FEE PROPOSAL FOR
ON-CALL MUNICIPAL NPDES
PROFESSIONAL SERVICES
Prepared for:
REMI CANDAELE, PE
200 S. Main Street, Ste 300
Corona, CA 92882
951.280.3300
Project Team Role:Director Project
Engineer
Design
Engineer
Eng.
Technici
an
Project
Manager
Project
Engineer
Staff
Engineer
Jr. Staff
Engineer
Field
Supervis
or
Billable Rate :$226 $185 $146 $106 $250 $200 $160 $130 $125
21 21 23 42 41 360 508 $5,100.00 $76,746.00
Review and Approve LID Plans - 3 Private Projects and 1 City
Project (3 plan checks per project)1 4 4 8 8 25 $4,346.00
Verify LID BMP's are Properly Installed - 3 Private Projects
and 1 City Project (1/2 day per site visit)1 2 2 3 2 16 26 $200.00 $4,066.00
Verify LID BMP's Properly Maintained - 2 City Projects (1/2
day per site visit)1 1 1 1 1 8 13 $100.00 $2,066.00
Review and Approve SWPPP's - 2 Private Projects and 1 City
Project (3 plan checks per project)2 3 3 7 7 22 $3,832.00
Track and Inspect Construction BMP Compliance - 5 Private
Projects and 1 City Project per month (2.5 days per month
for 12 months )
8 5 5 7 7 240 272 $2,400.00 $38,488.00
Conduct 3 Follow-Up Noncompliant Construction Inspections -
Per Month (2 hours per site inspection for 12 months )6 3 5 6 6 96 122 $2,400.00 $19,246.00
Prepare 10 Construction Site Enforcement Actions per year 2 3 3 10 10 28 $4,702.00
16 9 14 34 38 256 367 $3,600.00 $54,646.00
Conduct Follow-Ups at Non-compliant industrial/commercial
facilities - 20 each (2 hours per follow-up)4 2 4 4 4 40 58 $1,000.00 $9,364.00
Track, educate, and inspect BMP Compliance - 100 facilities
(2 hours per facility)10 4 4 16 24 200 258 $2,500.00 $37,240.00
Prepare Enforcement Actions - 10 each 1 2 2 10 10 25 $4,026.00
Conduct Illicit Discharge Investigations - 2 each (1 day each)1 1 4 4 16 26 $100.00 $4,016.00
$1,000.00 $1,000.00
Purchase and Print Educational Materials $1,000.00 $1,000.00
Totals 37 30 37 76 79 616 875 $9,700.00 $132,392.00
Notes:
Annual Cost Estimate for Professional Services
Annual Estimate for Tasks 3, 4, and 5 (12 months)
May 18, 2023
Annual Estimate for Tasks 6 and 7 (12 months)
Annual Estimate for Task 9 (12 months)
Subconsultant EEC Environmental Labor Hours and
Rates
City of Diamond Bar - Municipal NPDES Professional Services
Q3 Labor Hours and Rates
TOTAL
HOURS
OTHER DIRECT
COSTS (ODC's)
ANNUAL FEE
ESTIMATE
FEE SCHEDULE
January 1, 2023 through December 31, 2023
1 | P a g e
Compensation for work performed on a time and materials basis will be computed as follows:
MANAGEMENT HOURLY RATE
Principal ................................................................... $252.00
Director ..................................................................... 226.00
Associate ................................................................... 220.00
Sr. Project Manager, Sr. Technical Manager ............. 220.00
Project Manager ........................................................ 202.00
CIVIL ENGINEERING SERVICES
Senior Project Engineer ........................................... $202.00
Project Engineer ........................................................ 185.00
Senior Designer ......................................................... 180.00
Designer .................................................................... 170.00
Engineer .................................................................... 165.00
Design Engineer, Design Technician .......................... 146.00
CAD Technician, Design Engineer Technician ............ 122.00
Project Technician/Project Coordinator.................... 112.00
Engineering Technician ............................................. 106.00
Administration ............................................................ 94.00
Engineering Intern ....................................................... 81.00
SURVEY AND MAPPING SERVICES
Field Supervisor ....................................................... $196.00
Project Surveyor ........................................................ 172.00
GIS Specialist ............................................................. 158.00
Survey Analyst ........................................................... 122.00
Three Person Crew .................................................... 309.00
Two Person Crew ...................................................... 264.00
One Person Crew ....................................................... 190.00
NOTE: FOR SURVEY WORK REQUIRING PREVAILING
WAGE
Three Person Crew .................................................. $365.00
Two Person Crew ...................................................... 311.00
One Person Crew ....................................................... 199.00
SPECIAL SERVICES
Consultation Re: Litigation ...................................... $480.00
DRY UTILITY SERVICES
Principal ................................................................... $225.00
Sr. Project Manager, Sr. Technical Manager ........... $185.00
Project Manager ...................................................... $174.00
Senior Designer ....................................................... $152.00
Project Coordinator ................................................. $105.00
CAD Technician.......................................................... $95.00
Assistant Project Coordinator ................................... $85.00
Administration .......................................................... $82.00
CONSTRUCTION SUPPORT
Principal .................................................................. $247.00
Sr. Project Manager, Sr. Technical Manager .......... $196.00
Project Manager ..................................................... $180.00
Field Engineer ......................................................... $175.00
Administration .......................................................... $82.00
MISCELLANEOUS FEES
The following services are billed at our cost:
Subcontracted services
Map check fees or filing fees advanced by us
Transportation, meals and lodging for overnight
travel and incidental travel expenses
Commercial delivery services, including Federal
Express, Express Mail, and Messenger Services
Plotting and blueprint services and printing
PERSONNEL CHARGES Travel
Labor Classification Hourly Rate
Jr. Staff Engineer/Geologist/Scientist $130
Staff Engineer/Geologist/Scientist $160 Field Equipment
Sr Staff Engineer/Geologist/Scientist $175
Project Engineer/Geologist/Scientist - I $200
Project Engineer/Geologist/Scientist - II $210
Sr Project Engineer/Geologist/Scientist - I $230
Sr Project Engineer/Geologist/Scientist - II $250 Subcontractors and Reimbursables
Principal Geologist $275
Principal $275
Project Assistant $120
Technician $125
Drafter $140
Sr Technician $145 Other Project Charges
Compliance Inspector $145
Technician GIS/Technology $120
Analyst GIS/Technology $135
Sr Analyst GIS/Technology $150
Specialist GIS/Technology $160
Sr Specialist GIS/Technology $170
Supervisor GIS/Technology $185
Director/GIS Technology $200 Shipping and Postage
Construction Technician $105
Construction Field Supervisor $125
Construction Manager $130
Sr Construction Manager $165
Technical Editor $125 Interest Charges
Payment Terms
Emergency response will be charged at a rate of 1.5
times the standard hourly rate.
The charge for all time required for the performance of
the Scope of Work,including office,field and travel time,
will be billed at the hourly rate according to the labor
classifications set forth below:
The cost of additional report reproduction and
special project accounting will be billed as
appropriate. Plotting plans are charged by size,
black and white or color, and by the number of
copies supplied.
Field Equipment is billed at standard unit costs.
Rate schedules are available upon request.
The costs of subcontractors,materials,equipment
rental and costs incurred will be charged at cost
plus 0%, per the RFP.
Shipping charges include couriers and the postage
necessary will be charged at cost plus 0%, per the
Interest on late payments will be charged at the rate
of 1.5% per month.
This Fee Schedule is adjusted each subsequent year to reflect the economic changes for the new year, not to exceed the Consumer Price
Index for the preceding 12-month period. The new schedule will apply to existing and new assignments.
Net 30 days apply to all work performed and
invoiced unless superseded by a specific executed
contract.
2023 Fee Schedule
When EEC Staff appear as expert witnesses at court
trials, mediation, arbitration hearings and depositions,
their time will be charged at 2.0 times the standard rate.
All time spent preparing for such trials, hearings, and
depositions, will be charged at the standard hourly rate.
EEC Company Vehicles used on project
assignments will be charged at $75 per day.
Mileage is billed at the current rate established by
the Internal Revenue Service plus mark up. Per
Diem is billed at a unit cost of $75 per day (except in
high cost markets, which will adhere to GSA rates).
Airfare, lodging, rental cars and associated
expenses are billed at cost plus 15%.
200 S. Main Street, Ste 300
Corona, CA 92882
951.280.3300 | Q3consulting.net