HomeMy WebLinkAboutRCS-Diamond Bar Fee Study Proposal (1).pdf
Proposal for the City of Diamond Bar
CITYWIDE FEE STUDY &
COST ALLOCATION PLAN
1519 E Chapman Ave
Suite C
Fullerton, CA 92831
(714) 992-9020
www.revenuecost.com
Proposal for Citywide Fee Study & Cost Allocation Plan
Page | 2
TABLE OF CONTENTS FEBRUARY 9, 2024
Cover Letter ................................................................................................................................................................ 3
Project Team ............................................................................................................................................................... 4
Firm’s Experience/References ........................................................................................................................... 8
Methodology/Project Understanding ............................................................................................................ 10
Cost for Services ...................................................................................................................................................... 17
Proposal for Citywide Fee Study & Cost Allocation Plan
Page | 3
February 9, 2024
City of Diamond Bar
21810 Copley Drive
Diamond Bar California 91765
Proposal – Citywide Fee Study & Cost Allocation Plan
Revenue & Cost Specialists, LLC (RCS) enjoyed the experience of updating Diamond Bar’s
Citywide Fees in 2016 and appreciates the opportunity to respond with this proposal to
develop a Citywide Fee Study and Cost Allocation Plan. We have been providing fee studies
and other costing services since 1980, making us the first and foremost expert in costing
services for California. RCS’ skill set will generate maximum accountability for the City of
Diamond Bar. We have a history of delivering quality reports with defensible data that can
be acted on and adopted.
Our processes are straightforward, analytical and require minimal staff time. In the end, we
strive to ensure that the City of Diamond Bar will be able to confidently stand behind the
information and recommendations in the Report. As former city staff ourselves, we
understand how Diamond Bar operates, what you want, and that your time is precious. If
selected, RCS can begin work immediately, and proposes project completion in May 2024.
Based in Fullerton, we can provide timely support to City staff for years to come. The terms
of this proposal will be honored for 60 calendar days from the date of submittal. Please
contact Eric at (714) 992-9027 or eric@revenuecost.com with any questions.
Sincerely,
ERIC S. JOHNSON CHU THAI
President Partner
Proposal for Citywide Fee Study & Cost Allocation Plan
Page | 4
DIAMOND BAR PROJECT TEAM
While all RCS principals have worked independently on projects, Eric Johnson and Chu Thai
would both be primarily involved with the City of Diamond Bar. Prior to the project kick-off,
we will designate one principal as the Project Manager and primary contact. The other
principal will work behind the scenes, compiling and analyzing the data.
RCS assigns two principals for several reasons. Often, both principals will attend the public
hearing because two are better than one at convincing the policy makers. Two principals
allow us to discuss high-level issues for each project. Most important to RCS, we want our
principals to build long-term relationships with all our clients.
RCS may assign additional specialists to the project to help maintain the proposed schedule
and ensure the quality of the product. For the sake of continuity, only RCS principals will
interact with City staff, as our specialization and expertise will allow staff to focus on other
City functions. We thoroughly understand and will be involved in every phase of the fee
study, advising City staff when necessary.
RCS resumes for the project team are included in this proposal on the following pages.
Proposal for Citywide Fee Study & Cost Allocation Plan
Page | 5
EDUCATION
Bachelor of Arts in Political
Science - University of
Redlands
AFFILIATIONS
California Society of
Municipal Finance Officers
Government Finance Officers
Association
Eric S. Johnson
President
Mr. Johnson serves as President of Revenue & Cost Specialists
with over 30 years of professional knowledge in cost recovery
model and user fee studies. He focuses on providing a positive
experience for RCS clients, which minimizes staff interruptions
yet still produces a comprehensive, defensible study that is
adopted by the governing board.
Municipal Experience
City of Redlands – Redevelopment Intern (1987-1989)
Relevant Project Experience
City of Carmel-by-the-Sea – Comprehensive Fee Study: RCS
completed a Comprehensive Fee Study for the City in 2016 and
most recently in 2020. The City Council reviewed and
approved fee recommendations.
City of City of La Habra Heights – Cost recovery model and
Comprehensive Fee Study: Mr. Johnson developed a Cost
recovery model and Comprehensive Study for the City in 2018.
The City Council reviewed and approved fee
recommendations.
City of Lancaster – Cost recovery model and
Comprehensive Fee Study: Mr. Johnson developed a Cost
recovery model and Comprehensive Fee Study for the City
most recently in 2006, 2009 and 2014. He also updated the
Cost recovery model in 2010, 2011, 2012, 2016, and 2019.
City of Diamond Bar – Cost recovery model and
Comprehensive Fee Study: Mr. Johnson developed a Cost
recovery model and Comprehensive Fee Study in 2017. The
City Council is currently reviewing the fee recommendations.
City of San Bernardino Municipal Water – Cost recovery
model and Comprehensive Fee Study: Mr. Johnson
developed a Cost recovery model and Comprehensive Fee
Study for the Water Agency in 2016 and 2019. Review of the
Fee recommendations by the Water Board is upcoming.
Proposal for Citywide Fee Study & Cost Allocation Plan
Page | 6
EDUCATION
Claremont Graduate
University – Completed
coursework towards
Masters in Public Policy
Cal State Northridge – MA
Public Administration
Cal Poly, Pomona – BS in
Urban and Regional
Planning
AFFILIATIONS
California Society of
Municipal Finance
Officers (CSMFO – Board
Member)
Government Finance
Officers Association
(GFOA)
International
City/County Management
Association (ICMA)
(Cal-ICMA)
Municipal Information
Systems Association of
California (MISAC)
Chu Thai
Partner
Mr. Thai provides multiple aspects to the implementation of
user fees, impact fees and utility rates. His experience as a
municipal finance officer helps clients reach their goal of fee
adoption. Chu keeps current of all legal policies which impact
the noticing, calculation and reporting of fees.
Municipal Experience
Impact Fees: Cities of Morgan Hill and Monterey Park
Utility Rates: Cities of Morgan Hill, Beverly Hills, South
Pasadena and Monterey Park
User Fees: Cities of Claremont, Morgan Hill, Beverly Hills,
South Pasadena and Monterey Park
Director of Management Services, City of Monterey Park,
CA
• Managed department of 15 to provide financial
planning and reporting, revenue collections, treasury,
information technology, telecommunication and
support services
• Improved city's revenues through updated user fees,
utility rates, and impact fees
• Conducted long-term financial forecasting and analysis
• Streamlined and enforced purchasing process
Administrative Services Director, City of Eastvale, CA
• Managed department providing general accounting,
accounts payable, purchasing, payroll, business tax,
treasury, IT and communication services
• Updated the City's Investment Policy and strategy
• Developed long-term revenue strategy
• Performed communications audit and reduced
expenses by 75%
Finance Director, City of South Pasadena, CA
• Outsourced utility billing and customer service
• Completed $43.4 Million Water Bond Issuance and $12
Million Refunding
• Coordinated the passage of Utility Users Tax Ballot
Measure
• Negotiated lease agreements for city property and cell
towers
Proposal for Citywide Fee Study & Cost Allocation Plan
Page | 7
Chu Thai
Partner
Municipal Experience (continued)
Budget and Management Officer, City of Beverly Hills, CA
• Managed $400 million citywide budget for 750 full-
time employees
• Developed comprehensive capital improvement
program
• Developed quarterly performance report presented to
the City Council
• Implemented performance-based budget, including
goals and objectives
• Updated the city's user fees and utility rates
Budget Manager, City of Morgan Hill, CA
• Managed utility billing, purchasing, business license
and accounts receivable functions
• Coordinated IT overhaul, including finance, utility
billing and recreation software conversions,
standardization, training, disaster recovery and
outsourcing.
• Developed pro-formas for proposed aquatics and
community centers
• Updated the city's impact fees, user fees and utility
rates
Senior Management Analyst, City of Tustin, CA
• Coordinated the City’s $80 million operating and CIP
budget with all departments
• Managed finance software upgrade, focusing on
departmental reports
• Deployed online payment system for utility customers
Management Analyst, City of Claremont, CA
• Assisted in the development of effective parks and
recreation programs
• Assisted in the construction and programming of the
Claremont Youth Activity Center, Claremont Skate
Park and Hughes Community Center
• Coordinated budget and evaluated cost recovery for
the department
Proposal for Citywide Fee Study & Cost Allocation Plan
Page | 8
FIRM’S E XPERIENCE AND REFERENCES
RCS HISTORY
Revenue & Cost Specialists, LLC (Taxpayer ID No.
330787781) was founded in 1980 by two former City
Managers and a Finance Director who, after the passage of
Propositions 13 and 4, discovered that user fees were a legal
option to recover lost municipal revenues. Four decades
later, RCS continues its focus on cost allocation and fee
calculation services.
After the passage of AB 1600 in 1988, our company added impact
fee calculation services to help municipalities finance public facility
expansion. In those early years, RCS principals published articles and
presented at conferences, helping California municipal employees
understand how fees work. Our early work is the foundation of how fees
and cost allocation plans are calculated today.
In 2000, RCS created Government Software Systems to develop robust costing software that
serves fee calculation needs better than spreadsheets. Our company has provided additional
services to municipalities that include long-range financial planning, accounting procedures
and utility rate studies.
RCS continues to thrive through repeat business, referrals and references. As a small
business, RCS takes only a handful of new clients each year, allowing us to spend substantial
time with them. In 2024, RCS celebrates its 44th year in business and is looking forward to
another 40 plus years of partnering with municipalities.
QUALIFICATIONS
RCS’ principals make up the Limited Liability Company, which has been financially stable
since the company started. Combined, RCS principals have over 100 years of experience in
cost allocation plans and fee studies and served over 250 municipalities. We have provided
these services to a wide array of public agencies, from the smallest special district to larger
and more complex cities and counties. Though based in Orange County, we engage in
projects throughout the State of California.
RCS principals specialize in:
• User Fee Studies
• Cost Allocation Plans
• Development Impact Fee Studies
• Special Financial Management Studies and Reports
Proposal for Citywide Fee Study & Cost Allocation Plan
Page | 9
These specializations allow RCS to focus on every aspect of municipal fees and be the best of
what we do. We are confident in our project time estimates and do not respond to RFPs when
the project workload exceeds our capacity. We have suggested new fees that are not common
practice throughout the state and have challenged and removed municipal fees that were not
defensible. We have assisted municipalities in streamlining their fee-based processes.
All RCS principals have prior city experience, serving as analysts, managers or directors. We
are all knowledgeable in fund accounting, department structures and municipal services. We
stay current on pending financial and legal issues that challenge municipalities. All principals
are comfortable speaking with city staff at all levels, drafting reports and resolutions, and
presenting them to the public, stakeholders and City Council members.
Eric Johnson, President, has streamlined and perfected the process of CAP and User Fee
Study engagements. With over 30 years and hundreds of studies completed, Eric has created
a superior process that demands little staff time while obtaining maximum results. Eric
quickly understands complex city services and how to calculate fees for them. He relates well
with elected officials because he responds with candor and brevity. If you speak to any of
Eric’s prior or current clients, they will tell you how easy the process was.
Chu Thai, Partner, joined RCS after 22 years of municipal experience. As a budget manager
and finance director, Chu has successfully coordinated user fee increases, impact fee
increases, utility rate increases and tax ballot measures. His experience helps clients avoid
the unseen perils that jeopardize municipal projects. After project completion, Chu leaves
behind well-documented reports and spreadsheets for City staff. The focus of his career has
been to improve cities’ financial stability and implement operational effectiveness and
efficiencies in local government.
Scott Thorpe, Senior Vice President, joined RCS in 1985. Before that, he spent 13 years at the
cities of Chula Vista, Covina, Anaheim and Brea, serving in various roles within the city
manager’s offices. Scott performed user fee studies for several years, transitioning to
development impact fees when AB 1600 went into effect. He has written articles laying out
the fundamentals of impact fees, and his work has generated tens of millions in fee revenues
for cities.
Rick Kermer, Partner, was one of the founders of RCS. Rick used his CPA and audit experience
to build cost allocation and user fee spreadsheets and software that passes rigorous analysis
and reporting accounting standards. Rick’s work is the foundation of all the fee study work
offered today. He is now semi-retired, taking only a handful of projects each year.
Proposal for Citywide Fee Study & Cost Allocation Plan
Page | 10
METHODOLOGY/PROJECT UNDERSTANDING
The City of Diamond Bar wants to identify the full costs of all operational services that are
either currently charged a fee or could be charged a fee.
RCS will first update the City’s Cost Allocation Plan
(CAP), which is necessary in calculating the fully
burdened hourly rates for employees and is an
effective way to distribute the overhead costs to other
funds, departments, and the end-user services. Our
Cost Allocation Plan is powerful in capturing the
maximum overhead charges to enterprise funds. If
excluded from this Citywide Fee Study, RCS will use
the City’s prior Cost Allocation Plan.
Next, RCS will perform the fee study, reviewing the
staff time and program costs involved with each
service and calculating the full cost of services for each fee.
The proposed fee structure will recover these costs in the most equitable and efficient way
possible. The user fees will represent how operations are conducted in the City, and may
involve flat fees, deposits, valuation-based fees, step-increase fees, or a combination of these.
The eventual fee recommendations included in the final report and master fee resolution will
be defensible, easy to understand, and be supported by City staff.
The most important part of our work is performed through a series of focused meetings with
staff. Scheduled meetings commit staff to the timeline and ensure that our study draws from
the most knowledgeable person on the subject matter. A series of meetings also gives City
staff time to digest and reflect on the information generated. RCS uses only company
principals with more than 20-plus years of experience to conduct these meetings, which
makes the process quicker and the results more accurate. Our process provides the City with
well-documented and defensible service costs that will be used to develop fees that comply
with Propositions 4, 218 and 26.
We also identify 100% of the staff time on 100% of the services they provide. This gives City
staff a complete perspective on their time allocations instead of merely looking at time
allocations for individual services in a vacuum. These methods will ensure that City staff
feels confident about the data and, therefore, confident in supporting the results in public
hearings.
The other key result of identifying 100% of City services is that we are identifying not only
the cost of fee services, but of community-supported services, such as police, street and park
maintenance services. This allows us to have a real discussion with real numbers with the
City Council about tax subsidy policy. Since we are identifying the full costs of fee services,
we are also identifying the current subsidy of general tax dollars for these services.
Therefore, we can show the City Council how much fee services are subsidized at the expense
Proposal for Citywide Fee Study & Cost Allocation Plan
Page | 11
of community-supported services. Does the City want to continue to use precious tax dollars
to support, for instance, a bathroom remodel and permitting inspection that only benefits a
particular property owner or use those tax dollars on things that can only be supported by
tax dollars, like police patrol and park maintenance? They will now have that information to
be able to make that conscious choice.
Changing the discussion from fee increases to tax subsidy policy along with RCS’ experience
in successfully presenting the results of similar studies to City Councils ensures that the City
will be able to meet its policy objectives.
RCS will provide the City of Diamond Bar with the requested printed and electronic copies
of the final versions of the Cost of Services Study and Cost Allocation Plan, including related
schedules and cost documentation in a format that can be edited and updated by City staff to
accommodate desired changes.
Project Kick-Off
Task 1: Prepare City Data
RCS will review and prepare necessary files for the project. This includes obtaining
and reviewing prior user fee reports and fee schedules, line-item budget details,
salary schedules, MOUs and fringe benefit details.
Task 2: Kick-off Meeting
RCS will conduct a Citywide meeting, explaining the operational methodology of the
study and the role of staff. We will review any possible issues that may arise as well
as answer any questions from staff about the process. This meeting is crucial for the
process as we want to ensure that everyone understands the various steps in the
process and what is expected of them.
Cost Allocation Plan
Task 1: Identify Central Services and Allocate Staff Time
RCS will meet with various departments to identify and review central services and
allocate staff time and costs for those services. Examples of central services include
payroll, risk management, and facility maintenance. City staff time involved in the
meetings would be approximately 1-2 hours per central service department.
Task 2: Develop Allocation Factors
RCS will meet with City staff to develop the allocation factors for each central service
identified in the above task. These factors will form the basis for determining fully
burdened hourly rates and allocating central service costs. This meeting will be
Proposal for Citywide Fee Study & Cost Allocation Plan
Page | 12
concurrent with the time allocation meeting. Though City staff involvement in data
gathering is a function of the availability of the required information, RCS will develop
allocation factors that are easily reproducible from year to year but still equitably
allocate central service costs. RCS will calculate allocations to the functional centers
and review the results with the managers of the various central service departments.
City staff time to review the results of the allocations will be less than 1 hour per
department.
Task 3: Prepare and Review Draft Cost Allocation Plan with City
RCS will prepare a Draft Report with allocations to end user departments using our
20-step allocation model. RCS will review this Draft Report with the City’s
management, making any necessary adjustments to ensure that costs are allocated
properly.
Task 4: Prepare Final Cost Allocation Plan
RCS will then prepare a Final Report with allocations to end user departments. These
results will be used for the general overhead component of the Fee Study and can also
be used to determine the amounts for transfers to the General Fund for support
provided to other funds. RCS will provide the City’s requested number of printed
copies, as well as a PDF file of the Overhead Cost Allocation Study. RSC will also
provide a computer-based model for adjusting these fees and charges for the City’s
current and future needs, providing an electronic copy of the final study that can be
edited and updated as needed. RCS will consult with City Staff as necessary to defend
the cost allocation plan in the event of audits or other challenges.
User Fee Study
Task 1: Review the Service List with Staff
RCS will review the service list through meetings with City staff. We will also work
with Departmental staff to determine any changes to the fee calculation methods. The
end result, whichever method is used, will be a fee structure that best fits the City
going forward. While this list will change during the course of the Study as it is refined,
it will be the initial basis from where we start. City staff time for this review will be
approximately 1 hour per department.
Proposal for Citywide Fee Study & Cost Allocation Plan
Page | 13
Task 2: Staff Time/Contract Cost Allocations
RCS will interview personnel providing end-user services to ensure that costs from
all functional areas directly involved with a service are included in the cost of that
service. This component will form the bulk of the time spent by staff. There will be
two to four meetings with supervisory level staff in each functional area to create and
verify the amount of time spent by staff on the services identified in the task above.
We do not ask City staff to do our job by filling out forms detailing how they spend
their time. This interactive process, and the fact that we allocate 100% of all
departmental staff, ensures that the information being generated is valid and reliable.
Total time commitment per department varies from 2-20 hours, through a series of
working meetings.
Task 3: Develop Fully Burdened Hourly Rates
RCS will develop a fully burdened hourly rate for each departmental employee,
including salaries and benefits, miscellaneous operating services and supply costs,
citywide overhead and departmental overhead.
Task 4: Prepare Draft Report
RCS will prepare a Draft Report that identifies the total costs for each service, along
with current fees, and makes fee recommendations for each service presented as well
potential new fees for services the City provides but does not charge for. Service costs
will be compared with existing recovery levels. RCS will review this report with the
departments so that each will have input on the fees presented in the Final Report.
City staff time would be approximately 1-2 hours per department for those
departments that have fee services.
Task 5: Prepare Final Report
Based on staff input, RCS will prepare a Final Report, which will have
recommendations for new fees, subsidy percentages and revenue projections from
those fees. The Report will include text and summary tables that will clearly explain
the results and the context. All recommended fees will comply with Propositions 4,
218, 26 and any other applicable laws. RCS will provide the requested number of
copies and a Microsoft Word and PDF file of the Final Report. Any Master Fee
Schedule revisions will also be made available in Word, Excel and/or PDF formats.
RSC will provide a computer-based model for adjusting these fees and charges for the
City’s current and future needs, providing an electronic copy of the final study that
can be edited and updated as the need arises and allowing for the requirements
referred to in the City’s RFP. RCS will consult with staff as needed to defend the fee
study in the event of audits or other challenges.
Proposal for Citywide Fee Study & Cost Allocation Plan
Page | 14
Task 6: Survey Similar Municipalities
RCS will survey other municipalities and document the findings. The survey summary
would compare similar fees for services at different cities, however our results cannot
explain why the fees differ.
Task 7: Present Report to the City Council and Committees
RCS will assist City staff, the City Council and any Committee in the review and
adoption of revised service fees and subsidy percentages, at up to three public
meetings. RCS will assist City staff in the implementation of the revised service fees.
PROJECT TIMELINE
RCS is available to begin work immediately and will present the Final Report to the City
Council in July 2024. This schedule, of course, will require the cooperative participation of
City staff.
Project Timeline Mar
2024
Apr
2024
May
2024
Jun
2024
Jul
2024
User Fee Study
Obtain Budget & Personnel Data
Review Service List
Review Staff Time Allocations
Develop Fully Burdened Hourly Rates
Review Draft & Final Report
Prepare for City Council Meeting
ONSITE MEETINGS AND VIDEO CONFERENCING MEETINGS
RCS is available to be onsite at the City for the project kick-off meeting, all working meetings
occurring the same day, and when we present the draft reports to each department/division.
RCS Partner(s) will also be present at all public meetings involving the City Council or City
Committees.
RCS will utilize our Zoom account, or any video conferencing platform of the City’s choosing,
to facilitate all other working meetings. Our experience has determined that the use of video
conferencing is more flexible in scheduling meetings, permitting City staff to quickly access
reports and files on their computers, and allowing everyone to view and discuss the same
documents at the same time. Department meetings will be 30 minutes to two hours each.
Proposal for Citywide Fee Study & Cost Allocation Plan
Page | 15
CLIENT INPUT
RCS will make every effort to advise, seek input from and, in general, explain the work as it
is being performed. For a project to be completed successfully, we depend on dedicated and
engaged staff participation. Most of the staff participation is to attend working meetings with
RCS. There will be no “homework” to be completed and returned to us.
The City should also designate a Project Coordinator for the fee study who will:
1) Identify key City staff and coordinate the kick-off meeting(s)
2) Assist in obtaining requested information
3) Coordinate the review of draft reports, and
4) Provide project direction if needed
Proposal for Citywide Fee Study & Cost Allocation Plan
Page | 16
REFERENCES
Jurisdiction Contact Title
City of Carson Tarik Rahmani
(310) 952-1755
Deputy City Manager
trahmani@carsonca.gov
RCS completed a Cost Allocation Plan and Comprehensive Fee Study for the City in 2022,
and the City Council adopted the suggested user fees in 2023.
City of Lompoc Dean Albro
(805) 875-8274
City Manager
D_albro@ci.lompoc.ca.us
RCS assisted the City of Lompoc update their Impact Fees in 2018, and currently updating
their User Fees. We are preparing the final report for review and presentation to the City
Council.
City of Long Beach Geraldine Alejo
(562) 570-5478
Revenue Management Officer
Geraldine.Alejo@longbeach.gov
RCS was selected in 2019 to perform a three-year comprehensive update of Long Beach’s
2,850 fees, fines and permits.
City of Santa Barbara James Hamilton
(805) 564-5504
Comm Dev Business Manager
JHamilton@SantaBarbaraCA.gov
RCS recently completed a Development Services Fee Study for the City in 2019. The City
Council recently adopted changes to its fee schedule, including Building fees.
City of Santa Clarita Carmen Magana
(661) 255-4997
Admin Services Director
cmagana@santa-clarita.com
RCS developed a Cost Allocation Plan and Comprehensive Fee Study for the City most
recently in 2014 and has also updated the Cost Allocation Plan in 2011, 2012, and 2013,
2014, 2015, and 2016. RCS has been providing these services for the City since 1995.
Proposal for Citywide Fee Study & Cost Allocation Plan
Page | 17
COST FOR SERVICES
Revenue & Cost Specialists propose the following project costs, with a NOT TO EXCEED
AMOUNT OF $35,000.
Task Milestones/Deliverables Hours Total Cost
Cost Allocation Plan
Review Central Services/Times List of Central Services 12 2,100
Develop Allocation Factors Index of Allocation Factors 16 2,800
Initial Calculation Review Draft Cost Allocation Plan 8 1,400
Prepare Final Cost Allocation Plan Final Cost Allocation Plan 12 2,100
Cost Allocation Plan 48 $8,400
User Fee Study
Kick-Off Meeting Informational Meeting 8 1,400
Build Budget and Positions Schedule of Positions and Budget 24 4,200
Develop Service List Preliminary Service List 8 1,400
Develop Staff Time Allocations Time Detail Reports 32 5,600
Develop Fully Alloc. Hourly Rates Fully Alloc. Hourly Rate Reports 16 2,800
Prepare Draft Report Draft Fee Study Report 32 5,600
Prepare Final Report Final Report 24 4,200
Public Meetings Presentations 8 1,400
User Fee Study 152 $26,600
PROJECT TOTAL 200 $35,000
The above proposal is based on a cost of $175 per hour. The billing rate for any additional
work not covered by this proposal would be $195 per hour. Our proposal covers all costs
except for the following additional costs that the City may incur:
• Report reproduction beyond identified number of copies of the final reports.
• Meeting attendance beyond those identified in this proposal.
• Insurance coverage beyond our basic general liability and workers compensation
requiring an additional premium. RCS standard coverage includes workers
compensation pursuant to state law, comprehensive liability Insurance with a
combined single limit coverage of $2,000,000 and professional liability insurance
with a combined coverage of $2,000,000.
RCS will submit four equal invoices plus any miscellaneous costs from the previous
paragraph. The first invoice will be submitted ten days after notice to proceed. Each invoice
will be due within 30 days of submission.