HomeMy WebLinkAboutCASCProposal For:
CEQA DOCUMENT FOR
AN ELECTRONIC
BILLBOARD PROJECT
Submitted To:
CITY OF DIAMOND BAR
Attn: Dat Tran, Associate Planner
21810 Copley Drive
Diamond Bar, CA 91765
(909) 839-7034
DTran@DiamondBarCA.gov
Submitted via:
Planetbids & Hard Copies
Submittal Date:
September 20, 2024
Submitted By:
CASC ENGINEERING AND
CONSULTING, INC.
Frank Coyle
Director of Planning
633 West Route 66, Suite A
Glendora, CA 91740
fcoyle@cascinc.com
C: (909) 362-7645
TABLE OF CONTENTS
1. COVER LETTER
2. QUALIFICATIONS
-
-
-
-
3. PROJECT LIST AND SCHEDULE
-
-
4. SCOPE OF WORK
-
5. BUDGET ESTIMATED
6. ACCEPTANCE OF CONDITIONS
TABLE OF CONTENTS
633 West Route 66, Suite A
Glendora, CA 91740
Office: 855.383.0101
Fax: 818.841.8013
2024-0176 FC/mn
www.cascinc.com
1. COVER LETTERSeptember 20, 2024
CITY OF DIAMOND BAR
Attn: Dat Tran, Associate Planner
21810 Copley Drive
Diamond Bar, CA 91765
(909) 839-7034
Dtran@DiamondBarCA.gov
RE:RFP-PREPARE A CEQA DOCUMENT FOR AN ELECTRONIC BILLBOARD PROJECT
Dear Mr. Tran,
Casc Engineering and Consulting, Inc. (Casc), is pleased to provide the City of Diamond Bar ity proposal to prepare
an Initial Study Mitigated Negative Declaration (IS/MND) and supporting technical studies for the proposed electronic billboard, and to
identify appropriate mitigation measures to avoid or reduce those impacts to less-than-significant levels. The Project site consists of a
6.1-acre site and is located at
an approximately 100-foot tall electronic billboard located in the existing parking lot at the southwest corner of the project site. The
proposed billboard will include a pole structure supporting two electronic sign boards displaying commercial and public service
advertisements. The proposed signs will be visible along State Route 60 (SR-60) and nearby local arterial streets. Discretionary approvals
required for the Project include Development Code Amendment to permit billboards in the Industrial zoning district, Development
Review, Conditional Use Permit, and a Development Agreement between the City and Walnut Unified School District.
Casc recognizes that, ultimately, the success of this Project comes down to the people involved, and we are proposing a technically
seasoned team that is committed to serving the City on this Project. The Casc team is composed of highly experienced land use planning
and environmental professionals specializing in producing top-tier CEQA environmental clearance documents for the City of Diamond
Bar. The Casc team will be led by Frank Coyle,Director of Planning, who has over 35 years of experience working in both the public and
private sectors in Southern California and has successfully managed over 5 on-call planning and environmental agreements. Casc will
collaborate with the specialized expertise of Urban Crossroads and DUKE CRM. Our strong partnerships with these trusted consulting
firms ensure a collaborative and technically robust CEQA Initial Study process. The partnership between Casc and our subconsultants
guarantees a thorough, efficient, and high-quality service, ensuring that environmental clearance documents meet the City of Diamond
standards.
At Casc, our goal is to assist the City with preparing a cost-effective and legally defensible environmental document in a timely fashion.
In closing, we look forward to serving the City of Diamond Bar. If you have any questions or would like to schedule an interview, our
Director of Planning, Mr. Coyle, may be reached by phone at 909-362-7645 or by email at fcoyle@cascinc.com.
Statements:
Additional services outside the scope of services will be provided under separate authorization.
Sincerely,
mfurlong@cascinc.com fcoyle@cascinc.com
2
QUALIFICATIONS
-
-
FIRM HIGHLIGHTS
02
COMPANY OVERVIEW
PROJECT TEAM
-
-
-
-
-
-
-
-
City of Diamond Bar: CEQA - Electronic Billboard Project 3
City of Diamond Bar: CEQA - Electronic Billboard Project
02 QUALIFICATIONS
SERVICES PROVIDED AND AVAILABLE (DISCIPLINES)
ENVIRONMENTAL SERVICES
PLANNING SERVICES
-
NATURAL RESOURCES SERVICES
GIS SERVICES
LAND SURVEYING & MAPPING SERVICES
-
--
4
DUKE CRM
CULTURAL/PALEONTOLOGICAL
ACKERMAN LAW PC
CEQA/LAND USE ATTORNEY
URBAN CROSSROADS
TRANSPORTATION, AIR QUALITY, NOISE
Transportation:
Air Quality:
-
-
Noise:
-
SUBCONSULTANT
City of Diamond Bar: CEQA - Electronic Billboard Project
02 QUALIFICATIONS
5
ORGANIZATIONAL CHART
City of Diamond Bar: CEQA - Electronic Billboard Project
02 QUALIFICATIONS
Team Key:
--
PROJECT MANAGEMENT
CEQA ATTORNEY
KEY PERSONNEL
Preparation of
Environmental Documents/
Technical Studies
ENVIRONMENTAL
Preparation of
Technical Studies
DUKE CRM
URBAN CROSSROADS
ASSOCIATE IN-CHARGE
6
KEY PERSONNEL RESUMES
City of Diamond Bar: CEQA - Electronic Billboard Project
02 QUALIFICATIONS
FRANK COYLE
DIRECTOR OF PLANNING/
DAY-TO-DAY CONTACT
-
-
-
-
WORK HISTORY
-
ADDITIONAL EXPERIENCE
-
--
--
AVAILABILITY PERCENTAGE:
30%
YEARS OF EXPERIENCE:
35+ Years
PROFESSIONAL REGISTRATIONS,
TRAINING, CERTIFICATES,
LICENSES & AFFILIATIONS:
City of Redlands Climate Action
Task Force Committee
(Member), 2008 2011
American Planning Association
Urban Land Institute
ASTM International, Phase I
Environmental Site Assessments
(ESAs) for Commercial Real
Estate, 10/2004
Registered Environmental
Assessor I (REA I-07926), 2004
2011
EDUCATIONAL BACKGROUND:
B.S. Community and Regional
Planning, Iowa State University,
IA
7
City of Diamond Bar: CEQA - Electronic Billboard Project
02 QUALIFICATIONS
DANIELLE ORNELAS
SENIOR ENVIRONMENTAL PLANNER/
CEQA LEAD/ASSOCIATE-IN-CHARGE
-
--
--
-
WORK HISTORY
AVAILABILITY PERCENTAGE:
60%
YEARS OF EXPERIENCE:
8 + Years
EDUCATIONAL BACKGROUND:
M.S. Conservation Leadership,
Colorado State University
B.S. Environmental Studies,
Sonoma State University
AREAS OF EXPERTISE:
Project Management
Entitlement Process
Environmental Compliance
National Environmental Policy
Act (NEPA)
California Environmental
Quality Act (CEQA)
Initial Studies/Categorical
Exemptions/Negative
Declarations/Mitigated
Negative Declarations/
Environmental Impact Reports
Biological Monitoring
8
City of Diamond Bar: CEQA - Electronic Billboard Project
02 QUALIFICATIONS
JESSIE BRUCKHART
SENIOR PLANNER
-
-
WORK HISTORY
-
AVAILABILITY PERCENTAGE:
60%
YEARS OF EXPERIENCE:
8 + Years
EDUCATIONAL BACKGROUND:
B.S. Environmental Planning
and GIS, Indiana University of
Pennsylvania, PA
AREAS OF EXPERTISE:
Project Management
CEQA/NEPA
Zoning Code Updates
General Plan Updates
Planning Entitlements
Community Plans
Website Design and Social
Media
Spatial Analysis and GIS
Public Engagement
KACEY REINEMAN
ASSISTANT PLANNER
AVAILABILITY PERCENTAGE:
80%
YEARS OF EXPERIENCE:
4 + Years
EDUCATIONAL BACKGROUND:
B.S. Environmental Science,
University of Redlands, CA
AREAS OF EXPERTISE:
Planning Entitlements
Presentations
QA/QCWORK HISTORY
-
9
KATIE FAULKNER
ASSISTANT PLANNER/BIOLOGIST
-
AVAILABILITY PERCENTAGE:
80%
YEARS OF EXPERIENCE:
2 + Years
EDUCATIONAL BACKGROUND:
B.S. Wildlife, Fish and
Conservation Biology, University
of California, Davis
AREAS OF EXPERTISE:
CEQA/NEPA
Field Surveys
WORK HISTORY
-
-
BEN HAMADA, SUAS
GIS SPECIALIST
AVAILABILITY PERCENTAGE:
30%
YEARS OF EXPERIENCE:
7+ Years
EDUCATIONAL BACKGROUND:
M.S. GIS, University of Redlands,
CA
B.A. Art Studio, Minor in
Environmental Studies,
University of Redlands, CA
AREAS OF EXPERTISE:
Small Unarmed Aircraft Systems
(sUAS)
Geodatabase Management
Software Interrogation
Data Quality Control
3D Modeling
Data Delivery
--
WORK HISTORY
City of Diamond Bar: CEQA - Electronic Billboard Project
02 QUALIFICATIONS
10
BILL LAWSON, PE, INCE, AICP
PRINCIPAL
WORK HISTORY
HASEEB QURESHI, MES
PRINCIPAL
YEARS OF EXPERIENCE:
17+ Years
EDUCATIONAL BACKGROUND:
M.S. Environmental Studies, Cal.
State University, Fullerton, CA
B.A. Environmental Analysis and
Design, University of California,
Irvine, CA
PROFESSIONAL AFFILIATIONS:
AEP Association of
Environmental Planners
AWMA Air and Waste
Management Association
ASTM American Society for
Testing Materials
-
WORK HISTORY
City of Diamond Bar: CEQA - Electronic Billboard Project
YEARS OF EXPERIENCE:
30 + Years
EDUCATIONAL BACKGROUND:
M.S. Civil and Environmental
Engineering, California
Polytech State University, San
Luis Obispo, CA
B.S. City and Regional Planning,
California Polytech State
University, San Luis Obispo, CA
PROFESSIONAL REGISTRATIONS:
PE Registered Professional
Traffic Engineer TR 2537
AICP American Institute of
Certified Planners 013011
PTP Professional Transportation
Planner
INCE Institute of Noise Control
Engineering
PTP Professional Transportation
Planner, 2008
ITE Institute of Transportation
Engineers
SUBCONSULTANT RESUMES
02 QUALIFICATIONS
URBAN CROSSROADS (Air Quality, Greenhouse Gas, Energy, Noise and Traffic)
11
CURT DUKE
PRESIDENT/PRINCIPAL ARCHAEOLOGIST
-
WORK HISTORY
MORGAN BEIGLE
ARCHAEOLOGIST
YEARS OF EXPERIENCE:
7+ Years
EDUCATIONAL BACKGROUND:
M.A. Anthropology, California
State University, Los Angeles
Anthropology/Sociology,
Agnes Scott College
LICENSE AND CERTIFICATES:
RPA, NO. 18011
HAZWOPER 40-Hour -
220221520497--
City of Diamond Bar: CEQA - Electronic Billboard Project
02 QUALIFICATIONS
-
-
-
-
DUKE CRM (Cultural and Paleontological)
YEARS OF EXPERIENCE:
30 + Years
EDUCATIONAL BACKGROUND:
PROFESSION REGISTRATIONS:
-
--
--
12
PROJECT LIST & SCHEDULE
03
NAME OF PROJECT/DESCRIPTION CLIENT CONTACT INFORMATION YEAR (S)
-
-
-
-
-
-
-
--
-
-
-
-
-
-
-
--
-
-
13
OMP NELSON AVENUE DEVELOPMENT
-
SYSCO LOS ANGELES FACILITY EXPANSION
-
-
PROCTOR AVENUE DEVELOPMENT: REXFORD INDUSTRIAL
-
-
-
-
-
AMAR INDUSTRY HILLS DEVELOPMENT
--
-
RAILROAD STREET INDUSTRY REDEVELOPMENT
-
City of Diamond Bar: CEQA - Electronic Billboard Project
CONTRACT PLANNING &
ENVIRONMENTAL SERVICES CITY OF INDUSTRY
14
-
-
Caltrans Coordination:
Construction Coordination:
City of Diamond Bar: CEQA - Electronic Billboard Project
KTM MOTORSPORTS HEADQUARTERS
COUNTY OF RIVERSIDE
15
City of Diamond Bar: CEQA - Electronic Billboard Project
CORESTATES - MAVERICK GAS STATION
COUNTY OF SAN BERNARDINO
GENERAL PLAN UPDATE - LAND USE AND
CIRCULATION ELEMENTS & IS/MND CITY OF BANNING
-
FONTANA FREIGHTLINER EXPANSION -
VELOCITY TRUCK CENTERS COUNTY OF SAN BERNARDINO
--
16
City of Diamond Bar: CEQA - Electronic Billboard Project
-
--
--
-
-
GENERAL PLAN UPDATE, ZONING CODE
UPDATE, AND FOCUSED EIR CITY OF BUENA PARK
KEY ELEMENTS OF THE PROJECT INCLUDE:
Clear and objective design standards compliant
with state housing laws.
Ensure flexible development standards for multi-
family, mixed use, and single-family zones.
Expedited permit processes aimed at reducing
application processing time, thereby enhancing
the economic feasibility of delivering more
affordable housing units in a timely manner.
Integrate objective design criteria into Zoning
Code.
Develop mitigation measures for projects to follow
to avoid additional future CEQA analysis.
DOCUMENTS PREPARED FOR PROJECT:
General Plan Land Use & Community Design
Element Update
Comprehensive Zoning Code Update (Single-
Family Zones, Multi-Family Zones, Mixed-Use Zones,
Administration, Signage) + Incorporate Objective
Design Standards into Zoning Code for each
Division
Objective Design and Development Standards for
six (6) Housing Incentive Overlays
Citywide Architectural Styles Objective Design
Standards
Initial Study/Focused EIR
17
SCOPE OF WORK
04
PROJECT UNDERSTANDING
--
-
PROJECT APPROACH
City of Diamond Bar: CEQA - Electronic Billboard Project 18
TASK 1. PROJECT INITIATION
-
-
-
Deliverables:
-
TASK 2. PROJECT DESCRIPTION
--
Deliverables:
TASK 3. PREPARE TECHNICAL STUDIES
Note: -
04 SCOPE OF WORK
City of Diamond Bar: CEQA - Electronic Billboard Project 19
TASK 3A. AB 52 CONSULTATION & CULTURAL RESOURCES
-
-
-
-
--
-
TASK 3B. VISUAL IMPACT SIMULATION
TASK 3C. FOCUSED AIR QUALITY, GREENHOUSE GAS AND ENERGY CALCULATIONS
City of Diamond Bar: CEQA - Electronic Billboard Project
04 SCOPE OF WORK
20
TASK 3D. FOCUSED NOISE ANALYSIS
--
--
TASK 4. PREPARE IS/ND OR MND, MMRP
-
TASK 4A. PREPARE 1st SCREENCHECK IS/ND OR MND, MMRP
City of Diamond Bar: CEQA - Electronic Billboard Project
04 SCOPE OF WORK
21
Deliverables:
TASK 4B. PREPARE 2nd SCREENCHECK IS/ND OR MND, MMRP -OPTIONAL*
-
Deliverables:
Note:
TASK 4C. GIS EXHIBITS FOR IS/ND OR MND, MMRP
TASK 5. PREPARE PROOF CHECK DRAFT IS/ND OR MND, MMRP
Deliverables:
TASK 6. CIRCULATION OF DRAFT IS/ND OR MND, MMRP
Deliverables:
City of Diamond Bar: CEQA - Electronic Billboard Project
04 SCOPE OF WORK
22
TASK 7. PREPARE RESPONSES TO COMMENTS
Deliverables:
TASK 8. PUBLIC HEARING ATTENDANCE
TASK 9. MEETINGS AND COORDINATION
-
City of Diamond Bar: CEQA - Electronic Billboard Project
04 SCOPE OF WORK
23
PROJECT SCHEDULE
ELECTRONIC BILLBOARD PROJECT
TASK DESCRIPTION START
DATE
END
DATE
- -
- -
-
-
-
City of Diamond Bar: CEQA - Electronic Billboard Project
04 SCOPE OF WORK
24
CEQA DOCUMENT FOR ELECTRONIC BILLBOARD (COST PROPOSAL)
ACCEPTANCE & CONDITIONS
06
City of Diamond Bar: CEQA - Electronic Billboard Project 26