Loading...
HomeMy WebLinkAboutRES 2025-33RESOLUTION NO. 2025-33 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DIAMOND BAR, CALIFORNIA, REQUESTING THE BOARD OF SUPERVISORS AS THE BOARD OF THE LOS ANGELES COUNTY FLOOD CONTROL DISTRICT TO ACCEPT, ON BEHALF OF SAID DISTRICT, THE TRANSFER AND CONVEYANCE OF THE STORM DRAIN IMPROVEMENTS KNOWN AS PRIVATE DRAIN NO. 2240, IN THE CITY OF DIAMOND BAR, FOR FUTURE OPERATION, MAINTENANCE, REPAIR, AND IMPROVEMENT, AND AUTHORIZE THE TRANSFER AND CONVEYANCE THEREOF, WHEREAS, there have been dedicated to, or the City of Diamond Bar (the "City") has otherwise acquired, the storm drain improvements and drainage system known as Private Drain No. 2240, depicted on Los Angeles County Flood Control District Drawing No. 34-F1186 on file with the Director of Public Works for County of Los Angeles and described in Exhibit A attached hereto; and WHEREAS, the City is authorized and empowered to transfer and convey to the Los Angeles County Flood Control District (the "District") any storm drain improvements and drainage systems for future operations, maintenance, repair and improvement; and WHEREAS, the City and the District entered into an Agreement dated June 20, 1989, and recorded March 20, 1990, as Document No. 90-545570 of the Official Records in the Registrar-Recorder/County Clerk's Office, whereby the City made certain warranties about its future transfers and conveyances of flood control facilities to the District; and WHEREAS, the best public interest will be served by the transfer and conveyance oI the storm drain improvements and drainage system described in Exhibit A attached hereto from the City to the Los Angeles County Flood Control District for future operation, maintenance, repair and improvement. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Diamond Bar as follows: Section 1. That the City Council of the City of Diamond Bar does hereby request the District to accept the transfer and conveyance of the storm drain improvements and drainage system depicted in Exhibit A. Section 2. That, subject to the acceptance thereof of the Board of Supervisors of the District, the City Engineer is directed and ordered to prepare all necessary instruments and documents to effectuate the transfer and conveyance and that the Mayor is authorized and instructed to execute said documents and other instruments. The District shall have no obligation or responsibility to maintain the storm drain, improvements, and drainage until all rights of way for the drain now vested in the City and all other necessary rights of way have been conveyed to and accepted by the District. 0 Resolution No. 2025-33 Section 3. The City Clerk shall attest and certify to the passage and adoption of this Resolution and enter it into the book of original resolutions, and it shall become effective immediately upon its approval. PASSED, APPROVED and ADOPTED this I day of October, 2025. THE CITY OF DIAMOND BAR Chia Yu Teng, Mayor ATTEST: I, Kristina Santana, City Clerk of the City of Diamond Bar, do hereby certify that the foregoing Resolution was duly and regularly passed, approved and adopted by the City Council of the City of Diamond Bar, California, at its regular meeting held on the 7t" day of October, 2025, by the following vote: AYES: COUNCIL MEMBERS: Chou, Liu, Low, MPT/Tye, M/Teng NOES: COUNCIL MEMBERS: None ABSENT: COUNCIL MEMBERS: None ABSTAINED: COUNCIL MEMBERS: None Kristina Santana, City Clerk LAT. A-8 ADDED MH AND LATERAL "A-8"AT STA 1+43.00 101-19-23AS-BUILTREVISED AS-BUILT TO MATCHFIELD CONDITIONS.THIS REVISION HAS BEEN PREPARED IN PART BASEDON INFORMATION FURNISHED BY OTHERS. THOSERELYING ON THIS RECORD DOCUMENT ARE ADVISEDTO OBTAIN INDEPENDENT VERIFICATION OF ITSACCURACY.________________________________________________JOHN MARK THOMPSON, PE R.C.E. 82557 DATE1JOHN THOMPSONLAT. A-9THIS HYDROLOGY STUDY WAS RE ONLY TO DETERMINE CONFORMIT LACFCD TRANSFER STANDARDS A OTHER PURPOSE. THE HYDROLO INDICATES THAT THE CAPACITY O ASSOCIATED STORM DRAIN IMPR OR DRAINAGE SYSTEM CONFORM STANDARDS. THE FOREGOINGNOTWITHSTANDING, NOTHING HE INTENDED TO EXPRESS OR IMPLY REPRESENTATION OR COMMITME LACFCD THAT IT WILL ACCEPT TH OF THE STORM DRAIN IMPROVEM DRAINAGE SYSTEM IF CONSTRUC ADDITION, ANY REVIEW OF THE H STUDY FOR OTHER PURPOSES AS REQUIRED BY THE LOCAL JURISD BE DONE TO THE SATISFACTION O JURISDICTION.THIS PLAN WAS REVIEWED ONLY TODETERMINE CONFORMITY TO LACFCDTRANSFER STANDARDS, AND THE STORMDRAIN IMPROVEMENT OR DRAINAGE SYSTEMDEPICTED ON THIS PLAN CONFORMS TOTHOSE STANDARDS. THE FOREGOINGNOTWITHSTANDING, NOTHING HEREIN ISINTENDED TO EXPRESS OR IMPLY ANYREPRESENTATION OR COMMITMENT BY THELACFCD THAT IT WILL ACCEPT THE TRANSFEROF THE STORM DRAIN IMPROVEMENT ORDRAINAGE SYSTEM IF CONSTRUCTED. INADDITION, ANY REVIEWS REQUIRED BY THELOCAL JURISDICTION MUST BE DONE TO THESATISFACTION OF THAT JURISDICTION.CHECKED BY: _____________________ RCE NO. ________ DATE _________REVIEWED UNDER THE SUPERVISION OF:______________________________ DATE ________LOS ANGELES COUNTY PUBLIC WORKSLAND DEVELOPMENT DIVISION,~01/23/20232/6/2023RMRAMeasure MR Local ReturnGas Tax eet Rehab.- Area 1a, 1b, 2 (Design)n)ntain Laurel) anyon to Lemon) to BCY)82,779$ 82,779$ om Pathfinder to Mountain Laurel Way) (Const.)1,200,000$ 1,200,000$ eet Rehab - Area 1 (Const.)2,000,000$ 925,000$ 850,000$ 89,0 $ en Springs from Brea Canyon to Lemon Ave.) (Const.)900,000$ 500,000$ mp Project (Const.)177,855$ nt Projects4,360,634$ 1,700,000$ 1,007,779$ 850,000$ 89,0 $ 250-5510-46412)Project DescriptionTotal FY Budget(109) Measure M(111)Gas Tax (112) Prop A(113) Prop C Sign and HSL Replacement (Design)50,000$ 50,000$ Sign and HSL Replacement (Construction)350,000$ 350,000$ al 11 Locations (Design and Construction)380,000$ 90,000$ 100,000$ 190,0 $ 780,000$ 350,000$ 140,000$ 100,000$ 190,0 $ ments (250-5510-46413) Project DescriptionTotal FY Budget(113) Prop CFoothill Transit Grant60,000$ 60,000$ SD/Calbourne 40,000$ 40,000$ nfrastructure Improvements100,000$ 60,000$ 40,000$ 0-5510-46420) Project DescriptionTotal FY Budget(107) Measure W(108)RMRA(109) Measure M (113) Prop Covements-Phase 3 (Flapjack-Design)65,000$ 65,000$ 02-16-23DAVID G. LIUNOTE: THIS DRAWING IS ATTACHED TO AND MADEPART OF PERMIT NO.________________________. ANY DEVIATION FROM THE ATTACHED DRAWINGWITHOUT WRITTEN AUTHORIZATION FROM THISDEPARTMENT WILL VOID THIS PERMIT.DDN: 34-F1186FCDP2020000558AMENDED: 03/28/2023ADDED LATERAL "A-8" ANDLATERAL "A-10" 2JOHN THOMPSON10-10-24222111LAT. A-102LATERAL PROFILE................................................... 6REMEDIATION PLAN................................................ 7272DAVID G. LIU05-28-25RMRAMeasure MR Local ReturnGas Tax eet Rehab.- Area 1a, 1b, 2 (Design)n)ntain Laurel) anyon to Lemon) to BCY)82,779$ 82,779$ om Pathfinder to Mountain Laurel Way) (Const.)1,200,000$ 1,200,000$ eet Rehab - Area 1 (Const.)2,000,000$ 925,000$ 850,000$ 89,0 $ en Springs from Brea Canyon to Lemon Ave.) (Const.)900,000$ 500,000$ mp Project (Const.)177,855$ nt Projects4,360,634$ 1,700,000$ 1,007,779$ 850,000$ 89,0 $ 250-5510-46412)Project DescriptionTotal FY Budget(109) Measure M(111)Gas Tax (112) Prop A(113) Prop C Sign and HSL Replacement (Design)50,000$ 50,000$ Sign and HSL Replacement (Construction)350,000$ 350,000$ al 11 Locations (Design and Construction)380,000$ 90,000$ 100,000$ 190,0 $ 780,000$ 350,000$ 140,000$ 100,000$ 190,0 $ ments (250-5510-46413) Project DescriptionTotal FY Budget(113) Prop CFoothill Transit Grant60,000$ 60,000$ SD/Calbourne 40,000$ 40,000$ nfrastructure Improvements100,000$ 60,000$ 40,000$ 0-5510-46420) Project DescriptionTotal FY Budget(107) Measure W(108)RMRA(109) Measure M (113) Prop Covements-Phase 3 (Flapjack-Design)65,000$ 65,000$ AS-BUILT 0+36.11 0+37.77 70.69 30" 19.65 RCP (PUBLIC) 0+37.77 0+61.33 49.95 30" 20.52 RCP (PUBLIC)Line A 0+61.33 1+43.00 43.75 30" 24.22 RCP (PUBLIC) 1+43.00 4+25.10 37.35 30" 23.91 RCP (PUBLIC) 4+25.10 6+27.30 35.50 30" 22.77 RCP (PUBLIC) 6+27.30 8+71.49 32.89 24" 14.21 RCP (PUBLIC)LAT A-9 10+00.00 11+07.17 6.20 24" 13.75 RCP (PRIVATE)LAT A-8 10+00.00 10+21.00 6.30 18" 16.47 RCP (PRIVATE)HYDRAULIC ELEMENT TABLELINE PIPE REACH Q(cfs) PIPE SIZE MAX VELOCITY REMARKS STATION STATION (FPS) 1ADDED MH AND LATERAL "A-8"AT STA 1+43.00 1JOHN THOMPSON 01-19-23 REVISED AS-BUILT TO MATCHFIELD CONDITIONS.RMRAMeasure MR Local ReturnGas Tax eet Rehab.- Area 1a, 1b, 2 (Design)n)ntain Laurel) anyon to Lemon) to BCY)82,779$ 82,779$ om Pathfinder to Mountain Laurel Way) (Const.)1,200,000$ 1,200,000$ eet Rehab - Area 1 (Const.)2,000,000$ 925,000$ 850,000$ 89,0 $ en Springs from Brea Canyon to Lemon Ave.) (Const.)900,000$ 500,000$ mp Project (Const.)177,855$ nt Projects4,360,634$ 1,700,000$ 1,007,779$ 850,000$ 89,0 $ 250-5510-46412)Project DescriptionTotal FY Budget(109) Measure M(111)Gas Tax (112) Prop A(113) Prop C Sign and HSL Replacement (Design)50,000$ 50,000$ Sign and HSL Replacement (Construction)350,000$ 350,000$ al 11 Locations (Design and Construction)380,000$ 90,000$ 100,000$ 190,0 $ 780,000$ 350,000$ 140,000$ 100,000$ 190,0 $ ments (250-5510-46413) Project DescriptionTotal FY Budget(113) Prop CFoothill Transit Grant60,000$ 60,000$ SD/Calbourne 40,000$ 40,000$ nfrastructure Improvements100,000$ 60,000$ 40,000$ 0-5510-46420) Project DescriptionTotal FY Budget(107) Measure W(108)RMRA(109) Measure M (113) Prop Covements-Phase 3 (Flapjack-Design)65,000$ 65,000$ 02-16-23DAVID G. LIUNOTE: THIS DRAWING IS ATTACHED TO AND MADEPART OF PERMIT NO.________________________. ANY DEVIATION FROM THE ATTACHED DRAWINGWITHOUT WRITTEN AUTHORIZATION FROM THISDEPARTMENT WILL VOID THIS PERMIT.DDN: 34-F1186FCDP2020000558AMENDED: 03/28/2023ADDED LATERAL "A-8" ANDLATERAL "A-10" JOHN THOMPSON10-10-24LAT A-9 10+00.00 11+07.17 6.20 24" 15.50 RCPLAT A-8 10+00.00 10+21.00 6.30 18" 20.94 RCPLAT A-10 10+27.00 10+64.00 3.15 18" 16.81 RCP 222222(NOT TO BE MAINTAINED BY LACFCD)(NOT TO BE MAINTAINED BY LACFCD)(NOT TO BE MAINTAINED BY LACFCD)72DAVID G. LIU05-28-25RMRAMeasure MR Local ReturnGas Tax eet Rehab.- Area 1a, 1b, 2 (Design)n)ntain Laurel) anyon to Lemon) to BCY)82,779$ 82,779$ om Pathfinder to Mountain Laurel Way) (Const.)1,200,000$ 1,200,000$ eet Rehab - Area 1 (Const.)2,000,000$ 925,000$ 850,000$ 89,0 $ en Springs from Brea Canyon to Lemon Ave.) (Const.)900,000$ 500,000$ mp Project (Const.)177,855$ nt Projects4,360,634$ 1,700,000$ 1,007,779$ 850,000$ 89,0 $ 250-5510-46412)Project DescriptionTotal FY Budget(109) Measure M(111)Gas Tax (112) Prop A(113) Prop C Sign and HSL Replacement (Design)50,000$ 50,000$ Sign and HSL Replacement (Construction)350,000$ 350,000$ al 11 Locations (Design and Construction)380,000$ 90,000$ 100,000$ 190,0 $ 780,000$ 350,000$ 140,000$ 100,000$ 190,0 $ ments (250-5510-46413) Project DescriptionTotal FY Budget(113) Prop CFoothill Transit Grant60,000$ 60,000$ SD/Calbourne 40,000$ 40,000$ nfrastructure Improvements100,000$ 60,000$ 40,000$ 0-5510-46420) Project DescriptionTotal FY Budget(107) Measure W(108)RMRA(109) Measure M (113) Prop Covements-Phase 3 (Flapjack-Design)65,000$ 65,000$ LAT A-801-19-23LAT A-81+43.0018" RCP707.50 INV1STA: 1+42.20CL SD MHPRIVATE INLET PER GRADING PLANS(NOT TO BE MAINTAINED BY LACFCD)THIS REVISION HAS BEEN PREPARED IN PART BASEDON INFORMATION FURNISHED BY OTHERS. THOSERELYING ON THIS RECORD DOCUMENT ARE ADVISEDTO OBTAIN INDEPENDENT VERIFICATION OF ITSACCURACY.________________________________________________JOHN MARK THOMPSON, PE R.C.E. 82557 DATEAS-BUILT ADDED MH AND LATERAL "A-8"AT STA 1+43.00 JOHN THOMPSON1111PRIVATE INLET PER GRADING PLANS(NOT TO BE MAINTAINED BY LACFCD)PARKWAY DRAIN(NOT TO BE MAINTAINED BY LACFCD)1STA: 1+43.00CL SD MHRIM = 723.25VMAX=23.91 FPSQ50=43.75 CFSVMAX=24.22 FPSQ50=49.95 CFSVMAX=20.52 FPSQ50=49.95 CFSVMAX=20.52 FPSQ50=70.69 CFSVMAX=19.65 FPS11+43.00VMAX=23.91 FPSVMAX=22.77 FPSVMAX=14.21 FPSABANDONED LATERAL LAT A-9 (NOT TO BE MAINTAINED BY LACFCD)LAT A-9CONFLICTING SECTIONSTO BE REMOVED24" RCP PER CONNECTIONPERMIT NO. 92644-AREVISED AS-BUILT TO MATCHFIELD CONDITIONS.172.08'END OF EXISTINGINFRASTRUCTUREAT BEGINNING OF JUNCTION STRUCTURE30" RCP @13.30'RMRAMeasure MR Local ReturnGas Tax eet Rehab.- Area 1a, 1b, 2 (Design)n)ntain Laurel) anyon to Lemon) to BCY)82,779$ 82,779$ om Pathfinder to Mountain Laurel Way) (Const.)1,200,000$ 1,200,000$ eet Rehab - Area 1 (Const.)2,000,000$ 925,000$ 850,000$ 89,0 $ en Springs from Brea Canyon to Lemon Ave.) (Const.)900,000$ 500,000$ mp Project (Const.)177,855$ nt Projects4,360,634$ 1,700,000$ 1,007,779$ 850,000$ 89,0 $ 250-5510-46412)Project DescriptionTotal FY Budget(109) Measure M(111)Gas Tax (112) Prop A(113) Prop C Sign and HSL Replacement (Design)50,000$ 50,000$ Sign and HSL Replacement (Construction)350,000$ 350,000$ al 11 Locations (Design and Construction)380,000$ 90,000$ 100,000$ 190,0 $ 780,000$ 350,000$ 140,000$ 100,000$ 190,0 $ ments (250-5510-46413) Project DescriptionTotal FY Budget(113) Prop CFoothill Transit Grant60,000$ 60,000$ SD/Calbourne 40,000$ 40,000$ nfrastructure Improvements100,000$ 60,000$ 40,000$ 0-5510-46420) Project DescriptionTotal FY Budget(107) Measure W(108)RMRA(109) Measure M (113) Prop Covements-Phase 3 (Flapjack-Design)65,000$ 65,000$ 02-16-23DAVID G. LIUNOTE: THIS DRAWING IS ATTACHED TO AND MADEPART OF PERMIT NO.________________________. ANY DEVIATION FROM THE ATTACHED DRAWINGWITHOUT WRITTEN AUTHORIZATION FROM THISDEPARTMENT WILL VOID THIS PERMIT.DDN: 34-F1186FCDP2020000558AMENDED: 03/28/2023ADDED LATERAL "A-8" ANDLATERAL "A-10" JOHN THOMPSON10-10-24111SEE SEPERATE SOUTH POINTE WESTTR63623 PRIVATE SD IMPROVEMENT PLANS21(NOT TO BEMAINTAINED BYLACFCD)LAT A-10(NOT TO BEMAINTAINED BYLACFCD)22MH 321-272(NOT TO BE MAINTAINED BY LACFCD)(NOT TO BEBY LACFCD)MAINTAINED(NOT TOMAINTAINEDBEBYLACFCD)(NOT TO BE MAINTAINED BY LACFCD)NOT TO BE MAINTAINEDBY LACFCDDAVID G. LIU05-28-25RMRAMeasure MR Local ReturnGas Tax eet Rehab.- Area 1a, 1b, 2 (Design)n)ntain Laurel) anyon to Lemon) to BCY)82,779$ 82,779$ om Pathfinder to Mountain Laurel Way) (Const.)1,200,000$ 1,200,000$ eet Rehab - Area 1 (Const.)2,000,000$ 925,000$ 850,000$ 89,0 $ en Springs from Brea Canyon to Lemon Ave.) (Const.)900,000$ 500,000$ mp Project (Const.)177,855$ nt Projects4,360,634$ 1,700,000$ 1,007,779$ 850,000$ 89,0 $ 250-5510-46412)Project DescriptionTotal FY Budget(109) Measure M(111)Gas Tax (112) Prop A(113) Prop C Sign and HSL Replacement (Design)50,000$ 50,000$ Sign and HSL Replacement (Construction)350,000$ 350,000$ al 11 Locations (Design and Construction)380,000$ 90,000$ 100,000$ 190,0 $ 780,000$ 350,000$ 140,000$ 100,000$ 190,0 $ ments (250-5510-46413) Project DescriptionTotal FY Budget(113) Prop CFoothill Transit Grant60,000$ 60,000$ SD/Calbourne 40,000$ 40,000$ nfrastructure Improvements100,000$ 60,000$ 40,000$ 0-5510-46420) Project DescriptionTotal FY Budget(107) Measure W(108)RMRA(109) Measure M (113) Prop Covements-Phase 3 (Flapjack-Design)65,000$ 65,000$ AS-BUILTNOTE: THIS DRAWING IS ATTACHED TO AND MADEPART OF PERMIT NO.________________________. ANY DEVIATION FROM THE ATTACHED DRAWINGWITHOUT WRITTEN AUTHORIZATION FROM THISDEPARTMENT WILL VOID THIS PERMIT.DDN: 34-F1186FCDP2020000558AMENDED: 03/28/202372 AS-BUILT ADDED MH AND LATERAL "A-8"AT STA 1+43.00 JOHN THOMPSON 01-19-23REVISED AS-BUILT TO MATCHFIELD CONDITIONS.VOID LATERAL PER PERMIT 92644-AVOID LATERAL PER PERMIT 92644-ARMRAMeasure MR Local ReturnGas Tax eet Rehab.- Area 1a, 1b, 2 (Design)n)ntain Laurel) anyon to Lemon) to BCY)82,779$ 82,779$ om Pathfinder to Mountain Laurel Way) (Const.)1,200,000$ 1,200,000$ eet Rehab - Area 1 (Const.)2,000,000$ 925,000$ 850,000$ 89,0 $ en Springs from Brea Canyon to Lemon Ave.) (Const.)900,000$ 500,000$ mp Project (Const.)177,855$ nt Projects4,360,634$ 1,700,000$ 1,007,779$ 850,000$ 89,0 $ 250-5510-46412)Project DescriptionTotal FY Budget(109) Measure M(111)Gas Tax (112) Prop A(113) Prop C Sign and HSL Replacement (Design)50,000$ 50,000$ Sign and HSL Replacement (Construction)350,000$ 350,000$ al 11 Locations (Design and Construction)380,000$ 90,000$ 100,000$ 190,0 $ 780,000$ 350,000$ 140,000$ 100,000$ 190,0 $ ments (250-5510-46413) Project DescriptionTotal FY Budget(113) Prop CFoothill Transit Grant60,000$ 60,000$ SD/Calbourne 40,000$ 40,000$ nfrastructure Improvements100,000$ 60,000$ 40,000$ 0-5510-46420) Project DescriptionTotal FY Budget(107) Measure W(108)RMRA(109) Measure M (113) Prop Covements-Phase 3 (Flapjack-Design)65,000$ 65,000$ 02-16-23DAVID G. LIUNOTE: THIS DRAWING IS ATTACHED TO AND MADEPART OF PERMIT NO.________________________. ANY DEVIATION FROM THE ATTACHED DRAWINGWITHOUT WRITTEN AUTHORIZATION FROM THISDEPARTMENT WILL VOID THIS PERMIT.DDN: 34-F1186FCDP2020000558AMENDED: 03/28/2023ADDED LATERAL "A-8" ANDLATERAL "A-10" JOHN THOMPSON 10-10-2422722DAVID G. LIU05-28-25RMRAMeasure MR Local ReturnGas Tax eet Rehab.- Area 1a, 1b, 2 (Design)n)ntain Laurel) anyon to Lemon) to BCY)82,779$ 82,779$ om Pathfinder to Mountain Laurel Way) (Const.)1,200,000$ 1,200,000$ eet Rehab - Area 1 (Const.)2,000,000$ 925,000$ 850,000$ 89,0 $ en Springs from Brea Canyon to Lemon Ave.) (Const.)900,000$ 500,000$ mp Project (Const.)177,855$ nt Projects4,360,634$ 1,700,000$ 1,007,779$ 850,000$ 89,0 $ 250-5510-46412)Project DescriptionTotal FY Budget(109) Measure M(111)Gas Tax (112) Prop A(113) Prop C Sign and HSL Replacement (Design)50,000$ 50,000$ Sign and HSL Replacement (Construction)350,000$ 350,000$ al 11 Locations (Design and Construction)380,000$ 90,000$ 100,000$ 190,0 $ 780,000$ 350,000$ 140,000$ 100,000$ 190,0 $ ments (250-5510-46413) Project DescriptionTotal FY Budget(113) Prop CFoothill Transit Grant60,000$ 60,000$ SD/Calbourne 40,000$ 40,000$ nfrastructure Improvements100,000$ 60,000$ 40,000$ 0-5510-46420) Project DescriptionTotal FY Budget(107) Measure W(108)RMRA(109) Measure M (113) Prop Covements-Phase 3 (Flapjack-Design)65,000$ 65,000$ CITY OF DIAMOND BARDRAWING NO.APPROVALBASIS OF BEARINGSBENCH MARKAPPROVEDDATEREFERENCESDATEREVISIONSLARKSTONE DRIVEPD 2240PD 2240TR 63623PRIVATE DRAIN 2240LATERALS PROFILES& DETAILSPROFILE SCALE:HORIZ.: 1"= 20'VERT.: 1"= 10'LATERAL A-8, A-10901 VIA PIEMONTEPH: 909.477.6915SUITE 400www.imegcorp.comONTARIO, CA 91764ADDED LATERAL "A-8" ANDLATERAL "A-10" 2JOHN THOMPSON 10-10-242NOT TO BEMAINTAINEDBY LACFCDDAVID G. LIU05-28-25RMRAMeasure MR Local ReturnGas Tax eet Rehab.- Area 1a, 1b, 2 (Design)n)ntain Laurel) anyon to Lemon) to BCY)82,779$ 82,779$ om Pathfinder to Mountain Laurel Way) (Const.)1,200,000$ 1,200,000$ eet Rehab - Area 1 (Const.)2,000,000$ 925,000$ 850,000$ 89,0 $ en Springs from Brea Canyon to Lemon Ave.) (Const.)900,000$ 500,000$ mp Project (Const.)177,855$ nt Projects4,360,634$ 1,700,000$ 1,007,779$ 850,000$ 89,0 $ 250-5510-46412)Project DescriptionTotal FY Budget(109) Measure M(111)Gas Tax (112) Prop A(113) Prop C Sign and HSL Replacement (Design)50,000$ 50,000$ Sign and HSL Replacement (Construction)350,000$ 350,000$ al 11 Locations (Design and Construction)380,000$ 90,000$ 100,000$ 190,0 $ 780,000$ 350,000$ 140,000$ 100,000$ 190,0 $ ments (250-5510-46413) Project DescriptionTotal FY Budget(113) Prop CFoothill Transit Grant60,000$ 60,000$ SD/Calbourne 40,000$ 40,000$ nfrastructure Improvements100,000$ 60,000$ 40,000$ 0-5510-46420) Project DescriptionTotal FY Budget(107) Measure W(108)RMRA(109) Measure M (113) Prop Covements-Phase 3 (Flapjack-Design)65,000$ 65,000$ AS-BUILTNOTE: THIS DRAWING IS ATTACHED TO AND MADEPART OF PERMIT NO.________________________. ANY DEVIATION FROM THE ATTACHED DRAWINGWITHOUT WRITTEN AUTHORIZATION FROM THISDEPARTMENT WILL VOID THIS PERMIT.DDN: 34-F1186FCDP2020000558AMENDED: 03/28/2023727