Loading...
HomeMy WebLinkAbout11-26-2024PLANNING COMMISSION AGENDA Tuesday, November 26, 2024 6:30 PM Diamond Bar City Hall — Windmill Community Room 21810 Copley Drive, Diamond Bar, CA 91765 PUBLIC ADVISORY: Members of the public are encouraged to participate and address the Planning Commission during the public comment portion of the meeting either in person or via teleconference. CHAIR RUBEN TORRES VICE CHAIR MAHENDRA GARG COMMISSIONER NAILA BARLAS COMMISSIONER WILLIAM RAWLINGS COMMISSIONER RAYMOND WOLFE How to Observe the Meeting From Home: Members of the public can observe the meeting by calling +1 �562) 247-8321, Access Code: 792-102- 575, or visiting https:Hattendee.gotowebinar.com/register/5186933353278163551 How to Submit Public Comment: Please note, that in the event that comments by teleconferencing become infeasible due to an Internet or power outage or technical problems outside the City's control, the meeting at Diamond Bar City Hall — Windmill Community Room, 21810 Copley Drive, Diamond Bar, CA 91765 will proceed without interruption. If you wish to make certain that your comments are heard, please attend the meeting in person or send an email by 4.00 p.m. on the day of the meeting/hearing The public may provide public comment by attending the meeting in person, by sending an email, or by logging into the teleconference. Please send email public comments to Planning@DiamondBarCA.gov by 4:00 p.m. on the day of the meeting and indicate in the Subject Line "FOR PUBLIC COMMENT." Written comments will be distributed to the Planning Commission members and read into the record at the meeting, up to a maximum of five minutes. Members of the public will be called upon one at a time during the Public Comment portion of the agenda. Speakers are limited to five minutes per agenda item, unless the Chairperson determines otherwise. American Disability Act Accommodations: Pursuant to the Executive Order, and in compliance with the Americans with Disabilities Act, if you need special assistance to participate in the Planning Commission Meeting, please contact the Community Development Office (909) 839-7030 within 72 hours of the meeting. Commission recordings will be available upon request the day following the Planning Commission Meeting. City of Diamond Bar Planning Commission MEETING RULES PUBLIC INPUT Members of the public may address the Planning Commission on any item of business on the agenda during the time the item is taken up by the Planning Commission. In addition, members of the public may, during the Public Comment period address the Planning Commission on any Consent Calendar item or any matter not on the agenda and within the Planning Commission's subject matter jurisdiction. Any material to be submitted to the Planning Commission at the meeting should be submitted through the Minutes Secretary. Speakers are limited to five minutes per agenda item, unless the Chairperson determines otherwise. The Chairperson may adjust this time limit depending on the number of people wishing to speak, the complexity of the matter, the length of the agenda, the hour and any other relevant consideration. Speakers may address the Planning Commission only once on an agenda item, except during public hearings, when the applicant/appellant may be afforded a rebuttal. Public comments must be directed to the Planning Commission. Behavior that disrupts the orderly conduct of the meeting may result in the speaker being removed from the meeting. INFORMATION RELATING TO AGENDAS AND ACTIONS OF THE PLANNING COMMISSION Agendas for regular Planning Commission meetings are available 72 hours prior to the meeting and are posted in the City's regular posting locations and on the City's website at www.diamondbarca.gov. The Planning Commission may take action on any item listed on the agenda. Copies of staff reports or other written documentation relating to agenda items are on file in the Planning Division of the Community Development Department, located at 21810 Copley Drive, and are available for public inspection upon request. If you have questions regarding an agenda item, please call (909) 839-7030 during regular business hours. HELPFUL CONTACT INFORMATION Copies of Agenda, Rules of the Planning Commission, Recordings of Meetings (909) 839-7030 Email: info diamondbarca.gov Website: www.diamondbarca.aov CITY OF DIAMOND BAR PLANNING COMMISSION November 26, 2024 ►IT Next Resolution No. 2024-12 CALL TO ORDER: 6:30 p.m. PLEDGE OF ALLEGIANCE: 1. ROLL CALL: COMMISSIONERS: Barlas, Rawlings, Wolfe, Vice Chair Garg, Chair Torres 2. APPROVAL OF AGENDA: Chair 3. PUBLIC COMMENTS: "Public Comments" is the time reserved on each regular meeting agenda to provide an opportunity for members of the public to directly address the Planning Commission on consent calendar items or other matters of interest not on the agenda that are within the subject matter jurisdiction of the Planning Commission. Although the Planning Commission values your comments, pursuant to the Brown Act, members of the Planning Commission or staff may briefly respond to public comments, if necessary, but no extended discussion and no action on such matters may take place. There is a five-minute maximum time limit when addressing the Planning Commission. Please complete a speaker card and hand it to the Minutes Secretary (completion of this form is voluntary). The Planning Commission will call on in -person speakers first and then teleconference callers, one at a time to give their name and if there is an agenda item number they wish to speak on before providing their comment. If you wish to speak on a public hearing item or Planning Commission consideration item, you will then be called upon to speak at that point in the agenda. 4. CONSENT CALENDAR: The following items listed on the consent calendar are considered routine and are approved by a single motion. Consent calendar items may be removed from the agenda by request of the Planning Commission only: 4.1 MINUTES OF THE PLANNING COMMISSION REGULAR MEETING — November 12, 2024. 5. OLD BUSINESS: None. 6. NEW BUSINESS: None. NOVEMBER 26, 2024 PAGE 2 PLANNING COMMISSION 7. PUBLIC HEARING: 7.1 Conditional Use Permit Planning Case No. PL2024-15 ("Project"): Under the authority of DBCC Section 22.58, the property owner and applicant are requesting a Conditional Use Permit to operate a 13,830 square -foot child day care center for Kingdom Seed Academy, within an existing building previously occupied by office uses on a 3.37-acre site. The remaining 22,740 square feet of the building is currently occupied by an elementary school. The subject property is zoned Professional Office (OP) with an underlying General Plan land use designation of Office (0) Est PROJECT ADDRESS: 3333 S. Diamond Canyon Road Diamond Bar, CA 91765 (8269-011-015) APPLICANT: Jason Chen for Kingdom Seed Academy 3333 S. Diamond Canyon Road Diamond Bar, Ca 91765 PROPERTY OWNER: Omeda Investment, LLC 2259 Celano Ct. Chino Hills, CA 91709 ENVIRONMENTAL DETERMINATION: The project has been reviewed for compliance with the California Environmental Quality Act (CEQA). Based on that assessment, the City has determined the project to be Categorically Exempt from the provisions of CEQA pursuant to Article 19 under Section 15301(a) (interior alterations involving such things as interior partitions, plumbing, and electrical conveyances) of the CEQA Guidelines. No further environmental review is required RECOMMENDATION: Staff recommends that the Planning Commission adopt the attached Resolution (Attachment 1) approving Conditional Use Permit No. PL2024-15, based on the findings of Diamond Bar City Code (DBCC) Section 22.58, subject to conditions. I�_1�1�11►[�Z��]►ail►ail[+'%9[�7►[��]►ail►�il���i•'i�1►17�7:7►�i/_r�[�7�/_1>1���►�i6'� 9. STAFF COMMENTS / INFORMATIONAL ITEMS: 9.1 Project Status Report NOVEMBER 26, 2024 PAGE 3 PLANNING COMMISSION 10. SCHEDULE OF FUTURE EVENTS: THANKSGIVING HOLIDAY CITY COUNCIL MEETINGS PLANNING COMMISSION MEETING: CHRISTMAS HOLIDAY: 11. ADJOURNMENT Thursday, November 28, 2024 Friday, November 29, 2024 In observance of Thanksgiving, City offices will be closed. Tuesday, December 3, 2024, 6:30 p.m. South Coast Air Quality Management District 21865 Copley Drive Tuesday, December 10, 2024, 6:30 pm Diamond Bar City Hall Windmill Room Tuesday, December 24, 2024 Wednesday, December 25, 2024 In observance of the Christmas holiday, City offices will be closed. City offices will reopen on Thursday, December 26, 2024. 4.1 MINUTES OF THE CITY OF DIAMOND BAR REGULAR MEETING OF THE PLANNING COMMISSION November 12, 2024 CALL TO ORDER: C/Torres called the meeting to order at 6:30 p.m. in the South Coast Air Quality Management District/Government Center Room CC-8, 21865 Copley Drive, Diamond Bar, CA 91765. PLEDGE OF ALLEGIANCE: 1. ROLL CALL: ABSENT: C/Wolfe led the Pledge of Allegiance. Commissioners Barlas, Rawlings, Wolfe, Vice Chair Garg, Chair Torres None. STAFF PRESENT: Greg Gubman, Community Development Director, Grace Lee, Planning Manager; May Nakajima, Senior Planner, Arlene Laviera, Administrative Coordinator and James H. Eggart, City Attorney via Goto Webinar 2. APPROVAL OF AGENDA: As Submitted. 3. PUBLIC COMMENTS: None. 4. CONSENT CALENDAR: 4.1 Minutes of the Joint City Council/Planning Commission Study Session - October 8, 2024 C/Wolfe moved, and C/Rawlings seconded to approve consent calendar. Motion carried 5-0 by the following Roll Call vote: AYES: COMMISSIONERS: Barlas, Rawlings, Wolfe, VC/Garg, C/Torres NOES: COMMISSIONERS: None ABSTAIN: COMMISSIONERS: None ABSENT: COMMISSIONERS: None 4.2 Minutes of the Planning Commission Regular Meeting - October 8, 2024 C/Wolfe moved, and C/Rawlings seconded to approve consent calendar. Motion carried 5-0 by the following Roll Call vote: AYES: COMMISSIONERS: Barlas, Rawlings, Wolfe, VC/Garg, C/Torres NOES: COMMISSIONERS: None ABSTAIN: COMMISSIONERS: None ABSENT: COMMISSIONERS: None Packet Pg. 6 4.1 NOVEMBER 12, 2024 PAGE 2 PLANNING COMMISSION 5. OLD BUSINESS: None. 6. NEW BUSINESS: 7. CONTINUED PUBLIC HEARING: 7.1 Development Review and Tree Permit No. PL2024-36: Under the authority of DBCC Section 22.38 and 22.48, the applicant, Philip K. Chan, and the property owner, LHL 688 LLC, are requesting Development Review approval for the construction of a new 9,484 square -foot single-family residence with an 837 square -foot garage, 958 square feet of balcony area, 698 square feet of porch area, swimming pool and rear yard improvements on a 49,223 gross square - foot (1.13 gross acre) undeveloped lot. A Tree Permit (TP) is also requested to remove two protected California black walnut trees and one coast live oak tree and replace with nine coast live oak trees on site. The subject property is zoned Rural Residential (RR) with an underlying General Plan land use designation of Rural Residential. PROJECT ADDRESS: 2537 Indian Creek Road Diamond Bar, CA 91765 APPLICANT: Philip K. Chen 711 S. First Avenue Arcadia, CA 91006 PROPERTY OWNER: LHL 688 LLC 14328 Lomitas Avenue City of Industry, CA 91746 ENVIRONMENTAL DETERMINATION: The project has been reviewed for compliance with the California Environmental Quality Act (CEQA). Based on that assessment, the City has determined the project to be Categorically Exempt from the provisions of CEQA pursuant to Article 19 under Section 15303(a) (construction of a new single-family residence) of the CEQA Guidelines. No further environmental review is required. RECOMMENDATION: Staff recommends that the Planning Commission approve Development Review and Tree Permit No. PL2024-36 based on the findings of fact, and subject to the conditions of approval as listed within the draft resolution. SP/Nakajima presented the staff report. C/Torres opened the public hearing. No public comments were offered. Packet Pg. 7 4.1 NOVEMBER 12, 2024 PAGE 3 PLANNING COMMISSION Philip K. Chan, Applicant, provided an overview of the project. C/Torres closed public hearing. Rawlings moved, Garg seconded, to approve Development Review and Tree Permit No. PL2024-36, subject to conditions of approval. Motion carried by the following Roll Call vote: AYES: COMMISSIONERS: Barlas, Rawlings, Wolfe, VC/Garg, C/Torres NOES: COMMISSIONERS: None ABSTAIN: COMMISSIONERS: None ABSENT: COMMISSIONERS: None 8. PLANNING COMMISSION COMMENTS/INFORMATION ITEMS: None. 9. STAFF COMMENTS/INFORMATIONAL ITEMS: CDD/Gubman reported there will be a Planning Commission meeting on November 26, 2024. 4 10. SCHEDULE OF FUTURE EVENTS: %/ As noted in the agenda. ADJOURNMENT: With no further business before the Planning Commission, C/Torres adjourned the Regular Planning Commission meeting at 6:48 p.m. to the next regularly scheduled meeting on Tuesday, November 26, 2024. The foregoing minutes are hereby approved this 26TH day of November, 2024. Ruben Torres, Chair Attest: Respectfully Submitted, Greg Gubman, Community Development Director Packet Pg. 8 7.1 PLANNING COMMISSION AGENDA REPORT CITY OF DIAMOND BAR - 21810 COPLEY DRIVE - DIAMOND BAR, CA 91765 - TEL. (909) 839-7030 - FAX (909) 861-3117 AGENDA ITEM NUMBER MEETING DATE: 107T%1320a1IMilk 1I1u1:3210 PROJECT LOCATION: GENERAL PLAN DESIGNATION ZONING DISTRICT: PROPERTY OWNER: 7.1 November 26, 2024 I: 0=10flino R0ton ffaTi,",N►remWWZIj►ZaP. 3333 Diamond Canyon Road Diamond Bar, CA 91765 (APN 8269-011-015) Office Professional Office (OP) Omeda Investment, LLC 2259 Celano Ct Chino Hills, CA 91709 APPLICANT: Jason Chen Kingdom Seed Academy 3333 S. Diamond Canyon Road Diamond Bar, CA 91765 SUMMARY: The applicant is requesting approval of a Conditional Use Permit (CUP) to operate a 13,830 square -foot child day care at Kingdom Seed Academy, within an existing building previously occupied by office uses on a 3.37-acre site. The remaining 22,740 square feet of the building is currently occupied by a private elementary school. RECOMMENDATION: Adopt the attached Resolution (Attachment 1) approving Conditional Use Permit No. PL2024-15, based on the findings of Diamond Bar City Code (DBCC) Section 22.58, subject to conditions. Packet Pg. 9 7.1 BACKGROUND: The property was developed in 1989 with a 36,570 square -foot office building. The building was originally occupied by Biosense Webster (a subsidiary of Johnson & Johnson), followed by other office tenants and a years -long period of vacancy. In 2023, Kingdom Seed Academy —a Christian -based, non-profit elementary school —started occupying 22,740 square feet of the building on the west side. Currently, 20 staff members are employed at the school and approximately 50 students are enrolled. At maximum capacity, the school could enroll up to 128 students. Education is available from Transitional Kindergarten through 5th grade. There are 109 total off-street parking spaces on site. During the review of the CUP, the Building Official found that the school did not obtain permits to change the use of the building from office to school, which requires an analysis to verify that the building complies with fire rating and exiting requirements. A condition of approval is included in the draft resolution to finalize these permits for the school, prior to issuance of a final Certificate of Occupancy for the child day care center. The property is legally described as Lot 1 of Tract No. 50415. The Assessor's Parcel Number (APN) is 8269-011-015. Site and Surrounding General Plan, Zoning and Land Uses The project site is located on the north side of Diamond Canyon Road and west of the State Route 57 freeway. The site is surrounded by single-family residences to the west, hillside open space to the north, and church to the south. Site (Plan View) Aerial Conditional Use Permit No. PL2024-15 Page 2 of 13 Packet Pg. 10 7.1 The following table describes the surrounding land uses located adjacent to the subject property: Site General Plan Designation Office OP Elementary School North Open Space OS Open Space South Office OP Church East N/A N/A SR-57 Freeway West Low Medium Residential RLM Single -Family Homes !�41* i _ a .-� 1, Phil 0*,L - ;i��' 1� Project Site Looking North Conditional Use Permit No. PL2024-15 Page 3 of 13 Packet Pg. 11 7.1 Adjacent Homes to the West Project Description Adjacent Property to the South Kingdom Seed Academy is proposing to operate a 13,830 square -foot child day care center and occupy the remaining east portion of the vacant office building. Kingdom Seed Academy operates a similar day care center in the City of Walnut. At full capacity, the proposed facility would be able to accommodate up to 180 children (infants to 5 years old) and employ up to 20 staff members. The proposed floor plan divides the space into several areas, including five preschool classrooms, two toddler classrooms, infant room, infant indoor play area, six offices, employee break room, and toddler restrooms. The reception area located at the center of the building will be shared with the existing school. The outdoor play area located towards the rear of the property includes three pieces of playground equipment, a basketball court, and lunch area. An artificial turf area will be utilized by both the day care and school. In accordance with State requirements, playgrounds will be separated by a four -foot -high vinyl fence so that the day care children do not share play space with the school age children. DBCC Section 22.42.040 requires a minimum of 75 square feet of outdoor play area per child. Kingdom Seed Academy's proposed enrollment of 180 children would therefore require at least 13,500 square feet of outdoor play area. At 16,100 square feet, the proposed outdoor recreational space exceeds this requirement. The proposed business hours are 7 a.m. to 6 p.m., Monday through Friday (except holidays). Children will be dropped off between 7 a.m. to 10 a.m. and picked up between 4 p.m. to 6 p.m. Conditional Use Permit No. PL2024-15 Page 4 of 13 Packet Pg. 12 Proposed Indoor Floor Plan and Existing Outdoor Play Area Review Authority (DBCC Section 22.58) A CUP is required for uses whose effect on the surrounding area cannot be determined before being analyzed for suitability at a particular location. When reviewing a CUP, consideration is given to the location, design, configuration, operational characteristics and potential impacts to determine whether or not the proposed use will pose a detriment to the public health, safety and welfare. If it can be found that the proposed use is likely to be compatible with its surroundings, the Commission may approve the proposed use subject to conditions stipulating the manner in which the use must be conducted. If the Commission finds that the proposed use is likely to be detrimental to the general peace, health and general welfare, then it must deny the request. When a CUP is approved, it runs with the land and all conditions placed on the CUP are binding on all successors in interest. In other words, if the owner were to close the business, a new tenant could locate in the space and operate the same type of business. The new tenant would be required to comply with the same conditions as the Conditional Use Permit No. PL2024-15 Page 5 of 13 Packet Pg. 13 7.1 previous tenant and would not be permitted to expand the business without full review and approval by the Planning Commission. Parking and Circulation The minimum required number of parking spaces for child day care centers is one space for each 10 children, plus one space for each employee, plus one space for each vehicle used in conjunction with the use, plus a permanent drop-off area. Elementary school uses require three spaces for each classroom, plus one space for every 200 square feet of assembly area in an auditorium. The table below provides a summary of the parking requirements for the building. The site provides 109 off-street parking spaces, including six ADA accessible spaces and eight spaces designated for drop-off. All parking and drop-off areas will be shared with the existing elementary school and the proposed child day care center. The minimum number of parking spaces required for the elementary school is 37 spaces. The addition of the child day care use requires at least 38 more spaces. The total off- street parking requirement for the building would thus be at least 75 spaces, which is satisfied by the number of parking spaces already provided. City's Development Code Parking Requirement Use Sq. Ft. Parking Ratio Parking Parking Required Provided 3 per classroom, plus 1 for Existing every 200 SF of assembly area Elementary 22,740 *(7 classrooms and 3,134 SF 37 School auditorium Proposed Child 1 per 10 children, plus 1 space Day Care Center 13,830 for each employee 38 (180 children, 20 employees) Total 36,570 75 109 *Robotics, dance, music are all enrichment classes during the afternoon reserved for individual students only and are not full-time classrooms. Parking Demand When reviewing parking impacts, various uses and peak operating hours for those uses are taken into consideration. 22,740 square feet of the building is currently occupied by an elementary school. Although the project complies with parking based on Development Code requirements, staff required a parking study to analyze the demand based on the existing and proposed uses on site due to the large number of students/children that could be enrolled at maximum capacity. The applicant submitted a local transportation assessment signed by a licensed traffic engineer (Attachment C), which includes parking demand calculations and analysis. Conditional Use Permit No. PL2024-15 Page 6 of 13 Packet Pg. 14 7.1 M� - C��• swa a�+S.o+ "fir � ` ���, a as dI,♦O;♦,a+• a�a •.♦♦♦♦a .. +;ao M • ,�e, off. .� � •°'a 0�'r� a,♦�6, rr���.�r,B♦aaa'aa', ♦,♦'♦+•i+'♦P M+"�-+'i +i \\�,A\� „ r-♦ ♦PAMP•• P'� MPP•'♦'s �61atit" \ Will______' RONNIE VV aaari � . ....Desi. Parking Spa s Proposed Site Plan The recommended direction of traffic flow consists of vehicles entering from the east driveway and exiting through the west driveway. The designated drop-off area is provided mainly for the child day care center. It is required that all children attending the day care center and school are escorted by an adult into the building for everyone's safety. The school provides for an arrival/departure policy through a parent handbook, which reminds parents of this policy. This is being enforced by the front desk staff. Drop-off activities generally take place between 7 a.m. to 10 a.m. for the proposed child day care center. The traffic engineer estimates that drop-off activities will reach its peak from 8:30 a.m. to 9 a.m., and is estimated to account for 45 drop-off trips, equivalent to an average rate of 1.5 arrival trips per minute. With parents spending approximately five minutes on average to complete the drop-off, the estimated parking usage at this time is approximately eight spaces in the drop-off parking area (45 children arrival/30 min = 1.5 trips per minute x 5 minutes equals 7.5 trips, rounded up to 8 trips). The designated drop-off area provides eight spaces to adequately accommodate the drop-off demand. The existing elementary school starts at 8:30 a.m. The traffic engineer estimates that drop-off activities reach their peak from 8:00 a.m. to 8:30 a.m., and are estimated to account for 90 drop-off trips, equivalent to an average rate of three arrival trips per minute. With parents spending approximately four minutes on average to complete the drop-off, the estimated parking usage at this time is approximately 12 spaces (90 students arrival/30 min = 3 trips per minute x 4 minutes equals 12 trips). Conditional Use Permit No. PL2024-15 Page 7 of 13 Packet Pg. 15 7.1 Worst -Case Scenario Drop -Off Demand Time Period Elementary School Drop -Off Day Care Center Drop -Off Combined % 2 Trips Peak 3 Demand Trips Peak Demand Trips Peak Demand 7:00 AM - 7:30 AM 0% 0 0 10% 18 3 18 3 7:30 AM - 8:00 AM 20% 25 3 15% 27 5 65 8 8:00 AM - 830 AM 70% 90 12 20% 36 6 100 18 8:30 AM - 9:00 AM 10% 13 2 25% 45 8 71 10 9:00 AM - 9:30 AM 0% 0 0 20% 36 6 7 6 9:30 AM - 10:00 AM 0% 0 0 10% 18 3 4 3 Total = 128 Max. 12 Total = 180 Max. 8 Max. 18 1 Early drop-off after 7 AM is accepted for the convenience of working parents as a courtesy of this private school. 2 Estimated average duration of drop-off parking: 4 minutes for Elementary School & 5 minutes for Day Care Center. 3 Peak Demand = (Average arrival rate per minute) x (Average Duration in minutes) Source: Local Transportation Assessment prepared by K2 Traffic Engineering, Inc., dated November 5, 2024 Utilizing this methodology, the traffic engineer estimates that the worst -case scenario for drop-off demand for the existing elementary school and proposed child day care center is 18 spaces. Assuming both the school and child day care center are fully staffed with 20 employees, parking demand for the two uses is 40 spaces. With a combined parking demand of 58 spaces, the site provides sufficient parking with a surplus of 51 parking spaces under this scenario. The designated drop-off area and surplus of parking indicate that all vehicular activities will be sufficiently accommodated on site at full enrollment of both uses. Parking Demand Use Sq. Ft. Parking Ratio Parking Required Parking Provide. Existing Elementary 22,740 20 staff members 20 School Proposed Child Day 13,830 20 staff members 20 Care Center Peak Drop -Off Demand 18 Total 36,570 58 109 Conditional Use Permit No. PL2024-15 Page 8 of 13 Packet Pg. 16 7.1 It should be noted that these estimates may be conservative, as the analysis did not take carpooling into consideration. Some children carpool with their siblings or friends, thus reducing the number of overall trips. Additionally, the proposed child day care center will allow flexible pick-up schedules to meet each parent's needs. Children are picked up on a staggered basis between noon and 6 p.m. Without a concentration in any specific time period, drop-off activities are expected to be accommodated within the provided area. Signage will be installed and the curb painted in green to demarcate that these stalls are reserved for 10-minute parking only. However, once the day care center is in operation, and should traffic and/or parking issues arise, the Community Development Director, after providing the applicant a reasonable opportunity to mitigate the impact(s) to an acceptable level, may refer the matter back to the Planning Commission to consider amending or revoking the Conditional Use Permit to address such impacts (Condition of Approval #5). If the impacts are considered minor as determined by the Director, modifications required to mitigate the impact(s) may be reviewed administratively. Compatibility with Neighborhood The site is surrounded by single-family residences to the west, a hillside open space to the north, a church to the south and the 57 freeway to the east. A child day care use would provide services for nearby residents. Given the proposed hours of operation, the availability of parking, and types of adjoining uses, it is reasonable to conclude that the proposed child day care center will be compatible with the other uses in the neighborhood. Community Meeting On May 2, 2024, the applicant held a community meeting at the project site. Notices for those meetings were mailed to property owners within a 1,000-foot radius of the project site. There were two residents in attendance. Several concerns and comments were raised, which are listed below with responses provided in italics: • Although it has lessened in the last few months, it was noisy from kids playing outdoors when the school first opened. Will there be noise issues again with the opening of the new child day care center? Attachments D and E provides the complete schedules for the existing school and proposed child day care center. The table below lists the outdoor play times for both uses. Currently, there are no 3rd through 5th grade students enrolled at the school. Conditional Use Permit No. PL2024-15 Page 9 of 13 Packet Pg. 17 7.1 Outdoor Play Times .. 1. TK1 11:00 — 11:30 Pre-K 9:00 — 9:30 TK 2 11:00 — 11:30 Preschool (2 year) 10:20 — 10:40 Morning Kindergarten 10:30 — 10:55 preschool (3 year) 10:30 — 11:00 1 St grade 10:30 — 10:55 Preschool ( y ) 9:30 — 10:20 year) 2nd grade 10:00 — 10:30 TK1 2:20 — 2:55 Pre-K 3:30 — 4:00 TK2 2:20 — 2:55 Preschool 4:00 — 4:30 Afternoon Kindergarten 12:15 — 1:00 Preschool (3 year) 4:30 — 5:00 1st grade 12:15 — 1:00 Preschool 3 ear 5:00 — 5:30 ( year) 2nd grade 12:15 — 1:00 Staff worked with the applicant to modify the schedules of the existing school and proposed child day care center to stagger the outdoor play times to the extent feasible to alleviate potential noise generated by a large number of children playing outdoors at the same time. In addition, the California Department of Social Services (CDSS) requires school age children be separated from the day care children. Although there is a window of time from 10:00-10:55 where children from both uses will be outside, the playgrounds will be separated by a four -foot -high vinyl fence and the day care children will not be sharing playground space with the school age children during their own playtime, per State requirements. CDSS has reviewed the proposed outdoor play area layout and confirmed that this is acceptable for licensing standards. While driving up to the adjacent gated residential neighborhood, the existing landscaping creates visibility issues if vehicles are exiting the school site. Immediately following the meeting, the applicant removed the palm tree adjacent to the west driveway which may have impacted visibility for drivers. The applicant plans to replant the area with Elijah blue fescue grass, which is low -growing and drought tolerant. Additionally, an "Exit Only" sign will guide drivers that are navigating through the site, which shall be installed prior to issuance of a final Certificate of Occupancy for the child day care center. Conditional Use Permit No. PL2024-15 Page 10 of 13 Packet Pg. 18 7.1 Landscaping Removed Adjacent to West Driveway • There are general traffic, parking and access concerns, e.g. emergency access, employees parking on the street. During the meeting, the applicant responded that all employees are required to park on site. Additionally, they have arranged an agreement with the church across the street to share parking should the need arise for any special events. Staff required the applicant to submit a local transportation assessment signed by a licensed traffic engineer (Attachment C), to assess transportation effects upon project completion. The study showed that the project is expected to generate the following: -140 trips in the AM peak hour, including 74 inbound trips and 66 outbound trips -142 trips in the PM peak hour, including 67 inbound trips and 75 outbound trips -736 daily trips Upon project completion, the study intersection at Diamond Canyon Road and Brea Canyon Cutoff Road is expected to operate at Level of Service (LOS) D or better. According to the "City of Diamond Bar Transportation Analysis Guidelines for Vehicle Miles Traveled and Level of Service Assessment," dated September 2020, the acceptable LOS for intersections in the city is D or better as established in the City's General Plan. Any intersection operating at a LOS E or F is considered deficient. The study also showed that at upon project completion, the east and west driveways at the project site along Diamond Canyon Road will continue to operate at LOS A. Therefore, the project is expected to have no or less than significant traffic impact. The assessment was reviewed and approved by the City's consultant traffic engineer. Conditional Use Permit No. PL2024-15 Page 11 of 13 Packet Pg. 19 7.1 The applicant submitted plans to the L.A. County Fire Department for their preliminary review. The Fire Department cleared the project for hearing and the applicant is required to obtain approval of their construction plans during plan check. Additional Review The Building and Safety Division, Public Works Department and L.A. County Fire Department reviewed this project and included their comments in the attached resolution as conditions of approval. NOTICE OF PUBLIC HEARING: On November 15, 2024, public hearing notices were mailed to property owners within a 1,000-foot radius of the project site. On November 15, 2024, the notice was published in the San Gabriel Valley Tribune newspaper; the project site was posted with a notice display board; and a copy of the public notice was posted at the City's designated community posting sites. Public Comments Received No comments have been received as of the publication date of this report. ENVIRONMENTAL ASSESSMENT: This project has been reviewed for compliance with the California Environmental Quality Act (CEQA). Based on that assessment, the City has determined the project to be Categorically Exempt from the provisions of CEQA pursuant to the provisions of Article 19 Section 15301(a) (Interior alterations involving partitions and electrical conveyances) of the CEQA Guidelines. No further environmental review is required. PREPARED BY: ayu akajima, enior PI ner 11/26/2024 REVIEWED BY: Gr e Lee, fanning anager 11/21/2024 Gr Gubma ommuni Development Director 112112024 Conditional Use Permit No. PL2024-15 Page 12 of 13 Packet Pg. 20 7.1 Attachments: A. Draft Resolution No. 2024-XX, Standard Conditions of Approval B. Site Plan, Floor Plans, and Elevations C. Local Transportation Assessment prepared by K2 Traffic Engineering, Inc., dated November 5, 2024 D. Day Care Schedule E. School Schedule Conditional Use Permit No. PL2024-15 Page 13 of 13 Packet Pg. 21 7.1.a PLANNING COMMISSION RESOLUTION NO. 2024-XX A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF DIAMOND BAR, CALIFORNIA, APPROVING CONDITIONAL USE PERMIT NO. PL2024-15 TO OPERATE A 13,830 SQUARE -FOOT CHILD DAY CARE CENTER WITHIN AN EXISTING BUILDING PREVIOUSLY OCCUPIED BY OFFICE USES LOCATED AT 3333 DIAMOND CANYON ROAD, DIAMOND BAR, CA (APN 8269-011-015). A. RECITALS 1. Property owner, Omeda Investment, LLC, and applicant, Jason Chen for Kingdom Seed Academy, have filed an application for Conditional Use Permit No. PL2024-15 to operate a 13,830 square -foot child day care center at Kingdom Seed Academy, within an existing building previously occupied by office uses. The project site is more specifically described as 3333 S. Diamond Canyon Road, Los Angeles County, California. Hereinafter in this resolution, the subject Conditional Use Permit shall collectively be referred to as the "Project" or "Proposed Use." 2. The Project Site is made up of one parcel totaling 3.37 acres. It is located in the Professional Office (OP) zone and is consistent with the Office land use designation of the General Plan. 3. The legal description of the subject property is Lot 1 of Tract No. 50415. The Assessor's Parcel Number (APN) is 8269-011-0159. 4. On November 15, 2024, notification of the public hearing for this project was published in the San Gabriel Valley Tribune newspaper. On November 15, 2024, public hearing notices were mailed to property owners within a 1,000-foot radius of the Project site and posted at the City's designated community posting sites. 5. On November 26, 2024, the Planning Commission of the City of Diamond Bar conducted a duly noticed public hearing, solicited testimony from all interested individuals, and concluded said hearing on that date. B. RESOLUTION NOW, THEREFORE, it is found, determined and resolved by the Planning Commission of the City of Diamond Bar as follows: 1. The Planning Commission hereby specifically finds that all of the facts set forth in the Recitals, Part A, of this Resolution are true and correct. 2. The Planning Commission hereby determines the Project to be Categorically Exempt from the provisions of the California Environmental Quality Act (CEQA) pursuant to the provisions of Article 19, Section 15301(a) (Interior alterations involving partitions and electrical conveyances) of the CEQA Guidelines. Therefore, no further environmental review is required. Packet Pg. 22 7.1.a C. FINDINGS OF FACT Based on the findings and conclusions set forth herein and as prescribed under Diamond Bar City Code (DBCC) Section 22.58, the Planning Commission hereby finds and approves as follows: Conditional Use Permit Review Findings (DBCC Section 22.58) 1. The Proposed Use is allowed within the subject zoning district with the approval of a conditional use permit and complies with all other applicable provisions of this Development Code and the City Code. Pursuant to DBCC Section 22.10.030, Table 2-6, child day care centers are permitted in the OP zoning district with approval of a conditional use permit. The Proposed Use will be located within an existing building that is also occupied by a private elementary school. Through compliance with the conditions of approval stipulating the manner in which the use must be conducted, the Proposed Use will be compatible with neighboring uses within the building and surrounding neighborhood. 2. The Proposed Use is consistent with the general plan and any applicable specific plan. The Proposed Use is consistent with General Plan Goal ED-G-3: ("Support the retention, rehabilitation, and/or expansion of existing businesses, and the attraction of new businesses") in that the Proposed Use is a new business locating within an existing building that is underutilized. The Project site is not subject to the provisions of any specific plan. 3. The design, location, size and operating characteristics of the Proposed Use are compatible with the existing and future land uses in the vicinity. The Proposed Use will occupy a 13,830 square -foot vacant tenant space within a 36,570 square -foot office building. The remaining portion of the building is occupied by a private elementary school, which have similar operational characteristics. The Proposed Use complies with the City's Development Code parking requirements, and the parking demand generated by the Proposed Use is not likely to exceed the number of on -premise parking spaces available to serve the Proposed Use at any given time. The Proposed Use will operate from 7 a.m. to 6 p.m., Monday through Friday. The site is surrounded by single-family residences to the west, hillside open space to the north, a church to the south and the 57 freeway to the east. A child day care use would provide services for nearby residents. Given the proposed hours of operation, the availability of parking, and types of adjoining uses, it is reasonable to conclude that the Proposed Use will be compatible with the other uses within the building and surrounding neighborhood which are single-family residences and church. 2 PC Reso No. 2024-XX Packet Pg. 23 7.1.a 4. The subject site is physically suitable for the type and density/intensity of use being proposed, including access, provision of utilities, compatibility with adjoining land uses, and the absence of physical constraints. The Proposed Use is physically suitable within the subject site because it will be located in an existing vacant tenant space within an existing office building, and no additional square footage is being proposed. In addition, the Proposed Use will be using existing access and parking. The site provides 109 on -site parking spaces which will be shared by both uses. The minimum number of parking spaces required for the existing elementary school is 37 spaces. The parking requirement for the Proposed Use is 38 spaces. The total off-street parking requirement for the building would thus be at least 75 spaces, which is satisfied by the number of parking spaces already provided. The traffic engineer estimates that the worst -case scenario for drop-off demand for the existing school and proposed child day care center is 18 spaces. Assuming both the school and child day care center are fully staffed with 20 employees, parking demand for the two uses is 40 spaces. With a combined parking demand of 58 spaces, the site provides sufficient parking with a surplus of 51 parking spaces under this scenario. Therefore, the existing parking supply would accommodate existing use and the Proposed Use, and the designated drop-off area and surplus of parking spaces indicate that all vehicular activities will be sufficiently accommodated on site at full enrollment of both uses. The Proposed Use is physically suitable at the subject site. 5. Granting the conditional use permit will not be detrimental to the public interest, health, safety, convenience, or welfare, or injurious to persons, property, or improvements in the vicinity and zoning district in which the property is located. Prior to the issuance of any city permits, the Project is required to comply with all conditions of approval within the attached resolution, Building and Safety Division, and L.A. County Fire Department. 6. The proposed Project has been reviewed in compliance with the provisions of the California Environmental Quality Act (CEQA). The proposed use is categorically exempt from the provisions of the California Environmental Quality Act (CEQA) as set forth under Article 19 Section 15301(a) (Interior alterations involving partitions and electrical conveyances) of the CEQA Guidelines. D. CONDITIONS OF APPROVAL Based upon the findings and conclusion set forth above, the Planning Commission hereby approves Conditional Use Permit No. PL2024-15, subject to the following conditions: 3 PC Reso No. 2024-XX Packet Pg. 24 7.1.a 1. This approval is for the operation of a 13,830 square -foot child day care center at Kingdom Seed Academy, within an existing building previously occupied by office uses, as described in the application on file with the Planning Division, the Planning Commission staff report for Conditional Use Permit No. PL2024-15 dated November 12, 2024, and the Planning Commission minutes pertaining thereto, hereafter referred to as the "Use." 2. The Use shall substantially conform to the approved plans as submitted and approved by the Planning Commission and on file with the Community Development Department. 3. This Conditional Use Permit shall be valid only for 3333 S. Diamond Canyon Road, as depicted on the approved plans on file with the Planning Division. Prior to relocating or expanding the Use into other tenant spaces, the applicant shall first apply for and receive approval of an amended Conditional Use Permit. 4. If, at any time, the City finds that the Use is the cause of a parking deficiency, noise nuisance, or other land use impact, within or beyond the subject property boundaries, the Community Development Director, after providing the entitlement holder a reasonable opportunity to mitigate the impact(s) to an acceptable level, may refer the matter back to the Planning Commission to consider amending or revoking this Conditional Use Permit to address such impacts. If the impacts are considered minor as determined by the Community Development Director, modifications required to mitigate the impact(s) may be reviewed administratively. 5. No changes to the approved scope of services comprising the Use shall be permitted unless the applicant first applies for an amendment to this Conditional Use Permit, pays all application processing fees and receives approval from the Planning Commission, except that the Community Development Director may administratively approve minor modifications to the use if it is determined. 6. Prior to issuance of a final Certificate of Occupancy, an "Exit Only" sign and landscaping shall be installed per the approved plans at the west driveway to guide drivers that are navigating through the site. 7. Prior to issuance of a final Certificate of Occupancy for the child day care center, the existing school shall obtain and finalize building permits for the change of use from office to school. The Planning Commission shall: (a) Certify to the adoption of this Resolution; and (b) Forthwith transmit a certified copy of this Resolution, by certified mail to the property owner, Omeda Investment, LLC, 2259 Celano Ct, Chino Hills, CA 91709; and applicant, Jason Chen for Kingdom Seed Academy, 3333 S. Diamond Canyon Road, Diamond Bar, CA 91765. 4 PC Reso No. 2024-XX Packet Pg. 25 7.1.a APPROVED AND ADOPTED THIS 26TH DAY OF NOVEMBER, 2024, BY THE PLANNING COMMISSION OF THE CITY OF DIAMOND BAR. Ruben Torres, Chairperson I, Greg Gubman, Planning Commission Secretary, do hereby certify that the foregoing Resolution was duly introduced, passed, and adopted, at a regular meeting of the Planning Commission held on the 26th day of November, 2024, by the following vote: AYES: Commissioners: NOES: Commissioners: ABSENT: Commissioners: ABSTAIN: Commissioners: /_�MIX35 Greg Gubman, Secretary 5 PC Reso No. 2024-XX Packet Pg. 26 7.1.a COMMUNITY DEVELOPMENT DEPARTMENT STANDARD CONDITIONS USE PERMITS, COMMERCIAL AND RESIDENTIAL NEW AND REMODELED STRUCTURES PROJECT #: Conditional Use Permit No. PL2024-15 SUBJECT: To operate a 13,830 square -foot child day care center within an existing office building previously occupied by office uses PROPERTY Omeda Investment, LLC OWNER(S): 2259 Celano Ct Chino Hills, CA 91709 APPLICANT: Jason Chen for Kingdom Seed Academy 3333 S. Diamond Canyon Road Diamond Bar, CA 91765 LOCATION: 3333 S. Diamond Canyon Road Diamond Bar, CA 91765 ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT. APPLICANT SHALL CONTACT THE PLANNING DIVISION AT (909) 839-7030, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: A. GENERAL REQUIREMENTS 1. The applicant shall defend, indemnify, and hold harmless the City, and its officers, agents and employees, from any claim, action, or proceeding to attack, set -aside, void, or annul the approval of Conditional Use Permit No. PL2024-15 brought within the time period provided by Government Code Section 66499.37. In the event the city and/or its officers, agents and employees are made a party of any such action: 6 PC Reso No. 2024-XX Packet Pg. 27 7.1.a (a) Applicant shall provide a defense to the City defendants or at the City's option reimburse the City its costs of defense, including reasonable attorney fees, incurred in defense of such claims. (b) Applicant shall promptly pay any final judgment rendered against the City defendants. The City shall promptly notify the applicant of any claim, action of proceeding, and shall cooperate fully in the defense thereof. 2. This approval shall not be effective for any purpose until: (a) The applicant and property owner have each filed with the Community Development Department an affidavit stating that they are aware of and agree to accept all of the conditions of approval contained herein; and (b) All remaining application processing fees have been paid in full. 3. The business owners and all designers, architects, engineers, and contractors associated with this project shall obtain a Diamond Bar Business License for those businesses located in Diamond Bar. 4. The project site shall be maintained and operated in full compliance with the conditions of approval and all laws, or other applicable regulations. 5. Approval of this request shall not waive compliance with all sections of the Development Code, all other applicable City Ordinances, and any applicable Specific Plan in effect at the time of building permit issuance. 6. To ensure compliance with all conditions of approval and applicable codes, the Conditional Use Permit shall be subject to periodic review. If non-compliance with conditions of approval occurs, the Planning Commission may review the Conditional Use Permit. The Commission may revoke or modify the Conditional Use Permit. 7. Property owner/applicant shall remove the public hearing notice board within three (3) days of this project's approval. 8. The applicant shall comply with the requirements of City Planning, Building and Safety Divisions, Public Works Department, and the Fire Department. B. FEES/DEPOSITS 1. Applicant shall pay development fees (including but not limited to Planning, Building and Safety Divisions, and Public Works Department) at the established rates, prior to issuance of building permits, as required by the City. School fees as required shall be paid prior to the issuance of building permit. In addition, the applicant shall pay all remaining prorated City project review and processing fees prior to issuance of grading or building permit, whichever comes first. 7 PC Reso No. 2024-XX Packet Pg. 28 7.1.a 2. Prior to any plan check, all deposit accounts for the processing of this project shall have no deficits. C. TIME LIMITS The approval of Conditional Use Permit No. PL2024-15 shall expire within one (1) year from the date of approval if the use has not been exercised as defined pursuant to DBCC Section 22.66.050 (b)(1). The applicant may request in writing a one-year time extension subject to DBCC Section 22.60.050(c) for Planning Commission review and approval. APPLICANT SHALL CONTACT THE BUILDING AND SAFETY DIVISION, (909) 839-7020, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: General Conditions: Plans and construction shall conform to current State and Local Building Code (i.e. 2022 California Building Code series will apply) requirements and all other applicable construction codes, ordinances and regulations in effect at the time of permit issuance. 2. Implementation of the CAL Green Code shall be reflected on the plans, and certification shall be by a third party as required by the Building Division. Specific water, waste, low VOC, and related conservation measures shall be shown on plans. Construction shall conform to the current CAL Green Code. 3. A basic building analysis for the entire facility (including the existing classroom areas) is required and to be designed by a licensed architect. Plan Check — Items to be addressed prior to plan approval: 4. This project shall comply with the energy conservation requirements of the State of California Energy Commission. All lighting shall be high efficacy or equivalent per the current California Energy Code 119 and 150(k). 5. Indoor air quality shall be provided consistent with ASHRAE 62.2 as required per California Energy Code 150(o). 6. Public Works/Engineering Department is required to review and approve grading plans that clearly show all finish elevations, drainage, and retaining wall(s) locations. These plans shall be consistent with the site plan submitted to the Building & Safety Division. 7. An exit analysis shall be provided during plan check, showing occupant load for each space, exit width, exit signs, etc. The exit analysis will be provided for the entire facility including the existing classroom areas. 8. Number of plumbing fixtures shall be in compliance with CPC T-422. 8 PC Reso No. 2024-XX Packet Pg. 29 7.1.a 9. This project shall comply with the energy conservation requirements of the State of California Energy Commission. All lighting shall be high efficacy or equivalent per the current California Energy Code 140.6 to 140.9. 10. Indicate the proposed addition and existing building on the plans. Submit code analysis and justification showing the following: a. Each building square footage b. Each building height C. Type of construction d. Sprinkler system e. Each group occupancy f. Property line location in relation to each building (side yard) g. Exit analysis for each building (occupant load/corridor rating/exit width/exit signs, etc.) h. Accessibility analysis for the entire site and for each building i. Shaft rating/ exterior wall construction/ opening protection 11. Plans shall reflect adequate exit requirements. The distance between required exits shall be'/2 of the overall building diagonal dimension. 12. Fire Department approval shall be required. Contact the Fire Department for plan check requirements. 13. Design for future electric vehicle charging shall be provided consistent with CAL Green 4.106.4 or 5.106.5.3. 14. The existing school facility shall be designed as part of the overall permit and not excluded from the tenant improvement. 15. The design for a school and day care tenant improvement and existing areas shall be designed by a licensed architect for all Building Code requirements. 16. An occupancy separation needs to be provided to adjacent uses per CBC Table 508.4. Fire rated assemblies are required between the different uses. 17. An allowable area analysis shall be completed due to the higher use per CBC Table 506.2. Analyze for 1-4, A-3, and E occupancy in the allowable area analysis. 18. Each room shall be designed for a one -hour rated corridor or have a door directly to the outside or one -hour rated corridor per CBC 436.1.1. 19. Two exits are required for all larger classrooms 1000 square feet or greater per CBC 1006.2.2.8 and 436.1.1. Permit — Items required prior to building permit issuance: 9 PC Reso No. 2024-XX Packet Pg. 30 7.1.a 20. Solid waste management of construction material shall incorporate recycling material collection per Diamond Bar City Code 8.16 of Title 8. The contractor shall complete all required forms and pay applicable deposits prior to permit. 21. AQMD notification is required at least 10 days prior to any demolition. Proof of notification is required at permit issuance. 22. All workers on the job shall be covered by workers' compensation insurance under a licensed general contractor. Any changes to the contractor shall be updated on the building permit. Construction — Conditions required during construction: 23. Occupancy of the facilities shall not commence until all California Building Code and State Fire Marshal regulations have been met. The buildings shall be inspected for compliance prior to occupancy. 24. Every permit issued by the Building Official under the provisions of this Code shall expire and become null and void unless the work authorized by such permit is commenced within one year after permit issuance, and if a successful inspection has not been obtained from the Building Official within one -hundred - eighty (180) days from the date of permit issuance or the last successful inspection. A successful inspection shall mean a documented passed inspection by the City building inspector as outlined in Section 110.6. 25. All structures and property shall be maintained in a safe and clean manner during construction. The property shall be free of debris, trash, and weeds. 26. Existing fencing shall remain in -place during construction including pool barrier fencing. Any alteration of the fencing may result in a discontinuation of construction until the fences are returned to its original state. 27. All equipment staging areas shall be maintained in an orderly manner and screened behind a minimum 6' high fence. 28. The project shall be protected by a construction fence to the satisfaction of the Building Official, and shall comply with the NPDES & BMP requirements (sand bags, etc.). All fencing shall be view obstructing with opaque surfaces. 29. The applicant shall contact Dig Alert and have underground utility locations marked by the utility companies prior to any excavation. Contact Dig Alert by dialing 811 or their website at www.digalert.org. 30. The applicant shall first request and secure approval from the City for any changes or deviations from approved plans prior to proceeding with any work in accordance with such changes or deviations. 10 PC Reso No. 2024-XX Packet Pg. 31 7.1.a 31. All glazing in hazardous locations shall be labeled as safety glass. The labeling shall be visible for inspection. 32. All plumbing fixtures, including those in existing areas, shall be low -flow models consistent with California Civil Code Section 1101.1 to 1101.8. 1=1,11111 11 PC Reso No. 2024-XX Packet Pg. 32 3333 S DIAMOND CANYON RD, DIAMOND BAR, CA 91765 PROJECT INFORMATION SCOPE OF WORK FLOOR AREA BREAKDOWN NOTE: 1. Child day care centers shall comply with all applicable standards established by Ne Slate File Marshal, including, without limitation, standards for such WSONGINEW ROORAPFA(Yi. FT.)WNPANO GfWP ALLOWA91B AffA ' OlNM110N USED RRMIi.ANFN LIID➢OAY L4AECENiFA IS BFIN6 PIY1PoSfp. pmppAYG0.E NFN 13,BN I-0 R,Oppff facilities to Wntein fire eXlilguishers, smoke detector devices, CBrbwl TRAcr No -E pr_anLor_scglHTrorv: LOT, flfM6RgRy BOSIBiG 18,Kb E SBproS notitle tletectors, antl requiretl etits (DBCC Section 2242.040 (2)(b)]. ontrol) fa the 2. The facility shall be in full compliance wiN Chapter 22 28 (noise cFIRE 0.E�gW ENISTING ]W E SBpWSF ,maD subject zoning tlistrict [DBCC Section 22 42 040 (2)(c)]. 3. Prlor to issuance of a Certificate d Ocoupancy, resurtaco and restnpe the AIgTOWM DISTBIG A-3 3glppg SPRINKLER NFPA � corvsTquciron ttFE. Ina parking bt Packing areas shall be kept and maintained so as net tD detract from Me appearance of adjacent pmperlias and to protect the health, safety and WreMale of the user, accuperM and general public. Areas shall be kept in a neat eM clean cantlition, free of trash, debris or rubbish, and free of potholes, sinkholes, standing water, cracks antllor broken areas. Perking space and pavement striping and signs shell be repeinleq refurbished enNor replaced When they became fatletl, tlamagetl ar tlestmyetl to an extent that they areno bngereffective. Parking areas shall be pwiotlically resurtacetl or sealetl to (9"im ¢e seepage of water into the ground bebw IDBDD Section 2234.050 4. Prior to issuance of a Certificate of Occupancy, the pelmenenldmpv OWNER INFORMATION: CODE COMPLIANCE @JBDING CODE. UDESIGn ARCHIT-ALD=n 8TUR10 EZ DESIGN STUDIO LLC. 1409 SAN CARLOS RD, ARCADIA, CA 91006 (626)673-5686 PROJECT cup CHANGE USED ADDRESS 3333 S DIAMOND CANYON RD DIAMOND BAR These ma aspeunaaam, dm apmmit eerereie eeretirep�PeM STAMP '�ED�ARC� n �Of C REVISIONS Date No. Description DRAWING TITLE TITLE SHEET Drawn By: EC Scale: 1' = 40'A" Date: 07/24123 EA G NO. fTEIA' -14 CUP f Packet-Pg. 33 (E)CONTROLLED POINTOF ENTRY (E) HIGH (E) 6HIGH IRON FENCE IRON GATE \ `W EI1EF ENCY LANDSCAPE EXISTING KINGDERGARTEN PROPOSED CHILD DAYCARE PARKING SPACES CHILD DAYCARE CENTER NUMBER OF CHILDREN NUMBER OF EMPLOYEES 180 20 REQUIRED SPACES 18 20 ELEMENTARY SCHOOL NUMBER OF CLASSROOM AREA OF AUDITORIUM 7 3,134 SF REQUIRED SPACES 21 16 TOTAL REQUIRED 75 TOTAL PROVIED 101 +8 (permanent tlropoff area) N b b b 67 C3. 67� 66 �ADA PARKING UPGRADE 118" =1'A" (E)CONTROLLED / POINT OF ENTRY / (E)THIGH / IRON GATE I REQUIRED: DAYCARE 180 CHILDREN X 75=13,500 SF TOTAL REQUI RED: 13,500 SF PROVIDED. 16,100 SF , 1 PLAY STRUCTURE PROPOSED FLOOR PLAN PLAY STRUCTURE SCALE: 114" = 1'-0" 3 CUSTOMER GROUNDCOVER EZIDESion —11TECT111L —On STUDIO EZ DESIGN STUDIO LLC. 1409 SAN CARLOS RD, ARCADIA, CA 91006 (626)673-5686 PROJECT CUP CHANGE USED ADDRESS 3333 S DIAMOND CANYON RD DIAMOND BAR mm ma aspaenaaam, amgnuia ana�gemema dm are`mmttre�e are tnep HpM STAMP 9a _ �Of C REVISIONS Date No. Desviption 06 0814 A, CUP DRAWING TITLE PROPOSED SITE PLAN Drawn By: Autlar Stele: As iiMlcetetl Date: 04/17/24 DRAWING NO. A-1.02 Packet-Pg. 34 UDESIGn A6ceT wuD=n sreuio ES DESIGN STUDIO LLC. 1469 SAN CARLOS RD, ARCADIA, CA 91666 (626)673-5686 PROJECT CUP CHANGE USED ADDRESS 33M S DIAMOND CANYON - - - - - RD DIAMOND BAR 574 fit' l .p (E) FIRE HYDRANT (E) FIRE HYDRANT EXISTING ELEMENTARY SCHOOL (NO CHANGE ROPOSED HIED DAYCAR STAMP 9�0�� J7S Q REVISIONS Date No. De-dpbon —14 CUP �O 42968 O\� 5 a (E) FIRE HYDRANT DRAWING TITLE FIRE HVDRAMS LOCATION Drawn By: AutMr Stele: 1' = 40'A" Date: 04/29/24 DRAWING NO. A-1.03 Packet Pg. 35 UDESIGn AncaT wuD=n sraDIO EZ DESIGN STUDIO LLC. 1409 SAN CARLOS RD, ARCADIA CA 91006 (626)673-5686 PROJECT CUP CHANGE USED s ADDRESS NYON EXIT RO OM UTILITY RD DIAMOND BAR PIANO PIANO PIANO PIANO oa spaenuaars, CLASS CLASS CLASS CLASS INFANT INDOOR _ESCHOOL INFANT ROOMCLASS aeu�amgnuiaa eme a ART CLASS PLAYAREA fi495F 00995 SF dm w ntllnme are n"p HpM MUSIC CLASS UTILITY ROOM 5145E «..wra.weouva-=TORAGE F STORAGE STORAGETORAGEESCHOOL LIBRARY STORAGE AUDITORIUM SF CLASS STAMP 2ND GRADE EMSTINGKINGDERGARTEN DANCE ROOM o L1134 oaurv.,�.ao=.•-+® 998 SF (NO CHANGE) STORAGE aay.=.,.=wo ®a:ao CLASS 4 0 ❑ 0 STORAGE O p our c4�S *��a C� n � 0 0 0 0 CLASS 3 CLASS 5 tt O oc DD O PRESCHOOL 9" CLASS �OfC 1STjb CHINESE z O cc )D997 O SF STORAGE O O av,,.,„..ao.®nae. CLASS CtASS6 w O O REVISIONS ❑ G o 0 Date No. DeecnPeon TODDLERCLASS 548 SF —14 CUP 03 t OFFICE OFFICE OFFICE r STORAGE CLASS 7 ID (E) 1-HLFIREE EDCOR OR EXIT EXIT OFFICE OFFICE OFFICE OFFICE LOFFICEOFFICE OFFICE 128 SF 128 SF 2ti1 S� TODDLER CLASS AFTER SCHOOL (E) RECEPTION (E)1-HR FIRE RATED CORRIDOR 585 SF EXISTING FIRE RATED AREA =.v.1=0%vx.1. IXIT IXIT EXIT - PRESCHOOL PRESCHOOL CLASS CLASS 3S. F 986 SF ED KINDERGARTEN TRANSITIONAL KINDERGARTEN POL E °uw"".anuvae. o==+=....�...���_.113 REAKRO ROOM DRAWING TITLE 161 SF PROPOSED BUILDING FLOOR PLAN Drawn By: AutMr Stele: 1' = 10'A" N Date: Ofi/12124 PROPOSED BUILDING FLOOR PLAN DRAWING NO. scALE: 1" = W - A-1.04 Packet-Pg. 36 UDESIGn AM „n—D=n61allo (N) 4' HIGH VINYL FZ DESIGN STUDIO LLC FENCE 14a9 SAN CARLOS RD, ARCADIA, CA 91006 (628)673-5688 IF) 6' HIGH IRON FENCE (N) OUTDOOR LUNCH AREA _ PROJECT CUP CHANGE USED (E) 8' HIGH IRON FENCE O ADDRESS (E) PLAVGROU D EQUI MENT 33M S DIAMOND CANYON FOR DAYCARE RD DIAMOND BAR O O amgnuN arty rwreaemmttrereM ere�irep peM (E) ARTIFICIAL TUR E) BASKETBALL COURT STAMP PRESCHOOL NFANT INDOOR INFANT ROOM CLASS PLAYAREA 649 wO8. `Ugg �S«F°tl `��$�ED�71RC�n �Of C PRESCHOOL CLASS 9985E REVISIONS oawxrwa a®„r.o Date No. De-Hpbon CUP 0 0 O o PRESCHOOL CLASS 997 SF O O ac«wx.wro.°nurce O O TODDLER CLASS 548 SF OFFICE IoFFICE OFFICE , 320 SF F (E)1-HR FIRE RATED COB R OFFICE128 SF 282 SF TODDLERCLASS (E)RECEPTION E)1-HR FIRE RATED CORRIDOR 585 SF DRAWING TITLE PRESCHOOL PRESCHOOL CLASS CLASS EMPOL843 SF 98fi SF REAKR O INDOORLOUTDOOR BREAKM M °`w..rewm.°"P°" ««eA"*`wo..w°o° FLOOR PLAN ROOM 181 SF Drawn By: Au1Ihor Scale: 1:145 N Data: 07/24123 INDOOR & OUTDOOR FLOOR PLAN s-LE:.31=I- DRAWING NO. A-2.01 Packet-Pg. 37 (E)1-HR FIRE RATED CORRIDOR" EXIT (E)1-HR FIRE RATED SEPARATION E OFFICE OFFICE 2825E(E)1-HR FIRE RATED SEPARATION MIN FIRE RATED DOOR (E)1-HRFIRERATEDCORRIDOR o 0(E)90 TODDLER CLASSTPLAVAREAPRESCHOOL N—EDAR- CLASSPRESCHOOL 986 SF00C�$ LYEROM SF � PLAVAREA N �� PROPOSED FLOOR PLAN SCALE: il8" =1'A" UDESIGn A6ceT wuu—TUDIO EZ DESIGN STUDIO LLC. 1409 SAN CARLOS RD, ARCADIA, CA 91006 (626)673-5686 PROJECT CUP CHANGE USED ADDRESS 3333 S DIAMOND CANYON RD DIAMOND BAR amgnuNi e�gemenia rwreiemm ttrereM ere ttrepmpeM STAMP 0",-, REVISIONS Date No. De-dpbon A, CUP DRAWING TITLE PROPOSED FLOOR PLAN Drawn By: AutMr Stele: ile"=1'-P Date: 04/22/24 DRAWING NO. A-2.02 Packet Pg. 38 UDESIGn A6ceT wuD=n 8TUDIO EZ DESIGN STUDIO LLC. 1409 SAN CARLOS RD, ARCADIA, CA 91006 (626)673-5686 PROJECT EXIT EXIT EXIT CUP CHANGE USED EXIT TP-N. PIANO PIANO UTILITY ROOMrzADDRESS PRESCHOOL CLASS CLASS INFANT ROOM it CLASS 3333 S DIAMOND CANYON INFANT INDOO ART CLASS PLAYAREA 649 SF 9955E RD DIAMOND BAR MUSIC CLASS UTIDTY ROOM 814 SF «Nmx..w>. a.a�° euwnxr�wo.°anza °°xa..ew.°.4a rePrese�eptlxMreW exre� mreM STORAGE AUDITORIUM ❑ STORAGE I I STORAGE ouxa *134�SF STORAGE _ PRESCHOOL LIBRARY STORAGE CLASS 2ND GRADE 998 SF DANCE ROOM EXISTING KINGDERGARTEN aaurnxr�as°axaxo (NO CHANGE) O STORAGE C ASS 4 � STAMP ❑ o O O O O p STORAGE O O GLASS3 CLASS 4a O O PRESCHOOL 1ST GRADE CHINESE ¢ O O CLASS z STORAGE O O � CLASS2 CLASS ❑ O O O TODDLER CLASS 1AIR FIRE RATED4HR 548 SF REVISIONS K p OFFICE OFFICE OFFICE CORRIDOR Date No. De-dpbon w STORAGE CLASSI 3349 SF =a U O 320 SF 127 SF 189 SF w N re.ar.x� EXIT OFFICE OFFICE OFFICE E xE5fd9,.°= _" OFFICE OFFICE OFFICE OFFICE 128 SF 128 SF 262 SF IT AFTER SCHOOL (E) RECEPTIONEXSTING FIRE RATED AREA EXIT EXIT PRFSCHOOL PRESCHOOL CLASS CLASS 843 SF 986 SF KINDERGARTEN TRANSITIONAL KINDERGARTEN MPOLY E °"i°pXTOe""'"" ""°tl11°0`°""` 13 REAKRO ROOM 161 SF DRAWING TITLE EXIT PLAN Drawn By: AutMr Stele: 1' = 10'A" N Date: aenvz4 �� EXIT PLAN scALe 1^ =1ow^ DRAWING NO. A-2.03 Packet Pg. 39 FF TNADDRESS UDESIGn A60HrtEO1WnL D=n 8NDIO EZ DESIGN STUDIO LLC. 1468 SAN CARLOS RD, ARCADIA, CA 81666 (626)673-5686 PROJECT CUP CHANGE USED 33M S DIAMOND CANYON n SOUTH ELEVATION RD DIAMOND BAR mDa ainaaam U 1"=1U-0 repreaemmitereMrteretireapreM STAMP rrmm'��EDaARCy�A' NO RLEVATION E 4 E= 1"TH 1V 9 EASE ELEVATION ` MIT 3 WESTELEVATION T M IT, M 7, Tj MIM=- Ffl M -2 M T T REVISIONS Deie No, D-1pbon DRAWING TITLE EXISTING ELEVATION Drawn By: EC Stele: As iiMlwletl Deie: 04/68@4 DRAWING NO. A3.01 Packet-Pg. 40 7.1.c LOCAL TRANSPORATION ASSESSMENT Child Daycare Center at Kingdom Seed Academy 3333 S. Diamond Canyon Road In the City of Diamond Bar Date: November 5, 2024 Prepared For: Kingdom Seed Academy 3333 S. Diamond Canyon Road Diamond Bar, CA 91765 Prepared By: K2 Traffic Engineering, Inc. 1442 Irvine Blvd, Suite 210 Tustin, CA 92780 (714) 832-2116 Packet Pg. 41 7.1.c TABLE OF CONTENTS EXECUTIVE SUMMARY................................................................................................. 2 INTRODUCTION............................................................................................................. 4 STUDYSCENARIOS......................................................................................................7 EXISTING CONDITIONS................................................................................................7 TRIP GENERATION..................................................................................................... 10 TRAFFIC ASSIGNMENT.............................................................................................. 11 OPENING YEAR WITHOUT PROJECT........................................................................ 14 OPENING YEAR PLUS PROJECT............................................................................... 16 TRANSPORTATION EFFECTS.................................................................................... 18 PARKING CALCULATION............................................................................................ 18 DROP-OFF AND PICK-UP ACTIVITIES.......................................................................20 VMT SCREENING ASSESSMENT...............................................................................23 Packet Pg. 42 7.1.c LIST OF EXHIBITS Exhibit 1. Vicinity Map 5 Exhibit 2. Site Plan 6 Exhibit 3. Existing Lane Configurations and Traffic Volumes 9 Exhibit 4. Trip Distribution 12 Exhibit 5. Traffic Assignment 13 Exhibit 6. Opening Year Without Project Traffic Volumes 15 Exhibit 7. Opening Year Plus Project Traffic Volumes 17 Exhibit 8. Drop -Off & Pick -Up Circulation 22 Packet Pg. 43 7.1.c LIST OF TABLES Table 1. Existing Conditions Table 2. Trip Generation Rate Table 3. Project Trip Generation Table 4. Opening Year without Project Table 5. Opening Year Plus Project Table 6. Parking Calculation Table 7. Worst -Case Scenario Drop -Off Demand 8 10 10 14 16 19 20 Packet Pg. 44 7.1.c Child Daycare Center at Kingdom Seed Academy 3333 S. Diamond Canyon Road, Diamond Bar Local Transportation Assessment Child Daycare Center at Kingdom Seed Academy November 5, 2024 Local Transportation Assessment 3333 S. Diamond Canyon Road in the City of Diamond Bar K2 Traffic Engineering, Inc. Prepared under the supervision of JENDE KAY H5U y / No, T2285 (/ Exp.6 3Q 26 sl TRAFFIC a.P Jende Kay Hsu, P.E., T. E. ATF OF cALIF�)� Lic. # T2285 Packet Pg. 45 7.1.c Child Daycare Center at Kingdom Seed Academy November 5, 2024 3333 S. Diamond Canyon Road, Diamond Bar Local Transportation Assessment EXECUTIVE SUMMARY Kingdom Seed Academy is an existing elementary school (TK-5) located at 3333 S. Diamond Canyon Road in the City of Diamond Bar. The academy is seeking city's approval to operate a new child daycare center in the vacant space of the same building. The proposed child daycare center will consist of 13,830 sq. ft. to accommodate up to 180 children aged 0 to 5 and employ up to 20 staff. Hours of operation are Monday through Friday from 7:00 AM to 6:00 PM. The purpose of this assessment is to evaluate the traffic and parking impacts of the proposed child daycare center. The project is expected to generate 140 trips in the AM peak hour, including 74 inbound trips and 66 outbound trips, 142 trips in the PM peak hour, including 67 inbound trips and 75 outbound trips, and 736 daily trips. Upon project completion, the study intersection is expected to operate at acceptable LOS D or better. The project is expected to have no or less than significant traffic impact. Upon project completion, the site will provide a total of 109 parking spaces, including six (6) ADA accessible spaces and 8 spaces in the designated drop-off area. The parking demand for the proposed child day care center and the existing elementary school are 46 and 37 spaces, respectively. With a combined parking demand of 83 spaces, the site has provided sufficient parking with a redundancy of 26 parking spaces. The recommended direction of traffic flow consists of vehicles entering from the east driveway and exiting through the west driveway. Based on the actual enrollment of the elementary school and day care center, the drop- off schedule will be staggered and coordinated between all classes. For children's safety and comfort, all children must be escorted into the building by an adult and not dropped off at any other place outside the school. Parents can use any available parking space in the parking lot that is shared by the elementary school and child daycare center. K2 Traffic Engineering, Inc. 2 Packet Pg. 46 7.1.c Child Daycare Center at Kingdom Seed Academy 3333 S. Diamond Canyon Road, Diamond Bar November 5, 2024 Local Transportation Assessment For the convenience of parents dropping off young toddlers and infants, a designated loading area is provided in front of the day care center entrance. This loading area provides eight (8) spaces to match the anticipated demand of the day care center. Nonetheless, any excessive demand would be adequately accommodated since the site has a high parking redundancy with no overflow even at full enrollment. 10 MIN PARKING" signage will be installed for the designated loading area, and the curb will be painted in green with white letters of 10 MIN PARKING". Day Care Center is listed in the City's VMT Guidelines as a local serving project type that can be presumed to have a less than significant impact. Therefore, a full project - level VMT analysis is not required. K2 Traffic Engineering, Inc. 41 Packet Pg. 47 7.1.c Child Daycare Center at Kingdom Seed Academy November 5, 2024 3333 S. Diamond Canyon Road, Diamond Bar Local Transportation Assessment INTRODUCTION Kingdom Seed Academy is an existing elementary school (TK-5) located at 3333 S. Diamond Canyon Road in the City of Diamond Bar. The academy is seeking city's approval to operate a new child daycare center in the vacant space of the same building. The proposed child daycare center will consist of 13,830 sq. ft. to accommodate up to 180 children aged 0 to 5 and employ up to 20 staff. Hours of operation are Monday through Friday from 7:00 AM to 6:00 PM. The purpose of this assessment is to evaluate the traffic impact of the proposed child daycare center. The vicinity map is shown in Exhibit 1. Site plan is provided in Exhibit 2. K2 Traffic Engineering, Inc. 4 Packet Pg. 48 EXHIBIT 1. Vicinity Map (f:) No Scale NORTH I Packet Pg. 49 C�R V 5 Om ORI SgySSS"'' tl U m NH i N pQm$5 r Uw ep�byyss��s2cm _ w mr w omg" H a a Z Uz3 wo 0Wp sa='apEEas"-- �•Zpmw z3 z Ng voiocz�- w o N0Q OW HW o a oy a a H o a=< wi zx o w. W w x I a op 5° rc 0. +i+ 1 +U j1 I. tS2 w. ~Ord O.z I wowo z-9 a O J LL 0 w U) O a O w d Packet Pg. 7.1.c Child Daycare Center at Kingdom Seed Academy November 5, 2024 3333 S. Diamond Canyon Road, Diamond Bar Local Transportation Assessment STUDY SCENARIOS In compliance with the City of Diamond Bar Transportation Study Guidelines for Vehicle Miles Traveled and Level of Service Assessment, dated September 2020, the following scenarios are included in this assessment: i. Existing Conditions ii. Opening Year (2025) without Project Opening Year (2025) plus Project The study has performed Level of Service (LOS) analysis to evaluate potential traffic impacts for the intersection of Brea Canyon Cut-off Road and S. Diamond Canyon Road, and two project driveways on S. Diamond Canyon Road. LOS analysis is performed using SYNCHRO 6 software based on the methodologies prescribed in the Highway Capacity Manual (HCM). For signalized intersections the average control delay per vehicle is estimated for each lane group and aggregated for each approach and for the intersection as a whole. For stop -controlled project driveways, the average control delay per vehicle is estimated for the minor approach (project driveway). EXISTING CONDITIONS Brea Canyon Cut-off Road is an undivided roadway with two lanes in each direction. Brea Canyon Cut-off Road is classified as "Secondary Arterial" in the project vicinity. The speed limits are 40 mph. The intersection of Brea Canyon Cut-off Road and S. Diamond Canyon Road/Fallow Field Drive is controlled by traffic signals. S. Diamond Canyon Road is a local street with one lane in each direction and a left -turn lane at the intersection. The posted speed limit is 35 mph. Turning movement counts in the AM and PM peak hour were collected in a typical weekday on April 30, 2024. The existing lane configuration and traffic volumes at the K2 Traffic Engineering, Inc. 7 Packet Pg. 51 7.1.c Child Daycare Center at Kingdom Seed Academy 3333 S. Diamond Canyon Road, Diamond Bar November 5, 2024 Local Transportation Assessment study intersections are shown in Exhibit 3. Complete traffic count data can be found in Appendix A. The LOS and overall delay for existing conditions are shown in Table 1. The study intersections operate at LOS D or better in both the AM and PM peak hours under existing conditions. The analysis worksheets are provided in Appendix B. Table 1. Existing Conditions AM Peak Hour PM Peak Hour Delay Delay Intersection Control LOS sec LOS sec Brea Canyon Cut-off Rd at S. Diamond Canyon Rd/ Fallow Field Drive Traffic Signal C 32.9 D 40.5 S. Diamond Canyon Rd at Stop at East Driveway Driveway A 0 A 0 S. Diamond Canyon Rd at Stop at West Driveway Driveway A 8.7 A 8.7 K2 Traffic Engineering, Inc. 0 Packet Pg. 52 AM PEAK HOUR 1 1 � w N c S. DIAMOND CANYON RD. #3 #2 #1 0 0 0 I U 4L 0 FALLOW FIELD DR. N NORTH NOT TO SCALE LEGEND: O STUDY INTERSECTION 0 PROJECT DRIVEWAY TRAFFIC SIGNAL #2 #2 6 1 59 64 57 57 #3 #3 A 0 N t-- 0 L18 L - 18 10 13 EXISTING LANE CONFIGURATION AND TRAFFIC VOLUMES EXHIBIT 3 K2 TRAFFIC ENGINEERING CHILD DAYCARE CENTER AT KINGDOM SEED ACADEMY 3333 S. Diamon Canyon R Packet Pg. 53 7.1.c Child Daycare Center at Kingdom Seed Academy 3333 S. Diamond Canyon Road, Diamond Bar TRIP GENERATION November 5, 2024 Local Transportation Assessment Trip generation represents the amount of traffic attracted and produced by the project development. Based upon the recommendations from "Trip Generation, 11t" Edition," published by the Institute of Transportation Engineers (ITE), applicable trip generation rates are shown in Table 2. Table 2. Trip Generation Rate LAND USE (ITE CODE) UNIT DAILY AM PEAK HOUR PM PEAK HOUR Rate IN OUT Rate IN OUT Day Care Center 565 Students 4.09 0.78 53% 47% 0.79 47% 53% Project trip generation is calculated and summarized in Table 3. The project is expected to generate 140 trips in the AM peak hour, including 74 inbound trips and 66 outbound trips, 142 trips in the PM peak hour, including 67 inbound trips and 75 outbound trips, and 736 daily trips. Table 3. Project Trip Generation LAND USE ITE CODE QUANTITY DAILY AM PEAK HOUR PM PEAK HOUR TOTAL IN OUT TOTAL IN OUT Day Care Center (565) 180 Students 736 140 74 66 142 67 75 K2 Traffic Engineering, Inc. 10 Packet Pg. 54 7.1.c Child Daycare Center at Kingdom Seed Academy 3333 S. Diamond Canyon Road, Diamond Bar TRIP DISTRIBUTION November 5, 2024 Local Transportation Assessment Trip distribution represents the directional orientation of traffic to and from the proposed project. Directional orientation is largely influenced by the geographical location of the site, among many other factors. The trip distribution pattern for the project is illustrated in Exhibit 4. TRAFFIC ASSIGNMENT The traffic assignment to and from the site has been based upon the results of trip generation, trip distribution, and access layouts. Exhibit 5 illustrates the traffic assignment of the proposed project in the AM and PM peak hour. K2 Traffic Engineering, Inc. Packet Pg. 55 7.1.c EXHIBIT 4. TRIP DISTRIBUTION 1 NORTH NOT TO SCALE 1100% w I o o 1100% 100% r—N S. Diamond Legend: Inbound Trips I� Outbound Trips Directional Distribution Q Study Intersection p Project Driveway 40% anyon Rd ` 40% 5% 55% 40% 0 A Al co m 5% callow riela ur I 60% K2 Traffic Engineering, Inc. Packet Pg. 56 7.1.c AM PEAK HOUR #1 #2 74 66 #3 ID D I L Ir/7, N NORTH NOT TO SCALE LEGEND: O STUDY INTERSECTION F-1 PROJECT DRIVEWAY O TRAFFIC SIGNAL iPM K R #1 #2 67 75 #3 I� l-� TRAFFIC ASSIGNMENT EXHIBIT 5 K2 TRAFFIC ENGINEERING CHILD DAYCARE CENTER AT KINGDOM SEED ACADEMY 3333 S. Diamon Canyon R Packet Pg. 57 7.1.c Child Daycare Center at Kingdom Seed Academy 3333 S. Diamond Canyon Road, Diamond Bar OPENING YEAR WITHOUT PROJECT November 5, 2024 Local Transportation Assessment For the opening year 2025, the annual ambient growth rate of two percent (2%) is used. This factor represents traffic increases resulting from regional growth. Traffic volumes for the opening year without project are illustrated in Exhibit 6. The LOS and overall delay for opening year without project conditions are shown in Table 4. The study intersection remains operating at LOS D or better for the project opening year in AM and PM peak hours. The analysis worksheets can be found in Appendix B. Table 4. Opening Year without Project AM Peak Hour PM Peak Hour Delay Delay Intersection Control LOS sec LOS sec Brea Canyon Cut-off Rd at S. Diamond Canyon Rd/ Fallow Field Drive Traffic Signal C 34.3 D 43.0 S. Diamond Canyon Rd at Stop at East Driveway Driveway A 0 A 0 S. Diamond Canyon Rd at Stop at West Driveway Driveway A 8.7 A 8.7 K2 Traffic Engineering, Inc. 14 Packet Pg. 58 7.1.c -j— -j— o � 0 -�ff- O W U N H }� � S. DIAMOND CANYON RD. r #3 #2 FALLOW FIELD DR. z NORTH Z NOT TO SCALE U W m LEGEND: O STUDY INTERSECTION PROJECT DRIVEWAY oTRAFFIC SIGNAL AM PM PEAK PEAK HOUR HOUR #1 #1 7 j-q- 2 31 N 28 a� #2 #2 6 1 �60 �66 58 58 #3 #3 n � 0 N t-- 0 L18 L -18 10 13 OPENING YEAR WITHOUT PROJECT TRAFFIC VOLUMES EXHIBIT 6 K2 TRAFFIC ENGINEERING CHILD DAYCARE CENTER AT KINGDOM SEED ACADEMY 3333 S. Diamon Canyon R Packet Pg. 59 7.1.c Child Daycare Center at Kingdom Seed Academy 3333 S. Diamond Canyon Road, Diamond Bar OPENING YEAR PLUS PROJECT November 5, 2024 Local Transportation Assessment Traffic volumes for the opening year plus project traffic conditions are illustrated in Exhibit 7. The level of services and delays at the study intersections under this scenario are shown in Table 5. The study intersection remains operating at LOS D or better for the project opening year in AM and PM peak hours. Analysis worksheets can be found in Appendix B. Table 5. Opening Year Plus Project AM Peak Hour PM Peak Hour Delay Delay Intersection Control LOS (sec) LOS (sec) Brea Canyon Cut-off Rd at S. Diamond Canyon Rd/ Fallow Field Drive Traffic Signal D 36.5 D 45.1 S. Diamond Canyon Rd at Stop at East Driveway Driveway A 0 A 0 S. Diamond Canyon Rd at Stop at West Driveway Driveway A 9.0 A 9.0 K2 Traffic Engineering, Inc. 16 Packet Pg. 60 7.1.c � � o o � 0 W W � w 0 3 U /S.MOND CANYON RD. #3 #2 FALLOW FIELD DR. �� 0 NORTH NOT TO SCALE U Q W m LEGEND: O STUDY INTERSECTION E] PROJECT DRIVEWAY TRAFFIC SIGNAL AM PM PEAK PEAK HOUR HOUR 530 ^ 9 1 67 N r Oo o� #2 #2 80 68 �60 �ss 124 133 - #3 #3 � 0 0 L 18 L 18 10 13 OPENING YEAR PLUS PROJECT TRAFFIC VOLUMES EXHIBIT 7 K2 TRAFFIC ENGINEERING CHILD DAYCARE CENTER AT KINGDOM SEED ACADEMY 3333 S. Diamon Canyon R Packet Pg. 61 7.1.c Child Daycare Center at Kingdom Seed Academy November 5, 2024 3333 S. Diamond Canyon Road, Diamond Bar Local Transportation Assessment TRANSPORTATION EFFECTS According to the "City of Diamond Bar Transportation Analysis Guidelines for Vehicle Miles Traveled and Level of Service Assessment," dated September 2020, the acceptable LOS for intersections in the City of Diamond Bar is D or better as established in the City's General Plan. Any intersection operating at a LOS E or F is considered deficient. Signalized intersections will require improvements if one of the following conditions is met: • Any study intersection that is operating at a LOS 'D' or better for any study scenario without project traffic in which the addition of project traffic causes the intersection to degrade to a LOS 'E' or 'F' shall improve the deficiency so as to bring the intersection back to at least LOS 'D'. • Any study intersection that is operating at a LOS 'E' or 'F' for any study scenario without project traffic shall improve any deficiencies so as to bring the intersection back to the overall level of delay established prior to project traffic being added. Upon project completion, all study intersections are expected to operate at acceptable LOS D or better. The project is expected to have no or less than significant traffic impact. PARKING CALCULATION The proposed Child Daycare Center (age 0-5) has an enrollment capacity of 180 children with up to 20 employees, and the site will provide eight (8) spaces in the designated drop-off area. Parking requirements for Child Day Care Centers in the City of Diamond Bar are one space for each 10 children, plus one space for each employee, plus one space for each vehicle used in conjunction with the use, plus permanent drop- off area as approved by the director. The parking demand for the proposed child day care center is 46 spaces. Parking calculations are shown in Table 6. K2 Traffic Engineering, Inc. 18 Packet Pg. 62 7.1.c Child Daycare Center at Kingdom Seed Academy 3333 S. Diamond Canyon Road, Diamond Bar November 5, 2024 Local Transportation Assessment The existing elementary school (TK-6) operated by Kingdom Seed Academy consists of seven (7) classrooms for Transitional Kindergarten (TK), Kindergarten (K), and Grade 1 to 5 and an auditorium of 3,134 sq. ft. gross floor area. Parking requirements for elementary school in the City of Diamond Bar are three spaces for each classroom, plus one space for every 200 sq. ft. of assembly area in an auditorium. The parking demand for the existing elementary school is 37 spaces. Table 6. Parking Calculation Parking Facility Parking Ratio Note Demand 1 space for each 10 children, plus Proposed one space for each employee, plus 180 children, Child Day Care one space for each vehicle used in 20 employees, Center conjunction with the use, plus no company vehicle, (Age 0-5, Privatepermanent drop-off area 8 spaces for drop-off 46 Existing 3 spaces for each classroom, plus Elementary School one space for every 200 sq. ft. of 7 classrooms (TK, K-5), TK-6, Private assembly area in an auditorium auditorium of 3,134 sq. ft. 37 Total Parking Demand 83 Parking Capacity 109 Parking Redundancy +26 Upon project completion, the site will provide a total of 109 parking spaces, including six (6) ADA accessible spaces and 8 spaces in the designated drop-off area. With a combined parking demand of 83 spaces for the proposed child day care center and the existing elementary school, the site has provided sufficient parking with a redundancy of 26 parking spaces. K2 Traffic Engineering, Inc. 19 Packet Pg. 63 7.1.c Child Daycare Center at Kingdom Seed Academy November 5, 2024 3333 S. Diamond Canyon Road, Diamond Bar Local Transportation Assessment DROP-OFF AND PICK-UP ACTIVITIES Based on the actual enrollment of the elementary school and day care center, the drop- off schedule will be staggered and coordinated between all classes. For children's safety and comfort, all children must be escorted into the building by an adult and not dropped off at any other place outside the school. Parents can use any available parking space in the parking lot that is shared by the elementary school and child daycare center. As shown in Table 7, the overall drop-off demand in worst -case scenario of full enrollment is 18 spaces between 8:00 AM and 8:30 AM. The peak drop- off demand for the day care center is 8 spaces between 8:30 AM and 9:00 AM. Table 7. Worst -Case Scenario Drop -Off Demand Time Period Elementary School Drop -Off Day Care Center Dro -Off Combined % Trips 2 Peak Demand3 Trips Peak Demand Trips Peak Demand 7:00 AM - 7:30 AM 0% 0 0 10% 18 3 18 3 7:30 AM - 8:00 AM 20% 25 3 15% 27 5 65 8 8:00 AM - 8:30 AM 70% 90 12 20% 36 6 100 18 8:30 AM - 9:00 AM 10% 13 2 25% 45 8 71 10 9:00 AM - 9:30 AM 0% 0 0 20% 36 6 7 6 9:30 AM - 10:00 AM 0% 0 0 10% 18 3 4 3 Total = 128 Max. 12 Total = 180 Max. 8 Max. 18 For the convenience of parents dropping off young toddlers and infants, a designated loading area is provided in front of the day care center entrance, as shown in Exhibit 8. This designated loading area provides eight (8) spaces to match the anticipated demand of the day care center. Nonetheless, any excessive loading demand would be 1 Early drop-off after 7 AM is accepted for the convenience of working parents as a courtesy of this private school. 2 Estimated average duration of drop-off parking: 4 minutes for Elementary School & 5 minutes for Day Care Center. 3 Peak Demand = (Average arrival rate per minute) x (Average Duration in minutes) K2 Traffic Engineering, Inc. 20 Packet Pg. 64 7.1.c Child Daycare Center at Kingdom Seed Academy November 5, 2024 3333 S. Diamond Canyon Road, Diamond Bar Local Transportation Assessment adequately accommodated with no overflow even at full enrollment since the site has a high parking redundancy. Based on the actual enrollment of the elementary school, the pick-up schedule will be staggered and coordinated between all classes. The proposed child daycare center will allow flexible pick-up schedules to meet parents' demands each day. Pick-up schedules for young children age 0 to 5 vary largely on parents' own schedules. Children are picked up on a staggered basis between noon and 6 PM. Without a specific concentration in any time period, pick-up activities are expected to be sufficiently . I� 110 OF=2 61 The recommended direction of traffic flow consists of vehicles entering from the east driveway and exiting through the west driveway. The designated loading area is expected to function well with no overflow even at full enrollment. 10 MIN PARKING" signage will be installed for this designated loading area, and the curb will be painted in green with white letters of 10 MIN PARKING". K2 Traffic Engineering, Inc. 21 Packet Pg. 65 J rc� Z< M FF o-a m i 'Z@ V E E2i w -g,P 3CL •' F °a€g OowZ=. z N O Z o ro Zi 3 w 3 0 a W e� o pg a i a u Q Mrc§="a& nl w a o 0 Q ,� o do mo Nr wd¢H Nam o rc 29 a o wal ¢ f ¢ w opc ° � orc f0 N U ° Q N (0 O LU ° a c O U Z N = Z o W 0 U 0 W 6L'bgL OW o t� _ O - - ', J LL O�zo "bJ�"� O _-_ �yb�Os w } t «+«+«+++++++ ws Z o ❑ �V\ 1 o Y tied ' d vp� U O --------------- oa000000aa . •aaoaoaoa,.,.,.,.,., ,,❖.❖.❖a.❖.❖. •.❖.❖.❖.❖.❖.❖.❖.❖.❖. �aa.•aa.•aa.❖.. .•.•aaaaaa.•aa.•aaaaa.• ❖aaaaa.❖a.• •a.•aaaa.•aa.•aaaaaa.•. 000000000•. oa0000000,.,.,.,.,.,.,, oa00000ao.• • •00000000a00000a. 000•.000000• ooaoo•.000•.00•.000❖. ie 0000•.0000 .:.o•.0000•.00000000•. �•.0000000• 0000000aoo.•.00a000.•. •aaaa,,,•aaaa,,,o,,•aaaa,,,•aaaa,,•,• ooaoo•.00aoaoo•.oa•.®a�®.oa.®a®�a ee ppp'►�appppp�aapppp�aappppp�p����a_� ppp�p�,pp�J,pp�O,p�,pppppp�J,pp�� oo•.00000•.00•.000•.00•.000•.00•. .•aoaoo•.00aoo•.00aoo•.00a. ❖aaaaaa.•a.•®ea.•a.•a.� ,•aaaa.❖aaaaaea•®�aa.� Z L_0 r Q J U a Y U a U- LL O a 0 06 m w Packet Pg. 7.1.c Child Daycare Center at Kingdom Seed Academy 3333 S. Diamond Canyon Road, Diamond Bar VMT SCREENING ASSESSMENT November 5, 2024 Local Transportation Assessment For the purpose of Senate Bill (SB) 743 and California Environmental Quality Act (CEQA) compliance, a VMT analysis should be conducted for land use projects that have the potential to increase the average VMT per service population. In accordance with the City of Diamond Bar Transportation Study Guidelines for Vehicle Miles Traveled and Level of Service Assessment, Day Care Center is listed as a project type of local serving nature that can be presumed to have a less than significant impact. Therefore, a full project -level VMT analysis is not required. K2 Traffic Engineering, Inc. 23 Packet Pg. 67 7.1.c APPENDIX A TURNING MOVEMENT COUNT DATA Packet Pg. 68 7.1.c INTERSECTION TURNING MOVEMENT COUNTS PREPARED BY: AimTD LLC. tel: 714 253 7888 cs@aimtd.com DATE: Tue, Apr 30, 24 LOCATION: Diamond Bar PROJECT #: SC4639 NORTH & SOUTH: Brea Canyon Cut-off Rd LOCATION #: 1 EAST & WEST: S Diamond Canyon Rd CONTROL: SIGNAL NOTES: N S /W E► NORTHBOUND Brea Canyon Cut-off Rd SOUTHBOUND Brea Canyon Cut-off Rd EASTBOUND 5 Diamond Canyon Rd WESTBOUND Fallow Field Dr LANES: NL 1 NT NR 2 0 SL 1 ST 2 SR 0 EL 1 ET 1 ER 0 WL 0 WT 1 WR 0 TOTAL 7:00 AM 7:15 AM 1 62 5 1 1 4 273 0 3 0 2 6 0 4 357 391 3 86 281 0 2 0 0 7 2 5 7:30 AM 2 132 5 21 332 1 3 2 4 8 0 4 514 7:45 AM 6 137 3 29 321 1 4 0 10 4 1 13 529 8:00 AM 9 141 14 56 356 8 4 4 4 9 3 19 627 8:15 AM 16 151 6 49 279 14 9 1 12 12 4 59 612 8:30 AM 12 146 1 8 272 5 6 2 9 7 1 16 485 g 8:45 AM 8 143 5 14 267 4 6 0 10 6 1 12 476 a VOLUMES APPROACH % 57 998 40 5% 91% 4% 182 2,381 33 7% 92% 1% 37 9 51 38% 9% 53% 59 12 132 29% 6% 65% 3,995 APP/DEPART 1,099 / 1,167 2,596 2,495 97 / 231 203 / 102 0 BEGIN PEAK HR VOLUMES APPROACH % PEAK HR FACTOR 7:30 AM 33 561 28 5% 90% 4% 0.895 155 1,288 24 11% 88% 2% 0.873 20 7 30 35% 12% 53% 0.648 33 8 95 24% 6% 70% 0.453 2,283 0.910 APP DEPART 623 676 1,467 1,352 57 190 136 65 0 4:00 PM 7 249 2 15 266 5 12 0 7 3 1 0 17 583 4:15 PM 3 266 5 15 290 5 7 0 6 2 0 20 619 4:30 PM 11 217 4 14 275 9 5 0 8 4 0 19 566 4:45 PM 12 229 1 17 276 9 7 1 10 5 0 19 586 5:00 PM 7 272 1 11 289 12 5 1 9 2 0 14 623 5:15 PM 9 261 5 22 312 9 4 1 6 3 3 14 649 5:30 PM 5 262 2 16 301 6 8 1 7 6 0 18 632 g 5:45 PM 8 246 7 11 320 6 6 4 5 1 0 10 624 a VOLUMES APPROACH % 62 2,002 27 3% 96% 1% 121 2,329 61 5% 93% 2% 54 8 58 45% 7% 48% 26 3 131 16% 2% 82% 4,886 APP/DEPART 2,095 2,187 2,511 2,417 120 / 156 160 / 126 0 BEGIN PEAK HR VOLUMES APPROACH % PEAK HR FACTOR 5:00 PM 29 1,041 15 3% 96% 1% 0.969 60 1,222 33 5% 93% 3% 0.958 23 7 27 40% 12% 47% 0.891 12 3 56 17% 4% 79% 0.740 2,532 0.974 APP/DEPART 1089 1120 1 1315 1265 1 57 / 82 71 / 65 0 Brea Canyon Cut-off Rd t NORTH LEG t I I S Diamond Canyon Rd WEST LEG EAST LEG Fallow Field Dr 1 1 4 SOUTH LEG 0 Brea Canyon Cut-off Rd Packet Pg. 69 7.1.c AM/PM PEAK -HOUR TRAFFIC VOLUMES FOR PROJECT DRIVEWAYS 3333 S. Diamond Canyon Road, Diamond Bar #2 Project Driveway East at S. Diamond Canyon Rd* * Traffic volumes were derived from the intersection of S. Diamond Canyon Rd and Brea Canyon Cut -Off Road. #3 Project Driveway West at S. Diamond Canyon Rd* * Traffic volumes were derived from the intersection of S. Diamond Canyon Rd and Brea Canyon Cut -Off Road. Supplemental Data: S. Diamond Canyon Rd at S. Oak Valley PI* * Traffic volumes were derived from the intersection of S. Diamond Canyon Rd and Brea Canyon Cut -Off Road. Packet Pg. 70 7.1.c APPENDIX B LEVEL OF SERVICE ANALYSIS Packet Pg. 71 7.1.c HCM 6th Signalized Intersection Summary 1: Brea Canyon Cut-off Rd & S. Diamond Canyon Rd/Fallow Field Dr 08/16/2024 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations 1� t t Traffic Volume (veh/h) 20 7 30 33 8 95 33 561 28 155 1288 24 Future Volume (veh/h) 20 7 30 33 8 95 33 561 28 155 1288 24 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, vehlh/In 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 22 8 33 36 9 104 36 616 31 170 1415 26 Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 315 63 260 100 44 218 348 1507 76 352 1571 29 Arrive On Green 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.44 0.44 0.20 0.44 0.44 Sat Flow, vehlh 1280 319 1315 252 225 1102 1781 3443 173 1781 3570 66 Grp Volume(v), veh/h 22 0 41 149 0 0 36 318 329 170 704 737 Grp Sat Flow(s),vehlh/In 1280 0 1634 1579 0 0 1781 1777 1839 1781 1777 1859 Q Serve(g_s), s 0.0 0.0 1.9 1.5 0.0 0.0 1.5 11.0 11.0 7.6 33.1 33.1 Cycle Q Clear(g_c), s 1.5 0.0 1.9 7.2 0.0 0.0 1.5 11.0 11.0 7.6 33.1 33.1 Prop In Lane 1.00 0.80 0.24 0.70 1.00 0.09 1.00 0.04 Lane Grp Cap(c), veh/h 315 0 323 362 0 0 348 778 805 352 782 818 V/C Ratio(X) 0.07 0.00 0.13 0.41 0.00 0.00 0.10 0.41 0.41 0.48 0.90 0.90 Avail Cap(c_a), veh/h 315 0 323 362 0 0 348 778 805 352 782 818 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 29.6 0.0 29.7 31.8 0.0 0.0 29.7 17.3 17.3 32.0 23.4 23.4 Incr Delay (d2), s/veh 0.4 0.0 0.8 3.4 0.0 0.0 0.6 1.6 1.5 4.7 15.5 15.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 0.4 0.0 0.8 3.1 0.0 0.0 0.7 4.5 4.6 3.6 15.8 16.4 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 30.0 0.0 30.5 35.3 0.0 0.0 30.3 18.9 18.9 36.7 38.8 38.4 LnGrp LOS C A C D A A C B B D D D Approach Vol, veh/h 63 149 683 1611 Approach Delay, s/veh 30.3 35.3 19.5 38.4 Approach LOS C D B D Timer - Assigned Phs 1 2 4 5 6 8 Phs Duration (G+Y+Rc), s 22.8 44.4 22.8 22.6 44.6 22.8 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 18.8 40.4 18.8 18.6 40.6 18.8 Max Q Clear Time (g_c+11), s 9.6 13.0 3.9 3.5 35.1 9.2 Green Ext Time (p-c), s 0.3 3.9 0.2 0.0 3.8 0.5 Intersection Summary HCM 6th Ctrl Delay 32.9 HCM 6th LOS C 12/04/2023 Existing AM Synchro 10 Report Page 1 Packet Pg. 72 7.1.c HCM 6th TWSC 2: S. Diamond Canyon Rd & East Dwy 08/16/2024 Intersection Int Delay, s/veh Movement EBL EBT WBT WBR SBL SBR Lane Configurations *' Traffic Vol, veh/h 0 57 59 6 0 0 Future Vol, veh/h 0 57 59 6 0 0 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized None - None - None Storage Length - - 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 91 91 91 91 91 91 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 0 63 65 7 0 0 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 72 0 - 0 132 69 Stage 1 - - - - 69 - Stage 2 - - 63 - Critical Hdwy 4.12 - 6.42 6.22 Critical Hdwy Stg 1 - - 5.42 - Critical Hdwy Stg 2 - - 5.42 - Follow-up Hdwy 2.218 - 3.518 3.318 Pot Cap-1 Maneuver 1528 - 862 994 Stage 1 - - 954 - Stage 2 - - 960 - Platoon blocked, % - Mov Cap-1 Maneuver 1528 - 862 994 Mov Cap-2 Maneuver - - 862 - Stage 1 - 954 Stage 2 - 960 Approach EB WB SIB HCM Control Delay, s 0 0 0 HCM LOS A Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 Capacity (veh/h) 1528 - - HCM Lane V/C Ratio - - - HCM Control Delay (s) 0 - - 0 HCM Lane LOS A - - A HCM 95th %tile Q(veh) 0 - - 12/04/2023 Existing AM Synchro 10 Report Page 1 Packet Pg. 73 7.1.c HCM 6th TWSC 3: S. Diamond Canyon Rd & West Dwy 08/16/2024 Intersection Int Delay, s/veh 1.3 Movement EBL EBT WBT WBR SBL SBR Lane Configurations + + Traffic Vol, veh/h 0 10 18 0 5 0 Future Vol, veh/h 0 10 18 0 5 0 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized None - None - None Storage Length - - 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 91 91 91 91 91 91 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 0 11 20 0 5 0 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 0 - 0 31 20 Stage 1 - - - 20 - Stage 2 - 11 - Critical Hdwy - 6.42 6.22 Critical Hdwy Stg 1 - 5.42 - Critical Hdwy Stg 2 - 5.42 - Follow-up Hdwy - 3.518 3.318 Pot Cap-1 Maneuver 0 - 0 983 1058 Stage 1 0 - 0 1003 - Stage 2 0 - 0 1012 - Platoon blocked, % - Mov Cap-1 Maneuver - - - 983 1058 Mov Cap-2 Maneuver - 983 - Stage 1 - 1003 Stage 2 - 1012 Approach EB WB SIB HCM Control Delay, s 0 0 8.7 HCM LOS A Minor Lane/Major Mvmt EBT WBT SBLn1 Capacity (veh/h) - 983 HCM Lane V/C Ratio - 0.006 HCM Control Delay (s) - 8.7 HCM Lane LOS - A HCM 95th %tile Q(veh) - 0 12/04/2023 Existing AM Synchro 10 Report Page 2 Packet Pg. 74 7.1.c HCM 6th Signalized Intersection Summary 1: Brea Canyon Cut-off Rd & S. Diamond Canyon Rd/Fallow Field Dr 08/16/2024 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations 1� t t Traffic Volume (veh/h) 20 7 31 34 8 97 34 572 29 158 1314 24 Future Volume (veh/h) 20 7 31 34 8 97 34 572 29 158 1314 24 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, vehlh/In 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 22 8 34 37 9 107 37 629 32 174 1444 26 Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 312 61 261 100 44 218 348 1506 77 352 1571 28 Arrive On Green 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.44 0.44 0.20 0.44 0.44 Sat Flow, vehlh 1276 311 1322 252 222 1104 1781 3441 175 1781 3571 64 Grp Volume(v), veh/h 22 0 42 153 0 0 37 325 336 174 718 752 Grp Sat Flow(s),vehlh/In 1276 0 1632 1578 0 0 1781 1777 1839 1781 1777 1859 Q Serve(g_s), s 0.0 0.0 1.9 1.7 0.0 0.0 1.5 11.3 11.3 7.8 34.2 34.3 Cycle Q Clear(g_c), s 1.6 0.0 1.9 7.5 0.0 0.0 1.5 11.3 11.3 7.8 34.2 34.3 Prop In Lane 1.00 0.81 0.24 0.70 1.00 0.10 1.00 0.03 Lane Grp Cap(c), veh/h 312 0 323 362 0 0 348 778 805 352 782 818 V/C Ratio(X) 0.07 0.00 0.13 0.42 0.00 0.00 0.11 0.42 0.42 0.49 0.92 0.92 Avail Cap(c_a), veh/h 312 0 323 362 0 0 348 778 805 352 782 818 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 29.6 0.0 29.7 31.9 0.0 0.0 29.7 17.4 17.4 32.1 23.7 23.7 Incr Delay (d2), s/veh 0.4 0.0 0.8 3.6 0.0 0.0 0.6 1.6 1.6 4.9 17.5 17.1 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 0.4 0.0 0.8 3.2 0.0 0.0 0.7 4.6 4.8 3.7 16.6 17.3 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 30.0 0.0 30.6 35.5 0.0 0.0 30.4 19.0 19.0 37.0 41.2 40.8 LnGrp LOS C A C D A A C B B D D D Approach Vol, veh/h 64 153 698 1644 Approach Delay, s/veh 30.4 35.5 19.6 40.6 Approach LOS C D B D Timer - Assigned Phs 1 2 4 5 6 8 Phs Duration (G+Y+Rc), s 22.8 44.4 22.8 22.6 44.6 22.8 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 18.8 40.4 18.8 18.6 40.6 18.8 Max Q Clear Time (g_c+11), s 9.8 13.3 3.9 3.5 36.3 9.5 Green Ext Time (p-c), s 0.3 4.0 0.2 0.0 3.2 0.5 Intersection Summary HCM 6th Ctrl Delay 34.3 HCM 6th LOS C 12/04/2023 Open AM Synchro 10 Report Page 1 Packet Pg. 75 7.1.c HCM 6th TWSC 2: S. Diamond Canyon Rd & East Dwy 08/16/2024 Intersection Int Delay, s/veh Movement EBL EBT WBT WBR SBL SBR Lane Configurations *' Traffic Vol, veh/h 0 58 60 6 0 0 Future Vol, veh/h 0 58 60 6 0 0 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized None - None - None Storage Length - - 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 91 91 91 91 91 91 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 0 64 66 7 0 0 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 73 0 - 0 134 70 Stage 1 - - - - 70 - Stage 2 - - 64 - Critical Hdwy 4.12 - 6.42 6.22 Critical Hdwy Stg 1 - - 5.42 - Critical Hdwy Stg 2 - - 5.42 - Follow-up Hdwy 2.218 - 3.518 3.318 Pot Cap-1 Maneuver 1527 - 860 993 Stage 1 - - 953 - Stage 2 - - 959 - Platoon blocked, % - Mov Cap-1 Maneuver 1527 - 860 993 Mov Cap-2 Maneuver - - 860 - Stage 1 - 953 Stage 2 - 959 Approach EB WB SIB HCM Control Delay, s 0 0 0 HCM LOS A Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 Capacity (veh/h) 1527 - - HCM Lane V/C Ratio - - - HCM Control Delay (s) 0 - - 0 HCM Lane LOS A - - A HCM 95th %tile Q(veh) 0 - - 12/04/2023 Open AM Synchro 10 Report Page 1 Packet Pg. 76 7.1.c HCM 6th TWSC 3: S. Diamond Canyon Rd & West Dwy 08/16/2024 Intersection Int Delay, s/veh 1.3 Movement EBL EBT WBT WBR SBL SBR Lane Configurations + + Traffic Vol, veh/h 0 10 18 0 5 0 Future Vol, veh/h 0 10 18 0 5 0 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized None - None - None Storage Length - - 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 91 91 91 91 91 91 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 0 11 20 0 5 0 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 0 - 0 31 20 Stage 1 - - - 20 - Stage 2 - 11 - Critical Hdwy - 6.42 6.22 Critical Hdwy Stg 1 - 5.42 - Critical Hdwy Stg 2 - 5.42 - Follow-up Hdwy - 3.518 3.318 Pot Cap-1 Maneuver 0 - 0 983 1058 Stage 1 0 - 0 1003 - Stage 2 0 - 0 1012 - Platoon blocked, % - Mov Cap-1 Maneuver - - - 983 1058 Mov Cap-2 Maneuver - 983 - Stage 1 - 1003 Stage 2 - 1012 Approach EB WB SIB HCM Control Delay, s 0 0 8.7 HCM LOS A Minor Lane/Major Mvmt EBT WBT SBLn1 Capacity (veh/h) - 983 HCM Lane V/C Ratio - 0.006 HCM Control Delay (s) - 8.7 HCM Lane LOS - A HCM 95th %tile Q(veh) - 0 12/04/2023 Open AM Synchro 10 Report Page 2 Packet Pg. 77 7.1.c HCM 6th Signalized Intersection Summary 1: Brea Canyon Cut-off Rd & S. Diamond Canyon Rd/Fallow Field Dr 08/16/2024 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations 1� t t Traffic Volume (veh/h) 47 10 67 34 12 97 74 572 29 158 1314 54 Future Volume (veh/h) 47 10 67 34 12 97 74 572 29 158 1314 54 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, vehlh/In 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 52 11 74 37 13 107 81 629 32 174 1444 59 Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 309 41 278 97 51 212 348 1506 77 352 1531 62 Arrive On Green 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.44 0.44 0.20 0.44 0.44 Sat Flow,vehlh 1272 209 1408 241 260 1073 1781 3441 175 1781 3480 142 Grp Volume(v), veh/h 52 0 85 157 0 0 81 325 336 174 736 767 Grp Sat Flow(s),vehlh/In 1272 0 1617 1575 0 0 1781 1777 1839 1781 1777 1845 Q Serve(g_s), s 0.0 0.0 4.0 1.8 0.0 0.0 3.4 11.3 11.3 7.8 35.6 35.9 Cycle Q Clear(g_c), s 3.9 0.0 4.0 7.7 0.0 0.0 3.4 11.3 11.3 7.8 35.6 35.9 Prop In Lane 1.00 0.87 0.24 0.68 1.00 0.10 1.00 0.08 Lane Grp Cap(c), veh/h 309 0 320 361 0 0 348 778 805 352 782 812 V/C Ratio(X) 0.17 0.00 0.27 0.44 0.00 0.00 0.23 0.42 0.42 0.49 0.94 0.95 Avail Cap(c_a), veh/h 309 0 320 361 0 0 348 778 805 352 782 812 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 30.5 0.0 30.6 32.0 0.0 0.0 30.5 17.4 17.4 32.1 24.1 24.2 Incr Delay (d2), s/veh 1.2 0.0 2.0 3.8 0.0 0.0 1.6 1.6 1.6 4.9 20.7 20.7 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 1.0 0.0 1.7 3.3 0.0 0.0 1.6 4.6 4.8 3.7 17.9 18.7 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 31.7 0.0 32.6 35.8 0.0 0.0 32.1 19.0 19.0 37.0 44.8 44.9 LnGrp LOS C A C D A A C B B D D D Approach Vol, veh/h 137 157 742 1677 Approach Delay, s/veh 32.3 35.8 20.5 44.0 Approach LOS C D C D Timer - Assigned Phs 1 2 4 5 6 8 Phs Duration (G+Y+Rc), s 22.8 44.4 22.8 22.6 44.6 22.8 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 18.8 40.4 18.8 18.6 40.6 18.8 Max Q Clear Time (g_c+11), s 9.8 13.3 6.0 5.4 37.9 9.7 Green Ext Time (p-c), s 0.3 4.0 0.4 0.1 2.1 0.5 Intersection Summary HCM 6th Ctrl Delay 36.5 HCM 6th LOS D 12/04/2023 Open+Project AM Synchro 10 Report Page 1 Packet Pg. 78 7.1.c HCM 6th TWSC 2: S. Diamond Canyon Rd & East Dwy 08/16/2024 Intersection Int Delay, s/veh Movement EBL EBT WBT WBR SBL SBR Lane Configurations *' Traffic Vol, veh/h 0 124 60 80 0 0 Future Vol, veh/h 0 124 60 80 0 0 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized None - None - None Storage Length - - 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 91 91 91 91 91 91 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 0 136 66 88 0 0 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 154 0 - 0 246 110 Stage 1 - - - - 110 - Stage 2 - - 136 - Critical Hdwy 4.12 - 6.42 6.22 Critical Hdwy Stg 1 - - 5.42 - Critical Hdwy Stg 2 - - 5.42 - Follow-up Hdwy 2.218 - 3.518 3.318 Pot Cap-1 Maneuver 1426 - 742 943 Stage 1 - - 915 - Stage 2 - - 890 - Platoon blocked, % - Mov Cap-1 Maneuver 1426 - 742 943 Mov Cap-2 Maneuver - - 742 - Stage 1 - 915 Stage 2 - 890 Approach EB WB SIB HCM Control Delay, s 0 0 0 HCM LOS A Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 Capacity (veh/h) 1426 - - HCM Lane V/C Ratio - - - HCM Control Delay (s) 0 - - 0 HCM Lane LOS A - - A HCM 95th %tile Q(veh) 0 - - 12/04/2023 Open+Project AM Synchro 10 Report Page 1 Packet Pg. 79 7.1.c HCM 6th TWSC 3: S. Diamond Canyon Rd & West Dwy 08/16/2024 Intersection Int Delay, s/veh 6.5 Movement EBL EBT WBT WBR SBL SBR Lane Configurations + + Traffic Vol, veh/h 0 10 18 0 71 0 Future Vol, veh/h 0 10 18 0 71 0 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized None - None - None Storage Length - - 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 91 91 91 91 91 91 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 0 11 20 0 78 0 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 0 - 0 31 20 Stage 1 - - - 20 - Stage 2 - 11 - Critical Hdwy - 6.42 6.22 Critical Hdwy Stg 1 - 5.42 - Critical Hdwy Stg 2 - 5.42 - Follow-up Hdwy - 3.518 3.318 Pot Cap-1 Maneuver 0 - 0 983 1058 Stage 1 0 - 0 1003 - Stage 2 0 - 0 1012 - Platoon blocked, % - Mov Cap-1 Maneuver - - - 983 1058 Mov Cap-2 Maneuver - 983 - Stage 1 - 1003 Stage 2 - 1012 Approach EB WB SIB HCM Control Delay, s 0 0 9 HCM LOS A Minor Lane/Major Mvmt EBT WBT SBLn1 Capacity (veh/h) - 983 HCM Lane V/C Ratio - 0.079 HCM Control Delay (s) - 9 HCM Lane LOS - A HCM 95th %tile Q(veh) - 0.3 12/04/2023 Open+Project AM Synchro 10 Report Page 2 Packet Pg. 80 7.1.c HCM 6th Signalized Intersection Summary 1: Brea Canyon Cut-off Rd & S. Diamond Canyon Rd/Fallow Field Dr 08/16/2024 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations 1� t t Traffic Volume (veh/h) 23 7 27 12 3 56 29 1041 15 60 1222 33 Future Volume (veh/h) 23 7 27 12 3 56 29 1041 15 60 1222 33 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, vehlh/In 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 24 7 28 12 3 58 30 1073 15 62 1260 34 Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 401 72 288 83 42 278 392 1337 19 392 1317 36 Arrive On Green 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.37 0.37 0.22 0.37 0.37 Sat Flow,vehlh 1341 327 1308 138 189 1265 1781 3588 50 1781 3535 95 Grp Volume(v), veh/h 24 0 35 73 0 0 30 531 557 62 633 661 Grp Sat Flow(s),vehlh/In 1341 0 1635 1593 0 0 1781 1777 1861 1781 1777 1853 Q Serve(g_s), s 0.0 0.0 1.4 0.0 0.0 0.0 1.1 21.4 21.4 2.3 27.8 27.8 Cycle Q Clear(g_c), s 0.9 0.0 1.4 2.9 0.0 0.0 1.1 21.4 21.4 2.3 27.8 27.8 Prop In Lane 1.00 0.80 0.16 0.79 1.00 0.03 1.00 0.05 Lane Grp Cap(c), veh/h 401 0 360 403 0 0 392 662 693 392 662 690 V/C Ratio(X) 0.06 0.00 0.10 0.18 0.00 0.00 0.08 0.80 0.80 0.16 0.96 0.96 Avail Cap(c_a), veh/h 401 0 360 403 0 0 392 662 693 392 662 690 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 24.7 0.0 24.9 25.5 0.0 0.0 24.8 22.5 22.5 25.2 24.5 24.5 Incr Delay (d2), s/veh 0.3 0.0 0.5 1.0 0.0 0.0 0.4 10.0 9.5 0.9 25.8 25.3 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 0.4 0.0 0.6 1.2 0.0 0.0 0.5 9.9 10.2 1.0 15.2 15.7 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 25.0 0.0 25.4 26.5 0.0 0.0 25.1 32.4 32.0 26.1 50.3 49.8 LnGrp LOS C A C C A A C C C C D D Approach Vol, veh/h 59 73 1118 1356 Approach Delay, s/veh 25.2 26.5 32.0 48.9 Approach LOS C C C D Timer - Assigned Phs 1 2 4 5 6 8 Phs Duration (G+Y+Rc), s 22.6 34.8 22.6 22.6 34.8 22.6 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 18.6 30.8 18.6 18.6 30.8 18.6 Max Q Clear Time (g_c+11), s 4.3 23.4 3.4 3.1 29.8 4.9 Green Ext Time (p-c), s 0.1 3.8 0.1 0.0 0.7 0.2 Intersection Summary HCM 6th Ctrl Delay 40.5 HCM 6th LOS D 12/04/2023 Existing PM Synchro 10 Report Page 1 Packet Pg. 81 7.1.c HCM 6th TWSC 2: S. Diamond Canyon Rd & East Dwy 08/16/2024 Intersection Int Delay, s/veh Movement EBL EBT WBT WBR SBL SBR Lane Configurations + Traffic Vol, veh/h 0 57 65 1 0 0 Future Vol, veh/h 0 57 65 1 0 0 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized None - None - None Storage Length - - 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 97 97 97 97 97 97 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 0 59 67 1 0 0 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 0 - 0 127 68 Stage 1 - - - 68 - Stage 2 - 59 - Critical Hdwy - 6.42 6.22 Critical Hdwy Stg 1 - 5.42 - Critical Hdwy Stg 2 - 5.42 - Follow-up Hdwy - 3.518 3.318 Pot Cap-1 Maneuver 0 - 868 995 Stage 1 0 - 955 - Stage 2 0 - 964 - Platoon blocked, % - Mov Cap-1 Maneuver - - 868 995 Mov Cap-2 Maneuver - 868 - Stage 1 - 955 Stage 2 - 964 Approach EB WB SIB HCM Control Delay, s 0 0 0 HCM LOS A Minor Lane/Major Mvmt EBT WBT WBR SBLn1 Capacity (veh/h) - - HCM Lane V/C Ratio - - HCM Control Delay (s) - 0 HCM Lane LOS - A HCM 95th %tile Q(veh) - - 12/04/2023 Existing PM Synchro 10 Report Page 1 Packet Pg. 82 7.1.c HCM 6th TWSC 3: S. Diamond Canyon Rd & West Dwy 08/16/2024 Intersection Int Delay, s/veh 0.5 Movement EBL EBT WBT WBR SBL SBR Lane Configurations + + Traffic Vol, veh/h 0 13 18 0 2 0 Future Vol, veh/h 0 13 18 0 2 0 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized None - None - None Storage Length - - 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 97 97 97 97 97 97 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 0 13 19 0 2 0 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 0 - 0 32 19 Stage 1 - - - 19 - Stage 2 - 13 - Critical Hdwy - 6.42 6.22 Critical Hdwy Stg 1 - 5.42 - Critical Hdwy Stg 2 - 5.42 - Follow-up Hdwy - 3.518 3.318 Pot Cap-1 Maneuver 0 - 0 982 1059 Stage 1 0 - 0 1004 - Stage 2 0 - 0 1010 - Platoon blocked, % - Mov Cap-1 Maneuver - - - 982 1059 Mov Cap-2 Maneuver - 982 - Stage 1 - 1004 Stage 2 - 1010 Approach EB WB SIB HCM Control Delay, s 0 0 8.7 HCM LOS A Minor Lane/Major Mvmt EBT WBT SBLn1 Capacity (veh/h) - 982 HCM Lane V/C Ratio - 0.002 HCM Control Delay (s) - 8.7 HCM Lane LOS - A HCM 95th %tile Q(veh) - 0 12/04/2023 Existing PM Synchro 10 Report Page 2 Packet Pg. 83 7.1.c HCM 6th Signalized Intersection Summary 1: Brea Canyon Cut-off Rd & S. Diamond Canyon Rd/Fallow Field Dr 08/16/2024 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations 1� t t Traffic Volume (veh/h) 23 7 28 12 3 57 30 1062 15 61 1246 34 Future Volume (veh/h) 23 7 28 12 3 57 30 1062 15 61 1246 34 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, vehlh/In 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 24 7 29 12 3 59 31 1095 15 63 1285 35 Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 401 70 289 82 41 279 392 1337 18 392 1316 36 Arrive On Green 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.37 0.37 0.22 0.37 0.37 Sat Flow, vehlh 1340 318 1316 135 187 1270 1781 3589 49 1781 3534 96 Grp Volume(v), veh/h 24 0 36 74 0 0 31 542 568 63 646 674 Grp Sat Flow(s),vehlh/In 1340 0 1634 1593 0 0 1781 1777 1862 1781 1777 1853 Q Serve(g_s), s 0.0 0.0 1.4 0.0 0.0 0.0 1.1 22.0 22.0 2.3 28.7 28.7 Cycle Q Clear(g_c), s 0.9 0.0 1.4 3.0 0.0 0.0 1.1 22.0 22.0 2.3 28.7 28.7 Prop In Lane 1.00 0.81 0.16 0.80 1.00 0.03 1.00 0.05 Lane Grp Cap(c), veh/h 401 0 359 403 0 0 392 662 693 392 662 690 V/C Ratio(X) 0.06 0.00 0.10 0.18 0.00 0.00 0.08 0.82 0.82 0.16 0.98 0.98 Avail Cap(c_a), veh/h 401 0 359 403 0 0 392 662 693 392 662 690 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 24.7 0.0 24.9 25.5 0.0 0.0 24.8 22.7 22.7 25.2 24.7 24.8 Incr Delay (d2), s/veh 0.3 0.0 0.6 1.0 0.0 0.0 0.4 10.9 10.4 0.9 29.5 29.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 0.4 0.0 0.6 1.2 0.0 0.0 0.5 10.3 10.7 1.0 16.2 16.8 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 25.0 0.0 25.4 26.5 0.0 0.0 25.2 33.5 33.1 26.1 54.2 53.8 LnGrp LOS C A C C A A C C C C D D Approach Vol, veh/h 60 74 1141 1383 Approach Delay, s/veh 25.2 26.5 33.1 52.7 Approach LOS C C C D Timer - Assigned Phs 1 2 4 5 6 8 Phs Duration (G+Y+Rc), s 22.6 34.8 22.6 22.6 34.8 22.6 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 18.6 30.8 18.6 18.6 30.8 18.6 Max Q Clear Time (g_c+11), s 4.3 24.0 3.4 3.1 30.7 5.0 Green Ext Time (p-c), s 0.1 3.6 0.1 0.0 0.1 0.2 Intersection Summary HCM 6th Ctrl Delay 43.0 HCM 6th LOS D 12/04/2023 Opening PM Synchro 10 Report Page 1 Packet Pg. 84 7.1.c HCM 6th TWSC 2: S. Diamond Canyon Rd & East Dwy 08/16/2024 Intersection Int Delay, s/veh Movement EBL EBT WBT WBR SBL SBR Lane Configurations + Traffic Vol, veh/h 0 58 66 1 0 0 Future Vol, veh/h 0 58 66 1 0 0 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized None - None - None Storage Length - - 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 97 97 97 97 97 97 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 0 60 68 1 0 0 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 0 - 0 129 69 Stage 1 - - - 69 - Stage 2 - 60 - Critical Hdwy - 6.42 6.22 Critical Hdwy Stg 1 - 5.42 - Critical Hdwy Stg 2 - 5.42 - Follow-up Hdwy - 3.518 3.318 Pot Cap-1 Maneuver 0 - 865 994 Stage 1 0 - 954 - Stage 2 0 - 963 - Platoon blocked, % - Mov Cap-1 Maneuver - - 865 994 Mov Cap-2 Maneuver - 865 - Stage 1 - 954 Stage 2 - 963 Approach EB WB SIB HCM Control Delay, s 0 0 0 HCM LOS A Minor Lane/Major Mvmt EBT WBT WBR SBLn1 Capacity (veh/h) - - HCM Lane V/C Ratio - - HCM Control Delay (s) - 0 HCM Lane LOS - A HCM 95th %tile Q(veh) - - 12/04/2023 Opening PM Synchro 10 Report Page 1 Packet Pg. 85 7.1.c HCM 6th TWSC 3: S. Diamond Canyon Rd & West Dwy 08/16/2024 Intersection Int Delay, s/veh 0.5 Movement EBL EBT WBT WBR SBL SBR Lane Configurations + + Traffic Vol, veh/h 0 13 18 0 2 0 Future Vol, veh/h 0 13 18 0 2 0 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized None - None - None Storage Length - - 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 97 97 97 97 97 97 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 0 13 19 0 2 0 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 0 - 0 32 19 Stage 1 - - - 19 - Stage 2 - 13 - Critical Hdwy - 6.42 6.22 Critical Hdwy Stg 1 - 5.42 - Critical Hdwy Stg 2 - 5.42 - Follow-up Hdwy - 3.518 3.318 Pot Cap-1 Maneuver 0 - 0 982 1059 Stage 1 0 - 0 1004 - Stage 2 0 - 0 1010 - Platoon blocked, % - Mov Cap-1 Maneuver - - - 982 1059 Mov Cap-2 Maneuver - 982 - Stage 1 - 1004 Stage 2 - 1010 Approach EB WB SIB HCM Control Delay, s 0 0 8.7 HCM LOS A Minor Lane/Major Mvmt EBT WBT SBLn1 Capacity (veh/h) - 982 HCM Lane V/C Ratio - 0.002 HCM Control Delay (s) - 8.7 HCM Lane LOS - A HCM 95th %tile Q(veh) - 0 12/04/2023 Opening PM Synchro 10 Report Page 2 Packet Pg. 86 7.1.c HCM 6th Signalized Intersection Summary 1: Brea Canyon Cut-off Rd & S. Diamond Canyon Rd/Fallow Field Dr 08/16/2024 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations 1� t t Traffic Volume (veh/h) 53 11 69 12 6 57 66 1062 15 61 1246 60 Future Volume (veh/h) 53 11 69 12 6 57 66 1062 15 61 1246 60 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, vehlh/In 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 55 11 71 12 6 59 68 1095 15 63 1285 62 Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 401 48 308 80 54 269 392 1337 18 392 1285 62 Arrive On Green 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.37 0.37 0.22 0.37 0.37 Sat Flow, vehlh 1337 217 1401 127 247 1224 1781 3589 49 1781 3451 166 Grp Volume(v), veh/h 55 0 82 77 0 0 68 542 568 63 661 686 Grp Sat Flow(s),vehlh/In 1337 0 1618 1597 0 0 1781 1777 1862 1781 1777 1840 Q Serve(g_s), s 0.0 0.0 3.3 0.0 0.0 0.0 2.5 22.0 22.0 2.3 29.7 29.8 Cycle Q Clear(g_c), s 2.0 0.0 3.3 3.1 0.0 0.0 2.5 22.0 22.0 2.3 29.7 29.8 Prop In Lane 1.00 0.87 0.16 0.77 1.00 0.03 1.00 0.09 Lane Grp Cap(c), veh/h 401 0 356 403 0 0 392 662 693 392 662 686 V/C Ratio(X) 0.14 0.00 0.23 0.19 0.00 0.00 0.17 0.82 0.82 0.16 1.00 1.00 Avail Cap(c_a), veh/h 401 0 356 403 0 0 392 662 693 392 662 686 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 25.1 0.0 25.6 25.5 0.0 0.0 25.3 22.7 22.7 25.2 25.1 25.1 Incr Delay (d2), s/veh 0.7 0.0 1.5 1.1 0.0 0.0 1.0 10.9 10.4 0.9 34.6 34.6 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 0.9 0.0 1.4 1.3 0.0 0.0 1.1 10.3 10.7 1.0 17.5 18.1 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 25.8 0.0 27.1 26.6 0.0 0.0 26.3 33.5 33.1 26.1 59.7 59.7 LnGrp LOS C A C C A A C C C C E F Approach Vol, veh/h 137 77 1178 1410 Approach Delay, s/veh 26.6 26.6 32.9 58.2 Approach LOS C C C E Timer - Assigned Phs 1 2 4 5 6 8 Phs Duration (G+Y+Rc), s 22.6 34.8 22.6 22.6 34.8 22.6 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 18.6 30.8 18.6 18.6 30.8 18.6 Max Q Clear Time (g_c+11), s 4.3 24.0 5.3 4.5 31.8 5.1 Green Ext Time (p-c), s 0.1 3.6 0.4 0.1 0.0 0.2 Intersection Summary HCM 6th Ctrl Delay 45.1 HCM 6th LOS D 12/04/2023 Opening+ Project PM Synchro 10 Report Page 1 Packet Pg. 87 7.1.c HCM 6th TWSC 2: S. Diamond Canyon Rd & East Dwy 08/16/2024 Intersection Int Delay, s/veh Movement EBL EBT WBT WBR SBL SBR Lane Configurations t Traffic Vol, veh/h 0 133 66 68 0 0 Future Vol, veh/h 0 133 66 68 0 0 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized None - None - None Storage Length - - 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 97 97 97 97 97 97 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 0 137 68 70 0 0 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 0 - 0 240 103 Stage 1 - - - 103 - Stage 2 - 137 - Critical Hdwy - 6.42 6.22 Critical Hdwy Stg 1 - 5.42 - Critical Hdwy Stg 2 - 5.42 - Follow-up Hdwy - 3.518 3.318 Pot Cap-1 Maneuver 0 - 748 952 Stage 1 0 - 921 - Stage 2 0 - 890 - Platoon blocked, % - Mov Cap-1 Maneuver - - 748 952 Mov Cap-2 Maneuver - 748 - Stage 1 - 921 Stage 2 - 890 Approach EB WB SIB HCM Control Delay, s 0 0 0 HCM LOS A Minor Lane/Major Mvmt EBT WBT WBR SBLn1 Capacity (veh/h) - - HCM Lane V/C Ratio - - HCM Control Delay (s) - 0 HCM Lane LOS - A HCM 95th %tile Q(veh) - - 12/04/2023 Opening+ Project PM Synchro 10 Report Page 1 Packet Pg. 88 7.1.c HCM 6th TWSC 3: S. Diamond Canyon Rd & West Dwy 08/16/2024 Intersection Int Delay, s/veh 6.4 Movement EBL EBT WBT WBR SBL SBR Lane Configurations t t Traffic Vol, veh/h 0 13 18 0 77 0 Future Vol, veh/h 0 13 18 0 77 0 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized None - None - None Storage Length - - 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 97 97 97 97 97 97 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 0 13 19 0 79 0 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 0 - 0 32 19 Stage 1 - - - 19 - Stage 2 - 13 - Critical Hdwy - 6.42 6.22 Critical Hdwy Stg 1 - 5.42 - Critical Hdwy Stg 2 - 5.42 - Follow-up Hdwy - 3.518 3.318 Pot Cap-1 Maneuver 0 - 0 982 1059 Stage 1 0 - 0 1004 - Stage 2 0 - 0 1010 - Platoon blocked, % - Mov Cap-1 Maneuver - - - 982 1059 Mov Cap-2 Maneuver - 982 - Stage 1 - 1004 Stage 2 - 1010 Approach EB WB SIB HCM Control Delay, s 0 0 9 HCM LOS A Minor Lane/Major Mvmt EBT WBT SBLn1 Capacity (veh/h) - 982 HCM Lane V/C Ratio - 0.081 HCM Control Delay (s) - 9 HCM Lane LOS - A HCM 95th %tile Q(veh) - 0.3 12/04/2023 Opening+ Project PM Synchro 10 Report Page 2 Packet Pg. 89 DA'Y C A?- E 7.1.d Schedule of Classes DAILY SCHEDULE CLASS OF PEACE Mon Tues Weds Thurs Fri 7:00-8:00 Early Drop Off 8:00-8:30 Breakfast at Snack Tables 8:30-8:40 Help Set Up Classroom 8:40-9:00 Arrival 9:00-9:30 Outdoor Play 9:30-10:00 Morning Worship 10:00-10:10 Restroom / Wash Hands 10:10-10:45 Academic Lesson / Circle Time 10:45-11:25 Hands on Work 11:25-11:40 Bible 11:40-11:45 Wash Hands 11:45-12:30 Lunch 12:30-1:00 Quiet Activities/ Book Reading 1:00-3:00 Nap Time 3:00-3:10 Wake up / Clean Up 3:10-3:30 Snack Time 3:30-4:00 Outdoor Play 4:00-4:10 Wash Hands 4:10-5:00 Chinese Lesson 5:00-5:30 Free Play 5:30-6:00 Pickup from Front Lobby Packet Pg. 90 7.1.d ri Mon Tues Weds Thurs F-d 7:00-8:00 Early Drop Off / Arrival 8:00-8:30 Breakfast at Snack Tables 8:30-9:15 Educational Free Play & Learn 9:20-9:50 Worship & Bible Stories 9:50-10:00 Water Break & Change Shoes 10:20-10:40 Outdoor Play 10:40-10:50 Wash Hands / Diaper Change 10:50-11:15 Academic Lesson & Circle Time 11:15-11:30 Arts / Worksheet 11:30-11:45 Fine Motor Play 11:45-12:15 Lunch Time 12:15-12:30 Diaper Change & Read Books 12:30-3:00 Nap Time 3:00-3:15 Water Break & Diaper Change 3:15-3:45 Snack Time 3:45-4:00 Wash Hands / Water Break 4:00-4:30 Outdoor Play 4:30-4:45 Chinese Lesson & Movement Chinese Worksheet / Hands on 4:45-5:00 Activity 5:00-5:15 Freeplay / Diaper Check 5:15-5:45 Pick Up from Class of Patience 5:45-6:00 Pick Up from Front Lobby Packet Pg. 91 7.1.d * Water breaks in between classroom transitions, and outside play. * Changes in outside play times in ovservance of weather. DAILY SCHEDULE CLASS OF KINDNESS Mon Tues Weds Thurs Fri 7:00-8:00 Early Drop Off / Arrival 8:00-8:30 Breakfast / Educational Play & Learn 8:30-9:00 Morning Exercise / Indoor 9:00-9:15 Water, Hand Washing & Restroom 9:15-9:30 Morning Worship 9:30-9:40 Hand Washing and Water Break 9:40-10:25 Morning Circle Time & Hands On 10:30-11:00 Outdoor Activity 11:00-11:10 Water, Hand Washing & Restroom 11:10-11:50 Bible Lesson 11:50-12:40 Lunch 12:40-12:50 Restroom/ Story time 12:50-3:00 Nap time 3:00-3:10 Wake up, Clean Up, Water Break, Restroom 3:10-3:45 Snack 3:45-4:30 Chinese Lesson 4:30-5:00 Outdoor Activity 5:00-5:45 Structured Activity/ Centers/ Departure Packet Pg. 92 7.1.d Mon Tues Weds Thurs Fri 7:00-8:00 Early Drop Off / Arrival 8:00-8:30 Breakfast at Snack Tables 8:30-9:15 Outdoor Exercise 9:15-9:30 Morning Worship 9:30-10:20 Outdoor Play Water Break / Hand Washing / 10:20-10:30 Restroom 10:30-11:00 Circle Time 11:00-11:20 Table Work / Crafts 11:20-11:30 Wash Hands 11:30-12:00 Lunch 12:15-3:00 Nap Time 3:00-3:10 Water Break / Restroom 3:10-3:20 Music Movement 3:20-3:45 Bible Stories 3:45-4:00 Snack Time 4:00-4:30 Chinese Lesson 4:30-5:00 Play Centers 5:00-5:30 Outdoor Play 5:30-6:00 Pickup from Front Lobby Packet Pg. 93 51b C _Ho0L 7.1.e W1161 Student's arrive (7-8:40) .............. I............................ Class Rules (8:40-9:15) ........................................... Chapel (9:15-9:45) ............................ I.............. Mother Goose (9:50 - 10:45) Student's arrive (7-8:40) ............. .................... I.......... Class Rules (8:40-9:15) ............................................ Bible (8:45 - 9:30) ............................................ Mother Goose (9:30-10:45) Student's arrive (7-8:40) ........................................... Class Rules (8:40-9:15) ..................................... Bible (8:45 - 9:30) ........................................... Mother Goose (9:30 - 10:45) Student's arrive (7-8:40) .................. I ................... ...... Class Rules (8:40-9:15) ............................................ Bible (8:45 - 9:30) .......... .................... I............. Mother Goose (9:30 - 10:45) Student's arrive (7-8:40) ....................... I.................... Class Rules (8:40-9:15) ............................................ Bible (8:45 - 9:30) .............. I............................ Mother Goose (9:30-10:45) Readiness Skills (Abeka) ' Readiness Skills (Abeka) Readiness Skills (Abeka) ' Readiness Skills (Abeka) ' Readiness Skills (Abeka) (10:45-11:00) (10:45 - 11:00) (10:45-11:00) (10:45-11:00) (10:45-11:00) Restroom + Outdoor Recess (11:00 - 11:30) .................................................... Lunch (11:30 - 12:05) .................................................... Restroom (12:05-12:20) .................................................... Nap (12:30-2:00) .................................................... Wake up, clean up (2:00 - 2:15) Restroom + Outdoor Recess (11:00 - 11:30) ................................................... Lunch (11:30 -12:05 ) ................................................... Restroom (12:00-12:15 ) ................................................... Nap (12:30-2:00) .................................................... Wake up, clean up (2:00 - 2:15) Restroom + Outdoor Recess (11:00 - 11:30) ..................................................... Lunch (11:30-12:05) ..................................................... Restroom (12:00-12:15 ) ..................................................... Nap (12:30-2:00) .............................I....................... Wake up, clean up (2:00 - 2:15) Restroom + Outdoor Recess (11:00 - 11:30) .................................................... Lunch (11:30-12:05) .................................................... Restroom (12:00-12:15) .................................................... Nap (12:30-2:00) ............................... I.................... Wake up, clean up (2:00 - 2:15) Restroom + Outdoor Recess (11:00 - 11:30) .................................................... Lunch (11:30-12:05) .................................................... Restroom (12:00-12:15 ) ................................................... Nap (12:30-2:00) .......................... I ............... ......... Wake up, clean up (2:00 - 2:15) Snack + Outdoor Recess Snack + Outdoor Recess Snack + Outdoor Recess I Snack + Outdoor Recess Snack + Outdoor Recess (2:20 - 2:55) (2:20 - 2:55) (2:20 - 2:55) (2:20 - 2:55) (2:20 - 2:55) Lego (3:00 - 3:35) ................................................... Chinese (3:40 - 4:15) ........................... I ....................... Hands on Learning Id•,)n - warn Spanish (3:00 - 3:35) ................................................... Chinese (3:40 - 4:15) ................................................... Hands on Learning (4:20 - 4:40) Indoor PE (3:00 - 3:35) ................................................... Music (3:40 - 4:15) ............. ........... I.......................... Hands on Learning (4:20 - 4:40) .................................................... Indoor Play (4:40 - 6:00) Indoor PE (3:00 - 3:35) ................................................... Chinese (3:40 - 4:15) ................................................... Hands on Learning (4:20 - 4:40) Art (3:00 - 3:35) .................................................... Chinese (3:40 - 4:15) .................................................... Hands on Learning (4:20 - 4:40) Packet Pg. 94 7.1.e TK 2 Student's arrive (7-8:40) .............. I ............................ Class Rules (8:40-9:15) ........................................... Chapel (9:15-9:45) ................................I.......... Mother Goose (9:50-10:45) Student's arrive (7-8:40) .................... I ...................... Class Rules (8:40-9:15) ........................................... Bible (8:45 - 9:30) ........................................... Mother Goose (9:30-10:45) Student's arrive (7-8:40) ........................................... Class Rules (8:40-9:15) ........................................... Bible (8:45 - 9:30) ........................................... Mother Goose (9:30-10:45) Student's arrive (7-8:40) ............................................ Class Rules (8:40-9:15) ........................................... Bible (8:45 - 9:30) .............. I .......................... .. Mother Goose (9:30-10:45) Student's arrive (7-8:40) ............................................ Class Rules (8:40-9:15) ...............................1............ Bible (8:45 - 9:30) ............................................ Mother Goose (9:30-10:45) Readiness Skills (Abeka) I Readiness Skills (Abeka) I Readiness Skills (Abeka) ' Readiness Skills (Abeka) Readiness Skills (Abeka) (10:45 - 11:00) (10:45-11:00) (10:45 - 11:00) (10:45-11:00) (10:45-11:00) Restroom + Outdoor Recess (11:00-11:30) ...................... I ............................. Lunch (11:30-12:05) .................................................... Restroom (12:05-12:20) ............................................... Nap (12:30-2:00) .................................................... Wake up, clean up (2:00 - 2:15) Restroom + Outdoor Recess (11:00 - 11:30) .................................................... Lunch (11:30-12:05) .................................................... Restroom (12:00-12:15) .................................................... Nap (12:30-2:00) .................................................... Wake up, clean up (2:00 - 2:15) Restroom + Outdoor Recess (11:00 - 11:30) .................................................... Lunch (11:30-12:05) .................................................... Restroom (12:00-12:15) ........................... I ........................ Nap (12:30-2:00) ...............................................:.... Wake up, clean up (2:00 - 2:15) Restroom + Outdoor Recess (11:00 - 11:30) ............ ..................... I ................. , Lunch (11:30-12:05) .......... ... ........I ............................. . Restroom (12:00-12:15 ) .................................................... Nap (12:30-2:00) ...................... .......:...................... Wake up, clean up (2:00 - 2:15) Restroom + Outdoor Recess (11:00 - 11:30) ................................................... Lunch (11:30 -12:05 ) ................................................... Restroom (12:00-12:15) ............................. I..................... Nap (12:30-2:00) ................................................... Wake up, clean up (2:00 - 2:15) Snack + Outdoor Recess Snack + Outdoor Recess Snack + Outdoor Recess Snack + Outdoor Recess Snack + Outdoor Recess (2:20 - 2:55) (2:20 - 2:55) (2:20 - 2:55) (2:20 - 2:55) (2:20 - 2:55) Chinese (3:40 - 4:15) ......................... I ........... ............... Lego (3:00 - 3:35) .................................................... Hands on Learning (4:20 - 4:40) Chinese (3:40 - 4:15) ................................................... Spanish (3:00 - 3:35) ................................................... Hands on Learning (4:20 - 4:401 Music (3:40 - 4:15) .................................................... Indoor PE (3:00 - 3:35) .................................................... Hands on Learning (4:20 - 4:40) .................................................... Indoor Play (4:40 - 6:00) Chinese (3:40 - 4:15) ................................................... Indoor PE (3:00 - 3:35) ................................................... Hands on Learning (4:20 - 4:40) Chinese (3:40 - 4:15) .................................................... Art (3:00 - 3:35) .................................................. Hands on Learning (4:20 - 4:40) Packet Pg. 95 Kindergarten Monday Tuesday Wednesday Thursday Friday Student's arrive Student's arrive Student's arrive Student's arrive Student's arrive (7-8:30) .............................................. I ...................... ................................................ (7-8:30) .................. 8 ... ........................ Q.- :30) ................................................................ (7-8:30) (7-8:30) English Language ............................................. ..................................................................... (8:30-9:15) ................................................ ; .................... Chapel English Language English Language English Language English Language (9:15-9:45..) (8:30-10:30) (8:30-10:30 (8:30-10:30 (8:30-10:30 ............................................ ... .................... English Language (9:45-10:30 ..................................................).................. ..................................................................... ................................................................................................................................................ ............................................................ ...................... .............................................. ........................................................................................................................................................................................... Outdoor Recess (10:30-10:55) ........................ Math Math Math (11:00-11:30) Math ..................................................................... Math (11:00-11:30) (11:00-12:00) (11:00-12:00) ................................... I ................................. Bible (11:30-12:10) (11:00-12:00) ......................................... . .... ... ......... Bible (11:30-12:10) ........... ......................................................... ...................................................................... Lunch + Outdoor Recess ..................................................................... ...................................................................... Lunch + Outdoor Recess Lunch + Outdoor Recess Lunch + Outdoor Recess ..................................................................... Lunch + Outdor Recess (12:00-12:45) ................ ................ I .................................. ................ (1�:00-12:45) ........................................... ..... ..... I ................ .................. (12:.15-1:00) ................. ................ (12:00-12:45) ; (12:15-1:00) Chinese Chinese/ Bible ........................... ................. Chinese ..................... .................. ........ ............................... ........................ .......... (12:45-1:25) .................. (12:45-1:25) 111,111,111,1111*111,l*""**,""I ........... Spanish (12:45-1:25) Art ........................................ (1:00-1:50) I ............................. (1:00-1:50) Science History Health and Safety (1:35-2:15) (1:35-2:15) .............................................................. (1:35-2:15) .............................................. ...................... .. ............................................................. ................................................ Community Chinese/ Bible Intro to Music/ Choir ................. Indoor PE .................................. (1:55-3:00) ................... Indoor PE (2:20-3:00) (2:20-300) ...................... I ............ I ................ ................. ................... (?:20 -3:00) ........... I ................................. ..................................................................... ..................................................................... (2:20 -3:00) . ..................................................................... AFTERSCHOOL ................................. I ............................................................................................................................................................................................................................................................................................................................. ............................... ....................... I ................................................................ I ...................................................................................................................................................................................................................................... I Snack (3:00-3:30) ..................... .................................................................................................................................................................................................................................................................................................................................... Homework time/ Enrichment Classes (3:30-5:00) Free play/ Enrichment Classes (5:00-6:00) I Packet Pg. 96 First Grade monclay Tuesday Wednesday Thursday Friday Student's arrive Student's arrive Student's arrive Student's arrive Student's arrive (7-8:30) ..................................... I ...................... ........... (7-8:30) ............................... .......................... (7-8:30) ..................................................................... ....................................... (7-8:30) .............................. (7-8:30) ................................................................. English Language (8:30-9:15) ..................................................................... Chapel English Language English Language English Language English Language (9:15-9:45) .............................................. (8:30-10:30) (8:30-10:30 (8:30-10:30 (8:30-10:30 English Language (9:45-10:30) ..................................................................... ................ ........................................ ............ ............... ..................................................... ............... ............................................................................................................................ ..................................................................... ..................................... I..." .......................... Outdoor Recess (10:30-10:55) ..................................................................... ...................................................................... ..................................................................... Math (11:00-11:30) i i Math (11:00-11:30) Math Math Math (11:00-12:00) (11:00-12:00) ....................... ......................................... (11:00-12:00) ............................................................ Bible (11:30-12:10) Bible (11:30-12:10) ..................................................................... ................................................................... Lunch + Outdoor Recess .............................................................. ............................................................. Lunch + Outdoor Recess Lunch + Outdoor Recess Lunch + Outdoor Recess Lunch + Outdor Recess (12:00-12:45) (12:00-12:45) (12:15-1:00) (12:00-12:45) (12:15-1:00) .................... I ............................. Science ......................... History ..................................................................... ...................................................................... Health and Safety ..................................................................... (12:45-1:25) (12:45-1:25) Community (12:45-1:25) Art ............................... ........................................................................................................ ................................................... (1:00-1:50) (1:00-1:50) Chinese Chinese/Bible Chinese (1:35-2:15) (1:35-2:15) ..................................................................... (1:35-2:15) ..................................................................... ...................................................................... Spanish ...................................................................... Chinese/ Bible ............. ................................... ............. Intro to Music/ Choir Indoor PE (1:55-2:50) Indoor PE (2:00-3:00) (2:20-3:00) ..................................................................... ...................................................................... (2:20-3:00) ..................................................................... ...................................................................... (2:20-3:00) ..................................................................... A F T E R S C H 0 0 L .............................................................................................................................................................. ........... ............................................................................................................................................................................ Snack (3:00-3:30) ...................................................................................................... ........................................................................................................................................................................................................................................................ Homework time/ Enrichment Classes (3:30-5:00) ............................................................................................................................................................................................................................................................................................................................................................... Free play/ Enrichment Classes (5:00-6:00) I Packet Pg. 97 1 2nd Monday Tuesday Wednesday Thursday Friday Student's arrive Student's arrive Student's arrive Student's arrive Student's arrive (7-8:30) ........... .......................................... ............................................. (7-8:30) ................... (7-8:30) ..................................... .............................................................................................................................................................. (7-8:30) (7-8:30) English Language (8:30-9:15) ............... ..................................................... Chapel English Language s English Language English Language English Language (9:15-9:45) ...................... .............. (8:30-10:00) (8:30-10:00 (8:30-10:00 (8:30-10:00 English Language (9:45-10:00) ................................................................. ...................................................................... : ............ ....................................... ................. .................................................... .............................................. .................. ..................................................................... ..................................................................... Outdoor Recess (10:00-10:30) ..................................................................... ..................................................................... ..................................................................... Math Math Bible Math Bible (10:30-12:00) (10:30-12:00) (10:30-11:30) (10:30 - 12:00) (10:30-11:30) ..................................................................... .............................. Lunch + Outdoor Recess ....................................... ............. ....................................................... ...................................................................... Lunch + Outdoor Recess Lunch + Outdoor Recess Lunch + Outdoor Recess ................................................................ Lunch + Outdor Recess (12:00-12:45) (12:00-12:45) (12:15-1:00) (12:00-12:45) (12:15-1:00) ..................................................................... ...................................................................... Intro to Music/ Choir Indoor PE ..................................................................... ...................................................................... Indoor PE ..................................................................... (12:45-1:25) ..................................................................... ...................................................................... (12:45-1:25) Community ................................................................. (12:45-1:25) Chinese/ Bible (1:00-1:50) (1:00-2:00) Science History ............................... .................................. Health and Safety (1:35-2:15) (1:35-2:15) 1: (1:35-2:15) ............................. .......................... .................. ................................................. Spanish Art Chinese Chinese .................. (1:55-2:50) ................... I . Chinese........................ (2:10-3:00) (2:20-3:00) ..................................................................... .................................................................. (2:20-3:00) ..................................................................... ...................................................................... (2:20-3:00) ..................................................................... ............................................................................................................................................................................................................................................................................................................................................................... A F T E R S C H 0 0 L ............................................................................................................................................................................................................................................................................................................................................................... Snack (3:00-3:30) ............................................................................................................................................................................................................................................................................................................................................ Homework time/ Enrichment Classes (3:30-5:00) Free play/ Enrichment Classes (5:00-6:00) I Packet Pg. 98 1 9.1 Project Status Report CITY OF DIAMOND BAR November26, 2024 COMMUNITY DEVELOPMENT DEPARTMENT PROPERTY LOCATION PLANNING COMMISSION REVIEW File # AP Applicant PC CC PC CC PC CC 11 /26/24 12/03/24 12/10/24 12/17/24 01 /14/25 01 /21 /25 3333 Diamond Canyon Rd CUP PL2024-15 MN Kingdom Seed PH (Child Day Care Center) Academy ADMINISTRATIVE REVIEW Property Location AP Applicant None PENDING ITEMS Property Location File # AP Applicant Status 1024 Brea Canyon Road CUP/PCN DT Michael Zavaro Under Review (Modify existing convenience store's PL2024-64 Alcoholic Beverage Control license to permit sale of beer, wine and distilled spirits ABC type 21 license 2725 Clear Creek DR PL2022-74 DT Diane Shi Under Review New Single -Family Residence 2000 Chestnut Creek DR MCUP PL2024-7 DT Claire Lee First incomplete letter sent 2/22/24 — waiting for additional information (New Single -Family Residence) 2001 Derringer Lane TPM 83036 MN Gurbachan S. Juneja Fifth incomplete letter sent 7/30/24 - waiting for additional information 2-lot subdivision PL2021-46 334 S. Diamond Bar Blvd CUP PL2024-76 MN Jason Lee for Black Under Review (Banquet) Canvas South Gentle Springs Ln. and GPA, ZC, VTTM, DR GL/DT Tranquil Garden LLC First incomplete letter sent 4/16/21 — waiting for additional information S. Prospectors Rd. PL2021-23 1134 Hedgewood MCUP PP PL2024-78 RL/MN Dennis Pagoulatos Under Review (Addition and remodel to single-family residence 2521 Indian Creek DR & TP PL2024-65 RL/MN Philip K. Chan First incomplete letter sent 10/28/24 — waiting for additional information New single-family residence LEGEND PH = PUBLIC HEARING AP = ASSIGNED PLANNER PC = PLANNING COMMISSION CC = CITY COUNCIL D = DISCUSSION IT Packet Pg. 99 9.1 Project Status Report CITY OF DIAMOND BAR Page November 26, 2024 PENDING ITEMS (continued) Property Location File # AP A licant Status 22909 Lazy Trail Rd. DR, MCUP PL2021-05 DT Walt Patroske Under Review (Addition and remodel to single family residence 1829 Los Cerros Drive DR PL2023-46 DT Raz Grinbaum Under Review (Addition and remodel to single-family residence 2235 Morning Canyon Rd. TTM 83836, DR, TP MN Max Yang Under Review (20-unit condos) PL2022-89 23901 Ridge Line (2-lot Subdivision) TPM PL2022-119 DT Pete Volbeda Second incomplete letter sent 12/5/23 — waiting for additional information 2631 Rocky Trail DR PL2024-43 DT Katy Liu Second incomplete letter sent 9/12/24 - waiting for additional information (Addition and remodel to single-family residence Citywide Objective Design Standards DCA PL2024-51 MN/GL City of Diamond Bar Under Review SB9 Ordinance DCA PL2019-43 MN City of Diamond Bar Under Review Walnut Valley Unified School District DCA PL2024-40 DT/GL WVUSD First incomplete letter sent 7/1/24 - waiting for additional information Billboard Ordinance Packet Pg. 100