Loading...
HomeMy WebLinkAboutDiamond Bar Proposal 4-26-23 v1.pdf PROPOSAL FOR Windmill/Willow Room Audio Visual & Production Control Room Systems Upgrade Project April 26, 2021 September 22, 2022 Page 2 of 49 CITY OF DIAMOND BAR Windmill/Willow A/V PCR Systems Upgrade Project Table of Contents Executive Summary................................................................................................................................... 3 Statement of Qualifications ...................................................................................................................... 4 Project/Firm Experience ....................................................................................................................... 4 Project References: ............................................................................................................................... 4 System Documentation Examples .......................................................................................................... 5 Use Case Workflow ................................................................................................................................... 6 Workflow ...................................................................................................................................................... 7 Scope of Work .......................................................................................................................................... 10 Project Assumptions ............................................................................................................................ 13 Implementation and Migration Planning ............................................................................................... 14 Work Plan .................................................................................................................................................. 15 Labor Rate Schedule........................................................................................................................... 16 Project / Manpower Loading Schedules ........................................................................................... 17 Sample Change Order form ............................................................................................................... 17 Warranty Terms ................................................................................................................................... 18 Holiday Schedule ................................................................................................................................. 18 Dispute Resolution............................................................................................................................... 18 Personnel Problems ........................................................................................................................ 18 Project Issues and Disputes ........................................................................................................... 18 Equipment pricing .................................................................................................................................... 19 Organizational Chart and Team Identification ..................................................................................... 28 Appendix A ................................................................................................................................................ 29 Project Schedule and Manpower Loading ........................................................................................... 29 Manpower Loading – AV Presentation Systems ............................................................................ 29 Manpower Loading – TV Broadcast Production Systems ............................................................. 29 Appendix B ................................................................................................................................................ 30 Sample Change Order form ................................................................................................................... 30 Appendix C ............................................................................................................................................... 31 Sample Contract Terms and Conditions .............................................................................................. 31 September 22, 2022 Page 3 of 49 CITY OF DIAMOND BAR Windmill/Willow A/V PCR Systems Upgrade Project Executive Summary Artistic Resources Corporation (ARC) is very pleased to be considered as a potential system integration partner to City of Diamond Bar for the design and install a comprehensive state of the art all-inclusive technology solution. ARC feels we are an ideal match for the City of Diamond Bar, based on our extensive experience in the design and deployment of high-end, meeting and presentation facilities, coupled with our deep experience in the workings of municipal and governmental communications systems. ARC understands the challenges for the current City of Diamond Bar operations with pandemic adjustments and a diversely located participant base. We have advised many clients on the layout of facilities to improve and streamline production workflow and will, if appointed, give specific effort to aiding the City of Diamond Bar, and their operations team, to ensure that the work areas in the new facility are positioned to enable the most efficient workflow. In our mind, the second, most critical, requirement will be the migration of the existing operation and equipment while minimizing downtime and without jeopardizing the regular production. We have extensive experience in this area and will address this matter in more detail in a later section of this response. ARC strongly believes that the best production work environment is one where the on-camera talent feels comfortable and relaxed in performing their tasks. An environment where the technology gets in the way is not conducive to a proficient and professional outcome. ARC is not just another engineering-based integrator. We have a solid grounding in the operational disciplines – we understand how the final system is going to be used and we design it as though we were going to be using it ourselves. This ensures that the customer’s staff will have easy ownership and be at home in the new environment. Artistic Resources Corporation is a workflow design company. Each project is provided with a design and integration team suited specifically for that client. This sharply reduces overhead and provides the best talent available to execute the work in the most cost-effective fashion. It also enables us to be responsive to our clients’ needs as well as maintaining a professional and responsible approach to the task at hand. Our support does not stop at the end of the project; training, maintenance and technical support after completion provides the client with a “no stress” solution to their needs. We are the leading choice for organizations looking to outsource their technology solutions. ARC trusts that this response meets the criteria defined by the City of Diamond Bar in their request for a proposal and we look forward to a continued and rewarding engagement. September 22, 2022 Page 4 of 49 CITY OF DIAMOND BAR Windmill/Willow A/V PCR Systems Upgrade Project Statement of Qualifications Project/Firm Experience Billing and Shipping Address: Artistic Resources Corporation 429 South Victory Blvd. Burbank, CA 91502 Phone (323) 965-5200, (818) 841-5200 Fax (323) 965-5209, (818) 841-5209 President: Michael J. Little Federal ID: # 95-4535194 Financial Reference: Date Established: $2.2 Million in Sales (2022-Forecast) State of California - October, 1989 Staff: Current Staff: 5 Date of Incorporation: State of California - May 25, 1995 Hi Staff: 35, Low Staff: 3 Insurance Reference Knight Insurance Services 1327 Foothill Blvd., La Cañada Flintridge, CA 91011 Phone (818) 662-4210 Fax (818) 662-9312 Contact: Nadine Ybarra Project References: City of Inglewood 3300 N. San Fernando Burbank, CA 91504 Contact: Josh Howe Phone (310) 412-8791 Consulting, Design, and Deployment and Maintenance for Multi Camera television System with Campus wide interactive auditoriums for Live cablecast, streaming and archive 1.1M City of Rancho Cucamonga 3300 N. San Fernando Burbank, CA 91504 Contact: William Wittkopf Phone (909) 774-4101 Consulting, Design, and Deployment and Maintenance for Multi Camera television System with Campus wide interactive auditoriums for Live cablecast, streaming and archive 850K City of Santa Clarita 23900 Valencia Blvd. Santa Clarita, CA Contact: Evan Thomason Phone (661) 286-4167 Consulting, Design, and Deployment and Maintenance for Multi Camera television System with Campus wide interactive auditoriums for Live cablecast, streaming and archive $450 K Encompass Digital 2930 W Alameda Blvd. Burbank, CA 91505 Contact: David Loud Phone (213) 718-3907 Consulting, Design, and Re-Location and Deployment for 180 Channels of Teleport Services. Machine Room, Master Control, Robotic Playout, Worldwide Data Delivery Services $6.1 M Comcast 6314 Arizona Westchester, CA 90045 Contact: Renard Ricks Phone (310) 618-5762 Consulting, Design, and Deployment Multiple Projects- Mobile Truck, 3 Production Studios, Editing Suites $1.3 M Ascent Media 2939 W. Alameda Blvd. Burbank, CA 91502 Contact: Kurt Liddi Phone (203) 965-6350 Consulting and Deployment for Multiple Projects-80 channel satellite uplink/downlink teleport, Syndication, Post $ 16 M TVN Entertainment 2901 W. Alameda -7th Floor Burbank, CA 91505 Contact: Tony Ciesniewski Phone (818) 521-5010 Panda Shopping Channel Redesign and integrate 6 camera- 24/7 channel studio and master control $400 K Tribune Entertainment 5800 Sunset Blvd Los Angeles, CA 90028 Contact: John Hensch Phone (323) 491-1911 Design, and Deployment for mobile system with 8 Cameras with 12 VTR Hi-Definition Production System $4.8 M Correspondence to be directed to Michael Little September 22, 2022 Page 5 of 49 CITY OF DIAMOND BAR Windmill/Willow A/V PCR Systems Upgrade Project Number FrmRoom FrmRack FrmEquipFrmConn FrmType ToRoom ToRack ToEquip ToConn ToType Contents V1001 COUNCIL CHAMBERS CAM-01 OUT BNC CTL RM RK-905 VPP-01 A-01 BNC CHAMBERS*CAM-01*OUT V1002 COUNCIL CHAMBERS CAM-02 OUT BNC CTL RM RK-905 VPP-01 A-02 BNC CHAMBERS*CAM-02*OUT V1003 COUNCIL CHAMBERS CAM-03 OUT BNC CTL RM RK-905 VPP-01 A-03 BNC CHAMBERS*CAM-03*OUT V1004 COUNCIL CHAMBERS CAM-04 OUT BNC CTL RM RK-905 VPP-01 A-04 BNC CHAMBERS*CAM-04*OUT V1005 CTL RM RK-904 VR-01 OUT-A BNC CTL RM RK-905 VPP-01 A-05 BNC RK-904*VR-01*OUT-A V1006 CTL RM RK-904 VR-02 OUT-A BNC CTL RM RK-905 VPP-01 A-06 BNC RK-904*VR-02*OUT-A V1007 CTL RM MON WALL IFC-01 OUT BNC CTL RM RK-905 VPP-01 A-07 BNC MON WALL*IFC-01*OUT V1008 COUNCIL CHAMBERS CONS-01 OUT BNC CTL RM RK-905 VPP-01 A-08 BNC CHAMBERS*CONS-01*OUT V1009 COUNCIL CHAMBERS CONS-02 OUT BNC CTL RM RK-905 VPP-01 A-09 BNC CHAMBERS*CONS-02*OUT V1010 COUNCIL CHAMBERS CONS-03 OUT BNC CTL RM RK-905 VPP-01 A-10 BNC CHAMBERS*CONS-03*OUT V1011 CTL RM RK-905 SCLR-01 SDI OUT BNC CTL RM RK-905 VPP-01 A-11 BNC RK-905*SCLR-01*SDI OUT V1012 CNF-901 RK-910 CNV-922 OUT BNC CTL RM RK-905 VPP-01 A-12 BNC RK-910*CNV-922*OUT V1013 CTL RM RK-905 SWR-01 ME-01-PGM BNC CTL RM RK-905 VPP-01 A-13 BNC RK-905*SWR-01*ME-01-PGM V1014 CTL RM RK-905 SWR-01 ME-02-PGM BNC CTL RM RK-905 VPP-01 A-14 BNC RK-905*SWR-01*ME-02-PGM System Documentation Examples September 22, 2022 Page 6 of 49 CITY OF DIAMOND BAR Windmill/Willow A/V PCR Systems Upgrade Project PROGRAM RECORD AUX 2 ALS CHAMBERS MONITORS GRFX / PPT M/E 2 PROGRAM AUX 1 PROGRAM M/E 1 RECORDINGS PRESENTATION SOURCES PRODUCTION SWITCHER AUDIO FOLDBACK Page 1 SIGNAL FLOW -Overview COPYRIGHT 2022 ARTISTIC RESOURCES CORPORATION INFORMATION CONTAINED HEREIN IS PROPRIETARY AND MAY NOT BE USED IN ANY FORM WITHOUT THE EXPRESS WRITTEN CONSENT OF ARTISTIC RESOURCES CORP. 4K / HD CAMERAS TYPICAL MEETING SIGNAL FLOW AUDIO DSP AUDIO SOURCES MICROPHONES CALL-IN CALL-IN AUDITORIUM SPEAKERS VDR VDR PRESENTATION ZOOM / ETC PTZ CAMERAS Use Case Workflow FEATURES: · Multi-viewers (2) routable to any destination · Cameras assignable to anywhere · Controls capable on any laptop · Remote operation of system from anywhere · Voting System · Speaker timer module · Dais TV/Monitoring · Mix minus fold back to each Dais or staff participant · Selectable discreet feeds to all monitors on premise · Redundant control points · VOIP remote call in ability · Zoom, Webex, Teamviewer capable · Agenda items published on monitors · Clip / Grahics playback to chambers · PPT presentations (wired or wireless) via PCs · Wireless presenter option · Live television cablecast · Live streaming worldwide · Remote control and streaming of individual cameras · Fast (6-8 Weeks) ARO delivery September 22, 2022 Page 7 of 49 CITY OF DIAMOND BAR Windmill/Willow A/V PCR Systems Upgrade Project Workflow OPERATION: The City Clerk can lead the pacing of the meeting in coordination with the Mayor or whomever presides over the meeting agenda. The technical control of meeting elements within chambers is completed by one person without having to make it their sole activity for each event. An additional operator elsewhere (control room, etc.) may serve as a supporting operator of the technical elements. This approach affords great consistency with protocol and can express the tone and rhythm that is signature for the meeting entity. With the ability to recall setups for different bodies such as Planning Commission, Parks and Recreation, Library Commission, Public Safety Commission, Traffic and Transportation Commission as well as others, each body will maintain their own signature within the City charter. The entire production can be operated as a standalone with no technical assistance, locally operated equipment by skilled staff or fully operated remotely via staff or contracted entities. September 22, 2022 Page 8 of 49 CITY OF DIAMOND BAR Windmill/Willow A/V PCR Systems Upgrade Project (5) 4K/HD CAMS COPYRIGHT 2022 ARTISTIC RESOURCES CORPORATION INFORMATION CONTAINED HEREIN IS PROPRIETARY AND MAY NOT BE USED IN ANY FORM WITHOUT THE EXPRESS WRITTEN CONSENT OF ARTISTIC RESOURCES CORP. CLERK 40X40 MATRIX ROUTER ATEM PRODUCTION SWITCHER CHAMBERS MONITORS DAIS MONITORS CAMERAS HDSDI PIX + AUDIO DIG VIDEO ANALOG AUDIO HDBASE-T ENCODED NET STAFF HDSDI PIX ONLY ZOOM PIX + AUDIO PIX + AUDIO PIX + AUDIO INGEST/PLAYOUT SYSTEM PIX ONLY PIX ONLY PGM ME2 GFX ZOOM (5) CAMS (3) PCS GFX CHAMBERS PROGRAM STREAM TO VIMEO STREAM TO BCAST GATEWAY (GFX) PIX + AUDIO SIGNAL LEGEND VIDEO RECORD/PLAY VIDEO RECORD/PLAY CHAMBERS PROGRAM PIX + AUDIO Page 1 SIGNAL FLOW – Detail 1 Workflow - Cont. September 22, 2022 Page 9 of 49 CITY OF DIAMOND BAR Windmill/Willow A/V PCR Systems Upgrade Project Workflow - Cont. The heart of the audio system utilizes a mix minus signal management. This benefits all through a higher gain before feedback result. For participants and audience alike, the impression is greater clarity and intelligibility for microphones and media. September 22, 2022 Page 10 of 49 CITY OF DIAMOND BAR Windmill/Willow A/V PCR Systems Upgrade Project Scope of Work ARC understands the scope of work of this project to be the design, equipment procurement, installation, and commissioning for the City of Diamond Bar. The scope will consist of: · Conceptual design update based on value engineering · Detailed engineering design to single line detail, based on the final, agreed-to equipment list · Advise ownership on power, heating / cooling, and acoustic requirements for the various production work areas · Develop implementation plan · Produce a complete wire run list · Pre-assemble cables off site · Build certain sub-system pre-assemblies off site as may be appropriate · De-commissioning of existing systems · Onsite installation · Integrate equipment per implementation plan · System testing · System commissioning (in collaboration with vendor’s technical support engineers as may be deemed appropriate) · System training · Provide technical support during City of Diamond Bar’s staff training exercises · Provide technical support during initial live operations (120 Days) It should be noted that ARC does not provide extensive operational training on individual items of equipment. This must be arranged between City of Diamond Bar and the vendors in question. ARC is happy to help facilitate this. As noted elsewhere in this document, there will be a period of time towards the end of the project when both the new equipment and the existing equipment will need to be functioning in parallel, before the final switch-over. A migration plan will be drawn up, in collaboration with all affected parties, that will outline how and when certain crucial pieces of equipment will be commissioned. September 22, 2022 Page 11 of 49 CITY OF DIAMOND BAR Windmill/Willow A/V PCR Systems Upgrade Project Scope of Work - Cont. For this project ARC shall provide: 1. Project management for the life cycle of the project. Management functions to be provided are: · ARC Project Manager; acting as the single point of contact for the project · Management of ARC project labor and services · Management of ARC project equipment and materials · Coordination of the project plan with the City of Diamond Bar · Regular Client meetings throughout the course of the project, either in person or by conference call, the frequency of meetings to be determined at the start of the project · Problem solving and established escalation process for resolution 2. Initial consulting services for: · Room adjacencies · Power, heat and ventilation requirements on a room-by-room basis · Suitable acoustic levels for appropriate rooms 3. System design services and the provision of construction documentation (see item 4) in three phases: · Conceptual design; review and modify conceptual design in alignment with the value engineering discussions, conceptual design review and approval · Critical design, review and approval · Construction drawing package 4. A set of documentation as follows: · Master Drawing List (Index) o (AutoCAD 2015) · Master Equipment List o (MS Excel) · Equipment to be procured (by ARC) o (MS Excel) · Rack and Console Equipment Layouts o (AutoCAD 2015) · Studio Breakout Panel Layouts o (AutoCAD 2015) · Single Line Drawings for Video, Audio, Communications, and Control o (AutoCAD 2015) · Cable Run Lists o (MS Excel) · Jack field layouts and labeling o (MS Excel / AutoCAD 2015) · Review of the standard ARC cable, patch panel and button labeling September 22, 2022 Page 12 of 49 CITY OF DIAMOND BAR Windmill/Willow A/V PCR Systems Upgrade Project Scope of Work - Cont. 5. Procurement services for the equipment. Long lead items (major equipment) may need to be designated and authorized for purchase as early as possible in the design process. 6. Installation services including a partial pre-build within ARC’s facilities if necessary. The racks, patch panels, and selected systems may be pre-built to shorten the time spent on site. · Clean rooms are expected to be available for on-site installation by Mid October, 2022 7. The coordination, staging and performance of the following: · Pre-building and cabling of the consoles and racks if required · Dismantling of pre-built consoles, racks and attached cables for packing · Shipping of the pre-built systems to the City of Diamond Bar · Installation of the new racks and consoles · Installation and wiring of the equipment · Final testing and commissioning of the systems ARC strongly recommends that principle technical staff from the City of Diamond Bar be available to assist during the test and commissioning stages as our experience shows that this is an ideal way to ensure the City of Diamond Bar staff are fully conversant with the system and its operation. 8. The management of the procurement, shipping, and receiving of the system related materials. · Full asset inventory package can be provided 9. Provide an as-built drawing package. September 22, 2022 Page 13 of 49 CITY OF DIAMOND BAR Windmill/Willow A/V PCR Systems Upgrade Project Project Assumptions The following assumptions are made by ARC pertaining to this project for the City of Diamond Bar: 1. Plenum Cable 1.1. All cable will be run in client supplied conduit or otherwise non-plenum rated spaces. All material pricing assumes non-plenum rated cabling. Should the building or fire codes require plenum rated cables an additional materials charge will be made. 2. Conduit and Electrical Power Provision 2.1. The client’s General Contractor (GC) will supply all conduit or cable tray for all cables located outside any raised floor area. 2.2. The client’s General Contractor (GC) / Electrician will provide appropriately rated and located electrical outlets for all systems to be installed by ARC. 3. California Seismic Regulations 3.1. ARC is very familiar with the State of California codes on seismic bracing for technical installations and will ensure that any installation is suitably compliant. 4. City of Diamond Bar Fire Inspection 4.1. ARC is very familiar with the California Fire code for electrical equipment and, should the new location fall under the jurisdiction of the City of Diamond Bar, will ensure that the installation will pass the fire inspection. 5. Removal of old wiring, equipment 5.1. The responsibility for removing old wiring and de-commissioning old equipment from the existing location installation has been included in scope. Materials and equipment removed from operation shall be delivered to the client for disposition. ARC generally assumes that the responsibility for this lies with the client. 6. Union Issues 6.1. ARC has been advised of a prevailing wage condition. Any other on-site union jurisdiction that would affect the hiring and deployment of engineering or installation labor, shall enable ARC the right to re-quote the labor portion of this proposal to include the appropriate union staff and pay rates. September 22, 2022 Page 14 of 49 CITY OF DIAMOND BAR Windmill/Willow A/V PCR Systems Upgrade Project Implementation and Migration Planning ARC’s immediate task, upon being awarded the contract, will be to sit down with the City of Diamond Bar and their technical staff to initiate a “value engineering” session. It is anticipated that this will be an iterative series of meetings, the goal of which will be to refine the equipment list and design criteria to ensure that the final systems design will (a) meet the technical needs of the City of Diamond Bar’s production, both now and in the future and (b) produce a fiscally responsible deployment that avoids overspending on equipment and services and offers a cost effective solution without compromising the production integrity of the City content. Once the system design has been ratified by all parties, ARC’s senior engineering staff will liaise with any architect and/or general contractor regarding room adjacencies, cable paths, power requirements, HVAC requirements and acoustic treatments where necessary. It should be noted that ARC does not purport to be either, electrical engineers, HVAC engineers, nor acousticians, but are fully able to advise the appropriate individuals of the specific requirements for these services on a room-by-room basis. Design Review meetings will be held between ARC project management and principle designers, users, and technical staff from the City of Diamond Bar to ensure that the technical design meets the requirements of the City of Diamond Bar and that the project timeline is being adhered to. Although a large proportion of the equipment as specified in the proposal is new, there are certain sub-systems, which will be migrated from the legacy system. Legacy equipment shall be evaluated, cleaned, and inspected prior to re-installation. The client shall be advised of the equipment condition and a determination to be made by client as to its re-use. ARC understands the challenges related to moving a fully functioning, operational facility from one location to another in the least amount of time and with the least disruption to the production work patterns and requirements. Having performed similar tasks for previous clients we feel confident that an efficient and workable migration plan can be formulated. ARC will work closely with the City of Diamond Bar production staff to identify which sections of the existing infrastructure will be migrated to the new design, and whether any or all of these components can be re-located ahead of the switch-over period. It is expected that most critical to this migration will be the presentation systems. It would be ARC’s aim to move a few of these ahead of the switch-over period to allow training and rehearsals to be held in as real a scenario as possible without jeopardizing the existing production. The full cooperation of the City of Diamond Bar production staff will be required during this period. Our goal will be to develop a detailed migration plan that identifies equipment by function and existing rack location, and a date when that particular piece may be moved. This plan will be strictly adhered to in order to ensure that nothing is removed from the existing operation that will jeopardize the production on a daily basis. September 22, 2022 Page 15 of 49 CITY OF DIAMOND BAR Windmill/Willow A/V PCR Systems Upgrade Project Work Plan - Typical September 22, 2022 Page 16 of 49 CITY OF DIAMOND BAR Windmill/Willow A/V PCR Systems Upgrade Project Labor Rate Schedule The following prevailing wage labor rates will apply to this project: Classification Hourly Daily (8) Daily (10) Minimum Daily Consultation $355/hr $2840 N/A .25 hour Engineer $195/hr $1560 $2145 4 hours Project Manager $175/hr $1400 $1925 4 hours Supervisor $155/hr $1240 $1705 4 hours Wireman $125/hr $1000 $1375 4 hours Utility / Apprentice $85/hr $680 $935 4 hours CONTRACT SERVICE RATES and CONDITIONS Standard support is scheduled service between the hours of 9 am – 6 pm M-F (holidays excluded) Phone support- 2hr min. + dispatch charge ($75.00) Travel, Lodging, Meals are invoiced as cost +10% Travel is to be via business class or better Travel Days less than 8 hours are calculated at ½ RATE-1 Travel Days 8 hours or greater are calculated at ½ RATE-2 Rate-1 – Regular Daily / Weekly Rate Rate-3 – 2 times Rate Rate-2 – 1.5 times Rate Rate-4 – 2.5 times Rate - 1) Overtime for Daily is equal to RATE-2 in excess of 8 hours per day or 40 hours per week + 1) After Hours Support billed at Holiday Rates - 2) Overtime for Daily is equal to RATE-3 in excess of 12 hours per day or 60 hours per week + 2) Per Diem 30-50 mile radius from ARC main office - $50/day - 3) Overtime for Weekly is equal to RATE-2 in excess of 50 hours per week + 3) Per Diem beyond a 50 mile radius from ARC main office - $100/day - 4) Holidays are calculated at RATE-4 * 1) Lodging is calculated at $150/day for metro areas under 30k population - 5) Sixth day is calculated at RATE-2 * 2) Lodging is calculated at $210/day for metro areas under 750k population - 6) Seventh day is calculated at RATE-3 * 3) Lodging is calculated at $275/day for metro areas over 750k population January 1 - New Year's Day 3rd Monday in January - Martin Luther King, Jr. Day 3rd Monday in February - Presidents Birthday Last Monday in May - Memorial Day July 4 - Independence Day 1st Monday in September - Labor Day November 11 - Veterans' Day 4th Thursday in November - Thanksgiving 4th Friday in November – Day after Thanksgiving December 25 - Christmas Day September 22, 2022 Page 17 of 49 CITY OF DIAMOND BAR Windmill/Willow A/V PCR Systems Upgrade Project Project / Manpower Loading Schedules A project schedule and associated manpower loading schedule are attached as Appendix A below. Sample Change Order form This is attached as Appendix B below. All changes in Scope will be documented and approved in writing by the Client in advance of such changes being provided by ARC. Scope changes shall include, but are not limited to: · Changes to the Project, Scope of Work or the Delivery Schedule. This includes changes to the project timeline · Revisions to, or providing additional, drawings, documentation, equipment or materials caused by instructions that vary from instructions or written approvals previously given by the Client · Providing services relating to future facilities, systems and equipment · Coordinating work not performed by ARC · Providing services made necessary by major defects or deficiencies, or delays in the work of, or goods, facilities or services provided by, parties other than ARC or by performance failure(s) by either the Client or others not directly engaged by ARC · Providing consultation and services concerning replacement of any work damaged by fire or other cause during construction · Providing services caused by unsafe, incomplete or inadequately prepared site conditions · Providing additional services or delays caused by issues related to labor agreements not within the direct control of ARC · Supply chain delays or economic conditions driven equipment model changes owing to the manufacturer conditions also, shall merit a change order September 22, 2022 Page 18 of 49 CITY OF DIAMOND BAR Windmill/Willow A/V PCR Systems Upgrade Project Warranty Terms This is covered by clause 19 of the ARC contract terms and conditions, attached as Appendix C. Artistic Resources Corporation, being a locally-based organization, agrees to provide a four (4) hour response time to any emergency call during the warranty period provided the call is related to system failures, not specific equipment failures, with problem resolution within forty-eight (48) hours. Holiday Schedule ARC observes the standard Federal holidays as follows: 2023: New Year’s Day January 2 (in lieu) Martin Luther King Day 3rd Monday in January President’s Day 3rd Monday in February Memorial Day Last Monday in May Independence Day July 4 Labor Day 1st Monday in September Veteran’s Day November 11 Thanksgiving 4th Thursday in November Christmas Day December 25 Individual vacation schedules for key staff are not currently available at the time of writing. Dispute Resolution It is never the intention of ARC or any 3rd party to get into a situation where a dispute arises, either between ARC and the customer or within the ARC workforce. Nevertheless, procedures exist to mitigate and resolve problems as early as possible. Personnel Problems The Project Manager has ultimate control of the project and the assigned staff. It is his or her responsibility to arbitrate in the event of any personnel problems. These must be bought to the Project Manager’s attention as soon as possible by the appropriate supervisory staff (Lead Engineer or Installation Supervisor). The Project Manager attempts to resolve the matter as quickly as possible. In the event that a resolution cannot be achieved at this level, the matter will be escalated to the company president for final judgment. Project Issues and Disputes This is covered by clause 7 of the ARC contract terms and conditions, attached as Appendix C. September 22, 2022 Page 19 of 49 CITY OF DIAMOND BAR Windmill/Willow A/V PCR Systems Upgrade Project Equipment pricing As stated earlier, it would be ARC’s initial task to set up a series of value engineering meetings with appropriate staff from CITY OF DIAMOND BAR and ARC as soon as possible after contract award to refine the equipment list and conceptual design. It is expected that these meetings might result in changes to any combination of vendors, model numbers, model specifications, quantities and prices. ARC, in advance of those meetings, has studied the conceptual design and equipment list as included in the RFP in some detail. There are a number of alternative suppliers of equipment who may be able to offer functional equivalency at lower prices. It will not be ARC’s aim to reduce or otherwise impede the required functionality of the system by making substitutions without the full agreement of CITY OF DIAMOND BAR. ITEM QTY MFR MODEL ARC PRICE EXT COST DELIVERY DATE 1 11 CRESTRON DM-TX-4KZ-100-C-1G-B-T $583.00 $6,413.00 Q1 24 2 2 CRESTRON DMF-CI-8 $1,166.00 $2,332.00 Q1 24 3 11 CRESTRON DM-NVX-E760C $1,107.70 $12,184.70 Q1 24 4 1 CRESTRON DM-NVX-E30C $757.90 $757.90 Q1 24 5 3 CRESTRON DM-NVX-D30C $757.90 $2,273.70 Q1 24 6 7 CRESTRON DM-NVX-D30 $757.90 $5,305.30 Q1 24 7 1 CRESTRON DM-NVX-E30 $757.90 $757.90 Q1 24 8 0 CRESTRON PRO4 $0.00 $0.00DISCONTINUED 8 1 CRESTRON CP4N $1,632.40 $1,632.40 Q1 24 9 1 CRESTRON DM-NVX-DIR-80 $2,915.00 $2,915.00 IN STOCK 10 1 CRESTRON CEN-GWEXER $262.88 $262.88 Q1 24 11 1 CRESTRON TST-902 $2,215.40 $2,215.40 Q3 23 12 1 CRESTRON TST-902-BTP $87.98 $87.98 Q2 23 13 1 CRESTRON TST-902-DSW $874.50 $874.50 IN STOCK 14 2 CRESTRON TSW-770-B-S $1,049.40 $2,098.80 Q4 23 16 1 CRESTRON TS-770-B-S $1,166.00 $1,166.00 Q4 23 15 2 WALL-SMART 012-1-832-BL $472.76 $945.52 Q2 23 WINDMILL/WILLOW ROOM AUDIO VISUAL & PRODUCTION CONTROL ROOM SYSTEMS UPGRADE PROJECT CITY PROJECT NO. FP 23504 September 22, 2022 Page 20 of 49 CITY OF DIAMOND BAR Windmill/Willow A/V PCR Systems Upgrade Project Equipment pricing - Cont. September 22, 2022 Page 21 of 49 CITY OF DIAMOND BAR Windmill/Willow A/V PCR Systems Upgrade Project Equipment pricing – Cont. September 22, 2022 Page 22 of 49 CITY OF DIAMOND BAR Windmill/Willow A/V PCR Systems Upgrade Project Equipment pricing – Cont. September 22, 2022 Page 23 of 49 CITY OF DIAMOND BAR Windmill/Willow A/V PCR Systems Upgrade Project Equipment pricing – Cont. September 22, 2022 Page 24 of 49 CITY OF DIAMOND BAR Windmill/Willow A/V PCR Systems Upgrade Project Equipment pricing – Cont. September 22, 2022 Page 25 of 49 CITY OF DIAMOND BAR Windmill/Willow A/V PCR Systems Upgrade Project Equipment pricing – Cont. September 22, 2022 Page 26 of 49 CITY OF DIAMOND BAR Windmill/Willow A/V PCR Systems Upgrade Project Equipment pricing – Cont. September 22, 2022 Page 27 of 49 CITY OF DIAMOND BAR Windmill/Willow A/V PCR Systems Upgrade Project EXHIBIT – SIGNATURE PAGE NOTE: This affidavit is included as a portion of the proposal requirement in the Request for Proposal. BIDS DUE: Submit the entire Proposal via PlanetBids by 2:00 PM on April 26th, 2023. The proposals shall be sent to: FROM: Artistic Resources Corporation Company Michael Little (President) Contact 323.965.5200 Phone 323.965.5209 Fax arcorp@artisticresources.com Email September 22, 2022 Page 28 of 49 CITY OF DIAMOND BAR Windmill/Willow A/V PCR Systems Upgrade Project Organizational Chart and Team Identification Michael Little President Martin Grahl Technical Services Manager John Hartwell Engineering Services Manager Niura Band Administrative Services Niura Band Purchasing Niura Band AR/AP Project 1 Project Manager Project 1 Sr Engineer Project 1 Technician 1 Project 1 Technician 2 Project 1 Technician 3 Project 1 Technician 4 Project 1 Project 1 Engineer Project 1 Supervisor Project 2 Project Manager Project 2 Sr Engineer Project 2 Technician 1 Project 2 Technician 2 Project 2 Technician 3 Project 2 Technician 4 Project 2 Project 2 Engineer Project 2 Supervisor Project 3 Project Manager Project 3 Sr Engineer Project 3 Technician 1 Project 3 Technician 2 Project 3 Technician 3 Project 3 Technician 4 Project 3 Project 3 Engineer Project 3 Supervisor Project 4 Project Manager Project 4 Sr Engineer Project 4 Technician 1 Project 4 Technician 2 Project 4 Technician 3 Project 4 Technician 4 Project 4 Project 4 Engineer Project 4 Supervisor Laurie Cortez Legal Nadine Ybarra Risk Management Adrian Stern Accounting January 2022 Page 1 Artistic Resource Corporation ORGANIZATION CHART September 22, 2022 Page 29 of 49 CITY OF DIAMOND BAR Windmill/Willow A/V PCR Systems Upgrade Project Appendix A Project Schedule and Manpower Loading The following pages show a tentative project schedule and estimated manpower loading, based on our current knowledge of the project. Manpower Loading – AV Presentation Systems - TBD Manpower Loading – TV Broadcast Production Systems - TBD September 22, 2022 Page 30 of 49 CITY OF DIAMOND BAR Windmill/Willow A/V PCR Systems Upgrade Project Appendix B Sample Change Order form CHANGE ORDER – ______________ CONTRACT ____________ From Company Date: Street Job Name: City,State,Zip Job Type: Prepared By: To Company Work Begin: Street Work Complete: City,State,Zip Schedule Impact: Description: The work covered by this order shall be performed under the same terms and conditions as that included in the original. Approved: Company Labor: Name Equipment: Title Materials: Date Reason: Approved: Company Name Original Amount:: Title Change Amount: Date Net Change : September 22, 2022 Page 31 of 49 CITY OF DIAMOND BAR Windmill/Willow A/V PCR Systems Upgrade Project Appendix C Sample Contract Terms and Conditions The following pages contain the standard ARC contract with terms and conditions, some of which are referenced elsewhere. AGREEMENT made as of the ____ day of ________ in the year________ (In words, indicate day, month and year) BETWEEN: Company Name: _________________________ Address: _________________________ _________________________ _________________________ _________________________ hereby referred to as the “Owner” And Company Name: Artistic Resources Corporation Address: 429 S Victory Blvd Burbank, California, 91502 U.S.A. hereby referred to as the “Contractor” For this Project: Description of Project: ________________________________________________________________ ________________________________________________________________ Shipping Address: _________________________ _________________________ _________________________ _________________________ With a Contracted Value of: ____________________________________ Dollars ($____________.00), which amount represents the total price of all Equipment, Software, Work, and other components comprising the System, exclusive of taxes and Owner Furnished Products, provided that the Purchase Price amount may be adjusted in accordance with the terms and conditions contained herein relating to the costs, including variation or modification thereof, of the Equipment, Software, System, and/or Work. September 22, 2022 Page 32 of 49 CITY OF DIAMOND BAR Windmill/Willow A/V PCR Systems Upgrade Project The Owner and Contractor hereby agree as follows. 1 COMPLETE AGREEMENT 1.1 This Agreement shall not be binding upon Contractor, unless signed by an authorized representative of the Owner and signed by an officer of Contractor. 1.2 Neither the Owner nor Contractor shall assign this agreement without the written consent of the other, except that the Owner may assign this Agreement to an institutional lender providing financing for the Project. In such an event, the lender shall assume the Owner’s rights and obligations under this Agreement. Contractor shall execute all consents reasonably required to facilitate that assignment. 1.3 This Agreement represents the entire and integrated agreement between the Owner and Contractor and supersedes all prior negotiations, offers, counteroffers, representations or agreements, either written or oral. 1.4 This Agreement may be amended only by written instrument signed by both the Owner and Contractor. 1.5 This Agreement shall be construed and enforced in accordance with the laws of the State/Province of ____________ having application thereto, without reference to or application of its rules governing conflicts of law. 2 CONTRACTOR’S RESPONSIBILITIES 2.1 The Contractor’s services shall be performed in accordance with the degree of professional skill and care required by applicable law and as expeditiously as is consistent with professional skill and care and the orderly progress of the Project. 2.2 The Contractor shall submit for the Owner’s approval a schedule for the performance of the Contractor’s services (per Section 15) which may be adjusted as the Project proceeds. This schedule shall include allowances for periods of time required for the Owner’s review and for approval of submissions by authorities having jurisdiction over the Project. Time limits established by this schedule approved by the Owner shall not, except for reasonable cause, be exceeded by the Contractor or the Owner. 2.3 The Contractor shall designate a representative authorized to act on behalf of the Contractor with respect to the Project. Insofar as it is reasonable, the same person shall remain consistent from project inception until completion. This representative shall be referred to as the Project Manager. 2.4 The Contractor’s work shall be neat and workmanlike and shall assign enough workers with the required skills and qualifications to the job to meet its schedule commitments as outlined at the signing of this document. 2.5 The Contractor shall coordinate and cooperate with other trades to ensure satisfactory work progress. 2.6 The Contractor shall, at its own cost and expense, comply with all State/Provincial and local laws, ordinances, rules, regulations, codes, standards, orders, notices and requirements necessary for the prosecution of the Work. 2.7 The Contractor will install all equipment in accordance with the manufacturers’ instructions unless otherwise approved by the Owner. Where these instructions are exceeded by any applicable national and local regulations, ordinances, and codes, such regulations, ordinances, and codes shall apply. September 22, 2022 Page 33 of 49 CITY OF DIAMOND BAR Windmill/Willow A/V PCR Systems Upgrade Project 2.8 Upon completion of the Work, the Contractor shall remove from the site all unused materials, containers, and equipment. The Contractor will endeavor to protect all floors, walls, and other adjacent surfaces from stains, marring or other damage. The space shall be clean and undamaged. 2.9 The Contractor is not responsible for the operation or the performance of equipment supplied by others outside this contract. The Contractor does not warrant that equipment supplied by others either can be connected to or can work satisfactorily with our system, except as specified in this document. 3 OWNER’S RESPONSIBILITIES 3.1 The Owner shall provide full information in a timely manner regarding requirements for and limitations on the Owner’s objectives, schedule, constraints and criteria. 3.2 The Owner shall furnish to the Contractor, within 10 days after receipt of a written request, information necessary and relevant for the Contractor to evaluate, give notice of, or enforce lien rights. 3.3 The Owner shall designate a representative authorized to act on the Owner’s behalf with respect to the Project. The Owner or the designated representative shall render decisions in a timely manner pertaining to documents submitted by the Contractor in order to avoid unreasonable delay in the orderly and sequential progress of the Contractor’s services. 3.4 The Owner shall furnish the services, at the Owner’s expense, of any and all consultants reasonably required for the proper execution of the project as and when requested by the Contractor. The Contractor shall be entitled to rely upon the accuracy and completeness of any information provided by these consultants 3.5 The Owner shall furnish all legal, accounting, and insurance services that may be necessary at any time for the Project to meet the Owner’s needs and interests. 3.6 The Owner shall provide prompt written notice to Contractor if the Owner becomes aware of any fault or defect in the Project, including any errors, omissions, or inconsistencies in Contractor Instruments of Service. 3.7 Prior to installation of the Equipment, the Owner shall prepare the Project site and render the Project site in a condition so as to allow the Equipment to be installed in a square and plumb manner. The Owner shall ensure that the Project site is: a) broom clean, b) free from obstructions, including separate contractors and workers, c) dust-free before and after installation of the Equipment, d) safe and secure, and e) compliant with all load requirements specified by Contractor. Further, the Owner shall ensure that the project is secure and set up for both pre-wiring and installation of the Equipment in accordance with the requirements of Contractor. The Owner shall be solely responsible for the Project site conditions, including the security, safety, and fitness of the areas in which Contractor’s services are to be performed. The Owner warrants to Contractor that the Project site is adequate and sufficient to install, use, and store the Equipment. September 22, 2022 Page 34 of 49 CITY OF DIAMOND BAR Windmill/Willow A/V PCR Systems Upgrade Project 3.8 The Owner shall provide electrical outlets, cabling, and work surfaces for the operation of the Equipment as specified by Contractor in the Construction Documents. Further, the Owner shall be responsible for compliance with all applicable laws and codes regarding the installation and subsequent use of the electrical circuits. The Owner shall be solely responsible for any unforeseen costs resulting from existing conditions at the Project site, including, but not limited to, the conditions or locations of electrical outlets or other Owner-furnished connections, including cabling. 3.9 At the time of signing of this agreement, the Owner shall have identified and provide information to the Contractor of all other equipment and connections that will interface with the Equipment to be provided by the Contractor related to this project, with the understanding that any omissions to the information provided to date may result in additional charges from the Contractor in order to accommodate such changes or omissions. 3.10 The Owner shall provide access to the Project site during normal business hours to allow Contractor to perform its services in a timely and orderly manner. Further, the Owner shall provide suitable and secure locations at the Project site for storage of the Equipment prior to installation. 3.11 The Owner shall provide a representative to accept delivery of equipment from the Contractor as required at the Project site, and shall remain liable for any loss or damage to the Equipment located at the Project site. 4 SCOPE OF SERVICES 4.1 Within the context of this document, "Approve" means review of and comment on, existing conditions or design by others. "Design" means complete design service including drawings. "Specify" means establishment of criteria for design to be done by others. 4.2 The Contractor shall provide, develop, install, and integrate audiovisual systems for the Project. The Contractor will consult with the Owner and Owner’s representatives or authorized agents in order to review and evaluate the related architectural plans and systems requirements for the project. The Contractor will make all recommendations or modifications as may be required in cooperation with the Owner, or others as directed by the Owner, and shall assist in finalizing a functional description of the system Scope to include schematic designs, design administration, preparation of a preliminary and final budget estimate of audiovisual system costs, attendance at progress meetings, and preparation of preliminary and final drawings and documentation for competitive bid if required. 4.3 The Contractor may solicit the services of a lighting and acoustical consultant to aid in the development of the design program, with this work to include specifying illumination objectives and designing lighting control. The Owner shall not have, or be deemed to have, any direct contractual relationship with any consultant hired by the Contractor, and shall not be liable to pay, or liable for the nonpayment of, the fees and costs incurred by the Contractor. 4.4 The Contractor shall inspect audiovisual systems installed in the Project and will assist the Owner in the commissioning of the audio visual systems. The Contractor will make recommendations as to training, support, and maintenance of the audiovisual systems. September 22, 2022 Page 35 of 49 CITY OF DIAMOND BAR Windmill/Willow A/V PCR Systems Upgrade Project 4.5 The Scope of Work includes the recommendation of considerations relating to window treatments, acoustical conditions, lighting conditions, AV-related HVAC and electrical loads, AV-related LAN/WAN requirements, seating plan and room layout, and any other systems or design impacting or impacted by the Audio Visual Systems specified by the Contractor. 5 DELIVERABLES The Contractor shall provide to the Owner, in organized manner, copies of the following: 5.1 Within 2 weeks of Award 5.1.1 Ratification or modification of any previously supplied (if applicable) or provision of a detailed project timeline outlining proposed Owner and Contractor milestone completion dates for the Project in order to meet the currently proposed completion date. 5.2 Product Cut Sheets as required and requested 5.3 Throughout Project 5.3.1 Shop Drawings for custom built items. 5.3.2 Control System GUI for approval 5.3.3 Change order approvals if, as, and when required (see Section 21) 5.4 Upon Completion 5.4.1 Copies of all manufacturers’ operating instructions, user guides, and other items for equipment provided by Contractor within the scope of work related to this project. 5.4.2 Schematics of all mechanical and electrical components and electrical wiring diagrams. 5.4.3 Shop drawings of all mechanical and electrical components and electrical wiring diagrams. 5.4.4 As-built cable schedule. 5.4.5 Shop drawings of all custom-built items, including manufacturer’s part numbers for commercially procured components. 5.4.6 Test documentation 5.4.7 As-built block diagrams (in non-editable format; i.e., PDF file) 5.4.8 Source Codes of any and all Control System, Audio DSP, and any other applicable custom programmed or configured equipment (see Section 6 - Intellectual property). 6 INTELLECTUAL PROPERTY 6.1 The parties agree that Contractor shall be solely entitled to all patent rights and all copyrights to any products, tools, devices, manuals, plans, drawings, customized programs and software, and anything else subject to patent or copyright (the “Intellectual Property”) invented, generated, developed, or otherwise produced by Contractor or its agents, representatives, employees, and subcontractors in connection with the performance of the Services, and shall at all times remain the property of the Contractor. The parties hereto intend and agree, however, that the Contractor shall grant a September 22, 2022 Page 36 of 49 CITY OF DIAMOND BAR Windmill/Willow A/V PCR Systems Upgrade Project perpetual, non-exclusive, non-transferable license to any and all products, tools, devices, manuals, plans, drawings, customized programs, and software for the life of the project; provided, however, that: 6.1.1 Such license shall be non-transferable by the Owner without the prior written consent of Supplier, and shall be exercised by the Owner solely for the Owner’s benefit in direct connection with the Project following the date of this Agreement; 6.1.2 Licensing rights as outlined shall require the express written permission of the Contractor in order to reproduce or distribute to any other third party any or all of the above mentioned drawings, plans, specifications, reports, and other documentation; and 6.1.3 The Contractor shall maintain rights to all such software source codes, drawings, plans, specifications, reports, and other documentation, for use in connection with the conduct of the Contractor’s ordinary course of business, without any compensation or payment of any kind or nature being made to the Owner in connection with such use. 6.2 The Contractor shall provide the Owner with current copies of all software upon request; these shall be for Archival and administrative purposes only. 6.3 Notwithstanding the foregoing, as consideration for the limited licensing rights in connection with the above, the Owner hereby agrees to: 6.3.1 Use its best efforts to promote and credit Contractor‘s integral role in connection with the completion and operation of the Project, which efforts shall include, without limitation, the advertisement and promotion, whenever and wherever reasonably possible, of Supplier as the designer, provider, and supplier of the display technology used in connection with the Project; 6.3.2 Permit Contractor to cite the Project, together with Contractor’s role relative to the design technology developed and used in connection therewith, for purposes of Contractor’s advertising, marketing, and public relations efforts. 7 DISPUTE RESOLUTION 7.1 MEDIATION 7.1.1 Any claim, dispute, or other matter in question arising out of or related to this Agreement shall be subject to mediation as a condition precedent to arbitration or the institution of legal or equitable proceedings claims by either party. If such a matter relates to or is the subject of a lien arising out of Contractor services, Contractor may proceed in accordance with applicable law to comply with the lien notice or filing deadlines prior to resolution of the matter by mediation or by arbitration. 7.1.2 The Owner and Contractor shall endeavor to resolve claims, disputes, and other matters in question between them by mediation which, unless the parties mutually agree otherwise, shall be in accordance with the procedures of an established national, regional, or local mediation service. Request for mediation shall be filed in writing with the other party to this Agreement and with such mediation service. 7.1.3 The parties shall share the mediator’s fee and any filing fees equally. The mediation shall be held in the place where the Project is located, unless another September 22, 2022 Page 37 of 49 CITY OF DIAMOND BAR Windmill/Willow A/V PCR Systems Upgrade Project location is mutually agreed upon. Agreements reached in mediation shall be enforceable as settlement agreements in any court having jurisdiction. 7.2 ARBITRATION 7.2.1 Any dispute or disagreement arising between the parties in connection with this Agreement which is not settled to the mutual satisfaction of the parties by the mediation process above within sixty (60) days (or such longer or shorter period as may be mutually agreed upon) from the date that either party initiates a formal mediation request shall be settled by arbitration. 7.2.2 A demand for arbitration shall be made within a reasonable time after the claim, dispute, or other matter in question has arisen. In no event shall the demand for arbitration be made after the date when institution of legal or equitable proceedings based on such a claim dispute or other matter in question would be barred by the applicable statute of limitations. 7.2.3 No arbitration arising out of or relating to this Agreement shall include, by consolidation or joinder or in any other manner, an additional person or entity not a party to this Agreement, except by written consent containing a specific reference to this Agreement and signed by the Owner, Contractor, and any other person or entity sought to be joined. Consent to arbitration involving an additional person or entity shall not constitute consent arbitration to any claim, dispute, or other matter in question not described in the written consent or with a person or entity not there named or described. The foregoing agreement to arbitrate and other agreements to arbitrate with an additional person or entity duly consented to by parties to this Agreement shall be specifically enforceable in accordance with applicable law in any court having jurisdiction over it. 7.2.4 The parties agree that the arbitrator(s) shall have no power or authority to make awards or issue orders of any kind except as expressly permitted by this Agreement, and in no event shall the arbitrator(s) have the authority to make any award that provides for punitive or exemplary damages. 7.2.5 The award rendered by the arbitrator or arbitrators shall be final, and judgment may be entered upon in accordance with applicable law in any court having jurisdiction. 7.2.6 The cost of the arbitration, including the fees and expenses of the arbitrator(s), will be shared equally by the parties unless the award otherwise provides. Each party shall bear the cost of preparing and presenting its case. 8 PERMITS 8.1 The Owner shall bear at its own cost all consents, licenses, permits, approvals, authorizations, and inspections from local government authorities, agencies, or officials required for the prosecution and completion of the Work and the delivery of the System as obtained by either the Owner or the Contractor in relation to this project. 8.2 Where such consents, licenses, permits, approvals, authorizations, and inspections are obtained by the Contractor, such costs shall be considered in addition to the approved contract cost, and shall be subject to a 15% administration fee above and beyond the cost paid by the Contractor. 9 REPRESENTATIONS September 22, 2022 Page 38 of 49 CITY OF DIAMOND BAR Windmill/Willow A/V PCR Systems Upgrade Project 9.1 The Contractor is not, and does not represent to be, a licensed architect, electrician, electrical engineer, mechanical engineer, or structural engineer and shall not perform, nor be responsible for the performance of, the work of such persons. All information, drawings, schematics, specifications, or other documents containing references to, or depictions of, architectural, electrical, or mechanical attributes which are supplied to the Owner by the Contractor hereunder will be provided for the sole purpose of indicating the Contractor’s suggestions related to the Work, and the Contractor shall have no liability whatsoever, including liability for the Owner’s reliance thereon, except as such information, drawings, documents, specifications, or other documents may relate to the performance of the System. 9.2 The Owner’s signing and delivery of this Agreement and its performance of its obligations hereunder: (a) have been duly authorized by all necessary corporate action; (b) do not conflict with any terms or conditions of its Certificate of Incorporation or By- laws; (c) do not violate any law, regulation, order, judgment or decree by which it may be bound; and (d) will not violate or result in a breach, acceleration, or default under any agreement or understanding to which it is a party or by which it may be bound which will materially affect its ability to perform its obligations hereunder. When signed and delivered by the Owner, this Agreement will constitute the legal, valid and binding obligation of the Owner, and will be enforceable against it in accordance with its terms and conditions, subject only to the rights of creditors under applicable laws relating to bankruptcy or the relief of debtors. 10 TERM & TERMINATION 10.1 The term of this Agreement will be from the Effective Date until completion of the Work and payment of the Purchase Price, except as otherwise provided for herein. 10.2 Except as otherwise provided for herein, either party may terminate this Agreement upon notice in writing to the other in the event that such other party shall breach or be in default of any of the covenants, obligations, warranties, representations, terms, or conditions of this Agreement in a material manner (a “Default”) and such other party fails to remedy such Default within thirty (30) days after notice thereof from the party not in default; provided that where a remedy will reasonably require greater than thirty (30) days to complete, the non-defaulting party may terminate this Agreement if the defaulting party does not start to remedy the Default within the thirty (30) day period, or, once started, fails to diligently proceed with and complete the remedy. Such notice shall provide in reasonable detail the basis upon which the Default is claimed. 10.3 In the event that either party shall cease conducting business in the normal course, become insolvent, make a general assignment for the benefit of creditors, suffers or permits the appointment of a receiver for its business or assets or shall avail itself of, or become subject to, any proceeding under applicable bankruptcy legislation or any other applicable statute relating to insolvency or the protection of rights of creditors, then the other party may terminate this Agreement. 10.4 In the event the Contractor terminates this Agreement pursuant to either paragraph 10.2 or 10.3 of this Section, then all licenses granted by Contractor to the Owner shall immediately terminate and the Owner shall immediately discontinue use of September 22, 2022 Page 39 of 49 CITY OF DIAMOND BAR Windmill/Willow A/V PCR Systems Upgrade Project any Software furnished hereunder and return to the Contractor all copies of such Software and any Confidential Information furnished hereunder. 11 ADDITIONAL COSTS 11.1 The following costs shall be borne by the Owner in addition to the approved contract cost, and shall be billed in full plus an administration fee of 15% at the completion of the project: 11.1.1 Parking 11.1.2 Equipment Storage (under the conditions defined within Section 16.7) 11.1.3 Specifically requested Insurance other than as defined within Section 17 11.1.4 Performance and Labor bonds 11.1.5 Permits, licenses, approvals, and Inspections as defined within Section 8 12 PREVAILING TERMS 12.1 If any purchase order, acceptance, or other document is used by Purchaser in connection with the purchase of the System, then notwithstanding any provisions therein contained to the contrary, the terms of all such documents shall be governed by the provisions of this Agreement and any terms thereof which are inconsistent with, different from, or in addition to, the provisions of this Agreement shall be null and void and of no force or effect. 13 CHARGES AND INVOICING 13.1 The Owner shall pay to Contractor the charges for the equipment, all labor, materials, and services as detailed by Contractor’s proposal dated ____________ and final revision dated _____________ along with any modifications and changes to same as outlined in any subsequent change orders. 13.2 All charges are exclusive of federal, State/Provincial and local sales, use, excise, utility, and gross receipts taxes and other similar tax-like charges, including tax-related surcharges, which the Owner agrees to pay. In the event the Owner provides the Contractor with a duly authorized tax exemption certificate, the Contractor agrees to exempt the Owner in accordance with law, effective on the date exemption certificate is received by the Contractor. 13.3 The Contractor shall invoice the Owner for charges due under this Agreement as set forth herein. All invoices are due and payable within _______ days of the invoice date with the exception of the invoice for the project initiation fees which is due and payable upon signing the Agreement. The Owner is responsible for meeting payment terms as listed below. The Contractor reserves the right to withhold delivery of products, installation, and maintenance services pending this payment. 13.4 All invoiced amounts that remain unpaid for more than _____ days shall be subject to a finance charge of ___% per month, computed from the date of invoice. 13.5 The Owner shall not make any deductions of any kind from any payment becoming due to the Contractor unless Owner shall have received an official credit memorandum from Contractor authorizing such deduction. 13.6 If the Owner fails to make any payment to Contractor as provided for herein, the Contractor may, upon ___ business days prior written notice to the Owner, suspend September 22, 2022 Page 40 of 49 CITY OF DIAMOND BAR Windmill/Willow A/V PCR Systems Upgrade Project performance of the Work until such payment is received in full and the period of suspension shall be added to the time which Contractor has estimated to complete performance of same. 13.7 Payment terms and schedule are agreed as follows: ____________________________________________________________________ ____________________________________________________________________ ____________________________________________________________________ ____________________________________________________________________ ____________________________________________________________________ 14 OWNERSHIP 14.1 All hardware shall remain the property of Contractor until final payment of all is received. 14.2 Upon delivery of any equipment to site, a representative of the Owner shall be required to sign for acceptance of such equipment. 14.3 From the point that any hardware is delivered to site, responsibility for the safekeeping and security of such equipment shall be borne by the Owner, who shall remain responsible for the cost of any repair or replacement of such equipment damaged or lost as a result of any actions taken by any individual other than in the direct employ of Contractor. 15 PROJECT SCHEDULE 15.1 Time is of the essence in the performance of this Contract. Both the Owner and the Contractor shall proceed with the work in a prompt and diligent manner in accordance with the current project schedule. 15.2 The Contractor shall coordinate its Work with the work of others on the site in a manner which will avoid conflict or interference with the work of Contractor and others and which will avoid delay in the completion of any part or all of the Project. 15.3 The Owner recognizes that construction delays could affect the schedule for any given system, and shall advise Contractor immediately of any adjustments to the project schedule that may have an impact on any system related to Contractor’s Scope of Work. Upon presentation of a written request and cost adjustment, the Owner will review, in an expeditious manner, such charges as presented by Contractor to increase the likelihood of meeting the schedule. 15.4 Contractor will require various sign-offs and approvals throughout the design, engineering, and installation process. The Contractor, where applicable, shall provide the Owner with a required date of acceptance in order to maintain the agreed project schedule. At that time, the Owner agrees to not unreasonably withhold its agreement for September 22, 2022 Page 41 of 49 CITY OF DIAMOND BAR Windmill/Willow A/V PCR Systems Upgrade Project such documents. A minimum of ___ business days, where possible, shall be allotted by Contractor to allow for communication and response from the Owner without penalty to the schedule or project. 15.5 Contractor shall not be liable for any default or delay caused by any third party impeding production or delivery of the products ordered. All promises of delivery are made in good faith and Contractor will make best efforts to fulfill them. However, if Contractor is unable to meet a scheduled delivery date, then Contractor shall not be liable for additional transportation charges incurred on the Owner’s request to use a faster means of transportation. 16 DELAYS 16.1 Delays by other trades, Owner’s schedules, approval of Contractor's drawings and submittals, change orders, or non-availability of specific equipment shall be cause for reasonable extensions of completion date. 16.2 The Owner's criteria will always be the Contractor's goal; however, no liability can be assumed for such delays. 16.3 Any delays dues to performance of other trades and/or contractors or labor disputes/strikes related to trades outside Contractor’s obligations under this agreement will result in additional fees. 16.3.1 Additional fees will be calculated at the Contractor’s then current daily labor rates unless the Contractor receives notification of the delay within ___ hours of when such work is scheduled to be performed. 16.3.2 Once notified of a delay, the Contractor will require ___ hours to recommence work. In the event the Owner does not give notice as defined above, the Owner will be subject to additional fees including administrative fees during the ___ hour interim period following notification of a delay. 16.4 Identified shipping and delivery dates of Equipment are provided in good faith and represent Contractor’s best estimate. If the manufacture, delivery, or installation of the Equipment is delayed, in whole or in part, through no fault of Contractor, including, but not limited to, Acts of God, terrorism, war, strikes, fire, and governmental acts, Contractor’s performance time shall be extended and Contractor’s compensation shall be adjusted due to such a delay. 16.5 Contractor shall not be liable for any default or delay caused by any third party impeding production or delivery of the products ordered. 16.6 Freight charges contained in this proposal, if any, are estimated to allow standard ground- based shipping methods. If expedited shipping is requested by the Owner, or is required in order to meet a scheduled delivery date, Contractor shall be additionally compensated for additional transportation charges incurred on the Owner’s behalf. 16.7 If the Owner requests a delay in the shipment or installation of Equipment that has already been ordered or manufactured, Contractor upon receiving that Equipment may place the identified Equipment in storage at the Owner’s expense. 16.7.1 The Owner shall pay the storage charges upon acceptance. 16.8 If the Owner requests a delay in the shipment or installation of Equipment before the Equipment has been ordered or manufactured, the Owner shall pay any increases in the Equipment’s price occurring prior to the date of subsequent release of order by Contractor. September 22, 2022 Page 42 of 49 CITY OF DIAMOND BAR Windmill/Willow A/V PCR Systems Upgrade Project 16.9 Notwithstanding any provision to the contrary in this Agreement, if the Owner requests a delay, or if for any reason the project is suspended for thirty (30) consecutive days, the Owner shall compensate Contractor within ___ days of the date of notification of request of delay by Owner or within ___ days of the thirtieth (30th) day of suspension, (i) the full price of services performed prior to the request or suspension, and (ii) the full price of all Equipment ordered and applicable storage charges. 16.10 When the Project is resumed, Contractor shall be compensated for expenses incurred in the interruption and resumption of Contractor’s services. Contractor’s fees for the remaining services and the time schedules shall be equitably adjusted. 16.11 If the project is suspended or Contractor’s services are suspended for more than ___ consecutive days, Contractor may terminate this Agreement by giving not less than ___ days’ written notice. 17 INSURANCE 17.1 The Contractor shall, at its own expense, carry all workers compensation insurance to protect Contractor's employees and comprehensive general liability insurance necessary for the protection of the Contractor and the Owner. 17.1.1 This will cover injury to persons or property arising from acts of the Contractor during the progress of the work. 17.1.2 Any sub-contractors will be required to provide similar insurance coverages. 17.2 The Owner shall obtain and pay for insurance against injury to its own employees, if any, and persons on the site at the Owner’s direction. 17.3 The Contractor shall not be responsible for any on site damage solely caused by the Owner or his agents, or by Acts of God beyond the control of the Contractor. 17.4 The Contractor shall submit a Certificate of Insurance naming the Owner as additional insured upon written request by the Owner. 18 LIMITATION OF LIABILITY 18.1 IN NO EVENT SHALL CONTRACTOR BE LIABLE FOR ANY INDIRECT, INCIDENTAL, CONSEQUENTIAL OR SPECIAL DAMAGES; LOSS OF REVENUE OR PROFIT; OR LOSS, DAMAGE OR DESTRUCTION OF DATA OR PROPERTY INCLUDING SOFTWARE PROBLEMS EXPERIENCED BY OWNER IN SOFTWARE PACKAGES OR DATABASES IN PLACE PRIOR TO THE INSTALLATION OF ANY SOFTWARE HEREUNDER AND INCLUDING ANY ELECTRICAL DAMAGE OR ELECTRICAL PROBLEMS THAT MAY OCCUR AS A RESULT OF ANY OF THE USE OF THE EQUIPMENT OR INSTALLATION OR MAINTENANCE SERVICES PROVIDED UNDER THE TERMS OF THIS AGREEMENT; REGARDLESS OF THE FORM OF ACTION, WHETHER IN CONTRACT, TORT (INCLUDING NEGLIGENCE), BREACH OF WARRANTY OR OTHERWISE, EVEN IF AWARE OF THE POSSIBILITY THEREOF. CONTRACTOR’S LIABILITY FOR DAMAGES FOR BREACH OF THE AGREEMENT OR ARISING IN ANY OTHER RESPECT OUT OF THIS AGREEMENT, REGARDLESS OF THE FORM OF ACTION, SHALL NOT EXCEED THE MONIES PAID TO CONTRACTOR BY OWNER FOR THE ITEM(S) OF EQUIPMENT OR SERVICE GIVING RISE TO THE CAUSE OF ACTION; PROVIDED, HOWEVER, THAT THE FOREGOING LIMITATION SHALL NOT APPLY TO PERSONAL INJURY, INCLUDING DEATH OR DAMAGE TO TANGIBLE PROPERTY CAUSED BY THE September 22, 2022 Page 43 of 49 CITY OF DIAMOND BAR Windmill/Willow A/V PCR Systems Upgrade Project GROSS NEGLIGENCE OR WILLFUL MISCONDUCT OF CONTRACTOR. IT IS THE OWNER’S RESPONSIBILITY TO ENSURE THAT ALL OF ITS DATA FILES ARE ADEQUATELY DUPLICATED AND DOCUMENTED. CONTRACTOR WILL NOT BE RESPONSIBLE FOR THE OWNER’S FAILURE TO DO SO, OR FOR THE COST OF RECONSTRUCTION DATA STORED ON DISK FILES, TAPES, MEMORIES, ETC., WHICH IS LOST DURING THE COURSE OF PERFORMANCE OF CONTRACTOR HEREUNDER. 18.2 FORCE MAJEURE 18.2.1 Contractor shall not be deemed in breach of contract, negligent, at fault, or liable for any delay or failure of performance resulting from Acts of God, war, accidents, riots, terrorism, civil insurrection, labor disputes, strikes or any other cause not the fault of and beyond the reasonable control of Contractor; provided, that Contractor will give the Owner prompt notice of the delay in sufficient detail to permit the Owner the opportunity to minimize the effect of such delay, if practicable. 19 WARRANTY 19.1 All equipment furnished by Contractor shall be accompanied by each manufacturer’s standard warranty. Contractor shall be solely responsible for seeing that warranty repairs are made. 19.2 In addition to the standard manufacturer’s warranty, Contractor warrants that all Equipment and installation shall be fit for its intended purpose as outlined in the Statement of Work and free from defects in materials and workmanship for one year after Substantial Completion. 19.3 Notwithstanding the foregoing, Contractor’s warranty obligations shall not apply to the extent that the Equipment has been subjected to abuse, unauthorized modifications or alterations, improper maintenance, unauthorized or improper repair and misuse, including, but not limited to, operating the Equipment outside of its environmental, performance, electrical, temperature, or humidity specification. 19.4 For any services covered under the Contractor’s one (1) year warranty, Contractor shall be the sole source utilized for repairs. The Owner agrees to provide access for any scheduled or requested services of the System or Equipment. If the Equipment is not available during the scheduled time, Contractor may charge the Owner its normal trip charge and, if asked to wait on-site, Contractor’s current published hourly rates for standing by until the Equipment is made available or until instructed to return at another time. 19.5 DURATION OF WARRANTY 19.5.1 Except as otherwise provided by virtue of any manufacturer’s warranty set forth at Paragraph 19.2 above, all warranties made herein by Contractor shall commence as of the execution of this Agreement, and shall remain in effect for a period of one (1) year following the achieval of Substantial completion, as outlined within Section 20 or this document, or first beneficial use, whichever occurs first. 19.5.2 In the event that the Owner desires to engage Contractor to perform and/or provide additional services and/or Project maintenance following the expiration of said one (1) year warranty period, Contractor shall submit to the Owner a quotation for an extended service and/or maintenance arrangement. September 22, 2022 Page 44 of 49 CITY OF DIAMOND BAR Windmill/Willow A/V PCR Systems Upgrade Project 19.6 WARRANTY CLAIMS 19.6.1 Upon receipt of written notice from the Owner of any warranty claim pursuant to this Section, the Owner may, as its sole remedy against Contractor under this Agreement, require Contractor to correct any Services not conforming to the warranties set forth herein, or promptly repair and/or replace any deficient goods, materials, or equipment sold or provided by Contractor in connection herewith. 19.6.2 The cost and expense of all such remedial work, so as to bring the Services in compliance with the warranties set forth herein, shall be borne solely by the Contractor. 19.6.3 Contractor’s sole obligation in connection with this Section shall be limited to the correction and/or repair of any Services, or the repair and/or replacement of any goods, materials, or equipment sold or provided to the Owner in connection therewith, which do not conform to the warranties set forth herein. 19.6.4 Contractor shall assume no liability or expense for any corrections, repairs, or replacements except those performed by Contractor or its authorized agents, and Contractor shall not be liable for any expense or damages beyond the actual cost of correction, repair, or replacement as set forth in this Section. With respect to all repair and/or replacement obligations imposed upon Contractor pursuant to this Section, it shall be within the Contractor’s sole discretion as to whether to repair or replace any deficient goods, materials, or equipment; which option shall in all events be accepted by the Owner so long as the deficient goods, materials, or equipment, as applicable, are made to conform to the warranties set forth by Contractor pursuant to this Section. 19.7 THE WARRANTIES SET FORTH IN THIS ARTICLE IV ARE EXCLUSIVE AND ARE IN LIEU OF ALL OTHER WARRANTIES, WHETHER STATUTORY, EXPRESS OR IMPLIED, INCLUDING WITHOUT LIMITATION ANY IMPLIED WARRANTY OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE. THE REMEDIES SET FORTH IN THIS ARTICLE IV ARE EXCLUSIVE AND ARE ACKNOWLEDGED BY THE OWNER TO BE IN LIEU OF ALL SUCH OTHER REMEDIES AS MAY OTHERWISE BE AVAILABLE TO THE OWNER AT LAW OR IN EQUITY. 20 SUBSTANTIAL COMPLETION & ACCEPTANCE 20.1 Upon completion of installation and testing, notification will be transmitted by the Contractor to the Owner of such completion in the form of a Certificate of Substantial Completion. 20.2 A demonstration to the Owner of system functionality, in keeping with the Scope of Work as outlined herein, shall be scheduled within 7 days of such notification at a time mutually acceptable to both parties. 20.2.1 During the demonstration, the Owner shall prepare a punch list of deficiencies; if any deficiencies are noted during the demonstration, these shall be noted on the Certificate of Substantial Completion. 20.2.2 Contractor and the Owner shall agree upon and identify any deficiencies that would prevent the Owner from having beneficial use of the System(s) and Equipment. September 22, 2022 Page 45 of 49 CITY OF DIAMOND BAR Windmill/Willow A/V PCR Systems Upgrade Project 20.2.3 The Contractor shall promptly correct any deficiencies deemed as preventing beneficial use, at which point the Owner shall sign the Certificate of Substantial Completion. This shall be deemed as Substantial Completion. 20.3 In no event shall the Owner use or operate the System(s) or Equipment until Contractor achieves Substantial Completion. 20.4 Should the Owner use or operate the system prior to the Contractor achieving substantial completion, the Owner will automatically deem the project substantially complete, coincidentally triggering and accepting any payment conditions that may be associated with this milestone, with any outstanding deficiency resolution by the contract now deemed a part of final acceptance and signoff. 20.5 Promptly following Contractor’s provision to the Owner of a Certificate of Substantial Completion, the Contractor shall remedy any remaining deficiencies noted at the time of Substantial Completion, and the Owner shall execute a mutually acceptable Final Acceptance and Project Completion Agreement indicating that all facets of the Services have been completed by Contractor in accordance with the terms and conditions of this Agreement. 21 CHANGES IN THE SCOPE OF WORK 21.1 Costs resulting from material changes in the Scope of Work of this project by the Owner, additional requirements or restrictions placed on Contractor by the Owner, or changes in the configuration of the Equipment described herein, will be added to, or subtracted from, the contract value depending upon the changes required. 21.2 When Contractor becomes aware of the nature and impact of the change, a Contract Change Order will be submitted for review and approval by the Owner, prior to continuing work. Contract Change Order cost calculations will be commensurate with the materials and labor rates provided within the base contract. 21.3 Such changes shall be billed at 100% of the approved value upon completion of the change, and shall not be subject to the progressive payment schedule as outlined within Section 13 of this document. 22 RETURN POLICY & RESTOCKING CHARGES 22.1 Under no circumstances shall the Equipment be returned by the Owner without Contractor’s Return Merchandise Authorization (RMA) number. 22.2 The following conditions apply to systems included in this Agreement: 22.2.1 No custom equipment returns will be allowed. 22.2.2 Return of equipment damaged by the Owner, or any of their representatives will not be accepted. 22.2.3 Equipment returned for any reason, other than warranty repair or defect, must (i) be in original “as-new”, undamaged and untarnished condition (ii) include, at the time of return, all supplied accessories in original “as-new”, undamaged and untarnished condition, and (iii) include, at the time of return, all original packaging, manuals and documentation for any returns to be accepted. September 22, 2022 Page 46 of 49 CITY OF DIAMOND BAR Windmill/Willow A/V PCR Systems Upgrade Project (iv) It shall be the Owner’s responsibility to provide storage for such packaging should they wish to retain such subsequent to equipment delivery. 22.3 Returns of software products sold and delivered will not be accepted. 22.4 Restocking charges for equipment subject to return shall be invoiced to the Owner as follows: 22.4.1 Costs of any restocking fees to be charged by the Equipment vendor to Contractor to re-stock the items in question. 22.4.2 All related miscellaneous costs related to the return of such goods, including, but not limited to, transportation, brokerage, etc. 22.4.3 Labor charges associated with removal, project administration, project management, system re-engineering, system re-programming, system re- drafting, handling of goods, etc. 23 ASSIGNMENT 23.1 Neither party may assign or transfer to any person or entity its rights or obligations under this agreement without the prior written consent of the other party, which consent shall not be unreasonably withheld. 23.2 Any prohibited assignment of this Agreement or the obligations hereunder shall be null, void, and of no effect. 23.3 Upon permitted assignment hereunder, the terms and conditions of this Agreement shall become the direct and primary obligations of the assignee or successor in interest. 23.4 Subject to the foregoing, all of the terms, conditions, and provisions of this Agreement shall be binding upon and shall inure to the benefit of each party’s permitted successors and assignees. September 22, 2022 Page 47 of 49 CITY OF DIAMOND BAR Windmill/Willow A/V PCR Systems Upgrade Project 24 NOTICES A notice, document, or other communication required hereunder shall be deemed to have been properly given or delivered if same is delivered by hand, sent via fax or email and confirmed by certified mail, or sent by certified or registered mail to the following address: OWNER CONTRACTOR To: To: Artistic Resources Corporation Address: Address: 429 S. Victory Blvd Burbank, CA 91502 Attention: Attention: Michael Little Fax #: Fax #: 323.965.5209 E-mail: E-mail: arcorp@artisticresources.com 25 PUBLICITY 25.1 The Owner agrees that the Contractor may publicize and advertise its relationship with and work for the Owner to promote the Contractor’s business. 25.2 The Owner agrees the Contractor upon request and at an agreed and scheduled time may photograph its work related to this project at the Owner’s location(s). The Owner shall release all rights of reproduction of such photos to the Contractor; however, upon request the Owner shall be afforded any rights to reproduction or use of such photos for the Owner’s purposes without cost. 26 NON-SOLICITATION 26.1 The Owner agrees that it will not, without the prior written consent of the Contractor, during the term of this agreement or for a period of one (1) year after any direct contact with the employee; 26.1.1 induce, entice, hire, or attempt to hire or employ any employee of the Contractor. 26.1.2 contact and/or solicit any other Person that has an exclusive business relationship with the Contractor in the Contractor’s Business and which provides products and services to the Contractor. 27 ACCESS TO SITE – HOURS OF ACCESS 27.1 So as to ensure proper and timely performance of its duties, Contractor shall have access to the project site during all normal business hours, and otherwise upon the reasonable consent of the Owner. 27.2 Contractor shall not be liable for any delay or failure relative to the provision of its duties caused by the failure of Owner or site status to provide such access. 27.3 The Owner agrees that Contractor shall not be liable for any additional costs related to site access outside of these hours as a result of any delay per Sections 16 or 18 of this agreement. 27.3.1 Any requirement for the need to work overtime shall be presented by the Contractor to the Owner in writing for approval prior to being undertaken; the Owner agrees to approve such charges or grant an extension to the completion schedule within one (1) business day. September 22, 2022 Page 48 of 49 CITY OF DIAMOND BAR Windmill/Willow A/V PCR Systems Upgrade Project 27.3.2 If the site is not available during the scheduled time, the Contractor may charge the Owner the greater of its minimum callout/trip charge or, if asked to wait on-site, the Contractor’s hourly rates to stand by until the site is made available, plus travel time and mileage allowances if instructed to return at another time. September 22, 2022 Page 49 of 49 CITY OF DIAMOND BAR Windmill/Willow A/V PCR Systems Upgrade Project IN WITNESS WHEREOF, the parties by their duly authorized representatives have executed this Agreement as of the date first indicated above. SIGNED AND DELIVERED Artistic Resources Corporation Contractor’s Company Name: By: ___________________________________________ Print Name: ____________________________________ Title: _________________________________________ Print Name: ____________________________________ ______________________________________________ Owner’s Company Name: By: ___________________________________________ Print Name: ____________________________________ Title: _________________________________________ Print Name: ____________________________________