Loading...
HomeMy WebLinkAboutT&T Commission Agenda Packet - 5-11-23 TRAFFIC & TRANSPORTATION COMMISSION AGENDA May 11, 2023 6:30 P.M. Diamond Bar City Hall Windmill Community Room 21810 Diamond Bar, CA 91765 Telephonically: 1+ (631) 992-3221 – Access Code: 291-807-091 https://attendee.gotowebinar.com/register/6306038265603109463 Chairperson Gary Busteed Vice Chairperson Surendra Mehta Commissioner Romulo Morales Commissioner Raphael Plunkett Commissioner Manisha Sulakhe Written materials distributed to the Traffic and Transportation Commission within 72 hours of the Traffic and Transportation Commission meeting are available for public inspection immediately upon distribution in the City Clerk's office at 21810 Copley Drive, Diamond Bar, California, during normal business hours. Copies of staff reports or other written documentation relating to agenda items are on file in the Public Works Department, located at 21810 Copley Drive, and are available for public inspection. If you have questions regarding an agenda item, please call 909.839.7040 during regular business hours. In an effort to comply with the requirements of Title II of the Americans with Disabilities Act of 1990, the City of Diamond Bar requires that any person in need of any type of special equipment, assistance or accommodation(s) in order to communicate at a City public meeting must inform the Public Works Department at 909.839.7040 a minimum of 72 hours prior to the scheduled meeting. Please refrain from smoking, eating or drinking in the Windmill Community Room The City of Diamond Bar uses recycled paper and encourages you to do the same TRAFFIC AND TRANSPORTATION COMMISSION MEETING RULES Welcome to the meeting of the Traffic and Transportation Commission. Meetings are open to the public. You are invited to attend and participate. PUBLIC INPUT Members of the public may address the Commission on any item of business on the agenda during the time the item is taken up by the Commission. In addition, members of the public may, during the Public Comment period, address the Commission on any item or any matter not on the agenda and within the Commission’s subject matter jurisdiction. Persons wishing to speak should submit a speaker slip to the meeting clerk. Any material to be submitted to the Traffic and Transportation Commission at the meeting should be submitted through the meeting clerk. Speakers are limited to five minutes per agenda item, unless determined otherwise. The Commissioners may adjust this time limit depending on the number of people wishing to speak, the complexity of the matter, the length of the agenda, the hour and any other relevant consideration. Speakers may address the Commission only once on an agenda item, except during public hearings, when the applicant/appellant may be afforded a rebuttal. Public comments must be directed to the Commission. Behavior that disrupts the orderly conduct of the meeting may result in the speaker being removed from the Commission meeting room. INFORMATION RELATING TO AGENDAS AND ACTIONS OF THE COMMISSION Agendas for regular Traffic and Transportation Commission meetings are available 72 hours prior to the meeting and are posted in the City’s regular posting locations, and on the City’s website at www.diamondbarca.gov. A full agenda packet is available for review during the meeting, at the back of the meeting room. The Traffic and Transportation Commission may take action on any item listed on the agenda. ACCOMMODATIONS FOR THE DISABLED A cordless microphone is available for those persons with mobility impairments who cannot access the podium in order to make a public comment. Sign language interpretation is available by providing the City Clerk three business days’ notice in advance of a meeting. Please telephone (909) 839-7010 between 7:30 a.m. and 5:30 p.m. Monday through Thursday and 7:30 a.m. to 4:30 p.m. on Fridays. HELPFUL PHONE NUMBERS Computer access to agendas: www.diamondbarca.gov General information: (909) 839-7040 Written materials distributed to the Traffic & Transportation Commission within 72 hours of the Traffic & Transportation Commission meeting are available for public inspection immediately upon d istribution in the City Clerk’s Office at 21810 Copley Dr., Diamond Bar, California, during normal business hours. CITY OF DIAMOND BAR TRAFFIC AND TRANSPORTATION COMMISSION AGENDA Thursday, May 11, 2023 WINDMILL COMMUNITY ROOM Diamond Bar City Hall 21810 Copley Drive, Diamond Bar, Ca 91765 CALL TO ORDER: 6:30 P.M. PLEDGE OF ALLEGIANCE: Commissioner Plunkett ROLL CALL: Commissioners Morales, Plunkett, Sulakhe, Vice Chair Mehta, Chair Busteed I. REORGANIZATION OF THE TRAFFIC & TRANSPORTATION COMMISSION 1. Reorganization of the Traffic & Transportation Commission Recommended Action: Select a New Chair II. APPROVAL OF MINUTES: A. T& T Commission Meeting Minutes of March 9, 2023 Recommended Action: Receive and File III. PUBLIC COMMENTS: This is the time and place for the general public to address the Commission. Items to be discussed here are those which do not already appear on this agenda. IV. ITEMS FROM STAFF: A. Traffic Statistics - February and March 2023 Recommended Action: Receive and File MAY 11, 2023 PAGE 2 TRAFFIC AND TRANSPORTATION COMMISSION B. Monthly Updates of Various Projects/Programs Recommended Action: Receive and File V. NEW BUSINESS 1. FY 2024-2027 City of Diamond Bar Strategic Plan Recommended Action: Receive and File 2. FY 2023-2024 Capital Improvement Program (CIP) Budget and 5-Year CIP List Recommended Action: Receive and File VI. STATUS OF PREVIOUS ACTION ITEMS VII. ITEMS FROM COMMISSIONERS: VIII. SCHEDULE OF FUTURE CITY EVENTS: A. CITY COUNCIL MEETING – Tuesday, May 16, 2023 – 6:30 p.m., AQMD/Government Center, Auditorium, 21865 Copley Drive B. PLANNING COMMISSION MEETING – Tuesday, May 23, 2023 – 6:30 p.m., Diamond Bar City Hall Windmill Community Room, 21810 Copley Drive C. PARKS AND RECREATION COMMISSION MEETING – Thursday, May 25, 2023 – 6:30 p.m., Diamond Bar City Hall Windmill Community Room, 21810 Copley Drive D. CITY COUNCIL MEETING – Tuesday, June 6, 2023 – 6:30 p.m., AQMD/Government Center, Auditorium, 21865 Copley Drive E. PLANNING COMMISSION MEETING – Tuesday, June 13, 2023 – 6:30 p.m., Diamond Bar City Hall Windmill Community Room, 21810 Copley Drive F. CONCERTS IN THE PARK/MOVIES UNDER THE STARS – Wednesday, June 14, 2023 thru Wednesday, August 2, 2023 – 6:30 p.m. - 8:00 p.m. – Summitridge Park, 1425 Summitridge Drive (adjacent to Diamond Bar Center, 1600 Grand Avenue) – Schedule in the Diamond Bar Recreation Guide G. CITY COUNCIL MEETING – Tuesday, June 20, 2023 – 6:30 p.m., AQMD/Government Center, Auditorium, 21865 Copley Drive H. PLANNING COMMISSION MEETING – Tuesday, June 27, 2023 – 6:30 p.m., Diamond Bar City Hall Windmill Community Room, 21810 Copley Drive MAY 11, 2023 PAGE 3 TRAFFIC AND TRANSPORTATION COMMISSION I. INDEPENDENCE DAY – Tuesday, July 4, 2023 – City offices will be closed in observance of the holiday. We will re-open for business on Wednesday, July 5, 2023 at 7:30 a.m. J. CITY COUNCIL MEETING – Tuesday, July 4, 2023 – CANCELLED K. PLANNING COMMISSION MEETING – Tuesday, July 11, 2023 – 6:30 p.m., Diamond Bar City Hall Windmill Community Room, 21810 Copley Drive L. TRAFFIC & TRANSPORTATION COMMISSION MEETING – Thursday, July 13, 2023 – 6:30 p.m., Diamond Bar City Hall Windmill Community Room, 21810 Copley Drive IX. ADJOURNMENT TRAFFIC & TRANSPORTATION COMMISSION AGENDA REPORT AGENDA ITEM NUMBER: 1.1 MEETING DATE: May 11, 2023 TO: Chair and Members of the Traffic and Transportation Commission FROM: David G. Liu, Public Works Director/City Engineer SUBJECT: Reorganization of the Traffic and Transportation Commission RECOMMENDATION: Select a New Chair At our last meeting held on March 9, 2023, Commissioner Gary Busteed was selected as Chair of the Traffic and Transportation Commission. Staff has been notified tha t Chair Busteed is unable to fulfill his obligation as Chair at this time; therefore, a new Chair will be selected at this meeting. The Chair shall be the Presiding Officer at all meetings of the Commission. In the absence of the Chair, the Vice-Chair shall preside. In the absence of both the Chair and the Vice-Chair, the Commission shall select a temporary Presiding Officer to serve until the arrival of the Chair or Vice-Chair, or until adjournment. CITY OF DIAMOND BAR ~ 21810 COPLEY DRIVE ~ DIAMOND BAR, CA 91765 ~ TEL. (909) 839-7040 ~ FAX (909) 861-3117 1.1 Packet Pg. 6 TRAFFIC & TRANSPORTATION COMMISSION AGENDA REPORT AGENDA ITEM NUMBER: 2.A MEETING DATE: May 11, 2023 TO: Chair and Members of the Traffic and Transportation Commission FROM: David G. Liu, Public Works Director/City Engineer SUBJECT: T& T Commission Meeting Minutes of March 9, 2023 RECOMMENDATION: Receive and File Attached, for your review and approval, are the T&T Commission Meeting Minutes of March 9, 2023. Attachments: 1. T&T Commission Meeting Minutes of March 9, 2023 CITY OF DIAMOND BAR ~ 21810 COPLEY DRIVE ~ DIAMOND BAR, CA 91765 ~ TEL. (909) 839-7040 ~ FAX (909) 861-3117 2.A Packet Pg. 7 CITY OF DIAMOND BAR MINUTES OF THE TRAFFIC & TRANSPORTATION COMMISSION MEETING DIAMOND BAR CITY HALL WINDMILL ROOM 21810 COPLEY DRIVE, DIAMOND BAR, CA 91765 MARCH 9, 2023 CALL TO ORDER: Chair Busteed called the meeting to order at 6:45 p.m. PLEDGE OF ALLEGIANCE: C/Mehta led the Pledge of Allegiance. ROLL CALL: Commissioners Surendra Mehta, Romulo Morales, Raphael Plunkett, Manisha Sulakhe, Chair/Busteed. Staff present: David Liu, Public Works Director; Hal Ghafari, Public Works Manager/Assistant City Engineer Christian Malpica, Associate Engineer; Nicholas “Nick” Delgado, Engineering Technician; Marcy Hilario, Administrative Coordinator I. INTRODUCTION PWD/Liu introduced newly appointed Commissioner Romulo Morales. II. REORGANIZATION OF THE TRAFFIC & TRANSPORTATION COMMISSION: A. Selection of Chair C/Sulakhe nominated Commissioner Plunkett to serve as Chair of the Traffic and Transportation Commission. The nomination was seconded by C/Mehta. Roll Call vote on C/Plunkett’s nomination 2 yes, 3 no. Nomination failed. Mehta Yes Morales No Plunkett Yes Sulakhe No Busteed No C/Busteed nominated himself to serve as Chair of the Traffic and Transportation Commission. C/Morales seconded the nomination. Roll Call vote: C/Busteed was unanimously elected to serve as Chair of the Traffic and Transportation Commission by the following Roll Call vote: 2.A.a Packet Pg. 8 Attachment: T&T Commission Meeting Minutes of March 9, 2023 (T&T Commission Meeting Minutes of March 9, 2023) MARCH 9, 2023 PAGE 2 T&T COMMISSION Mehta Yes Morales Yes Plunkett Yes Sulakhe Yes Busteed Yes B. Selection of Vice Chair C/Mehta nominated himself to serve as Vice Chair of the Traffic and Transportation Commission. C/Plunkett seconded the nomination. C/Mehta was unanimously elected to serve as Vice Chair of the Traffic and Transportation Commission by the following Roll Call vote: Mehta Yes Morales Yes Plunkett Yes Sulakhe Yes Chair/Busteed Yes III. APPROVAL OF MINUTES: A. Traffic and Transportation Commission Regular Meeting Minutes of January 12, 2023. VC/Mehta moved, C/Plunkett seconded, to approve the Regular Meeting Minutes of January 12, 2023. Motion carried by the following Roll Call vote: AYES: COMMISSIONERS: Plunkett, VC/Mehta, Chair/Busteed NOES: COMMISSIONERS: None ABSTAIN: COMMISSIONERS: Morales, Sulakhe ABSENT: COMMISSIONERS: None IV. PUBLIC COMMENTS: None Offered V. ITEMS FROM STAFF: A. TRAFFIC STATISTICS – DECEMBER 2022 AND JANUARY 2023. C/Plunkett moved, VC/Mehta seconded, to Receive and File the December 2022 and January 2023 Traffic Statistics Report. Motion carried by the following Roll Call vote: AYES: COMMISSIONERS: Morales, Plunkett, Sulakhe, VC/ Mehta, Chair/Busteed NOES: COMMISSIONERS: None ABSENT: COMMISSIONERS: None 2.A.a Packet Pg. 9 Attachment: T&T Commission Meeting Minutes of March 9, 2023 (T&T Commission Meeting Minutes of March 9, 2023) MARCH 9, 2023 PAGE 3 T&T COMMISSION B. MONTHLY UPDATES OF VARIOUS PROJECTS/PROGRAMS: 1. Residential & Collector Streets Rehabilitation (Area 2) and Arterial Street Rehabilitation (Golden Springs Drive from Brea Canyon Road to Grand Avenue) – AE/Malpica - City Council approved the plans and specifications for the subject project on February 7th. Subsequently, staff advertised the project for construction bids on Planetbids with the due date of March 8, 2023. The Area 2 neighborhood is located south of Grand Avenue, west of Diamond Bar Boulevard, north of Pathfinder Road, and east of SR-57. The project will improve approximately 12 centerline miles of residential and collector streets with slurry seal, chip seal, localized asphalt concrete (AC) dig- outs, and ADA curb ramp improvements, as determined by field conditions in Area 2. Additionally, the project will rehabilitate Golden Springs Drive from Brea Canyon Road to Grand Avenue with AC grind and overlay, enhanced bike lanes, signing and striping, and ADA curb ramp improvements. This 1.5-mile stretch of roadway is recommended for rehabilitation by the current Pavement Management System Report. 2. Grand Avenue/Golden Springs Drive Intersection Improvements – AE/Malpica - As of the end of February 2023, the west side tunnel has been completed. The construction on the east side tunnel is currently underway, with tentative completion by the end of May. Full completion of the project has been rescheduled to August 2023. 3. NTMP/Hawkwood Road Neighborhood – Neighborhood Traffic Management Program – AE/Malpica - The roadway striping along Hawkwood Road was completed on January 26, 2023, as part of a two- phase approach. Striping included new thermoplastic solid double yellow lines centered within the roadway, 6" thermoplastic solid edge white lines, and thermoplastic 25 mph speed limit pavement markings. Residents along Hawkwood Road were notified via letter and 72- hours "No Parking" signs during the week of January 16th. Staff will monitor the area and follow up with traffic data collection in 6 months to determine if the improvements have had the ir intended effect on speed and traffic behavior. This will determine if a second phase is needed. 4. Area 2 CBDG Curb Ramp Project – AE/Malpica - Construction work on the subject project began on October 10, 2022 and was completed on December 19, 2022. A total of 16 ramps were installed per plan with the exception of 4 ramps that were relocated in order to improve neighborhood drainage. The project was completed under budget. 5. SR-57/60 Interchange Improvements Project – PWD/Liu - On February 27, 2023, SGVCOG Capital Projects and Construction Committee’s Executive Director was authorized to award a construction contract to Skansa USA Civil West for the subject Project, in the not-to- 2.A.a Packet Pg. 10 Attachment: T&T Commission Meeting Minutes of March 9, 2023 (T&T Commission Meeting Minutes of March 9, 2023) MARCH 9, 2023 PAGE 4 T&T COMMISSION exceed amount of $266,900.00. A funding agreement with Metro was approved as well. SGVCOG will oversee construction activities and construction is scheduled to commence in late spring/early summer of 2023. 6. Brea Boulevard Corridor Improvement Project – ET/Delgado - Orange County Public Works (OCPW) identified the need to widen sections of Brea Boulevard from the intersection of Central Avenue/State College Boulevard in Brea to approximately 1,700 feet northeast of Tonner Canyon Road in unincorporated Orange County. The proposed Project aims to improve traffic flow, improve safety for bicyclists and motorists, and replace 80 plus year old bridges that support the roadway. Proposed improvements include widening of the roadway from one to two lanes in each direction (four total); realignment of radius curves; new center median construction; a new standard 8ft shoulder for a Class III bicycle lane; and, a new 3-way traffic signal at the Brea Canyon Road and Tonner Canyon Road intersection. This Project is in the planning and environmental review phase and, in order to comply with the California Environmental Quality Act (CEQA), OCPW has circulated this project's draft environmental impact report (EIR) for public review. The City of Diamond Bar has reviewed the traffic element of the report to learn more about the existing traffic conditions, the project's potential impacts, and the recommended mitigation measures to reduce or avoid any potential impacts on our city traffic. Findings of the draft report indicate that there will be minimal traffic-related impacts in Orange County's jurisdiction after this Project is complete. Because the Project is not land-development related that would generate new trips and, is characterized as a roadway circulation network solution to enhance safety and traffic flow, the impacts to Brea Canyon Road in the City of Diamond Bar are not projected to be significant beyond its current conditions. The City will continue to monitor this proposed project during the planning phase and once approved for construction, OCPW anticipates this will be a four (4) year construction project. The City's Public Works staff will work with OCPW and their contractors to learn more about the future construction schedule and minimize any potential traffic impacts tp Diamond Bar. 7. Upcoming Utility Construction Projects – ET/Delgado - Staff approved plans and issued encroachment permits for several utility improvement projects that are anticipated to begin construction in the coming weeks: Frontier Communications – Peaceful Hills Road Neighborhood Residential Fiber Optic Cable Service Installation; Frontier Communications – Canyon Ridge Road Neighborhood Residential Fiber Optic Cable Service Installation 2.A.a Packet Pg. 11 Attachment: T&T Commission Meeting Minutes of March 9, 2023 (T&T Commission Meeting Minutes of March 9, 2023) MARCH 9, 2023 PAGE 5 T&T COMMISSION Southern California Edison – Brea Canyon Road, from Cool Springs Drive to Cold Spring Lane, Rule 20A Utility Pole Underground Conversion Project SoCalGas – Kiowa Crest Drive from Eldertree Drive to Santaquin Drive Residential Gas Service Mainline Replacement SoCalGas – Deerfoot Drive from Kiowa Crest Drive to Sunbluff Drive Residential Gas Service Mainline Replacement Walnut Valley Water District – 850 Brea Canyon Road Domestic Water Meter and Recycled Water Service Installation Walnut Valley Water District – Golden Springs Drive at Grand Avenue New Recycled Water Meter Installation Walnut Valley Water District – Via Sorella at Brea Canyon Road Water Mainline Replacement C/Plunkett moved, C/Sulakhe seconded, to receive and file the Monthly Updates of Various Projects/Programs report. Motion carried by the following Roll Call vote: AYES: COMMISSIONERS: Morales, Plunkett, Sulakhe, VC/ Mehta, Chair/Busteed NOES: COMMISSIONERS: None ABSENT: COMMISSIONERS: None VI. NEW BUSINESS: NONE VII. STATUS OF PREVIOUS ACTION ITEMS: NONE VIII. ITEMS FROM COMMISSIONERS: C/Plunkett thanked staff for swift removal of the tree that fell across Diamond Bar Boulevard. She relayed that residents have also commented about a tree blocking the view of the traffic signal at Golden Springs Drive and Diamond Bar Boulevard. Residents asked her to thank the City for the March 4 th hazardous waste disposal event. IX. SCHEDULE OF FUTURE CITY EVENTS: As listed in the agenda and reported by Chair/Busteed. 2.A.a Packet Pg. 12 Attachment: T&T Commission Meeting Minutes of March 9, 2023 (T&T Commission Meeting Minutes of March 9, 2023) MARCH 9, 2023 PAGE 6 T&T COMMISSION ADJOURNMENT: There being no further business to come before the Traffic and Transportation Commission, Chair/ adjourned the meeting at 7:45 p.m. to May 11, 2023 at 6:30 p.m. The foregoing minutes are hereby approved this day of , 2023. Respectfully Submitted, ______________________________ David G. Liu, Secretary Attest: ___________________________________________ Gary Busteed, Chairperson 2.A.a Packet Pg. 13 Attachment: T&T Commission Meeting Minutes of March 9, 2023 (T&T Commission Meeting Minutes of March 9, 2023) TRAFFIC & TRANSPORTATION COMMISSION AGENDA REPORT AGENDA ITEM NUMBER: 4.A MEETING DATE: May 11, 2023 TO: Chair and Members of the Traffic and Transportation Commission FROM: David G. Liu, Public Works Director/City Engineer SUBJECT: Traffic Statistics - February and March 2023 RECOMMENDATION: Receive and File Attached, for your review, is the Traffic Statistics Report for the months of February and March 2023, as provided by the L.A. County Sheriff’s Department. Attachments: 1. Traffic Statistics - February & March 2023 CITY OF DIAMOND BAR ~ 21810 COPLEY DRIVE ~ DIAMOND BAR, CA 91765 ~ TEL. (909) 839-7040 ~ FAX (909) 861-3117 4.A Packet Pg. 14 CITY OF DIAMOND BAR TRAFFIC STATISTICS FEBRUARY & MARCH 2023 Prepared by: PUBLIC WORKS DEPARTMENT Data Provided by: LOS ANGELES COUNTY SHERIFF’S DEPARTMENT WALNUT/DIAMOND BAR SHERIFF’S STATION Report Completed: APRIL 2023 4.A.a Packet Pg. 15 Attachment: Traffic Statistics - February & March 2023 (Traffic Statistics - February and March 2023) CITATIONS 16 103 119 16 74 90 Feb-23 Mar-23 Non-Haz Hazard Total 4.A.a Packet Pg. 16 Attachment: Traffic Statistics - February & March 2023 (Traffic Statistics - February and March 2023) COLLISIONS 1110 2225 3435 Feb-23 Mar-23 INJURY NON INJ TOTAL FEBRUARY 2023 D.U.I ARREST= 10 D.U.I. COLLISIONS= 0 MARCH 2023 D.U.I ARREST= 0 D.U.I. COLLISIONS= 0 4.A.a Packet Pg. 17 Attachment: Traffic Statistics - February & March 2023 (Traffic Statistics - February and March 2023) STREET SWEEPING 315 636 Feb-23 Mar-23 4.A.a Packet Pg. 18 Attachment: Traffic Statistics - February & March 2023 (Traffic Statistics - February and March 2023) TRAFFIC & TRANSPORTATION COMMISSION AGENDA REPORT AGENDA ITEM NUMBER: 4.B MEETING DATE: May 11, 2023 TO: Chair and Members of the Traffic and Transportation Commission FROM: David G. Liu, Public Works Director/City Engineer SUBJECT: Monthly Updates of Various Projects/Programs RECOMMENDATION: Receive and File A. Residential & Collector Streets Rehabilitation (Area 2) and Arterial Street Rehabilitation (Golden Springs Drive from Brea Canyon Road to Grand Avenue) Construction is slated to begin in mid-May 2023, with an anticipated completion date of July 2023. The Project aims to improve 12 centerline miles of residential and collector streets through a variety of technique, including slurry seal, chip seal, localized asphalt concrete (AC) dig-outs, and curb ramp improvements. Please refer to the attached vicinity map. B. Residential & Collector Streets Rehabilitation (Area 3, 4 & 5) and Arterial Street Rehabilitation Design Project The design contract was awarded on February 21, 2023 in the amount of $361,950. The Project’s objectives are to complete approximately 12-16 centerline miles of residential and collector streets with slurry seal, chip seal and asphaltic concrete (AC) overlay; to remove/repair isolated damaged AC pavement as determined by field conditions in Areas 3, 4 and 5, which are the next areas scheduled for street rehabilitation, and to rehabilitate three (3) sections of our arterials which include Diamond Bar Boulevard, Grand Avenue, Golden Springs Drive, Chino Hills Parkway , Brea Canyon Cut-Off, CITY OF DIAMOND BAR ~ 21810 COPLEY DRIVE ~ DIAMOND BAR, CA 91765 ~ TEL. (909) 839-7040 ~ FAX (909) 861-3117 4.B Packet Pg. 19 Lemon Avenue and streets within the Gateway Corporate Center. The design work for the Area 3 Community Development Block Grant (CDBG) Project, which aims to upgrade 16 curb ramps within the area, is currently in progress as well. Please refer to the attached maps for the locations of all improvements. C. Grand Avenue/Golden Springs Drive Intersection Improvements By the end of April 2023, the contractor has made significant progress on the Project. They successfully completed the construction of the precast concrete west tunnel, as well as the installation of fencing and decorative elements along Golden Spring Drive. The contractor’s crew is diligently working on the precast concrete of the east tunnel and the below-grade work for the northbound lanes along Grand Avenue. Following the completion of this work, the installation of streetscape amenities will commence. D. SR-57/60 Interchange Improvements Project At the February 27, 2023 SGVCOG Capital Projects and Construction Committee meeting, the Executive Director was authorized to award a construction contract to Skansa USA Civil West for the subject Project, in the not -to-exceed amount of $266,900,000. The SGVCOG will oversee this Project’s construction activities, and a funding agreement with Metro was also approved. A pre-construction meeting has been scheduled for May 22, 2023, with the construction anticipated to start in July, 2023. E. Brea Boulevard Corridor Improvement Project Orange County Public Works Department (OCPW) has discontinued its work on the Environmental Impact Report and intends to cancel the Brea Boulevard Corridor Improvement Project. The County will instead monitor traffic conditions at Brea Boulevard / Brea Canyon Road after the completion of Caltrans’ SR-57 Lambert Road Interchange Improvement and SR-57 Freeway Widening projects to determine if any future modifications (i.e., a traffic signal at the Tonner Canyon Road intersection) are necessary. F. Citywide Bus Shelter Replacement Program The Public Works Department has started to replace all of the bus shelters citywide. This project includes the removal of the existing shelter structures, benches, trash bins, and minor concrete foundation work. There are 30 different locations that will be improved with this project. Construction started in late April 2023 and is anticipated for completion by June 2023 Public Works staff has coordinated activity with Foothill Transit to minimize any impacts to the local bus routes and ridership. 4.B Packet Pg. 20 G. New Traffic Signal/Highway Safety Lights The Public Works Department has started the installation of new traffic signal safety lights citywide, replacing the existing high-pressure sodium-vapor (HPSV) lamps with light emitting diode (LED) fixtures. These safety lights will help i lluminate the signalized intersections to enhance safety benefits to pedestrians and vehicles as they travel along the arterials. Installation of the new safety lights started in late-April 2023 and will continue over the next several weeks. As part of the same project, all of the illuminated street name signs will also be replaced at each signalized intersection citywide, which is anticipated to start in July 2023. H. Upcoming Utility Construction Projects Staff approved plans and issued encroachment permits for several utility improvement projects that are anticipated to start construction in the coming weeks: • Southern California Edison – Brea Canyon Road, from Cool Springs Drive to Cold Spring Lane o Rule 20A Utility Pole Underground Conversion Project • SoCalGas – Glenbrook Drive, from Brea Canyon Road to Gona Court o Residential Gas Service Mainline Replacement • SoCalGas – Kiowa Crest Drive, from Eldertree Drive to Santaquin Drive o Residential Gas Service Mainline Replacement • SoCalGas – Deerfoot Drive, from Kiowa Crest Drive to Sunbluff Drive o Residential Gas Service Mainline Replacement • Walnut Valley Water District – Golden Springs Drive at Grand Avenue o New Recycled Water Meter Installation Public Works staff is committed to ensuring that all construction im pacts are properly mitigated to limit the effect on our community. The City's Public Works Inspector monitors all active utility construction projects to ensure that work is completed per the approved plans and permit conditions. Attachments: 1. Area 2 - Vicinity Map 2. Areas 3, 4 & 5 - Attachments 4.B Packet Pg. 21 VICINITY MAP - Area 2 Citywide Residential and Collector Road Maintenance Golden Springs Drive from Brea Canyon Road to Grand Avenue DEPARTMENT OF PUBLIC WORKS Golden Springs Drive from Brea Canyon Roadto Grand Avenue Residential &Collector 4.B.a Packet Pg. 22 Attachment: Area 2 - Vicinity Map (Monthly Updates of Various Projects/Programs) AREA 1 AREA 2 AREA 3 AREA 4 AREA 5 AREA 6 AREA 1 AREA 7 Attachment Residential Street Rehab Locations FY 2022-2023 thru 2025-20226 DEPARTMENT OF PUBLIC WORKS 4.B.b Packet Pg. 23 Attachment: Areas 3, 4 & 5 - Attachments (Monthly Updates of Various Projects/Programs) Attachment Arterial Street Rehab Locations FY 2022-2023 thru 2025-20226 DEPARTMENT OF PUBLIC WORKS Legend Area 3 Area 4 Area 5 4.B.b Packet Pg. 24 Attachment: Areas 3, 4 & 5 - Attachments (Monthly Updates of Various Projects/Programs) D IA M O N D B A RBLVDREAC A N Y O N C UTOFFRDBREACANYONRDH A W KW OODRDSTEEPLECHASELNWAGONTRCASTLEROCKRDCANYON RID G E R DPEACE RGREENSPRI NGSRDPATHFINDERRD CASTLEROCKRDAM BU SH E R SSTCOLD SPRINGLNNRD Attachment CDBG Curb Ramp Locations FY 2022-2023 DEPARTMENT OF PUBLIC WORKS Legend New ADA curb ramp (16) AREA 3 4.B.b Packet Pg. 25 Attachment: Areas 3, 4 & 5 - Attachments (Monthly Updates of Various Projects/Programs) TRAFFIC & TRANSPORTATION COMMISSION AGENDA REPORT AGENDA ITEM NUMBER: 5.1 MEETING DATE: May 11, 2023 TO: Chair and Members of the Traffic and Transportation Commission FROM: David G. Liu, Public Works Director/City Engineer SUBJECT: FY 2024-2027 City of Diamond Bar Strategic Plan RECOMMENDATION: Receive and File Attached, for your reference, is the City of Diamond Bar’s Strategic Plan for FY 2024 - 2027, which was approved by City Council on April 18, 2023. This plan was the result of extensive staff and Council discussion, augmented by major policy decisions (General Plan, Town Center Specific Plan, Homelessness Action Plan, etc.) and related public input. It will serve as the foundation for consistent policy, program, and service development over the next three years and will help all departments develop consistent annual work plans through the budget process . Each strategic goal includes a number of objectives supplemented with action statements that narrow the focus even more. Performa nce measures are established for each strategic goal to gauge progress over time. Specific work plan items to support the goals and objectives are adopted in the annual budget process, and quarterly updates will be published to ensure the community is eng aged and apprised of progress. Attachments: 1. FY 2024-2027 City of Diamond Bar Strategic Plan CITY OF DIAMOND BAR ~ 21810 COPLEY DRIVE ~ DIAMOND BAR, CA 91765 ~ TEL. (909) 839-7040 ~ FAX (909) 861-3117 5.1 Packet Pg. 26 City of Diamond BarStrategic Plan FY 2024-2027 DiamondBarCA.gov/strategicplan 5.1.a Packet Pg. 27 Attachment: FY 2024-2027 City of Diamond Bar Strategic Plan (FY 2024-2027 City of Diamond Bar Strategic Plan) Our Values Community and Livability We maintain and improve the quality of life for everyone that lives or works in Diamond Bar. Transparency and Accountability We operate openly to foster public trust and encourage community input. Service and Professionalism We deliver exceptional service and work creatively to solve problems. The 2024-2027 City Council Strategic Plan is the third multi-year strategic planning initiative approved by the Diamond Bar City Council since 2017. The plan is the result of an extensive collaborative planning process that will serve as the foundation for addressing community issues and needs over the next three years. The key components of the Strategic Plan connect to forge an aspirational, but achievable, community action plan. The Values set the guiding principles. The Goals and Objectives set focused priorities for consistent policymaking, connecting day-to-day operations with the bigger picture. Performance Measures are key indicators used to gauge progress over time. Specific supporting initiatives are developed annually by the City Council during the annual budget process. Regular community updates will be made to highlight the programs, services, and projects that contribute to progress and ensure that the public remains engaged in the process. Three Strategic GoalsAbout this Plan City of Diamond Bar FY 2024-2027 Strategic Plan 2 Responsible Stewardship of Public Resources The City strives to protect and augment resources owned by and relied upon by the public, from the local revenues that fund programs and services to the infrastructure that is the foundation of the community. Open, Engaged and Responsive Government Safe, Sustainable and Healthy Community The City strives to provide an environment in which public participation is welcomed and easily accessible and public services are effective and of high-quality. The City strives to maintain and enhance the overall quality of life in Diamond Bar, with safe neighborhoods, connected communities, and a resilient environment. It Means: It Means: It Means: 5.1.a Packet Pg. 28 Attachment: FY 2024-2027 City of Diamond Bar Strategic Plan (FY 2024-2027 City of Diamond Bar Strategic Plan) Objective 1.1: Foster a healthy and resilient local economy. • Create economic development programs that support and attract businesses and entrepreneurs to generate sustainable community-supporting revenue streams. • Engage directly with the business community to understand needs, provide business development resources, and promote local economic opportunity. • Promote infill development opportunities that revitalize and reimagine existing commercial, office and business centers to foster new and diverse economic opportunities. We will: Objective 1.2: Provide safe and reliable public infrastructure. • Invest in the ongoing maintenance of City-owned streets, sidewalks, parks, public facilities, and community infrastructure. • Work collaboratively with third-party providers of public infrastructure to maintain local safety, performance and access. • Implement a resilient information technology infrastructure that provides easily accessible constituent services, while maintaining data security and privacy across City-operated networks. We will: aerial of Diamond Bar Boulevard and Golden Springs Drive, location designated for future downtown Objective 1.3: Foster fiscal health through disciplined long-term planning, cost control, efficiency, increased revenue, and cost recovery. • Maintain financial records in a manner consistent with the most up-to-date governmental standards for reporting and transparency. • Use “smart sourcing” to evaluate and analyze contract services to ensure the City is realizing the greatest value and performance. • Evaluate and prioritize infrastructure funding needs. • Pursue grant programs and regional, state, and federal funding opportunities that improve services and/or offset general fund costs. • Reduce or eliminate subsidies for personal choice services. We will: • GFOA Budget Award • GFOA Financial Reporting Award • Pavement Condition Index (PCI) • MISAC Excellence Award • Bond Rating • Sales Tax Revenues/Annual City of Diamond Bar 2024-2027 Strategic Plan 3 Responsible Stewardship of Public Resources1 Performance Measures 5.1.a Packet Pg. 29 Attachment: FY 2024-2027 City of Diamond Bar Strategic Plan (FY 2024-2027 City of Diamond Bar Strategic Plan) Objective 2.1: Provide effective and accessible government services that meet the needs of a diverse population. • Implement policies, procedures, and technologies that streamline business processes and enhance the overall customer service experience. • Ensure contract service providers meet contractual expectations and deliver high quality services. • Utilize data and metrics to guide decision-making and set benchmarks that measure performance of services and programs. • Actively participate in the development of public policy and legislation at all levels. • Leverage resources to ensure that internal support is robust enough to meet service expectations. We will: Objective 2.3: Establish City of Diamond Bar as an Employer of Choice • Foster an organizational culture and environment that values service, innovation, and creativity. • Implement policies and programs that attract and retain talented employees. • Develop in-house talent to address future succession planning needs. • Develop supervisors that foster employee development and effectively manage performance. • Directly engage and communicate with employees to improve organizational performance and employee wellness. We will: Objective 2.2: Build relationships, establish trust, and foster collaboration in the Diamond Bar community. • Operate openly, making it easy for the public to participate in the decision-making process and access information. • Provide residents of all ages and backgrounds with a variety of opportunities to share their perspectives on community issues. • Engage with members of the community using a variety of outreach methods and formats. • Collaborate with other local government agencies that serve Diamond Bar. • Support local service and community organizations. We will: City of Diamond Bar 2024-2027 Strategic Plan 4 Open, Engaged and Responsive Government2 • Customer Service Survey Rating • Public Records Request Response Time • Employee Turnover Rate Performance Measures Residents can participate in City Council meetings in person or remotely (via computer or phone) 5.1.a Packet Pg. 30 Attachment: FY 2024-2027 City of Diamond Bar Strategic Plan (FY 2024-2027 City of Diamond Bar Strategic Plan) Objective 3.1: Foster a safe and welcoming environment for residents, businesses, visitors, and employees. • Work collaboratively with law enforcement personnel, fire department officials, and animal control agency leadership to implement public safety programs that address unique local needs. • Engage and educate the community to be active participants in crime prevention and emergency preparedness. • Be prepared to respond to and recover quickly from local and regional emergencies. • Maintain community health, safety, and aesthetics through proactive neighborhood improvement efforts. We will: Objective 3.3: Protect natural resources. We will: Objective 3.4: Improve transportation and mobility systems. • Implement measures that reduce cut-through traffic impacts. • Support advocacy, funding, and construction efforts associated with regional transportation projects that reduce local impacts. • Encourage increased use of active modes of transportation, such as walking and biking. • Implement projects that improve the safety of all modes of travel. • Work with neighborhood groups to address localized traffic issues. We will: • Provide access to high quality parks, trails, open space and other recreational facilities for all ages and abilities. • Provide access to high quality community events, classes, and activities for all ages and abilities. • Encourage and support healthy community initiatives and social connections. • Foster exercise and athletic opportunities for a diverse community. We will: Objective 3.2: Build a vibrant, healthy, and supportive community. City of Diamond Bar 2024-2027 Strategic Plan 5 Safe, Sustainable and Healthy Community3 • Responsibly preserve publicly-owned open space areas. • Implement policies that encourage environmental sustainability and effective natural resource management. • Promote responsible solid waste diversion and recycling efforts. • Maintain a healthy urban forest. • Promote sustainable building design. 5.1.a Packet Pg. 31 Attachment: FY 2024-2027 City of Diamond Bar Strategic Plan (FY 2024-2027 City of Diamond Bar Strategic Plan) City of Diamond Bar 2024-2027 Strategic Plan 6 Safe, Sustainable and Healthy Community3 Objective 3.5: Address the needs of people experiencing homelessness. • Implement strategies that reduce the number of persons experiencing homelessness in Diamond Bar. • Participate in regional initiatives that increase placements in permanent housing and provide services to those in need. • Partner with third-party agencies and non-profit groups to provide local housing, mental health, and other human services to those in need. We will: continued Because of its commitment to caring for its community trees, the City of Diamond Bar has earned Tree City USA distinction since 2000. • Part 1 Crime Rate/1,000 residents • Average Speed/Travel Time on Arterials • Voluntary Code Compliance Rate • Solid Waste Diversion Rate – Residential • Solid Waste Diversion Rate – Commercial Performance Measures Objective 3.6: Foster local housing accessibility. • Implement strategies that increase housing supply, address affordability, and ensure quality and diversity of housing stock. We will: 5.1.a Packet Pg. 32 Attachment: FY 2024-2027 City of Diamond Bar Strategic Plan (FY 2024-2027 City of Diamond Bar Strategic Plan) City of Diamond Bar 21810 Copley Drive Diamond Bar, CA 91765 City Manager’s Office (909) 839-7000 | info@diamondbarca.gov DiamondBarCA.gov/strategicplan Pub. April 2023 5.1.a Packet Pg. 33 Attachment: FY 2024-2027 City of Diamond Bar Strategic Plan (FY 2024-2027 City of Diamond Bar Strategic Plan) TRAFFIC & TRANSPORTATION COMMISSION AGENDA REPORT AGENDA ITEM NUMBER: 5.2 MEETING DATE: May 11, 2023 TO: Chair and Members of the Traffic and Transportation Commission FROM: David G. Liu, Public Works Director/City Engineer SUBJECT: FY 2023-2024 Capital Improvement Program (CIP) Budget and 5-Year CIP List RECOMMENDATION: Receive and File The FY 2023-2024 Capital Improvement Program (CIP) Budget , as well as the 5-Year CIP list, were reviewed and discussed at the City Council Study Session held on Tuesday, May 2, 2023. Based on direction provided by the City Council, the FY 2023- 2024 CIP Budget and the 5-Year CIP list will be incorporated into the City’s official budget document for consideration/adoption at the June 6, 2023 Council meeting . Attached, for your information, is the staff report and attachments, as presented. A PowerPoint presentation will be presented at this meeting. Attachments: 1. CC Staff Report - Study Session - 5-2-23 2. Attachment 1 - FY 2023-24 CIP Budget 3. Attachment 2 - FY 2023-24 CIP Project Details 4. Attachment 3 - 5-YEAR CIP List CITY OF DIAMOND BAR ~ 21810 COPLEY DRIVE ~ DIAMOND BAR, CA 91765 ~ TEL. (909) 839-7040 ~ FAX (909) 861-3117 5.2 Packet Pg. 34 Agenda #: 1 Meeting Date: May 2, 2023 CITY COUNCIL STUDY SESSION REPORT TO: Honorable Mayor and Members of the City Council VIA: Daniel Fox, City Manager FROM: Jason Jacobsen, Finance Director TITLE: DRAFT FY 2023-24 CAPITAL IMPROVEMENT PROGRAM (CIP) BUDGET BACKGROUND: Each year, the City prepares an annual Operating Budget and Capital Improvement Program (CIP) for City Council consideration that implements the Council’s priorities and Strategic Plan Goals, and provides the financial resources to deliver services to the community. The preparation of the annual budget is a significant and important undertaking that takes place over the course of more than five months. Below is the schedule for the preparation of the FY 2023/24 City Budget:  Council Study Session on Draft FY 2023/24 CIP and Draft Five-Year CIP Review – Scheduled for 5/2/2023  Council Study Session on Draft FY 2023/24 Operating Budget – Scheduled for 5/16/2023  Adoption of the Proposed FY 2023/24 City Budget & CIP – Scheduled for 6/6/2023 The purpose of this budget study session is to provide the opportunity for the City Council to review the proposed projects in the Draft FY 2023/24 CIP budget. Additionally, staff is presenting the City Council with the Draft FY 2023/24 Five-Year CIP for review. Based on direction provided by the Council, staff will incorporate the FY 2023/24 CIP budget and the Five-Year CIP list into the City’s official budget document for consideration and adoption at the June 6, 2023 Council Meeting. As the City adopts budgets on an annual basis, only the FY 2023/24 CIP will be funded. The approved Five-Year CIP will be looked to for guidance as staff prepares future budget requests. 5.2.a Packet Pg. 35 Attachment: CC Staff Report - Study Session - 5-2-23 (FY 2023-2024 Capital Improvement Program (CIP) Budget and 5-Year CIP List) The Draft FY2023/24 CIP and Draft FY 2023/24 Five-Year CIP are presented in detail in Attachments 1 through 3. DISCUSSION: The Draft FY 2023/24 CIP budget includes 10 new projects totaling $12.03 million. Some proposed projects have already received funding for the design phase in FY 2022/23 and are now proposed to move to the construction phase. The Draft FY 2023/24 CIP encompasses five project categories and represents an expenditure increase of 18% when compared to the Revised CIP for FY 2022/23. The full itemized project list, with funding sources, is included in Attachment 1. As the Council will recall, the CIP for FY 2022/23 was ambitious compared to the prior FY 2021/22, and represented a year-over-year budget increase of 24% ($1.8 million). This was possible due to the appropriation of one-time General Fund savings in the amount of $2.15 million for prioritized improvements to facilities and parks projects. Likewise, the Draft FY 2023/24 CIP is equally ambitious and represents an increase of 18% year-over-year, with new projects proposed for streets, parks, facilities, transportation, traffic, and miscellaneous improvements. The Draft FY 2023/24 CIP presented to the City Council for discussion this evening once again proposes to utilize one-time General Fund savings for the construction of prioritized facilities and parks projects in the amount of $1.11 million (these projects have received funding for the design phase in the previous fiscal year). Other funding sources proposed for the remainder of the requested projects amount to $10.9 million (see Attachment 1). Detailed descriptions and related images for each of the ten (10) proposed projects are included in Attachment 2. 5.2.a Packet Pg. 36 Attachment: CC Staff Report - Study Session - 5-2-23 (FY 2023-2024 Capital Improvement Program (CIP) Budget and 5-Year CIP List) Proposed CIPs for FY 2023/24 - Total Budget Request: $12,030,964 Project No. Street Improvements: $9,720,464 SI24101 Residential and Collector Street Rehab.- Area 3 (Construction) SI24103 Arterial Street Rehab (Construction):  Golden Springs Dr from Grand Ave to Temple Ave  Grand Ave from Diamond Bar Blvd to East City Limits  Gateway Center, Copley Dr, Bridgegate Dr SI24104 CDBG Area 4 ADA Curb Ramp Project (Construction) Project No. Traffic Management/Safety Projects: $64,000 TM24201 Battery Back-Up and CCTV Replacement Program (Construction) Project No. Transportation Infrastructure Improvements: $336,500 TI24301 Intersection Safety Improvements (Construction) Project No. Miscellaneous Public Works Improvements: $300,000 PW24401 Steep Canyon Erosion Control and Sedimentation Prevention (Design & Const.) Project No. Facilities, Parks and Rec Improvements: $1,610,000 FP24500 DBC GVBR Lighting & Controls Upgrade (Construction) FP24501 DBC Main Entry/Doors & ADA Improvements (Construction) FP24505 City Hall Roof Rehabilitation/Solar System Removal and Reinstallation (Const.) FP24502 Heritage Park Renovation Phases 1 and 2 (Design) Completed CIPs in FY 2022/23: Of the 28 capital improvement projects underway at the start of FY 22/23, a total of fourteen (14) projects are anticipated to be completed by the end of FY 2022/23, which include: Project No. Project Description Current Project Phase Notes Street Improvements SI22103 Arterial Street Rehab (Golden Springs from Brea Canyon to Lemon Ave.) (Const.) Started FY 21/22; Complete SI22105 Residential and Collector Street Rehab - Area 1 (Const.) Started FY 21/22; Complete SI23102 Residential and Collector Street Rehab - Area 2 (Const.) Awarded contract, under construction as of May 2023 Complete June 2023; NOC July/Aug SI23103 Arterial Street Rehab (Golden Springs from Brea Canyon to Grand Ave.) (Const.) Awarded contract, under construction as of May 2023 Complete June 2023; NOC July/Aug 5.2.a Packet Pg. 37 Attachment: CC Staff Report - Study Session - 5-2-23 (FY 2023-2024 Capital Improvement Program (CIP) Budget and 5-Year CIP List) Traffic Management/Safety Projects TM22201 Battery Back-Up and CCTV Replacement Program (FY23) Awaiting delivery of components; Started FY 22/23 Complete June 2023 Transportation Infrastructure Improvements TI20300 Bus Shelter Replacement - GSD/Calbourne Pending installation of 2 shelters in May 2023; Started FY 19/20 Complete June 2023 TI22300 Citywide Bus Shelter Replacement Program (Design & Const.) In construction phase. (multiple locations); Started FY 21/22 Complete June 2023 Miscellaneous Public Works Improvements PW23401 Groundwater Drainage Improvements-Phase 4 & 5 (Copley & Moonlake) (Design) Started FY 22/23; Complete PW23403 Brea Canyon Storm Drain Lining Project (800 ft between DB Church and GSD) In procurement Complete June 2023 Facilities, Parks and Rec Improvements FP17500 Canyon Loop Trail (Design) Started FY 19/20; Complete FP20500 DBC Slope Stabilization (Construction) Started FY 22/23; Work complete NOC by June 2023 FP22501 DBC AC Replacement & Air Quality Upgrades (Design) Complete (Feb 2023); Started FY 21/22 FP23505 City Hall Roof Rehab/Solar System Removal and Reinstall (Design) Started FY 22/23; Contract award pending (May 2023) Complete June 2023 FP23502 Sport Field Lighting Control Link Started FY 22/23; Contract award pending (May 2023) Complete June 2023 Projects Carried in to FY 2023/24: Of the 28 capital improvement projects underway at the start of FY 22/23, a total of fourteen (14) projects will be carried over to the next FY 2023/24, which include: Project No. Project Description Current Project Phase Note Street Improvements SI23101 Residential and Collector Street Rehab.- Area 3, 4, 5 (Design) Arterial Street Rehab - 3 Locations (Design) [Locations Pending PMS Update] CDBG Curb Ramp - Area 3, 4, 5 (Design) Design work underway Completed June 2024 5.2.a Packet Pg. 38 Attachment: CC Staff Report - Study Session - 5-2-23 (FY 2023-2024 Capital Improvement Program (CIP) Budget and 5-Year CIP List) SI23104 CDBG Area 3 ADA Curb Ramp Project (Const.) Award of contract pending (June 2023) Completed by Aug 2023 Traffic Management/Safety Projects TM23201 LED Illuminated Street Name Sign and Highway Safety Light Replacement (Design and Const.) In procurement phase Completed by Aug 2023 Miscellaneous Public Works Improvements PW18400 Grand/GSD Intersection Enhancement (Const) In construction Completed by Aug 2023 PW23401 Groundwater Drainage Improvements-Phase 4 & 5 (Copley & Moonlake) (Construction) In procurement phase Completed by Aug 2023 PW23402 Grand Avenue Median Drainage Improvement Project (Design and Const.) Design Complete, in procurement for const Completed by Aug 2023 Facilities, Parks and Rec Improvements FP17500 Canyon Loop Trail (Construction) Const. complete with exception of installation of shelters at end of nesting season (Oct 2023) Started 21/22 FP22501 DBC AC Replacement & Air Quality Upgrades (Const.) in procurement phase Start May 2023 FP23500 DBC GVBR Lighting & Controls Upgrade (Design) award of contract (May 2023) Finish Nov 2023 FP23501 DBC Main Entry/Doors & ADA Improvements (Design) Ongoing, pending contract award May 2023 Finish Nov 2023 FP23503 Pantera Park Hard Court Rehab and LED Retrofit Project (Design & Const.) in procurement phase TBD FP23504 City Hall Cable Channel Broadcast and A/V Equip Upgrade (Const.) in procurement phase TBD FP23506 Maple Hill Park Playground/Restroom Replmt and ADA Upgrades (Design) award of contract pending (May 2023) Finish Dec 2023 FP23506 Maple Hill Park Playground/Restroom Replmt and ADA Upgrades (Const) Not started Start Jan 2024 The Draft FY 2023/24 CIP budget is scheduled to be reviewed for consistency with the City's General Plan at the May 9, 2023 Planning Commission meeting. Attachments: 1. Attachment 1_DRAFT FY 2023-24 CIP Budget 2. Attachment 2_DRAFT FY 2023-24 CIP Details 3. Attachment 3_DRAFT 5-YEAR CIP 5.2.a Packet Pg. 39 Attachment: CC Staff Report - Study Session - 5-2-23 (FY 2023-2024 Capital Improvement Program (CIP) Budget and 5-Year CIP List) DRAFT FY 2023/24 CAPITAL IMPROVEMENT PROGRAM BUDGET ATTACHMENT 1 Street Improvement Projects (301610-56101)Funding Sources: Project #Phase Project Description Status FY 23/24 Budget Request (202) RMRA (203) Measure M (204) Measure R Local Return (205) Gas Tax (207) Prop C (252) Hauler Fees (225) CDBG SI23101 DESIGN Residential and Collector Street Rehab.- Area 3, 4, 5 (Design) Arterial Street Rehab - 3 Locations (Design) CDBG Curb Ramp - Area 3, 4, 5 (Design)Ongoing- No New Request -$ SI24101 CONSTRUCT Residential and Collector Street Rehab - Area 3 (Const.)NEW 2,050,000$ 1,200,000$ 600,000$ 250,000$ SI24103 CONSTRUCT Arterial Street Rehab (Const.) -Golden Springs Dr from Grand Ave to Temple Ave -Grand Ave from Diamond Bar Blvd to East City Limits -Gateway Center, Copey Dr, Bridgegate Dr NEW 7,525,000$ 4,050,000$ 575,000$ 400,000$ 2,500,000$ SI23104 CONSTRUCT CDBG Area 3 ADA Curb Ramp Project (Const.)Ongoing- No New Request -$ SI24104 CONSTRUCT CDBG Area 4 ADA Curb Ramp Project (Const.)NEW 145,464$ 145,464$ Total - Street Improvement Projects 9,720,464$ 4,050,000$ 1,200,000$ 1,175,000$ 400,000$ 2,500,000$ 250,000$ 145,464$ Traffic Management/Safety Projects (301610-56102)Funding Sources: Project #Phase Project Description Status FY 23/24 Budget Request (207) Prop C (203) Measure M (205) Gas Tax TM24201 ALL Battery Back-Up and CCTV Replacement Program NEW 64,000$ 64,000$ TM23201 ALL LED Illuminated Street Name Sign and Highway Safety Light Replacement (Design and Const.)Ongoing - No New Request -$ Total - Traffic Management/Safety Projects 64,000$ 64,000$ -$ -$ -$ -$ -$ -$ Transportation Infrastructure Improvements (310610-56103) Funding Sources: Project #Phase Project Description Status FY 23/24 Budget Request (207) Prop C Foothill Transit Grant (45030) (206) Prop A HSIP Grant (CalTrans)(209) TDA TI24301 CONSTUCT Intersection Safety Improvements (Constr.)NEW 336,500$ 302,850$ 33,650$ Total-Transportation Infrastructure Improvements 336,500$ -$ -$ -$ 302,850$ 33,650$ -$ -$ Miscellaneous Public Works Improvements (301610-56105) Funding Sources: Project #Phase Project Description Status FY 23/24 Budget Request (204) Measure R (202) RMRA (203) Measure M (207) Prop C (251) AB2766 (209) TDA (201) Measure W PW18400 CONSTRUCT Grand/GSD Intersection Enhancement (Construction)Ongoing - No New Request PW23401 CONSTRUCT Groundwater Drainage Improvements-Phase 4 & 5 (Copley & Moonlake) (Construction)Ongoing - No New Request -$ PW23402 ALL Grand Avenue Median Drainage Improvement Project (Design and Const.)Ongoing - No New Request -$ PW24401 ALL Steep Canyon Erosion Control and Sedimentation Prevention (Design & Const.)NEW 300,000$ 300,000$ Total - Miscellaneous PW Improvements 300,000$ -$ -$ -$ -$ -$ -$ 300,000$ Facilities, Parks and Rec Improvements (301630-56104) Funding Sources: Project #Phase Project Description Status FY 23/24 Budget Request (100) General Fund Habitat Conserv Grant (43110) (262) Park Development (504) Building & Facilities Fund (201) Measure W (261) Measure A PEG Fees FP17500 CONSTRUCT Canyon Loop Trail (Construction)Ongoing - No New Request -$ FP23500 DESIGN DBC GVBR Lighting & Controls Upgrade (Design)Ongoing - No New Request -$ FP24500 CONSTRUCT DBC GVBR Lighting & Controls Upgrade (Const.)NEW 330,000$ 330,000$ FP23501 DESIGN DBC Main Entry/Doors & ADA Improvements (Design)Ongoing - No New Request -$ FP24501 CONSTRUCT DBC Main Entry/Doors & ADA Improvements (Const.)NEW 310,000$ 310,000$ FP23504 CONSTRUCT City Hall Cable Channel Broadcast and A/V Equipment Upgrade (Const.)Ongoing - No New Request -$ FP23503 CONSTRUCT Pantera Park Hard Court Rehab and LED Retrofit Project (Design & Const.)Ongoing - No New Request -$ FP24505 CONSTRUCT City Hall Roof Rehabilitation/Solar System Removal and Reinstallation (Const.)NEW 470,000$ 470,000$ FP23506 DESIGN Maple Hill Park Playground/Restroom Replacement and ADA Upgrades (Design)Ongoing - No New Request -$ FP23506 CONSTRUCT Maple Hill Park Playground/Restroom Replacement and ADA Upgrades (Const.)Ongoing - No New Request -$ FP22501 CONSTRUCT DBC AC Replacement & Air Quality Upgrades (Const.)Ongoing - No New Request -$ FP24502 DESIGN Heritage Park Renovation Phases 1 and 2 (Design)NEW 500,000$ 500,000 Total - Facilities, Parks and Rec Improvements 1,610,000$ 1,110,000$ -$ 500,000$ -$ -$ -$ -$ GRAND TOTAL FY 2023-24 CIP PROGRAM REQUEST 12,030,964$ Projects Life-to-Date Budget Total (Includes FY 2023/24 Request)*18,786,563$ *see below and Draft Five-Year CIP for further information 5.2.b Packet Pg. 40 Attachment: Attachment 1 - FY 2023-24 CIP Budget (FY 2023-2024 Capital Improvement Program (CIP) DRAFT FY 2023/24 CAPITAL IMPROVEMENT PROGRAM BUDGET ATTACHMENT 1 CIP Program Year-Over-Year FY 2022/23 DRAFT FY 2023/24 % Change Street Improvements 3,875,916$ 9,720,464$ 151% Traffic Mgmnt./Safety Improv.1,077,200 64,000 -94% Transportation Infrastructure Improvements 270,000 336,500 25% Misc. PW Improvements 910,000 300,000 -67% Facilites, Parks and Rec. Improv.4,025,623 1,610,000 -60% Total 10,158,739$ 12,030,964$ 18% Draft FY 2023/24 CIP Program Totals by Type Street Improvements 9,720,464$ Traffic Management/Safety Improvements 64,000 Transportation Infrastructure Improvements 336,500 Miscellaneous Public Works Improvements 300,000 Facilites, Parks and Rec. Improvements 1,610,000 Total 12,030,964$ Fund #Funding Source Totals FY 23/24 Request Listed Projects Lifetime 100 General Fund 1,110,000$ 2,713,623$ 201 Measure W 300,000 1,050,000 202 RMRA (SB-1)4,050,000 4,923,302 203 Measure M 1,200,000 2,353,060 204 Measure R 1,175,000 1,175,000 205 Gas Tax 400,000 850,000 206 Prop A - - 207 Prop C 2,564,000 2,780,814 209 SB 821 Fund - Bike and Pedestrian Paths (TDA)33,650 134,034 251 AB2766 - - 225 CDBG 145,464 341,380 252 Hauler Fees 250,000 250,000 261 Measure A - 185,000 262 Park Development 500,000 1,160,000 504 Building & Facilities Maintenance Fund - - -HSIP Grant 302,850 302,850 -PEG Fees - 300,000 301-45030 Foothill Transit Grant - - 301-43110 Habitat Conservation Grant - 267,500 Total 12,030,964$ 18,786,563$ 5.2.b Packet Pg. 41 Attachment: Attachment 1 - FY 2023-24 CIP Budget (FY 2023-2024 Capital Improvement Program (CIP) DRAFT FY 2023/24 CAPITAL IMPROVEMENT PROGRAM DETAILS ATTACHMENT 2 STATUS NEW TIMELINE February 2024 June 2024 ESTIMATED COST $1,200,000 Measure R $600,000 Hauler Fees $250,000 $2,050,000 LOCATION Measure M Total Budget Residential and Collector Street Rehab.- Area 3 (Construction) Project #: SI24101 DESCRIPTION The project includes the application of slurry seal over the existing pavement and AC edge grind and overlay. This type of maintenance activity is performed annually throughout the City on residential streets to extend the life of the roadways. Construction Start Completion Area 3 is located east of the western City limits, north of the southern City limits, south of Pathfinder Rd, and west of the Country Estates. 5.2.c Packet Pg. 42 Attachment: Attachment 2 - FY 2023-24 CIP Project Details (FY 2023-2024 Capital Improvement Program DRAFT FY 2023/24 CAPITAL IMPROVEMENT PROGRAM DETAILS ATTACHMENT 2 STATUS NEW TIMELINE February 2024 June 2024 ESTIMATED COST RMRA $4,050,000 Measure R $575,000 Gas Tax $400,000 Prop C $2,500,000 $7,525,000Total Budget Arterial Street Rehab. (Constrution) Project #: SI22103 DESCRIPTION The project includes the complete rehabilitation of the following roadway segments: -Golden Springs Dr from Grand Ave to Temple Ave -Grand Ave from Diamond Bar Blvd to East City Limits -Gateway Center, Copley Dr, Bridgegate Dr Based on existing pavement conditions, it is anticipated the treatment will include AC edge grind or full-width overlay and ADA curb ramp improvements. Construction Start Completion LOCATION -Golden Springs Dr from Grand Ave to Temple Ave -Grand Ave from Diamond Bar Blvd to East City Limits -Gateway Center, Copley Dr, Bridgegate Dr 5.2.c Packet Pg. 43 Attachment: Attachment 2 - FY 2023-24 CIP Project Details (FY 2023-2024 Capital Improvement Program DRAFT FY 2023/24 CAPITAL IMPROVEMENT PROGRAM DETAILS ATTACHMENT 2 STATUS NEW TIMELINE August 2023 December 2023 ESTIMATED COST CDBG $145,464 $145,464 LOCATION Total Budget CDBG Area 4 ADA Curb Ramp Project (Construction) Project #: SI24104 DESCRIPTION The project includes upgrading existing curb ramps and installing new curb ramps that meet the latest Federal ADA Compliance Standards. Project Start Construction Start Completion Area 4 is located east of the western City limits, west of the 57 freeway, and north of Pathfinder Road. 5.2.c Packet Pg. 44 Attachment: Attachment 2 - FY 2023-24 CIP Project Details (FY 2023-2024 Capital Improvement Program DRAFT FY 2023/24 CAPITAL IMPROVEMENT PROGRAM DETAILS ATTACHMENT 2 STATUS NEW TIMELINE November 2023 May 2024 ESTIMATED COST Prop C $64,000 $64,000Total Budget Battery Back Up and CCTV Replacement Program Project #: TM24201 DESCRIPTION The Battery Back Up and CCTV project will replaced existing aging equipment that was originally installed in 2008 to 2011. Cons. Start Completion CCTV Replacement Locations: -Diamond Bar Boulevard & Grand Avenue -Grand Avenue & Shotgun Lane Battery Backup Replacement Locations: -Pathfinder Road & Brea Canyon W/O SR-57 Freeway -Diamond Bar Boulevard & Grand Avenue -Brea Canyon Road & Diamond Crest Ln 5.2.c Packet Pg. 45 Attachment: Attachment 2 - FY 2023-24 CIP Project Details (FY 2023-2024 Capital Improvement Program DRAFT FY 2023/24 CAPITAL IMPROVEMENT PROGRAM DETAILS ATTACHMENT 2 STATUS NEW TIMELINE Start February 2024 June 2024 ESTIMATED COST LOCATION HSIP Grant $302,850 TDA $33,650 Total Budget $336,500 - Diamond Bar Blvd at Golden Springs, Sunset Crossing, Grand Ave, Pathfinder, Brea Canyon. - Golden Springs at Brea Canyon, Carpio. - Grand Ave at Summitridge Dr. - Brea Canyon at Pathfinder Rd. Intersection Safety Improvements (Construction) Project #: TI24301 DESCRIPTION This project will install nearside supplemental traffic signals, pedestrian countdown signal heads, and restripe crosswalks to high visibility crosswalks to increase pedestrian and bikers safety Citywide. Completion 5.2.c Packet Pg. 46 Attachment: Attachment 2 - FY 2023-24 CIP Project Details (FY 2023-2024 Capital Improvement Program DRAFT FY 2023/24 CAPITAL IMPROVEMENT PROGRAM DETAILS ATTACHMENT 2 STATUS NEW TIMELINE Design Start October 2023 Construction Start March 2024 June 2024 ESTIMATED COST Measure W $300,000 $300,000 Adjacent to the cul-de-sac on Clear Creek Canyon Dr. at Steep Canyon Road.Total Budget Steep Canyon Erosion Control and Sedimentation Prevention (Design & Const.) Project #: PW24401 DESCRIPTION The project will minimize the amount of sediment, from an existing constructed hill, discharged into the storm drain system. Currently, sediment from the hillside is transferred from the hillside by the stormwater that sheet flows to the street and the adjacent stormwater catchbasin. The project will design and construct an LID BMP (settling basins or bioswales) to remove the sediment from the stormwater before transferring its overflow to the storm drain system. Completion LOCATION 5.2.c Packet Pg. 47 Attachment: Attachment 2 - FY 2023-24 CIP Project Details (FY 2023-2024 Capital Improvement Program DRAFT FY 2023/24 CAPITAL IMPROVEMENT PROGRAM DETAILS ATTACHMENT 2 TIMELINE January 2024 June 2024 ESTIMATED COST LOCATION General Fund $330,000 Diamond Bar Center $330,000Total Budget Diamond Bar Center GVBR Lighting & Controls Upgrade (Const.) Project #: FP24500 DESCRIPTION The project includes the construction of a new house lighting and controls system for the grand view ballroom at the Daimond Bar Center. This will improve reliability, efficiency and provide a better end user experience. Project Start Completion LOCATION 5.2.c Packet Pg. 48 Attachment: Attachment 2 - FY 2023-24 CIP Project Details (FY 2023-2024 Capital Improvement Program DRAFT FY 2023/24 CAPITAL IMPROVEMENT PROGRAM DETAILS ATTACHMENT 2 TIMELINE January 2024 June 2024 ESTIMATED COST LOCATION Diamond Bar Center General Fund $310,000 $310,000Total Budget Diamond Bar Center Main Entry/Doors & ADA Improvements (Const.) Project #: FP24501 DESCRIPTION The project includes the construction of the main entry, new door hardware and ADA improvements at the Diamond Bar Center. Project Start Completion 5.2.c Packet Pg. 49 Attachment: Attachment 2 - FY 2023-24 CIP Project Details (FY 2023-2024 Capital Improvement Program DRAFT FY 2023/24 CAPITAL IMPROVEMENT PROGRAM DETAILS ATTACHMENT 2 TIMELINE September 2023 Completion December 2023 ESTIMATED COST LOCATION City Hall General Fund $470,000 $470,000Total Budget City Hall Roof Rehabilitation/Solar System Removal and Reinstallation (Const.) Project #:FP24505 DESCRIPTION The project is the construction works related to the City Hall roof rehabilitation that will include removal and reinstallation of the solar system at City Hall. Project Start 5.2.c Packet Pg. 50 Attachment: Attachment 2 - FY 2023-24 CIP Project Details (FY 2023-2024 Capital Improvement Program DRAFT FY 2023/24 CAPITAL IMPROVEMENT PROGRAM DETAILS ATTACHMENT 2 TIMELINE July 2023 Completion June 2024 ESTIMATED COST LOCATION Heritage Park Park Development $500,000 $500,000Total Budget Heritage Park Renovation Phases 1 and 2 (Design) Project #:FP24502 DESCRIPTION The project includes the design of the following phases of improvement to facilities at Heritage Park: Phase 1: Renovate the community center, restrooms, and ADA improvements to increase accessibility for persons of all ages; Phase 2: Update the playground, tot lot, picnic area, and basketball courts to provide a stimulating play experience for children and individuals with disabilities. Project Start 5.2.c Packet Pg. 51 Attachment: Attachment 2 - FY 2023-24 CIP Project Details (FY 2023-2024 Capital Improvement Program DRAFT 5-YEAR CAPITAL IMPROVEMENT PROGRAM ATTACHMENT 3 Rev: 4/26/2023 Project #Project Description * Priority ** Potential Funding Sources Total Project Budget Request Potential Funding Gap FY 22-23 Cont'd to FY 23-24 NEW Proposed FY 23-24 FY 24-25 FY 25-26 FY 26-27 FY 27-28 Unscheduled Projects Pending Funding Street Improvement Projects SI22102 (SI22105) Residential and Collector Street Rehab.- Area 1 (Const.)2 SB1, MM, MR, GT, HF -$ None Completed FY 22-23 SI22100 Arterial Street Rehab (Golden Springs from Brea Canyon to Lemon Ave.) (Const.)1 SB1, MM, MR, GT, HF, PA, PC - None Completed FY 22-23 SI23104 CDBG Area 3 ADA Curb Ramp Project 1 CDBG 195,916 None 195,916$ SI23102 Residential and Collector Street Rehab.- Area 2 (Const.)2 SB1, MM, MR, GT, HF - None Completed FY 22-23 SI23103 Arterial Street Rehab (Golden Springs from Brea Canyon to Grand) (Const.)1 SB1, MM, MR, GT, HF, PA, PC - None Completed FY 22-23 SI23101 Residential and Collector Street Rehab.- Area 3, 4, 5 (Design) Arterial Street Rehab - 3 Locations (Design) [Locations Pending PMS Update] CDBG Curb Ramp - Area 3, 4, 5 (Design) 1 SB1, MM, MR, GT, HF, PA, PC 380,000 None 380,000$ SI24101 Residential and Collector Street Rehab.- Area 3 (Const.)2 SB1, MM, MR, GT, HF 2,050,000 None 2,050,000$ SI24103 Arterial Street Rehab (Location pending) (Const.)1 SB1, MM, MR, GT, HF, PA, PC 7,525,000 None 7,525,000$ SI24104 CDBG Area 4 ADA Curb Ramp Project (Conr.)2 CDBG 145,464 None 145,464$ NEW Arterial Street Rehab (Location pending) (Const.)1 SB1, MM, MR, GT, HF, PA, PC 7,200,000 5,700,000 7,200,000$ NEW Residential and Collector Street Rehab.- Area 4 (Const.)2 SB1, MM, MR, GT, HF 2,500,000 700,000 2,500,000$ NEW CDBG Area 5 ADA Curb Ramp Project 2 CDBG 180,000 None 180,000$ NEW Arterial Street Rehab (Location pending) (Const.)1 SB1, MM, MR, GT, HF, PA, PC 2,500,000 1,000,000 2,500,000$ NEW Residential and Collector Street Rehab.- Area 5 (Const.)2 SB1, MM, MR, GT, HF 2,300,000 500,000 2,300,000$ NEW Residential and Collector Street Rehab.- Area 6, 7, 1 (Design) Arterial Street Rehab - 3 Locations (Design) CDBG Curb Ramp - Area 6, 7, 1 (Design) 1 SB1, MM, MR, GT, HF 500,000 None 500,000$ NEW CDBG Area 6 ADA Curb Ramp Project 2 CDBG 180,000 None 180,000$ NEW Arterial Street Rehab (Location pending) (Const.)1 SB1, MM, MR, GT, HF, PA, PC 6,000,000 4,500,000 6,000,000$ NEW Residential and Collector Street Rehab.- Area 6 (Const.)2 SB1, MM, MR, GT, HF 2,500,000 500,000 2,500,000$ NEW CDBG Area 7 ADA Curb Ramp Project 2 CDBG 180,000 None 180,000$ NEW Arterial Street Rehab (Location pending) (Const.)1 SB1, MM, MR, GT, HF, PA, PC 6,000,000 4,500,000 6,000,000$ NEW Residential and Collector Street Rehab.- Area 7 (Const.)2 SB1, MM, MR, GT, HF 2,500,000 500,000 2,500,000$ NEW CDBG Area 1 ADA Curb Ramp Project 2 CDBG 180,000 None 180,000$ SubTotal - Street Improvement Projects 43,016,380$ 17,900,000$ 575,916$ 9,720,464$ 9,880,000$ 5,480,000$ 8,680,000$ 8,680,000$ $ - Traffic Management/Safety Projects TM22200 Battery Back-Up and CCTV Replacement Program 1 PC 320,000$ None Completed FY 22-23 64,000$ 64,000$ 64,000$ 64,000$ 64,000$ TM23201 LED Illuminated Street Name Sign and Highway Safety Light Replacement (Design and Construction) 1 GF, MM 1,016,200 None 1,016,200$ SubTotal - Traffic Management/Safety Projects 1,336,200$ -$ 1,016,200$ 64,000$ 64,000$ 64,000$ 64,000$ 64,000$ $ - DRAFT 5-YEAR CAPITAL IMPROVEMENT PROGRAM FY 23-24 TO FY 27-28 1 5.2.d Packet Pg. 52 Attachment: Attachment 3 - 5-YEAR CIP List (FY 2023-2024 Capital Improvement Program (CIP) Budget DRAFT 5-YEAR CAPITAL IMPROVEMENT PROGRAM ATTACHMENT 3 Rev: 4/26/2023 Project #Project Description * Priority ** Potential Funding Sources Total Project Budget Request Potential Funding Gap FY 22-23 Cont'd to FY 23-24 NEW Proposed FY 23-24 FY 24-25 FY 25-26 FY 26-27 FY 27-28 Unscheduled Projects Pending Funding DRAFT 5-YEAR CAPITAL IMPROVEMENT PROGRAM FY 23-24 TO FY 27-28 Transportation Infrastructure Improvements TI20300 Bus Shelter Replacement - GSD/Calbourne (Foothill Transit Bus Stop Enhancement Grant Program) 1 FT -$ None Completed FY 22-23 TI22300 Citywide Bus Shelter Replacement 4 PA - None Completed FY 22-23 TI24301 Intersection Safety Improvement (Construction)4 HSIP, TDA 336,500 None 336,500$ TI18300 Lemon Avenue Quiet Zone (To be Implemented in FY24 due to agreement needed with UPRR) 1 PC 75,000 None 75,000$ SubTotal - Transportation Infrastructure Improvements 411,500$ -$ -$ 336,500$ 75,000$ -$ -$ -$ $ - Miscellaneous PW Improvements PW18400 Grand/GSD Intersection Enhancement 1 SB1, MM, PC, TM, TDA, 1,397,359$ None $ 1,397,359 PW23402 Grand Avenue Median Drainage Improvement Project (Design and Construction)1 MW 100,000 None 100,000$ PW23401 Groundwater Drainage Improvements-Phase 4 &5 (Copley Drive @ City Hall, Moonlake) (Design ) 2 MW - None Completed FY 22-23 PW23401 Groundwater Drainage Improvements-Phase 4 & 5 (Copley & Moonlake ) (Const.)2 MW 530,000 None 530,000$ PW23403 Brea Canyon Storm Drain Lining Project 2 MR - None Completed FY 22-23 PW24401 Steep Canyon Erosion Control and Sedimentation Prevention (Design & Const.)3 MW 300,000 None 300,000$ NEW Installation of Full Capture Devices on Stormwater Catchbasin for Trash Amendment Compliance 2 MW 500,000 None 500,000$ NEW City Entry Monument and Median Improvements (Lemon Ave.) Design 5 GF 74,750 74,750 74,750$ NEW City Entry Monument and Median Improvements (Lemon Ave.) Construction 5 GF 517,500 517,500 517,500$ NEW Diamond Bar Blvd. Complete Streets (GSD - 60FWY)-Construction 3 GRANT, MM, MR, MW, PA, SPA, PC, WH, GT, TM, SB1, STP- L 6,600,000 2,500,000 6,600,000$ NEW Groundwater Drainage Improvements-Phase 6 (Cold Springs Lane @ South of Diamond Ridge)2 MW 250,000 None 250,000$ NEW City Entry Monument and Parkway Improvements (Brea Canyon Road) Design 5 GF 45,000 45,000 45,000$ NEW City Entry Monument and Parkway Improvements (Brea Canyon Road) Construction 5 GF 250,000 250,000 250,000$ NEW Groundwater Drainage Improvements-Phase 7 (Cleghorn Drive @ North of Gold Nugget)2 MW 250,000 None 250,000$ SubTotal -Miscellaneous PW Improvements 10,814,609$ 3,387,250$ 2,027,359$ 300,000$ 7,692,250$ 545,000$ 250,000$ -$ $ - 2 5.2.d Packet Pg. 53 Attachment: Attachment 3 - 5-YEAR CIP List (FY 2023-2024 Capital Improvement Program (CIP) Budget DRAFT 5-YEAR CAPITAL IMPROVEMENT PROGRAM ATTACHMENT 3 Rev: 4/26/2023 Project #Project Description * Priority ** Potential Funding Sources Total Project Budget Request Potential Funding Gap FY 22-23 Cont'd to FY 23-24 NEW Proposed FY 23-24 FY 24-25 FY 25-26 FY 26-27 FY 27-28 Unscheduled Projects Pending Funding DRAFT 5-YEAR CAPITAL IMPROVEMENT PROGRAM FY 23-24 TO FY 27-28 Facilites, Parks and Rec Improvements FP17500 Canyon Loop Trail (Design)1 GF, Q, PD -$ None Completed FY 22-23 FP17500 Canyon Loop Trail (Const.)1 MW, HC, MA 1,096,123 None 1,096,123$ FP22500 (FP22501) DBC AC Replacement & Air Quality Upgrades (Design)1 504, GF - None Completed FY 22-23 FP22500 (FP22501) DBC AC Replacement & Air Quality Upgrades (Construction)1 504, GF 750,000 None 750,000$ FP20500 DBC Slope Creep Repairs and Enhancements (Construction)1 GF - None Completed FY 22-23 FP23504 City Hall Cable Channel Broadcast and A/V Equipment Upgrade (Cnostruction)1 PEG 300,000 None 300,000$ FP23501 DBC Main Entry/Doors & ADA Improvements (Design)2 GF 40,000 None 40,000$ FP23503 Pantera Park Hard Court Rehab and LED Retrofit Project (Design & Construction)2 GF, Prop 68 270,000 None 270,000$ FP23500 DBC GVBR Lighting and AV Upgrades (Design)3 GF 20,000 None 20,000$ FP23505 City Hall Roof Rehabilitation/Solar System Removal and Reinstallation (Design)2 GF - None Completed FY 22-23 FP23502 Sportfield Lighting Control Link (Design and Const.)2 GF - None Completed FY 22-23 FP23506 Maple Hill Park Playground/Restroom Replacement and ADA Upgrades (Design)4 MA, GF, PD 60,000 None 60,000$ FP23506 Maple Hill Park Playground/Restroom Replacement and ADA Upgrades (Construction)4 MA, GRANT, PD 600,000 None 600,000$ FP24501 DBC Main Entry/Doors & ADA Improvements (Construction)2 GF 310,000 None 310,000$ FP24505 City Hall Roof Rehabilitation/Solar System Removal and Reinstallation (Const)2 504, GF 470,000 None 470,000$ FP24500 DBC GVBR Lighting and AV Upgrades (Const.)3 504, 503, GF 330,000 None 330,000$ FP24502 Heritage Park Renovation Phases 1 and 2 (Design)2 PD 500,000 None 500,000$ NEW Sycamore Canyon Park Lower Bridge Replacement (Design)3 GF, MW, CDBG 50,000 50,000 50,000$ NEW Ronald Reagan Park Playground Replacement and ADA Upgrades (Design)5 MA, GF, PD 50,000 50,000 50,000$ NEW Sycamore Canyon Park Lower Bridge Replacement (Construction)3 GF, MW, CDBG 300,000 300,000 300,000$ NEW Ronald Reagan Park Playground Replacement and ADA Upgrades (Construction)5 MA, GF, PD 500,000 500,000 500,000$ NEW Summitridge Park Band Shelter 3 GF 200,000 200,000 200,000$ NEW DBC Patio/Outdoor Renovations 5 GF 200,000 200,000 200,000$ NEW DBC Library Pad Renovations 5 GF 500,000 500,000 500,000$ NEW DBC Exterior Paint 4 GF 80,000 80,000 80,000$ NEW Civic Center Carpet Replacement 4 GF 250,000 250,000 250,000$ NEW Dog Park Lighting (Design)5 GF 30,000 30,000 30,000$ NEW Dog Park Lighting (Construction)5 GF 250,000 250,000 250,000$ NEW Sunset Crossing Park (Construction)3 GF, Grant, MW 6,500,000 6,500,000 6,500,000$ NEW Heritage Park Upgrades (Const.)2 GF, 504 6,500,000 6,500,000 6,500,000$ NEW Peterson Park Upgrades (Design)4 Q, GRANT 207,000 207,000 207,000$ NEW Peterson Park Upgrades (Const.)4 Q, GRANT 2,000,000 2,000,000 2,000,000$ NEW Musco LED Upgrade (per site)4 GF 400,000 400,000 400,000$ NEW Parking Lot LED Upgrade (all facilities)4 GF 250,000 250,000 250,000$ NEW Pantera Park, New Restroom by Courts 5 GF 750,000 750,000 750,000$ SubTotal - Facilites, Parks and Rec Improvements 23,763,123$ 19,017,000$ 3,136,123$ 1,610,000$ 100,000$ 1,000,000$ 700,000$ 330,000$ $ 16,887,000 5-Yr Program Total FY 23-24 to 27-28 5-Yr Program Funding Gap FY 22-23 Cont'd to FY 23-24 NEW Proposed FY 23-24 FY 24-25 FY 25-26 FY 26-27 FY 27-28 Unscheduled Projects Pending Funding $ 79,341,812 $ 40,304,250 $ 6,755,598 $ 12,030,964 $ 17,811,250 $ 7,089,000 $ 9,694,000 $ 9,074,000 $ 16,887,000 Grand Totals: 3 5.2.d Packet Pg. 54 Attachment: Attachment 3 - 5-YEAR CIP List (FY 2023-2024 Capital Improvement Program (CIP) Budget DRAFT 5-YEAR CAPITAL IMPROVEMENT PROGRAM ATTACHMENT 3 Rev: 4/26/2023 Priority Total 5-Year CIP Total 5-Year Funding Gap 1 Mandatory: Must Have 35,159,682$ 15,700,000$ GF General Fund Reserves 2 Needed: If Delayed Will Cost More to Fix 22,095,464$ 8,700,000$ SPA Sale of Prop A Funds 3 Enhancement: Improve Amenity 14,300,000$ 9,550,000$ SB1 RMRA (SB-1)4 Desirable: May be Delayed 4,183,500$ 3,187,000$ MM Measure M 5 Wished: A Luxury Item 3,167,250$ 3,167,250$ MR Measure R TOTAL 78,905,896$ 40,304,250$ GT Gas Tax Fund PA Prop A PC Prop C TM Traffic Mitigation (Private Developer Fair Share)LEGEND SI Sewer Improvement Fund Authorized - Carryover to Next FY 23-24 AB2766 Air Quality Improvement Fund Authorized - To be Completed in FY 22-23 TDA SB 821 Fund - Bike and Pedestrian Paths (TDA) Article 3 (METRO)Request for the Next FY 23-24 MTA MTA Grants Proposed for Future FY's 24-25 to 27-28 WH Waste Hauler Fund Unscheduled - Pending Funding/Timing Q Quimby PD Park Development Fund CDBG Community Development Block Grant Funds MA Measure A HC Habitat Conservation Grant FEMA Federal Emergency Management Agency MSRC Mobile Source Air Pollution Grant MW Measure W - Safe, Clean Water Act FT Foothill Transit Grant SCE Southern California Edison Grant 540 Internal Service Fund - (540) Building Facility & Maintenance Fund 530 Internal Service Funds - (530) Equipment Maintenance & Replacement Fund STP-L Federal Surface Transportation Program - Local HSIP Grant CA Highway Safety Improvement Prog. Grant Black - Annual revenue source Red -One-time, non-annual revenue source ** Funding Sources 5-Year CIP * Priority & Funding Gap Totals N/A N/A N/A 4,143,000$ 1,267,000$ 1,224,000$ 561,000$ 2,085,000$ 2,711,000$ N/A 880,000$ 70,000$ 53,399$ N/A 150,000$ N/A N/A Planned On-Going & One-Time ResourcesDescription N/A N/A N/A N/A 1,100,000$ N/A 300,000$ 240,000$ N/A N/A N/A 4 5.2.d Packet Pg. 55 Attachment: Attachment 3 - 5-YEAR CIP List (FY 2023-2024 Capital Improvement Program (CIP) Budget