL Fees 19,560.00$ OVERALL TOTAL WITH OPTIONAL/AS NEEDED FEES 99,856.50$ Task Total HoursTotals