Loading...
HomeMy WebLinkAbout1st Amendment - CT&T Concrete Paving Inc.FIRST AMENDMENT TO MAINTENANCE SERVICES AGREEMENT This First Amendment to Maintenance Services Agreement ("First Amendment") is made and entered into as of June 30, 2023) by and between the City of Diamond Bar, a municipal corporation ("City"), and CT&T (herein referred to as the "Contractor") with reference'to the following: A. The City and the Contractor entered into that certain Maintenance Services Agreement dated as of June 21, 2022, which is incorporated herein by this reference (the 'Original Agreement"); and B. The City and the Contractor desire to amend the Original Agreement to modify, amend and supplement certain portions of the Original Agreement, NOW, THEREFORE, the parties hereby agree as follows: 1. Defined Terms. Except as otherwise defined herein, all capitalized terms used herein shall have the meanings set forth for such terms in the Original Agreement. 2. Term. The Term of the Original Agreement as set forth in Section 2 therein is from June 21, 2022 to June 30, 2023. This First Amendment extends the Term up to and including June 30, 2024. 3. Compensation. The total not -to -exceed compensation set forth in Section 3 of the Original Agreement was the sum of Six Hundred Thousand Dollars ($600,000). Section 3 of the Original Agreement is hereby amended to provide for an increase of Eight Hundred Ten thousand Dollars ($810,000) so that the total not -to -exceed compensation, as amended by this First Amendment shall not exceed One Million Four Hundred Ten Thousand Dollars ($1,410,000) without the prior authorization of the City. 4. Integration. This First Amendment and all attachments hereto (if any) integrate all of the terms and conditions mentioned herein, and supersede all negotiations with respect hereto. This First Amendment amends, as set forth herein, the Original Agreement and except as specifically amended hereby, the Original Agreement shall remain in full force and effect. To the extent that there is any conflict or inconsistency between the terms and provisions of this First Amendment and the terms and provisions of the Original Agreement, the terms and provisions of this First Amendment shall control. IN WITNESS hereof, the parties enter into this First Amendment on the year and day first above written. 973895.1 CT & T CITY OF DIAMOND BAR *B/g / y. y. , Pri ted Name: sctt tf, v/,ram/./ Daniel Fox, Cffy Manager Title: P.40- s �0-j'_ r7�1 *By: '�, ATTEST: Printed me: 3?ir, ccu� Title: recLsirarzc� na Santana, City Clerk PROVED Omar TO FORM: *NOTE: If Consultant is a corporation, the City requires the following signature(s): -- (1) the Chairman of the Board, the President or a Vice -President, AND (2) the Secretary, the Chief Financial Officer, the Treasurer, an Assistant Secretary or an Assistant Treasurer. If only one corporate officer exists or one corporate officer holds more than one corporate office, please so indicate. OR -- The corporate officer named in a corporate resolution as authorized to enter into this Agreement. A copy of the corporate resolution, certified by the Secretary close in time to the execution of the Agreement, must be provided to the City. 973895.1 EXHIBIT "A" ADDITIONAL SCOPE OF SERVICES [Behind this page.3 973845.1 ./\ Concrete Paving; lnc. 2023 Updated Pricing 2.8% Increase ROAD MAINTENANCE SERVICES COMPENSATION BASE SID SCHEDULE ITEM NO WORKAGTIVITIES UNIT EST. ANNUAL My UNIT PRICE ROAD MAINTENANCE AC PAVEMENT 1 4" AC SURFACE R&R SF 31000 $ 9,97 2 6" AC SURFACE R&R SF 2,000 $ 15.21 3 8" AC SURFACE R&R SF 51000 $ 15.42 4 AC SKIN PATCH SF 5000 $ 3,60 5 1 1/2" MILL GRIND & OVERLAY (1000 SF MIN) SF 107000 $ 3,86 6 2" MILL GRIND & OVERLAY (1000 SF MIN) SF 10,000 $ 4,42 7 2 %' MILL GRIND & OVERLAY (1000 SF MIN) SF 101000 $ 5,35 8 SAW CUT LF 1,000 $ 2.06 9 ADJUST MANHOLE EA 50 $ 1,439.20 ROAD MAINTENANCE PCC $ 10 4" PCC SIDEWALK/DRIVEWAY/FLATWORK R&R SF 1 20,000 $ 15,93 11 6" PCC SIDEWALK/DRIVEWAY/FLATWORK R&R SF 10,000 $ 18.20 12 6" PCC DRIVEWAY SPPWC STD PLAN 110-2 TYPE A & B R&R SF 2,000 $ 19.43 13 6" PCC DRIVEWAY SPPWC STD PLAN 110-2 TYPE C R&R SF 2,000 $ 19.43 14 CURB & GUTTER R&Rw/ VAC Pavement Slot LF 11000 $ 65,79 15 6" A -CURB R&R LF 500 $ 47,29 16 8" A -CURB R&R LF 500 $ 48.83 17 SIDEWALK AC PATCH (RAMPING) SF 11000 $ 17,48 18 SIDEWALK GRINDING LF 3,000 $ 10.28 19 REMOVE EXISTING CONDITIONS & INSTALL CURB RAMPS SPPWC STD PLAN 111-5 TYPE 1-6 CASE A EA 10 $ 5,345.60 20 REMOVE EXISTING CONDITIONS & INSTALL CURB RAMPS SPPWC STD PLAN 111-5 TYPE 1-2 CASE B EA 10 $ 5,345,60 21 3"Concrete V-DITCH 44"W x L R&R LF 500 $ 22,10 22 8" CROSS GUTTER 6'w x L SPPWC STD PLAN 122-2 LF 1000 $ 20,56 Sid Schedule Note: horn # 10-22 may require additional concrete to fill in low spots and some tree roots removal. Contractors should take in consideration when oricina. ROA_A MAINTENANCE SERVICES COMPENSATION BASE BID SCHEDULE ITEM SERVICE NO STORM BRAIN WORK ACTIVITIES UNIT CALLS PER UNIT PRICE YEAR 1 JETTERIVAC— STORM DRAIN CLEANING 12"-36" PIPE HOURLY 4 - 6 $ 501.66 2 CCTV STORM DRAIN LINES HOURLY 4-6 $ 501,66 EXHIBIT "B" ROAD MAINTENANCE SERVICES COMPENSATION OPTION BID SCHEDULE EST I NO WORK ACTIVITIES CALTRAN S STD PLANS UNIT ANNUAL OTY UNIT PRICE ROAD MARKINGS PAINT 1 18' ARROW TYPE I EA 25 $ 58.60 2 24'ARROW TYPE I EA 15 $ 86,87 3 10'ARROW TYPE I EA 25 $ 33.15 4 (L)/(R) 8' ARROW TYPE IV EA 100 $ 40.25 5 (L)/(R) 18' ARROW TYPE VI EA 25 $ 87,89 6 5' BIKE LANE ARROW ----� EA 50 $ 19.22 7 15' LEFT/STRAIGHT/RIGHTARROW TYPE Vlll EA 25 $ 85,79 8 13' (L) OR (R) STRAIGHT ARROW TYPE VII EA 15 $ 74.53 9 RAILROAD CROSSING SYMBOL EA 2 $ 102.80 10 8' LETTER EA 11000 $ 14.68 11 4' LETTER _ EA 100 $ 11.82 12 12" LIMIT LINE (STOP LINE) _W LF 51000 $ 1.80 13 TYPE AAND TYPE AY PLASTIC MARKER _ EA 1,000 $ 4.11 14 TYPE AAND TYPE AY PLASTIC MARKER y EA 12000 $ 4.11 15 TYPE C AND TYPE D MARKER EA 500 $ 4.11 16 TYPE G AND TYPE H MARKER EA 500 $ 4.11 17 SANDBLAST ROAD MARKINGS - SF 51000 $ 2.24 18 SANDBLAST PAINTED CURBS LF 5,000 $ 7.02 19 ROAD MARKINGS THERMOPLASTIC $ 20 CHANNELIZING LINE D LF 51000 $ 1 03 38AIL 21 BIKE LANE LINE DETAIL39 LF 15,000 $ 0.62 22 INTERSECTION LINE BIKE LANE DEAT LF 57000 $ 0.41 39AIL 23 LANE LINE EXTENSIONS THRU INT DETAIL 40 LF 21000 $ 0.15 24 18'ARROW TYPE I EA 25 $ 67.85 25 24'ARROW TYPE EA 15 $ 85.58 26 10'ARROW TYPE I EA 25 $ 38.81 27 (L)/(R) 8' ARROW 'TYPE IV EA 100 $ 40.97 28 (L)/(R) 18'ARROW TYPE VI EA 25 $ 107.94 29 5' BIKE LANE ARROW EA 50 $ 19.15 30 15' LEFT/STRAIGHT/RIGHT ARROW TYPE VIII EA 25 $ 99.72 31 13' (L) OR (R) STRAIGHTARROW TYPE VII EA 15 $ 74.02 32 RAILROAD CROSSING SYMBOL EA 2 $ 164,48 33 B' LETTER EA 11000 $ 20.81 34 4' LETTER - - - EA 100 $ 14,69 35 12" LIMIT LINE (STOP LINE) - LF 51000 $ 2.31 36 MACHINE THERMAPLASTIC REMOVAL - - - SF 51000 $ 2.45 EXHIBIT "B" ROAD MAINTENANCE SERVICES COMPENSATION SCHEDULE LABOR RATES LABOR RATES PER HOUR REGULAR HOUR RATE OVERTIME HOUR RATE SUPERINTENDENT $ 100,74 $ 151412 SUPERVISOR $ 100.74 $ 151.12 FOREMAN $ 118.22 $ 147.00 HEAVY EQUIPMENT OPERATOR $ 1%22 $ 147.00 10 WHEEL DUMP TRUCK OPERATOR $ 97.66 $ 124.39 MASON $ 100.74 $ 128.50 ASPHALT RAKER $ 100.74 $ 128,50 LABORER $ 94.68 Is 123.15 WALK BEHIND SAW OPERATOR $ 99.72 $ 128.09 EQUIPMENT WITH OPERATOR RATES REGULAR OVERTIME EQUIPMENT WITH OPERATOR HOURLY RATE HOUR RATE BACKHOE IS 190.18 $ 285.27 SKIDSTEER LOADER $ 190,18 $ 285,27 10 WHEEL DUMP TRUCK $ 133,64 $ 200,46 WATERTRUCK $ 149,06 $ 223,59 SKIP LOADER $ 149,06 223,59 CONSTRUCTION SWEEPER WITH SIDE AND REAR BRUSHES $ 174,76 $ 262.14 WALK BEHIND SAW MACHINE $ 159.34 239.01 SIDEWALK—GRINDER/CONCRETE SCARIFIER $ 15934 $ 239.01 EQUIPMENT RATES EQUIPMENT RATES HOURtY RATE WEEKLY RATE MONTHLY RATE PORTABLE AIR COMPRESSOR $ 35,98 $ 916,98 $ 1;534.80 PORTABLE ARROWBOARD $ 19,02 $ 272,42 $ 771.00 PORTABLE WATER TRAILER $ 28,89 $ 810,06 $ 1,426,86 PICKUP TRUCK $ 51AO $ 822A0 $ 1,829.84 VIBRATING COMPACTION ROLLER $ 53A6 $ 1,533.78 $ 3,932.10 BACKHOE $ 60,65 $ 1,665,36 $ 4,317.60 SKIDSTEER LOADER $ 48,32 $ 11387,80 $ 33469,50 10 WHEEL DUMP TRUCK $ 60465 $ 1,757488 $ 41240,60 CONTRACTOR WORK TRUCK $ 82,24 $ 11130,80 $ 2,775,60 WATER TRUCK $ 53,46 $ 1,696.20 $ 3,855,00 SKIP LOADER $ 53,46 $ 11696,20 $ 4,009.20 CONSTRUCTION RUSHES SWEEPER WITH SIDE AND REAR B $ 123,36 $ 3,495.20 $ 5,345.60 WALK BEHIND SAW MACHINE $ 53,46 $ 1,480.32 $ 3,469a50 PORTABLE CHANGEABLE MESSAGE SIGN $ 35.98 $ 765.86 $ 1,542,00 PORTABLE ARROWBOARD $ 19.02 $ 272,42 $ 771.00