HomeMy WebLinkAboutDiamond Bar CAP Fees eProposal_MatrixCG (1).pdf
Proposal to Conduct a Citywide Fee Study and Cost
Allocation Plan
DIAMOND BAR, CALIFORNIA
February 9, 2024
Table of Contents
A Cover Letter i
B Project Team 1
C Firm’s Experience/References 6
D Methodology/Project Understanding 12
E Cost for Services 26
F Insurance 27
G Consultant Services Agreement 28
February 9, 2024
Dannette Allen
Principal Management Analyst
City of Diamond Bar
21810 Copley Drive
Diamond Bar, CA 91765
Dear Ms. Allen:
The Matrix Consulting Group is pleased to submit our proposal to conduct a Citywide Fee
Study and Cost Allocation Plan for the City of Diamond Bar. The importance of
establishing documented and defensible plans that facilitate the recovery of direct and
indirect costs. Our experience in providing similar services and understanding of the
impact and implementation issues faced by jurisdictions in Southern California comes
from recent work with the following clients: Burbank, Glendale, Manhattan Beach,
Pasadena, Pomona, South Pasadena, San Bernardino, and Walnut.
At Matrix Consulting Group, we distinguish ourselves from our competitors through our
commitment to delivering unparalleled value. Our key differentiators lie in the fusion of
data-driven analysis and a team of cross-trained professionals. Our staff possess a deep
understanding of service and process assumptions behind the cost of service. This dual
expertise allows us to provide comprehensive insights and solutions that optimize
efficiency and maximize our clients' value.
We are committed to dedicating the time, personnel, and resources to the City’s effort as
identified in this proposal. Studies of this nature typically take approximately 20 weeks to
complete.
I am the firm’s President and authorized to contractually bind the firm. Courtney Ramos,
a vice president, can provide clarification regarding this proposal, which is valid for 90
days upon receipt. We can be reached at the letterhead locations or via email at
rbrady@matrixcg.net and cramos@matrixcg.net
Richard Brady, President
Matrix Consulting Group, Ltd.
mat rix
consulting group
Proposal to Conduct a Cost Allocation Plan and Citywide Fee Study Diamond Bar, CA
Matrix Consulting Group 1
B Project Team
The project team proposed by the Matrix Consulting Group comprises full-time
employees of our firm. The following chart outlines the project team's roles and reporting
structure.
The table below provides an overview of our proposed project team’s experience and roles
throughout this project.
Khushboo Ingle
Vice President
Study Manager
Experience:
12 years
Ms. Ingle is a Vice President who manages cost allocation plan, user fee,
development impact fee, and cost of service engagements. Her
experience with the firm also includes participation in operational audit
engagements focusing on organization, staffing, and internal processes.
Khushboo has completed over 150 cost of service studies. Recent
Southern California clients include Menifee, Manhattan Beach, Glendale,
Burbank, Pasadena, South Pasadena, Adelanto, Walnut, Riverside,
Redlands, and San Bernardino.
Ms. Ingle is a CSMFO member and trained in Revenue Best Practices.
Coordination of data
collection, support City staff
in data development, and
populate models.
Primary contact for the
project, providing expertise
in leading meetings,
reviewing drafts, and
presenting results.
Project oversight and
overall project approval.City of Diamond Bar
Khushboo Ingle
Project Manager
Madison Dixson
Analyst Abnash Minhas
Analyst
Proposal to Conduct a Cost Allocation Plan and Citywide Fee Study Diamond Bar, CA
Matrix Consulting Group 2
Madison Dixson
Senior Consultant,
Data Analyst
Experience:
3 years
Ms. Dixson is a lead analyst who assists our study manager on cost
allocation plan, user fee, development impact fee, and cost of service
engagements.
Madison has participated in over 30 cost of service studies. Recent
Southern California clients include Glendale, Burbank, Pasadena, Menifee,
Redlands, Walnut, and San Bernadino.
Ms. Dixson is a CSMFO member and has also received training on user
fee regulations.
Abnash Minhas
Consultant,
Analyst
Experience:
1 year
Ms. Minhas is an analyst who has recently joined our firm to assist our
staff on cost-of-service engagements including cost allocation plan, user
fee, and development impact fee studies. Prior to joining the firm Ms.
Minhas had extensive experience working on indirect rates and capturing
overhead costs.
Recently she has worked for California clients such as Pomona, Redlands,
Glendale, Menifee, and Chula Vista.
We understand that if any personnel changes occur during the contract period, we must
notify the City and furnish the same information for review and approval.
Resumes for our Project Team members have been included on the following pages.
Proposal to Conduct a Cost Allocation Plan and Citywide Fee Study Diamond Bar, CA
Matrix Consulting Group 3
KHUSHBOO INGLE
VICE PRESIDENT
Ms. Ingle is a Vice President who manages cost allocation plan, user
fee, development impact fee, and cost of service engagements. Her
experience with the firm also includes participation in operational audit
engagements focusing on reviewing organizational, staffing, and
internal processes to enhance services.
Khushboo’s relevant experience include:
• Completed over 150 cost of service studies for clients across the
United States.
• Analysis focuses on development and documentation of direct and
indirect costs, fair and equitable allocation methodologies,
defensible results.
• Expertise also includes development of fiscal policies and
procedures relating to cost of service and cost recovery.
Experience Highlights
Glendale, CA: Khushboo served as the Project Manager on this
engagement which looked and conducting a citywide fee study. Key
analysis includes:
• Discussing time assumptions on current and future fees for service.
• Documenting the cost of service assumptions for all city fee
departments.
Redlands, CA: Khushboo served as the project manager on this
engagement which looked and developing a citywide cost plan, and
comprehensive fee. Key analysis included:
• Review of current administrative functions, and ensuring all
appropriate functions were included in the plan.
• Incorporating updated metrics to account for each service area.
• Calculation of Indirect costs for enterprise fund reimbursements
Role on This Engagement:
Khushboo will serve as the Project Manager on this engagement,
leading interviews and coordinating necessary data collection for the
financial analysis, policy discussions, and working with the Analysts to
compile and analyze data.
Relevant CA Clients:
Berkeley
Citrus Heights
Cupertino
Dixon
Elk Grove
Fairfield
Glendale
Livermore
Long Beach
Manhattan Beach
Orange
Pacific Grove
Pomona
Redlands
Redwood City
Riverside
San Bernardino County
San Pablo
San Mateo
Santa Clara
Santa Clara County
Sonoma County
South San Francisco
Stanislaus County
Sunnyvale
Walnut
Years of Experience: 12
Education:
B.A., University of California
– San Diego, International
Economics
M.A., University of California
– San Diego, International
Affairs
Professional Association /
Certification:
California Society of
Municipal Finance Officers
OMB Cost Allocation Best
Practices
Proposal to Conduct a Cost Allocation Plan and Citywide Fee Study Diamond Bar, CA
Matrix Consulting Group 4
MADISON DIXSON
SENIOR CONSULTANT
Ms. Dixson is a lead analyst on cost allocation plan, user fee,
development impact fee, and cost of service engagements.
Madison’s relevant experience include:
• Completed over 50 cost of service studies for clients across the
United States.
• Analysis focuses on comparative review of services and fee levels.
• Expertise also includes narrative analysis of cost of service
studies.
Experience Highlights
Riverside, CA: Madison served as a project analyst on this
engagement. She worked with the project team to input data into the
model to develop the OMB Compliant Cost Plan for the City of
Riverside.
Glendale, CA: Madison supported our senior team members in
collection, analysis, and distillation of allocation metrics for input into
the Citywide Fee Model. This ensured accurate development of fee
results, as well as clear backup documentation for the City.
Redlands, CA: Madison worked as a project analyst, participating in
interviews discussing support areas, reviewing and compiling agenda
statistic information, and developing a cost allocation narrative to
describe the services being allocated.
Role on This Engagement:
Madison will serve as the Lead Analyst on this engagement, collecting
and reviewing data, inputting data into analytical models, and
producing final results.
Relevant CA Clients:
Adelanto
Burbank
Cupertino
Daly City
Dixon
Fairfield
Fort Bragg
Glendale
Menifee
Millbrae
Palo Alto
Pasadena
Port of Long Beach
Redlands
Redwood City
Riverside
San Bernardino
San Bernardino County
San Mateo
Santa Clara
Stockton
South San Francisco
Sunnyvale
Years of Experience: 3
Education:
B.A., University of
California, Irvine,
Anthropology
Professional Association /
Certification:
California Society of
Municipal Finance Officers
Revenue Cost Allocation
Best Practices
Proposal to Conduct a Cost Allocation Plan and Citywide Fee Study Diamond Bar, CA
Matrix Consulting Group 5
ABNASH MINHAS
CONSULTANT
Ms. Minhas is an analyst on cost allocation plan, user fee,
development impact fee, and cost of service engagements.
Abnash’s relevant experience include:
• Completed over 20 cost of service studies for clients across the
United States.
• Analysis focuses on data analysis of metrics.
• Expertise also includes narrative analysis of cost-of-service
studies.
Experience Highlights
Calimesa, CA: Abnash supported the project team on this
engagement. She worked with the project team to clean up data and
conduct comparative analyses for the fee study.
Redlands, CA: Abnash worked as a project analyst, participating in
comparative analyses, and putting together workbooks for city staff
review.
Malibu, CA: Abnash is currently assisting on a project for the City of
Malibu, working on gathering comparative information, calculating
hourly rates, and inputting data into models.
Role on This Engagement:
Abnash will serve as an Analyst on this engagement, collecting data,
inputting data into analytical models, and assisting with development
of reports.
Relevant Clients:
Burlingame
Calimesa
Chula Vista
Glendale
Los Altos
Malibu
Pacific Grove
Pomona
Redlands
Redwood City
San Mateo
San Ramon
Sonoma Fire
South San Francisco
Years of Experience: 3
Education:
B.A., University of
California – San Diego,
Economics
Professional Association /
Certification:
OMB Cost Allocation Best
Practices
Proposal to Conduct a Cost Allocation Plan and Citywide Fee Study Diamond Bar, CA
Matrix Consulting Group 6
C Firm’s Experience/References
The Matrix Consulting Group was formed by experienced consultants to pursue an
operating model in which analytical work is performed by senior-level staff. Our firm’s
history and composition are summarized below:
• We were founded in 2003, incorporated in California, and have our headquarters
there (in San Mateo with a Southern California satellite office in Irvine) and regional
offices in Edwardsville (IL), the Dallas Metroplex (TX), Portland (OR), and the
Tampa (FL) area.
• We are comprised of 27 full-time and seven part-time highly experienced
management consultants who specialize in analyzing local government functions
encompassing the entire spectrum of critical operational areas. We have a
dedicated financial services team.
• Since our founding, we have worked with over 1,700 government agencies,
conducting cost of service and management studies and providing
recommendations for operations, improvements, and cost recovery.
The market and service focus of the Matrix Consulting Group has always been financial,
management, staffing, and operations analysis of local government. The following
outlines the core financial services provided by our firm:
OMB 2 CFR Part 200 Cost Plans User Fee Studies
Full Cost Plans Development Impact Fee Studies
Indirect Cost Rate Proposals Fully Burdened Hourly Rates
Internal Service Fund Analyses Revenue Projections
No other firm better understands how public agencies operate or how to help them thrive.
Cost Allocation Plan Study Experience
Our firm has extensive experience developing Full Cost and OMB compliant Cost
Allocation Plans, as well as Indirect Cost Rate Proposals for various municipal
organizations across the United States. Whether we are working with large cities, small
towns, special districts, or individual departments, our goal is to document and define the
services being provided, and accurately allocate costs to all beneficiaries. The following
points highlight our experience with developing cost allocation processes and metrics:
• Administrative Functions: Our firm has extensive experience in evaluating
processes and functions associated with Finance, Human Resources, and
Proposal to Conduct a Cost Allocation Plan and Citywide Fee Study Diamond Bar, CA
Matrix Consulting Group 7
Purchasing. From basic tasks and responsibilities to process improvement and
oversight controls, our project teams can:
- Identify core service functions, such as payroll, employee benefits, budget
preparation, agenda, and board support.
- Review current data metrics, and work with staff to ensure resulting
allocations are appropriate, fair, and equitable.
- Recognize services that are not in direct support of departments, including
land acquisition and stewardship, and ensure they are accurately identified,
but not further allocated.
Our project teams understand the core services associated with administrative
functions, as well as the time associated with process completion, and are adept
at helping staff determine daily, weekly, monthly, or annual time spent on a task.
These assumptions form the core basis of a cost allocation plan, and should be
defensible not only through documentation, but also by City staff.
• Governmental Functions: The Matrix Consulting Group has worked with and been
a part of managerial studies relating to Manager and Legal services. Additionally,
we have extensive experience working with, and presenting to various boards,
councils, subcommittees, and the public. Our understanding of the various types
of services provided allow our project teams to assess what services are best for
allocation, including:
- Categorizing services and support that benefit the City as an organization,
such as contract negotiation, and approval of internal policies.
- Identifying services that benefit the City economically, such as lobbying,
and economic development, which should not be allocated.
Our team understands how these costs can and should be treated in both a Full
Cost Plan and OMB compliant plan, including making staff aware of common
practices, as well as aggressive allocation options.
• Internal Services: The Matrix Consulting Group has significant experience
evaluating services and functions associated with facilities maintenance, fleet
services, and information technology. While these services can be part of the
general fund or internal services, their allocation is important when trying to
understand the indirect costs associated with any fund, department, or program.
Our project teams work with these departments to:
- Review existing allocation processes and metrics to ensure compliance
with state and federal regulations.
Proposal to Conduct a Cost Allocation Plan and Citywide Fee Study Diamond Bar, CA
Matrix Consulting Group 8
- Determine if newer metrics, or metric alterations could provide more
accurate allocations.
• Indirect Cost Rate Proposals: Our firm’s experience with indirect cost rate
proposals ranges from developing citywide proposals to departmental and
divisional proposals. We look at all indirect costs related to the service and
program area, determine if it is allowable and then set up the indirect cost rate
calculation. Based upon the jurisdiction’s rate methodology we are versed in
provisional, fixed final, and fixed carry forward rates. We work with our clients to
review rates, outline appropriate applications, and customize templates based
upon cognizant agency guidelines.
The following table provides a sampling of California jurisdictions for whom we have
provided similar services within the last five (5) years, including the types of services
provided to each jurisdiction, relevant to cost allocation services:
Jurisdiction Full Cost OMB Indirect Rates Annual Plan
Adelanto, CA X
Citrus Heights, CA X X
Cupertino, CA X X
Daly City, CA X
Dixon, CA X X
Downey, CA X X
Elk Grove, CA X X X
Fairfield, CA X X
Livermore, CA X X X
Manhattan Beach, CA X X X
Menifee, CA X X
Millbrae, CA X X
Pacific Grove, CA X X
Port of Long Beach, CA X X
Redlands, CA X
Redwood City, CA X X
Riverside, CA X X
Sacramento Regional Transit, CA X X X
San Mateo, CA X X X
Santa Clara, CA X X X
South San Francisco, CA X X
Sunnyvale, CA X X X
We are happy to provide additional project details upon request.
Fee Study Experience
Our firm has extensive experience conducting comprehensive user fee studies for various
municipal organizations and departments. When conducting comprehensive user fee
studies, the focus is often on Community Development (building, planning, and
Proposal to Conduct a Cost Allocation Plan and Citywide Fee Study Diamond Bar, CA
Matrix Consulting Group 9
engineering) and Parks and Recreation services. The following points highlight our
experience in these areas:
• Community Development: Our firm has extensive experience evaluating
development review permitting functions for Building, Planning, Engineering, and
Fire Prevention. From the basic process steps for submitting, reviewing,
inspecting, and approving applications and permits to the development of
processes, procedures, and cost recovery goals, our project teams can address
topics such as:
- The best metric for assessing fees, such as building valuation, square
footage, construction estimate, or number of fixtures.
- Appropriate deposit amounts, guidelines, and processes to ensure actual
cost recovery is achieved.
- Setting fees at levels that both recover costs but are not cost-prohibitive.
- Cost recovery and implementation options for support services including
General Plan Updates, Technology Fees, GIS, etc.
Beyond understanding processes and assessing time estimates provided, our
project teams are aware of the cross-departmental support associated with
application and permit services. These costs are included in the full cost
calculation and can be expressed as part of the established fee or a separate fee.
• Parks and Recreation: The Matrix Consulting Group has worked with every type of
recreation function, including traditional parks and recreation, libraries, and open
space preserves. Our experience spans master and strategic planning, park
condition assessments, program staffing, and cost recovery. Our project teams are
well versed in the areas that most impact cost recovery, including:
- The best use of a tiered recovery approach, such as resident versus non-
resident or profit versus non-profit.
- Setting fees according to the cost recovery pyramid ensures that premium
services have a higher cost recovery.
The goal in reviewing parks and recreation costs for service is to ensure that fees
and rates are set at a level that allows the City to continue to serve the community
in a manner consistent with current goals and commitments.
All our cost of service and user fee studies are developed in compliance with California
State regulations including Propositions 218 and 26, as well as government codes 66014
and 66016 which stipulate that user fees charged by local agencies “…may not exceed
Proposal to Conduct a Cost Allocation Plan and Citywide Fee Study Diamond Bar, CA
Matrix Consulting Group 10
the estimated reasonable cost of providing the service for which the fee is charged”. The
following table includes a sampling of California clients over the last five (5) years for
whom we have conducted cost of service (user fee) studies:
Jurisdiction Planning Building Engineering
Fire
Prev. Admin Utility Police Recreation
Adelanto, CA X X X X X
Citrus Heights, CA X X X X X X
Commerce, CA X
Cupertino, CA X X X X
Daly City, CA X X X X X X
Dixon, CA X X X X X X
Downey, CA X X X X X X X X
Elk Grove, CA X X X
Livermore, CA X X X X
Los Altos, CA X X X
Los Altos Hills, CA X X X X
Manhattan Beach, CA X X X X X X X X
Millbrae, CA X X X X X X
Mill Valley, CA X X X X X X
Montebello, CA X X X X X X X X
Orange, CA X X X X X X X X
Pacific Grove, CA X X X X X X
Redwood City, CA X X X X X X X X
San Bernardino, CA X X
San Mateo, CA X X X
Santa Clara, CA X X X X X X X X
South Pasadena, CA X X X X X X X
So. San Francisco, CA X X X X X X X X
Stockton, CA X X X X
Winters, CA X X X X X X X
Services provided to the above clients were delivered by our proposed project executive
and project manager out of our San Mateo (headquarters) and Irvine, CA offices.
Proposal to Conduct a Cost Allocation Plan and Citywide Fee Study Diamond Bar, CA
Matrix Consulting Group 11
References
The following table references three clients for whom similar services were provided and
managed by our project executive and project manager.
Client Client Contact Project Type/Details
Glendale, CA
141 N. Glendale Ave.
Glendale, CA 91206
Mari Karamyan
Budget Manager
(818) 551-4608
MKaramyan@Glendaleca.gov
Citywide Fee Study
Development Impact Fee
Study
Oct. 2021-Dec. 2022
Menifee, CA
29844 Haun Road
Menifee, CA 92586
Margarita Cornejo
Financial Services Manager
(951) 723-3716
mcornejo@cityofmenifee.us
Cost Allocation Plan
Citywide User Fee Study
Development Impact Fee
Study
July 2021-Sept. 2022
Redlands, CA
125 W. Vine St.
Redlands, CA 92373
Danielle Garcia
Management Services Manager
(909) 798-7555
dgarcia@cityofredlands.org
Full Cost Allocation Plan
Citywide User Fee Study
October 2022 – Aug 2023
Additional details are available upon request.
Proposal to Conduct a Cost Allocation Plan and Citywide Fee Study Diamond Bar, CA
Matrix Consulting Group 12
D Methodology / Project Understanding
The City of Diamond Bar is requesting two scopes of work: (1) a Full Cost Allocation Plan
and (2) a Comprehensive User Fee Study. The following points outline the basic approach
to each of these scopes, including a summary of the steps required for each study.
• Cost Allocation Plan: will help the City establish a full cost allocation methodology
for specific administrative overhead costs that will properly reimburse the General
Fund and estimate anticipated reimbursements. The following chart outlines the
basic process steps for developing a cost allocation plan.
A Full Cost plan would be developed based on budgeted expenditures, and would
be used for interfund transfers, development of fully burdened hourly rates, and
incorporation into the User Fee Study.
• Comprehensive User Fee Study: will document the direct and indirect costs
associated with fee-based city services. This study would also identify services
currently provided for which fees could be assessed and understand how services
and fees compare within the region. The following chart outlines the basic process
steps for conducting a comprehensive user fee study.
The culmination of the citywide user fee study will provide the City with
documentation outlining the full cost of providing fee-based services. This
information, in conjunction with the jurisdictional survey will help the City
determine where to set fees.
Review existing allocation assumptons
Determine cost categories and services for allocation
Review indirect costs for allocation
Develop allocation recommendations
Review existing fees and services
Establish time estimates and service level assumptions
Calculate fully burdened hourly rates
Conduct jurisdicitonal comparison
Develop fee recommendations and master fee schedule
Proposal to Conduct a Cost Allocation Plan and Citywide Fee Study Diamond Bar, CA
Matrix Consulting Group 13
The results of this engagement will provide the City with documentation outlining the
direct and indirect costs associated with providing services both internally and externally,
and outline options for recovering costs through fees or other mechanisms.
Project Approach
The Matrix Consulting Group works with various clients ranging from small towns to
major metropolitan cities in over 45 states across the U.S. and Canada. Every project is
unique but is managed according to the following essential project approach:
The approach chosen for completing this project allows us to deliberately review and
categorize the allowability of indirect costs as well as determine the best and most
tangible metrics for allocation.
Project Management and Quality Control
We believe very strongly in the science of our craft, especially as it relates to cost
allocation and cost of service studies. As such, our firm utilizes quality control techniques
which include:
• Project Management: Ensuring our projects meet the needs and timelines of our
clients are accomplished through the following:
- The project manager and lead analyst develop general and project specific
data collection plans and interview guides.
- All project work activities are defined in advance and tied to each project
team member, deliverables, the schedule, and the budget.
Understanding City-specific financial data.
Working collaboratively wtih City staff through meetings and
workshops.
Applying industry standards, best management practices, and
technical expertise for cost allocation and fee application.
Calculating defensible results with buy-in from internal and
external stakeholders.
Providing recommendations and transferring knowledge and
work products to City staff for sccessful implementation.
Proposal to Conduct a Cost Allocation Plan and Citywide Fee Study Diamond Bar, CA
Matrix Consulting Group 14
- We have frequent client review meetings to discuss the quality and direction
of the project through interim deliverables and draft documents.
• Numerical Results: Financial analyses are used to develop budgets and
projections, and often are subject to public oversight and review. For this reason,
our firm ensures data determined quality control through the following:
- Expenditure data entered into cost models are tied to budget documents.
- Allocation metrics are tied to published reports / data outputs.
These project management approaches have resulted in all our projects being delivered
at a high level of quality, on time and on budget.
Work Plan/Methodology
The requested scopes of work can be conducted concurrently, as there are economies of
scale that can be achieved by doing so. The following subsections detail our approach to
project-wide, cost allocation plan, and citywide fee study-specific tasks, including
deliverables.
Project-Wide Tasks
There are four (4) key tasks will initiate and close out this project. The following tasks are
related to both the cost plan and user fee study scopes of work.
Task 1 Data Collection
Prior to any initial meetings, the Matrix Consulting Group will provide the City with a list
of initial data requirements for the study. This will allow our project team to review this
information thoroughly in preparation for initial discussions with staff. A common list of
data collection items include:
• Budgeted expenditures on a fund, department, and line-item basis.
• Copy of any prior studies
• List of all budgeted personnel by fund, department, and division.
• Most recent completed Fiscal Year revenue reports
• List of all current fees being charged to be included in the analysis.
• List of comparative jurisdictions to be included in the analysis.
Proposal to Conduct a Cost Allocation Plan and Citywide Fee Study Diamond Bar, CA
Matrix Consulting Group 15
The above list is a sampling of the type of information that will be requested. The
provision of these items allows our project team to familiarize themselves with current
financial practices.
Deliverable List of basic data requirements for the Study
Meetings None
Task 2 Study Objectives and Project Schedule
Once the data has been collected, the project team will then meet with designated City
staff to discuss any issues identified by the project team, as well as to clarify any existing
concerns held by the City regarding current fee methodologies. Discussions will include:
• Review of the City’s specific needs and critical issues surrounding development
and implementation of the cost plan and fee studies.
• Discussion of concerns or issues that should be addressed during the
development of the study.
• Discussions regarding current fee structure and any potential changes.
• Review and identify existing cost recovery policies or established subsidies.
At the culmination of the meeting, the project team and the designated City staff will leave
with a greater understanding of the overall approach and methodology that will be taken
by the project team to conduct both the User Fee study and cost allocation plan.
Deliverable Project Schedule
Meetings Kickoff
Task 3 Present the Final Report to Key Stakeholders
The presentation of results to City officials and/or stakeholders is critical to the success
of the overall engagement. Because the product from the study is often controversial, the
objective of this final step is to present a succinct summary that provides decision
makers with key information.
We will attend and present the study at a minimum of three (3) meetings, to include City
Council, appropriate sub-committees, or outside stakeholders.
Deliverable Fee Study Presentation
Meetings Min. of 4 City Committee / Council and Stakeholder Meetings
Proposal to Conduct a Cost Allocation Plan and Citywide Fee Study Diamond Bar, CA
Matrix Consulting Group 16
Task 4 Implementation and Future Support
The Matrix Consulting Group is committed to helping our clients develop accurate and
defensible cost-of-service methodologies and ensure that they can implement the results
of these studies appropriately. Our project team will work with City staff to facilitate an
understanding of the results and how to incorporate those results into budget and policy
documents, informational handouts, and other City materials.
Our Client support continues even after a final report has been issued. We understand
that questions can arise about the development of a study well after project completion
and are committed to working with our clients to answer any questions about
methodologies and applications of results. This support is provided to our clients at no
extra cost.
Cost Allocation Plan Tasks
The following tasks provide our workplan for developing a full cost allocation plan.
Task 1 Interview Staff and Gather Allocation Metrics
The project team would review the City’s existing cost allocation plan and methodologies,
as well as budget and financial structure to identify departments and services to be
allocated. To structure a custom cost allocation model, our project team would perform
the following:
• Review and discuss the accounting (fund and organizational levels) structure of
the City based upon the budgeted expenditures to identify any anomalies from
previous years.
• Identify and meet specific central services departments to develop allocation
bases and ensure that the plan reflects the following aspects:
- All current services provided by the Department are identified and
documented within the Cost Allocation Plan.
- Allocation bases discussed to be utilized are reflective of the current level
of effort and most relatable to the service being performed.
The following is a sample flowchart visually representing discussion outcome, the
first level is the central services department, the second level is the identified
service category, and the third level is the basis by which costs will be allocated:
Proposal to Conduct a Cost Allocation Plan and Citywide Fee Study Diamond Bar, CA
Matrix Consulting Group 17
• Discuss alternative allocations, including outcomes and potential impacts.
The points above provide examples of the types of detailed and in-depth discussions that
the project team will have with City departments involved in the cost allocation process.
At this point in the process, the project team would reach out to each department and ask
for specific allocation metrics such as purchase orders, invoices, sq. ft. per facility, etc.
Deliverable Allocation Metric Requests from Support Departments
Meetings 1 hour per Department
Task 2 Review of Draft Cost Allocation Metrics
Based upon units of service identified in Task 3 and the allocation metrics collected, the
project team would put together allocation statistic workbooks for review with specific
Central Service Departments.
The purpose of these workbooks is to review the initial results of the allocation metrics
gathered. The following graphic shows an example of the allocation workbook:
Fund Dept Desc
# of AR Transactions
per Fund/Dept Allocation %
1 10 City Manager 3 0.87%
1 16 Human Resources 30 8.75%
1 20 City Attorney 30 8.75%
1 30 Police 68 19.83%
1 35 Fire 1 0.29%
1 40 Development Services 7 2.04%
1 50 Public Works Streets 5 1.46%
1 50 Public Works Facilities 1 0.29%
1 50 Public Works Community Services 185 53.94%
10 Water 1 0.29%
14 Sewer 8 2.33%
29 Self-Insured Liability Fund 4 1.17%
TOTAL 343 100.00%
Finance
Payroll
# of Employees per
Division
Accounts Payable
# of Invoices per
Division
Financial Reporting
Actual Expenses
per Division
Proposal to Conduct a Cost Allocation Plan and Citywide Fee Study Diamond Bar, CA
Matrix Consulting Group 18
In the sample graphic provided, based upon the number of AR Transactions per
Fund/Department, the primary support is for Public Works Community Services (54%) for
all the Parks and Recreation transactions, followed by Police (20%). Based upon the
results of this sample, the project team would verify with Finance that the statistics were
allocated to the appropriate fund/department and that the resulting percentage is
reflective of the support being provided by the Accounts Receivable staff and function.
This type of detailed review is critical for the development of a defensible cost allocation
plan. It also ensures that departmental staff and city staff are comfortable with the use
of the allocation metrics and the support that those metrics represent.
Deliverable Draft Allocation Workbooks
Meetings 1 hour per Department
Task 3 Structure and Prepare Draft Full Cost Allocation Model
Once the central service departments and administrative functional areas have agreed
upon the appropriate allocation metrics for their services; allowable administrative or
other indirect costs are allocated to each benefiting City department, operating unit, or
fund. At this point the project team would begin developing the draft Full Cost Allocation
Plan ensuring methodologies and assumptions comply with Federal and State
regulations, as well as general accounting principles.
During the development of the cost allocation plan, the project team will ensure that any
expenses included in the plan are vetted and reviewed with Finance staff as well as
incorporate any direct reimbursements. The results of the draft cost allocation model will
be provided to City staff in numerical format in Excel before developing a draft report.
Deliverable Draft Cost Allocation (Excel Results)
Meetings 1 hour with Finance
Task 4 Finalize the Full Cost Allocation Plan
Upon review and approval of the draft full cost plan by central service departments and
the Finance Department, the project team will finalize the Full Cost Allocation Plan and
report. The final deliverables associated with the Full Cost Allocation Plan would be:
• Full cost allocation plan report: including all detailed allocation schedules, cost
schedules, summary schedules, and narrative information regarding the central
services included.
• Excel summary schedule: the results of the full cost allocation plan in Excel format
for ease of calculations, incorporation into City documents, and review by staff.
Proposal to Conduct a Cost Allocation Plan and Citywide Fee Study Diamond Bar, CA
Matrix Consulting Group 19
• Results Memo: summarizing the methodologies and uses of the Full Cost Plan.
This type of final work product ensures that information is available in a variety of formats
for City staff to use. The detailed report serves as backup documentation, whereas the
Excel results can be input into budget documents. The memo provides insight into major
differences between current and proposed methodologies.
Deliverable Final Full Cost Allocation Report
Meetings None
Comprehensive User Fee Study Tasks
The following tasks provide our workplan for developing a Citywide Fee study.
Task 1 Develop a Schedule of Current and Potential Fees for Service
The scope of this effort will include all citywide fees charged by the City of Diamond Bar.
The project team will work with staff to go through their current fee schedules in line-item
by line-item detail. This meeting is critical in ensuring staff can incorporate any updates
or changes to the fee study based on code, regulation, staffing, process, or technological
changes. The focus of this meeting will be the following:
• Renaming fees: Rewording or renaming fees to identify services more clearly.
• Eliminating fees: Removing any outdated services or fees.
• Adding new fees: Capturing any new services or breaking out existing fee
categories to identify all the services being provided by City staff more clearly and
identify potential fees for service that the City would like to provide.
• Recategorization of fees: Collapsing or expanding multiple fee ranges to better
capture the services provided. For example, eliminate lot ranges or acreages if
those do not impact the review amount, but add categories based upon the
approval body (i.e., Commission vs. Director level).
It is important to note that this meeting occurs first to ensure that any major proposed
structural changes are captured prior to collecting time estimate information or
developing draft fee results. However, there is the ability to make future adjustments.
Deliverable Proposed Fee Structure(s)
Meetings Fee Structure Meetings
Proposal to Conduct a Cost Allocation Plan and Citywide Fee Study Diamond Bar, CA
Matrix Consulting Group 20
Task 2 Conduct Time Data Gathering Workshops
The project team will conduct workshops to gather time estimates for each service
included in the study, interview key personnel from each department, and analyze the
various activities. Below is an example of the steps involved in permit processing and the
time associated with each step.
As the chart above shows, basic process steps in application/permit processing will be
documented and provided in detail for each department / division represented in the
study. The project team will try to minimize the impact on staff by incorporating any
baseline assumptions from prior city studies.
The project team will conduct multiple time estimate workshop(s) for each department /
division included in the study, and the workshop results will be an Excel-based
workbook(s) that staff can review. Staff will be provided time for edits or comments on
time estimate information.
Deliverable Time Estimate Workbook(s)
Meetings 2-3 Time Estimate Workshops
Task 3 Develop Fully Burdened Hourly Rates
Based on the City’s staffing and budget information, the project team will calculate fully
burdened hourly rates, including direct and indirect costs. The following points highlight
the cost components and factors included in fully burdened rates:
• Direct costs: This component accounts for salary and benefits associated with
each employee or position and reflects City staffing and salary reports.
Intake and Processing. Permit Tech: 15 minutes.
Routing. Permit Tech: 10 minutes.
Initial Review. Plan Checker: 1 hour.
Final Review. Plan Checker: 30 minutes.
Issue Permit. Permit Tech: 15 minutes.
Proposal to Conduct a Cost Allocation Plan and Citywide Fee Study Diamond Bar, CA
Matrix Consulting Group 21
• Indirect costs - departmental: This component accounts for administrative and
management support provided to line-level staff, as well as operational services
and supplies that are used in the execution of job duties. This cost component is
developed through interviews with staff and an analysis of services and supply
budgets.
• Indirect costs - citywide: This component accounts for citywide support such as
Finance, HR, and Solicitor support provided by other city departments. This cost
component is derived from the City’s Cost Allocation Plan. The project team will
develop an indirect rate if no Cost Plan is available.
Once the cost components have been documented and developed, the project team will
review MOUs and talk with departmental staff to determine appropriate productive hour
calculations. This reduction in available hours will ensure that fully burdened hourly rates
account for leave accruals (holiday, vacation, and sick), as well as meetings or training.
The results of this analysis will be fully burdened hourly rates by position. The project
team will utilize the results of this task along with Task 4 to calculate the full cost of
services.
Deliverable Fully Burdened Hourly Rates
Meetings None
Task 4 Perform a Total Cost Analysis
The Matrix Consulting Group’s costing model is built based on the city’s operations,
budget details, and intended uses for the results. This method is a customized approach
specific to each jurisdiction for cost analysis of user fee services. It is a “bottom-up”
approach, which is the most defensible methodology for calculating user fees. The
methodology incorporates the time estimate information and fully burdened hourly rate
information. The following graphic shows the cost calculation:
This costing method uses time and annual activity level data to establish the cost of
providing services on both a unit and an annual level. Once the time spent for a fee activity
is determined for each individual or position, the team uses its fee and rate software to
apply the fully burdened hourly rates calculated in the previous task.
Time
Estimate
Fully
Burdened
Rate
Full Cost
Fee
Proposal to Conduct a Cost Allocation Plan and Citywide Fee Study Diamond Bar, CA
Matrix Consulting Group 22
Resulting costs are presented on a unit and annual level and are compared to the existing
fee schedule and revenue reports. The following graphic shows a sample presentation:
Per Unit
Fee Title Current Fee Total Cost Per Unit
Surplus /
(Deficit) Per Unit
Cost Recovery
%
Lot Line Adjustment $900 $1,557 ($657) 58%
Temporary Use Permit $40 $325 ($285) 12%
AVERAGE COST RECOVERY PER UNIT 35%
Annual
Fee Title Workload
Revenue at Current
Fee
Revenue at Full
Cost
Annual
Surplus/
(Deficit)
Lot Line Adjustment 4 $3600 $6,228 ($2,628)
Temporary Use Permit 60 $2400 $19,500 ($17,100)
TOTAL $6,000 $25,728 ($19,728)
As the example in the graphic above indicates, the per unit subsidy for the Lot Line
Adjustment at $657 is more than double the per unit subsidy for the Temporary Use
Permit. However, the annual results help provide City management with some additional
context, as due to the volume of activity, the larger impact on the Department is felt by
the smaller subsidy for the Temporary Use Permit.
The City will obtain detailed information like that presented in the previous graphic
regarding cost recovery surpluses and deficits on both a detailed (per unit) and global
(annualized) level, as well as an understanding of cost components for each service.
Deliverable Per Unit and Annual Fee Study Results
Meetings 1-2 Draft Results Meetings
Task 5 Conduct a Market Rate Survey to Similar Jurisdictions
The project team will work with the City to identify jurisdictions within Los Angeles County
for the fee comparison survey. This comparative survey activity will be conducted utilizing
the following steps:
• Developing fee scenarios for the department included in the study to be compared
to other jurisdictions (e.g., Single Family Home 2,500 sq. ft. $325,000).
• Graphing the results of the fee analysis for easy visual comparison purposes. The
following graph provides an example of how comparative survey results for fees
would be presented:
Proposal to Conduct a Cost Allocation Plan and Citywide Fee Study Diamond Bar, CA
Matrix Consulting Group 23
• Collecting contextual information such as population size, budget, staffing, last
time fee study was done, and last fee schedule update.
As market surveys do not provide adequate or objective information about the
relationship of a jurisdiction’s costs to its fees, these steps ensure we provide the City
with the most amount of information possible.
Deliverable Comparative Graphs (included in Draft Report)
Meetings None
Task 6 Review / Revise Fee Study Results
Because the analysis of fees for service is based on estimates and information provided
by City and contract staff, all participants must be comfortable with our methodology and
the data they have provided. Once the Department agrees that the analysis reflects the
reasonable costs of providing services, City management will have an opportunity to
review the results.
Deliverable Revised Draft Results
Meetings None
Task 7 Prepare a Draft User Fee Study Report
Upon conclusion of the fee study, we will prepare a detailed report summarizing the
results of each of the previous work tasks described above. This report will include:
• A succinct executive summary discussing the study, methodology, and the results.
• A narrative describing the services included in the study.
Proposal to Conduct a Cost Allocation Plan and Citywide Fee Study Diamond Bar, CA
Matrix Consulting Group 24
• A section on proposed modifications to the current fee schedule, including removal
or addition of new fees for service.
• A section on per unit results for each fee included in the analysis, and annual
results where workload data is available.
• A comparative survey section outlining key fees and their comparison to other
local jurisdictions and contextual information regarding budget, staffing, and when
they last conducted fee studies.
The draft report will be provided to City staff for any edits, comments, or revisions.
Deliverable Draft Fee Study Report
Meetings None
Task 8 Master Fee Schedule and Backup Documentation / Future Updates
Once the final user fee study report is approved, the project team will develop a master
fee schedule, consolidating all fees in a singular location. The master fee schedule will
include a numbering system, the department name, the fee title, the unit of application,
the current fee, the total cost per unit calculated through the study, the difference, the cost
recovery, the relevant rule / regulation that applies to the fee type, the staff recommended
fee, and staff recommended cost recovery level. This attachment is extremely helpful for
staff as part of the staff report provided to the City Council upon adoption.
During this task, we will also provide the City with backup Excel documentation for the
fees, as well as the ability to include annual escalators to set up future fee increases.
Deliverable Master Fee Schedule and Backup Documentation
Meetings None
Task 9 Finalize Fee Study Report
Any edits or revisions to the draft user fee study report will be incorporated into the
finalized fee study report. This finalized fee study report will include all elements of the
draft fee study report and any additional cost recovery considerations and policy
considerations for the Council’s review.
Deliverable Final Fee Study Report
Meetings None
Proposal to Conduct a Cost Allocation Plan and Citywide Fee Study Diamond Bar, CA
Matrix Consulting Group 25
Schedule
Studies of this nature typically take approximately 4-5 months (20 weeks) to complete.
The following table outlines our proposed project schedule on a task-by-task basis.
Task
Month
1 2 3 4 5
Project Wide Tasks
Data Collection
Study Objectives
Presentations
Cost Allocation Plan
Interview Staff and Gather Data
Review Allocation Metrics
Structure Draft Full Cost Plan
Finalize Full Cost Plan
Citywide Fee Study
Current & Potential Fees
Data Workshops
Fully Burdened Hourly Rates
Total Cost Analysis
Comparative Survey
Review/Revise Results
Draft Fee Study Report
Prepare Final Report
Develop Master Fee Schedule
The City is looking for implementation on July 1, 2025; this means that fees must be
finalized by January 1, 2025. The City is anticipating an award date in March / April 2024.
If the City desires to utilize FY24-25 budget information, we recommend that the project
commence in May / June 2024 to allow the use of the most accurate data in the study.
Proposal to Conduct a Cost Allocation Plan and Citywide Fee Study Diamond Bar, CA
Matrix Consulting Group 26
E Cost of Services
The Matrix Consulting Group proposes to perform the tasks and services associated with
the development of a Cost Allocation Plan and Citywide User Fee Study for a fixed-price
not-to-exceed fee of $63,450. The following table breaks our proposed project cost by
estimated hours per task and position.
Project
Executive
Project
Manager Analyst
Total Cost
Project-Wide Tasks
Data Collection 2 2 2 $1,050
Study Objectives 2 0 0 $500
Presentation of Fee Results 6 2 0 $1,800
Project-Wide Subtotal 10 4 2 $3,350
Cost Allocation Plan
Interview Staff and Gather Data 4 2 2 $1,550
Review Allocation Metrics 4 2 6 $2,050
Structure Draft Full Cost Plan 2 4 10 $2,350
Final Full Cost Plan 4 2 6 $2,050
Cost Analysis Subtotal 14 10 24 $8,000
Comprehensive Fee Study Tasks
Current & Potential Fees 2 8 8 $2,700
Data Workshops 4 12 12 $4,300
Fully Burdened Hourly Rates 6 16 20 $6,400
Total Cost Analysis 8 30 36 $11,000
Comparative Survey 2 6 24 $4,400
Review/Revise Results 8 14 18 $6,350
Draft Fee Study Report 12 20 24 $9,000
Prepare Final Report 6 10 12 $4,500
Develop Master Fee Schedule 4 8 10 $3,450
Fee Study Subtotal 52 124 164 $52,100
Total Hours 76 138 190
Hourly Rate $250 $150 $125
Total Professional Fees $19,000 $20,700 $23,750 $63,450
Total Project Cost $63,450
This price is a fixed, not-to-exceed price contract, inclusive of all travel and any other
expenses. Our typical practice is to bill for hours worked monthly. If any additional
services are required, they will be billed at the hourly rates noted.
Proposal to Conduct a Cost Allocation Plan and Citywide Fee Study Diamond Bar, CA
Matrix Consulting Group 27
F Insurance
We understand that Proof of insurance requirements addressed in the professional
services agreement of the City’s RFP will be required by the selected Consultant.
Proposal to Conduct a Cost Allocation Plan and Citywide Fee Study Diamond Bar, CA
Matrix Consulting Group 28
G Consultant Services Agreement
The Matrix Consulting Group agrees to the City’s Consultant Services Agreement terms
and conditions.