Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
23030 - City of Diamond Bar Erosion Control & Sedimentation Prevention - Fee Proposal
Project Team Role:Principal Engineer Project Engineer Senior Designer Billable Rate :$175 $175 $175 Fee Fee 1 Meetings, Consultation & Coordination 4 16 4 24 $ 4,200 $ 250 $ 4,450 2 Data Collection and Review 2 6 8 $ 1,400 $ 1,400 3 Utility Research and Coordination 2 6 8 $ 1,400 $ 5,750 $ 7,150 4 Preliminary Design Development (30%)16 24 40 $ 7,000 $ 7,000 5 Land Survey and Topographic Mapping 2 2 4 $ 700 $ 11,270 $ 11,970 6 Hydrology & Hydraulics 2 16 16 34 $ 5,950 $ 5,950 7 60%, 90%, 100% PS&Es 32 48 48 128 $ 22,400 $ 250 $ 22,650 8 Bid Assistance 4 8 4 16 $ 2,800 $ 2,800 9 Construction Support Services 16 4 20 $ 3,500 $ 250 $ 3,750 10 Stormwater Pollution Prevention Plan (SWPPP)8 40 32 80 $ 14,000 $ 14,000 Subtotal 54 174 134 362 63,350 $ 11,270 $ 5,750 $ 750 $ 81,120 QA/QC 12 12 $ 2,100 $ 2,100 Internal Project Management 26 26 $ 4,550 $ 4,550 Subtotal Project Mgmt 38 38 $ 6,650 $ - $ - $ - $ 6,650 Total Hours and Fee 92 174 134 400 $ 70,000 $ 11,270 $ 5,750 $ 750 $ 87,770 Percent of Hours: 23% 44% 34% 100% 11 Landscape Architecture and Irrigation Engineering (Optional) - TBD TBD 12 Geotechnical Engineering - TBD TBD Total Optional Tasks $ - $ - $ - $ - $ - Total Including Optional Tasks 92 174 134 400 $ 70,000 $ 11,270 $ 5,750 $ 750 $ 87,770 Percent of Hours: 23% 44% 34% 100% Steep Canyon Road Erosion Control and Sedimentation Prevention Project J. Smith & T. Muli, Inc. Cost Proposal Labor Hours and Rates TOTAL HOURS JS&TM LABOR FEE Subconsultants GIS Surveyors C-Below July 27, 2023 OTHER DIRECT COSTS (ODC's) TOTAL FEE Optional Tasks Project Management Tasks Page 1 of 1