HomeMy WebLinkAbout1st Amendment - CT&T Concrete Paving Inc.FIRST AMENDMENT
TO
MAINTENANCE SERVICES AGREEMENT
This First Amendment to Maintenance Services Agreement ("First Amendment") is
made and entered into as of June 30, 2023) by and between the City of Diamond Bar, a
municipal corporation ("City"), and CT&T (herein referred to as the "Contractor") with
reference'to the following:
A. The City and the Contractor entered into that certain Maintenance Services
Agreement dated as of June 21, 2022, which is incorporated herein by this reference (the
'Original Agreement"); and
B. The City and the Contractor desire to amend the Original Agreement to
modify, amend and supplement certain portions of the Original Agreement,
NOW, THEREFORE, the parties hereby agree as follows:
1. Defined Terms. Except as otherwise defined herein, all capitalized terms
used herein shall have the meanings set forth for such terms in the Original Agreement.
2. Term. The Term of the Original Agreement as set forth in Section 2 therein is
from June 21, 2022 to June 30, 2023. This First Amendment extends the Term up to and
including June 30, 2024.
3. Compensation. The total not -to -exceed compensation set forth in Section 3
of the Original Agreement was the sum of Six Hundred Thousand Dollars ($600,000).
Section 3 of the Original Agreement is hereby amended to provide for an increase of Eight
Hundred Ten thousand Dollars ($810,000) so that the total not -to -exceed compensation,
as amended by this First Amendment shall not exceed One Million Four Hundred Ten
Thousand Dollars ($1,410,000) without the prior authorization of the City.
4. Integration. This First Amendment and all attachments hereto (if any)
integrate all of the terms and conditions mentioned herein, and supersede all negotiations
with respect hereto. This First Amendment amends, as set forth herein, the Original
Agreement and except as specifically amended hereby, the Original Agreement shall
remain in full force and effect. To the extent that there is any conflict or inconsistency
between the terms and provisions of this First Amendment and the terms and provisions of
the Original Agreement, the terms and provisions of this First Amendment shall control.
IN WITNESS hereof, the parties enter into this First Amendment on the year and
day first above written.
973895.1
CT & T CITY OF DIAMOND BAR
*B/g /
y. y. ,
Pri ted Name: sctt tf, v/,ram/./ Daniel Fox, Cffy Manager
Title: P.40- s �0-j'_ r7�1
*By: '�, ATTEST:
Printed me: 3?ir, ccu�
Title: recLsirarzc�
na Santana, City Clerk
PROVED
Omar
TO FORM:
*NOTE: If Consultant is a corporation, the City requires the following signature(s):
-- (1) the Chairman of the Board, the President or a Vice -President, AND (2) the Secretary, the
Chief Financial Officer, the Treasurer, an Assistant Secretary or an Assistant Treasurer. If
only one corporate officer exists or one corporate officer holds more than one corporate office,
please so indicate. OR
-- The corporate officer named in a corporate resolution as authorized to enter into this
Agreement. A copy of the corporate resolution, certified by the Secretary close in time to the
execution of the Agreement, must be provided to the City.
973895.1
EXHIBIT "A"
ADDITIONAL SCOPE OF SERVICES
[Behind this page.3
973845.1
./\ Concrete Paving; lnc.
2023 Updated Pricing
2.8% Increase
ROAD MAINTENANCE SERVICES COMPENSATION BASE SID SCHEDULE
ITEM
NO
WORKAGTIVITIES
UNIT
EST. ANNUAL
My
UNIT PRICE
ROAD MAINTENANCE AC PAVEMENT
1
4" AC SURFACE R&R
SF
31000
$ 9,97
2
6" AC SURFACE R&R
SF
2,000
$ 15.21
3
8" AC SURFACE R&R
SF
51000
$ 15.42
4
AC SKIN PATCH
SF
5000
$ 3,60
5
1 1/2" MILL GRIND & OVERLAY (1000 SF MIN)
SF
107000
$ 3,86
6
2" MILL GRIND & OVERLAY (1000 SF MIN)
SF
10,000
$ 4,42
7
2 %' MILL GRIND & OVERLAY (1000 SF MIN)
SF
101000
$ 5,35
8
SAW CUT
LF
1,000
$ 2.06
9
ADJUST MANHOLE
EA
50
$ 1,439.20
ROAD MAINTENANCE PCC
$
10
4" PCC SIDEWALK/DRIVEWAY/FLATWORK R&R
SF
1 20,000
$ 15,93
11
6" PCC SIDEWALK/DRIVEWAY/FLATWORK R&R
SF
10,000
$ 18.20
12
6" PCC DRIVEWAY SPPWC STD PLAN 110-2 TYPE A &
B R&R
SF
2,000
$ 19.43
13
6" PCC DRIVEWAY SPPWC STD PLAN 110-2 TYPE C
R&R
SF
2,000
$ 19.43
14
CURB & GUTTER R&Rw/ VAC Pavement Slot
LF
11000
$ 65,79
15
6" A -CURB R&R
LF
500
$ 47,29
16
8" A -CURB R&R
LF
500
$ 48.83
17
SIDEWALK AC PATCH (RAMPING)
SF
11000
$ 17,48
18
SIDEWALK GRINDING
LF
3,000
$ 10.28
19
REMOVE EXISTING CONDITIONS & INSTALL CURB
RAMPS SPPWC STD PLAN 111-5 TYPE 1-6 CASE A
EA
10
$ 5,345.60
20
REMOVE EXISTING CONDITIONS & INSTALL CURB
RAMPS SPPWC STD PLAN 111-5 TYPE 1-2 CASE B
EA
10
$ 5,345,60
21
3"Concrete V-DITCH 44"W x L R&R
LF
500
$ 22,10
22
8" CROSS GUTTER 6'w x L SPPWC STD PLAN 122-2
LF
1000
$ 20,56
Sid
Schedule
Note:
horn #
10-22 may require additional
concrete to fill
in low
spots and some
tree roots
removal.
Contractors
should
take
in consideration
when
oricina.
ROA_A MAINTENANCE SERVICES COMPENSATION BASE BID SCHEDULE
ITEM
SERVICE
NO
STORM BRAIN WORK ACTIVITIES
UNIT
CALLS PER
UNIT PRICE
YEAR
1
JETTERIVAC— STORM DRAIN CLEANING 12"-36" PIPE
HOURLY
4 - 6
$ 501.66
2
CCTV STORM DRAIN LINES
HOURLY
4-6
$ 501,66
EXHIBIT "B"
ROAD MAINTENANCE SERVICES COMPENSATION OPTION BID SCHEDULE EST
I NO
WORK ACTIVITIES
CALTRAN
S STD
PLANS
UNIT
ANNUAL OTY
UNIT PRICE
ROAD MARKINGS PAINT
1
18' ARROW
TYPE I
EA
25
$ 58.60
2
24'ARROW
TYPE I
EA
15
$ 86,87
3
10'ARROW
TYPE I
EA
25
$ 33.15
4
(L)/(R) 8' ARROW
TYPE IV
EA
100
$ 40.25
5
(L)/(R) 18' ARROW
TYPE VI
EA
25
$ 87,89
6
5' BIKE LANE ARROW
----�
EA
50
$ 19.22
7
15' LEFT/STRAIGHT/RIGHTARROW
TYPE Vlll
EA
25
$ 85,79
8
13' (L) OR (R) STRAIGHT ARROW
TYPE VII
EA
15
$ 74.53
9
RAILROAD CROSSING SYMBOL
EA
2
$ 102.80
10
8' LETTER
EA
11000
$ 14.68
11
4' LETTER
_
EA
100
$ 11.82
12
12" LIMIT LINE (STOP LINE)
_W
LF
51000
$ 1.80
13
TYPE AAND TYPE AY PLASTIC MARKER
_
EA
1,000
$ 4.11
14
TYPE AAND TYPE AY PLASTIC MARKER
y
EA
12000
$ 4.11
15
TYPE C AND TYPE D MARKER
EA
500
$ 4.11
16
TYPE G AND TYPE H MARKER
EA
500
$ 4.11
17
SANDBLAST ROAD MARKINGS
-
SF
51000
$ 2.24
18
SANDBLAST PAINTED CURBS
LF
5,000
$ 7.02
19
ROAD MARKINGS THERMOPLASTIC
$
20
CHANNELIZING LINE
D
LF
51000
$ 1 03
38AIL
21
BIKE LANE LINE
DETAIL39
LF
15,000
$ 0.62
22
INTERSECTION LINE BIKE LANE
DEAT
LF
57000
$ 0.41
39AIL
23
LANE LINE EXTENSIONS THRU INT
DETAIL 40
LF
21000
$ 0.15
24
18'ARROW
TYPE I
EA
25
$ 67.85
25
24'ARROW
TYPE
EA
15
$ 85.58
26
10'ARROW
TYPE I
EA
25
$ 38.81
27
(L)/(R) 8' ARROW
'TYPE IV
EA
100
$ 40.97
28
(L)/(R) 18'ARROW
TYPE VI
EA
25
$ 107.94
29
5' BIKE LANE ARROW
EA
50
$ 19.15
30
15' LEFT/STRAIGHT/RIGHT ARROW
TYPE VIII
EA
25
$ 99.72
31
13' (L) OR (R) STRAIGHTARROW
TYPE VII
EA
15
$ 74.02
32
RAILROAD CROSSING SYMBOL
EA
2
$ 164,48
33
B' LETTER
EA
11000
$ 20.81
34
4' LETTER
- - -
EA
100
$ 14,69
35
12" LIMIT LINE (STOP LINE)
-
LF
51000
$ 2.31
36
MACHINE THERMAPLASTIC REMOVAL
- - -
SF
51000
$ 2.45
EXHIBIT "B"
ROAD MAINTENANCE SERVICES COMPENSATION SCHEDULE
LABOR RATES
LABOR RATES PER HOUR
REGULAR
HOUR
RATE
OVERTIME
HOUR RATE
SUPERINTENDENT
$
100,74
$
151412
SUPERVISOR
$
100.74
$
151.12
FOREMAN
$
118.22
$
147.00
HEAVY EQUIPMENT OPERATOR
$
1%22
$
147.00
10 WHEEL DUMP TRUCK OPERATOR
$
97.66
$
124.39
MASON
$
100.74
$
128.50
ASPHALT RAKER
$
100.74
$
128,50
LABORER
$
94.68 Is
123.15
WALK BEHIND SAW OPERATOR
$
99.72
$
128.09
EQUIPMENT WITH OPERATOR RATES
REGULAR
OVERTIME
EQUIPMENT WITH OPERATOR
HOURLY
RATE
HOUR RATE
BACKHOE
IS 190.18
$ 285.27
SKIDSTEER LOADER
$
190,18
$
285,27
10 WHEEL DUMP TRUCK
$
133,64
$
200,46
WATERTRUCK
$
149,06
$
223,59
SKIP LOADER
$
149,06
223,59
CONSTRUCTION SWEEPER WITH SIDE AND REAR
BRUSHES
$
174,76
$
262.14
WALK BEHIND SAW MACHINE
$
159.34
239.01
SIDEWALK—GRINDER/CONCRETE SCARIFIER
$
15934
$
239.01
EQUIPMENT RATES
EQUIPMENT RATES
HOURtY
RATE
WEEKLY
RATE
MONTHLY
RATE
PORTABLE AIR COMPRESSOR
$
35,98
$
916,98
$
1;534.80
PORTABLE ARROWBOARD
$
19,02
$
272,42
$
771.00
PORTABLE WATER TRAILER
$
28,89
$
810,06
$
1,426,86
PICKUP TRUCK
$
51AO
$
822A0
$
1,829.84
VIBRATING COMPACTION ROLLER
$
53A6
$
1,533.78
$
3,932.10
BACKHOE
$
60,65
$
1,665,36
$
4,317.60
SKIDSTEER LOADER
$
48,32
$
11387,80
$
33469,50
10 WHEEL DUMP TRUCK
$
60465
$
1,757488
$
41240,60
CONTRACTOR WORK TRUCK
$
82,24
$
11130,80
$
2,775,60
WATER TRUCK
$
53,46
$
1,696.20
$
3,855,00
SKIP LOADER
$
53,46
$
11696,20
$
4,009.20
CONSTRUCTION RUSHES SWEEPER WITH SIDE AND REAR
B
$
123,36
$
3,495.20
$
5,345.60
WALK BEHIND SAW MACHINE
$
53,46
$
1,480.32
$
3,469a50
PORTABLE CHANGEABLE MESSAGE SIGN
$
35.98
$
765.86
$
1,542,00
PORTABLE ARROWBOARD
$
19.02
$
272,42
$
771.00