Loading...
HomeMy WebLinkAboutT&T Commission Agenda Packet 7-10-25 TRAFFIC & TRANSPORTATION COMMISSION AGENDA July 10, 2025 6:30 PM Diamond Bar City Hall Windmill Community Room 21810 Copley Drive, Diamond Bar, CA 91765 Telephonically +1(415) 655-0060 - Access Code: 623-100-803 https://attendee.gotowebinar.com/register/7114620233791626325 Chairperson Patrick Mercado Vice Chairperson Romulo Morales Commissioner Gary Busteed Commissioner Amy Mao Commissioner Raphael Plunkett Written materials distributed to the Traffic and Transportation Commission within 72 hours of the Traffic and Transportation Commission meeting are available for public inspection immediately upon distribution in the City Clerk's office at 21810 Copley Drive, Diamond Bar, California, during normal business hours. Copies of staff reports or other written documentation relating to agenda items are on file in the Public Works Department, located at 21810 Copley Drive, and are available for public inspection. If you have questions regarding an agenda item, please call 909.839.7040 during regular business hours. In an effort to comply with the requirements of Title II of the Americans with Disabilities Act of 1990, the City of Diamond Bar requires that any person in need of any type of special equipment, assistance or accommodation(s) in order to communicate at a City public meeting must inform the Public Works Department at 909.839.7040 a minimum of 72 hours prior to the scheduled meeting. Please refrain from smoking, eating or drinking in the Windmill Community Room The City of Diamond Bar uses recycled paper and encourages you to do the same TRAFFIC AND TRANSPORTATION COMMISSION MEETING RULES Welcome to the meeting of the Traffic and Transportation Commission. Meetings are open to the public. You are invited to attend and participate. PUBLIC INPUT Members of the public may address the Commission on any item of business on the agenda during the time the item is taken up by the Commission. In addition, members of the public may, during the Public Comment period, address the Commission on any item or any matter not on the agenda and within the Commission’s subject matter jurisdiction. Persons wishing to speak should submit a speaker slip to the meeting clerk. Any material to be submitted to the Traffic and Transportation Commission at the meeting should be submitted through the meeting clerk. Speakers are limited to five minutes per agenda item, unless determined otherwise. The Commissioners may adjust this time limit depending on the number of people wishing to speak, the complexity of the matter, the length of the agenda, the hour and any other relevant consideration. Speakers may address the Commission only once on an agenda item, except during public hearings, when the applicant/appellant may be afforded a rebuttal. Public comments must be directed to the Commission. Behavior that disrupts the orderly conduct of the meeting may result in the speaker being removed from the Commission meeting room. INFORMATION RELATING TO AGENDAS AND ACTIONS OF THE COMMISSION Agendas for regular Traffic and Transportation Commission meetings are available 72 hours prior to the meeting and are posted in the City’s regular posting locations, and on the City’s website at www.diamondbarca.gov. A full agenda packet is available for review during the meeting, at the back of the meeting room. The Traffic and Transportation Commission may take action on any item listed on the agenda. ACCOMMODATIONS FOR THE DISABLED A cordless microphone is available for those persons with mobility impairments who cannot access the podium in order to make a public comment. Sign language interpretation is available by providing the City Clerk three business days’ notice in advance of a meeting. Please telephone (909) 839-7010 between 7:30 a.m. and 5:30 p.m. Monday through Thursday and 7:30 a.m. to 4:30 p.m. on Fridays. HELPFUL PHONE NUMBERS Computer access to agendas: www.diamondbarca.gov General information: (909) 839-7040 Written materials distributed to the Traffic & Transportation Commission within 72 hours of the Traffic & Transportation Commission meeting are available for public inspection immediately upon distribution in the City Clerk’s Office at 21810 Copley Dr., Diamond Bar, California, during normal business hours. CITY OF DIAMOND BAR TRAFFIC AND TRANSPORTATION COMMISSION AGENDA Thursday, July 10, 2025 WINDMILL COMMUNITY ROOM Diamond Bar City Hall 21810 Copley Drive, Diamond Bar CALL TO ORDER: 6:30 PM PLEDGE OF ALLEGIANCE: Commissioner Busteed ROLL CALL: Commissioners Busteed, Mao, Plunkett, Vice- Chair Morales, Chair Mercado I. APPROVAL OF MINUTES: A. T&T Commission Meeting Minutes of May 8, 2025 Recommended Action: Receive and File II. PUBLIC COMMENTS: This is the time and place for the general public to address the Commission. Items to be discussed here are those which do not already appear on this agenda. III. ITEMS FROM STAFF: A. Traffic Statistics for March & April 2024-2025 Recommended Action: Receive and File B. Updates on Various Projects/Programs Recommended Action: Receive and File IV. NEW BUSINESS V. OLD BUSINESS JULY 10, 2025 PAGE 2 TRAFFIC AND TRANSPORTATION COMMISSION 1. NTMP Hawkwood - Stop Signs & Pavement Legends Recommended Action: Concur with the installation of two (2) stop signs and associated legend markings at the intersections of Hawkwood Road and Chirping Sparrow Road and Ambusher Street, as the final phase of the NTMP. VI. STATUS OF PREVIOUS ACTION ITEMS VII. ITEMS FROM COMMISSIONERS: VIII. SCHEDULE OF FUTURE CITY EVENTS: A. CITY COUNCIL MEETING – Tuesday, July 15, 2025 – 6:30 p.m., AQMD/ Government Auditorium, 21865 Copley Drive B. PLANNING COMMISSION MEETING – Tuesday, July 22, 2025 – 6:30 p.m., Diamond Hall Windmill Community Room, 21810 Copley Drive C. PARKS AND RECREATION COMMISSION MEETING – Thursday, July 24, 2025 – 6:30 p.m. – Diamond Bar City Hall Windmill Community Room, 21810 Copley Drive D. CITY COUNCIL MEETING – Tuesday, August 5, 2025 – 6:30 p.m., AQMD/ Government Auditorium, 21865 Copley Drive F. PLANNING COMMISSION MEETING – Tuesday, August 12, 2025 – 6:30 p.m., Diamond Hall Windmill Community Room, 21810 Copley Drive G. CITY COUNCIL MEETING – Tuesday, August 19, 2025 – 6:30 p.m., AQMD/ Government Auditorium, 21865 Copley Drive H. PLANNING COMMISSION MEETING – Tuesday, August 26, 2025 – 6:30 p.m., Diamond Hall Windmill Community Room, 21810 Copley Drive I. LABOR DAY HOLIDAY – Monday, September 1, 2025 – City offices will be closed in observance of the holiday. We will re-open on Tuesday, September 2, 2025 at 7:30 a.m. J. CITY COUNCIL MEETING – Tuesday, September 2, 2025 – 6:30 p.m., AQMD/Government Auditorium, 21865 Copley Drive K. PLANNING COMMISSION MEETING – Tuesday, September 9, 2025 – 6:30 p.m., Diamond Hall Windmill Community Room, 21810 Copley Drive L. TRAFFIC & TRANSPORTATION COMMISSION MEETING – Thursday, September 11, 2025 p.m., Diamond Bar City Hall Windmill Community Room, JULY 10, 2025 PAGE 3 TRAFFIC AND TRANSPORTATION COMMISSION 21810 Copley Drive IX. ADJOURNMENT TRAFFIC & TRANSPORTATION COMMISSION AGENDA REPORT AGENDA ITEM NUMBER: 1.A MEETING DATE: July 10, 2025 TO: Chair and Members of the Traffic and Transportation Commission FROM: David G. Liu, Public Works Director/City Engineer SUBJECT: T&T Commission Meeting Minutes of May 8, 2025 RECOMMENDATION: Receive and File Attached for your review and approval are the T&T Commission Meeting Minutes of May 8, 2025. Attachments: 1. T&T Commission Meeting Minutes - 5/8/25 CITY OF DIAMOND BAR ~ 21810 COPLEY DRIVE ~ DIAMOND BAR, CA 91765 ~ TEL. (909) 839-7040 ~ FAX (909) 861-3117 1.A Packet Pg. 6 CITY OF DIAMOND BAR MINUTES OF THE TRAFFIC & TRANSPORTATION COMMISSION DIAMOND BAR CITY HALL WINDMILL ROOM 21810 COPLEY DRIVE, DIAMOND BAR, CA 91765 MAY 8, 2025 CALL TO ORDER: Chair Mercado called the meeting to order at 6:01 p.m. PLEDGE OF ALLEGIANCE: Chair Mercado led the Pledge of Allegiance ROLL CALL: Commissioners Amy Mao, Raphael Plunkett, Chair Patrick Mercado ABSENT: Commissioner Gary Busteed, Vice-Chair Romulo Morales Staff present: David Liu, Public Works Director; Hal Ghafari, Public Works Manager/Assistant City Engineer; Vivian Chen, Associate Engineer; Nicholas Delgado, Public Works Management Analyst; Angie Hernandez, Administrative Coordinator I. APPROVAL OF MINUTES: A. Traffic and Transportation Commission Meeting Minutes of March 13, 2025 C/Plunkett moved, C/Mao seconded, to approve the Meeting Minutes of March 13, 2025. Motion carried by the following Roll Call vote: AYES: COMMISSIONERS: Mao, Plunkett, Chair/Mercado ABSENT: COMMISSIONERS: Busteed, VC/Morales ABSTAIN: COMMISSIONERS: None II. PUBLIC COMMENTS: None 1.A.a Packet Pg. 7 Attachment: T&T Commission Meeting Minutes - 5/8/25 (T&T Commission Meeting Minutes of May 8, 2025) MAY 8, 2025 PAGE 2 T&T COMMISSION III. ITEMS FROM STAFF: A. TRAFFIC STATISTICS – JANUARY & FEBRUARY 2025 C/Plunkett moved, C/Mao seconded, to receive and file the January & February 2025 Traffic Statistics Report. Motion carried by the following Roll Call vote: AYES: COMMISSIONERS: Mao, Plunkett, Chair/Mercado ABSENT: COMMISSIONERS: Busteed, VC/Morales ABSTAIN: COMMISSIONERS: None B. MONTHLY UPDATES OF VARIOUS PROJECTS/PROGRAMS: C/Plunkett moved and C/Mao seconded to approve the Monthly Updates of Various Projects/Programs. Motion carried by the following Roll Call vote: AYES: COMMISSIONERS: Mao, Plunkett, Chair/Mercado ABSENT: COMMISSIONERS: Busteed, VC/Morales NOES: COMMISSIONERS: None IV. STATUS OF PREVIOUS ACTION ITEMS: MA/Delgado provided the Commission with an update regarding the City Street Name Sign Give-Away. V. ITEMS FROM COMMISSIONERS: C/Mao asked about the Grand Avenue traffic control measures during the next phase of construction. Questions were answered by PWM/Ghafari. C/Plunkett made staff aware of a bag of trash on the transformer located at Grand Avenue/Country View Drive. Staff will follow up. VI. SCHEDULE OF FUTURE CITY EVENTS: As presented in the Agenda. 1.A.a Packet Pg. 8 Attachment: T&T Commission Meeting Minutes - 5/8/25 (T&T Commission Meeting Minutes of May 8, 2025) MAY 8, 2025 PAGE 3 T&T COMMISSION VII. ADJOURNMENT: There being no further business to come before the Traffic and Transportation Commission, Chair/Mercado adjourned the meeting at 7:01 p.m. to Thursday, July 10, 2025, at 6:30 p.m. The foregoing minutes are hereby approved this day of , 2025. Respectfully Submitted, ______________________________ David G. Liu, Secretary Attest: ___________________________________________ Chair Patrick Mercado 1.A.a Packet Pg. 9 Attachment: T&T Commission Meeting Minutes - 5/8/25 (T&T Commission Meeting Minutes of May 8, 2025) TRAFFIC & TRANSPORTATION COMMISSION AGENDA REPORT AGENDA ITEM NUMBER: 3.A MEETING DATE: July 10, 2025 TO: Chair and Members of the Traffic and Transportation Commission FROM: David G. Liu, Public Works Director/City Engineer SUBJECT: Traffic Statistics for March & April 2024-2025 RECOMMENDATION: Receive and File Attached for your review are the Traffic Statistics Reports for the months of March and April – 2024-2025, as submitted by the L.A. County Sheriff’s Department. Both years have been provided for side-by-side comparison. Attachments: 1. Traffic Statistics - March & April - 2024-2025 CITY OF DIAMOND BAR ~ 21810 COPLEY DRIVE ~ DIAMOND BAR, CA 91765 ~ TEL. (909) 839-7040 ~ FAX (909) 861-3117 3.A Packet Pg. 10 3.A.aPacket Pg. 11Attachment: Traffic Statistics - March & April - 2024-2025 (Traffic Statistics for March & April 2024-2025) 3.A.aPacket Pg. 12Attachment: Traffic Statistics - March & April - 2024-2025 (Traffic Statistics for March & April 2024-2025) 3.A.aPacket Pg. 13Attachment: Traffic Statistics - March & April - 2024-2025 (Traffic Statistics for March & April 2024-2025) 3.A.aPacket Pg. 14Attachment: Traffic Statistics - March & April - 2024-2025 (Traffic Statistics for March & April 2024-2025) TRAFFIC & TRANSPORTATION COMMISSION AGENDA REPORT AGENDA ITEM NUMBER: 3.B MEETING DATE: July 10, 2025 TO: Chair and Members of the Traffic and Transportation Commission FROM: David G. Liu, Public Works Director/City Engineer SUBJECT: Updates on Various Projects/Programs RECOMMENDATION: Receive and File A. FY2025/26 Capital Improvement Program Budget The Public Works Department has prepared the FY2025/26 Capital Improvement Program (CIP) for the City Council’s consideration at their May 6, 2025, meeting. The proposed list of projects includes the construction and design phases for several street rehabilitations, park improvements, and other enhancements to existing public facilities and infrastructure. The proposed FY2025 -26 CIP Budget is $19.675 million, of which $5.163 million is for new projects and $14.512 million is carryover funds from ongoing projects. A presentation and the detailed approved FY 2025/26 CIP, 5 -Year CIP, and the Status of the FY 2024/25 CIP are attached. B. Grand Avenue and Golden Springs Drive Intersection Improvements Public Works continues to collaborate closely with the City of Industry, along with its project manager and inspectors, to ensure the successful completion of the Project. The majority of punch-list items have been successfully addressed. SCE’s work is still pending to energize the streetlight poles. Once this work is completed, the city will be able to formally close out the Project. CITY OF DIAMOND BAR ~ 21810 COPLEY DRIVE ~ DIAMOND BAR, CA 91765 ~ TEL. (909) 839-7040 ~ FAX (909) 861-3117 3.B Packet Pg. 15 C. Area 4 Residential, Collector and Arterial Paving Improvement Project A construction contract for the Area 4 Pavement Rehabilitation Project was awarded at the May 6, 2025, City Council meeting. The pre -construction meeting was held on June 3, 2025, and construction began during the week of June 16, 2025. Project completion is anticipated in September 2025. This project will rehabilitate approximately 2.7 centerline miles of residential and collector streets using a combination of techniques, including slurry seal, chip seal, localized asphalt concrete (AC) dig-outs, and ADA curb ramp upgrades. See attached Vicinity Map. D. CDBG Area 5 Residential ADA Curb Ramp Improvement Project A construction contract for the CDBG Area 5 Project was awarded in early April 2025, and a pre-construction meeting was held on April 22, 2025. Construction began the week of June 3, 2025, and the construction work has since been completed, with punch-list items currently underway. The scope of work included the full construction of six (6) new ADA -compliant curb ramps within the Golden Springs Elementary School neighborhood. The goal of this project was to enhance accessibility by upgrading existing curb ramps to meet current ADA standards. See attached Vicinity Map. E. SR-57/60 Confluence Improvements Project Construction for the SR-57/60 Interchange Improvements continues. Contractor completed placing concrete for the SR-57/Golden Springs Drive Undercrossing Bridge stem and soffit. Contractor is also currently working on constructing retaining wall foundations and footings along eastbound SR-60, storm drain relocations at various locations, roadway work, and utility relocations along Grand Avenue. City staff, in coordination with the Community Relations team, continues to provide timely updates to keep the community informed. Attachments: 1. FY26 CIP Power Point Presentation 2. FY25 CIP Status Ver. 4 05072025 3. FY26 CIP Ver. 4 05072025 4. FY26-30 5YCIP Ver. 4 05072025 5. Area 4 Street/Arterial Rehab - Vicinity Map 6. CDBG Area 5 - Vicinity Map 3.B Packet Pg. 16 FY 2025/26 CAPITAL IMPROVEMENT PROGRAM (CIP) Traffic and Transportation Commission July 10, 2025 3.B.a Packet Pg. 17 Attachment: FY26 CIP Power Point Presentation (Updates on •FY 2025/26 CIP •5-Year CIP •FY 2024/25 CIP Report •Discussion 2 CONTENTS 3.B.a Packet Pg. 18 Attachment: FY26 CIP Power Point Presentation (Updates on FY 2025/26 CIP 3.B.a Packet Pg. 19 Attachment: FY26 CIP Power Point Presentation (Updates on •Total of 13 new and ongoing projects with a total budget of $19,675,000. • $5,163,000 of new FY 2025/26 budget requests for 5 new projects. •No new budget requests on ongoing projects. 11 8 62% 5 38% NUMBER OF PROJECTS Ongoing New FY 2025/26 CIP $14,512,000 74% $5,163,000 26% PROJECTS’ BUDGET 3.B.a Packet Pg. 20 Attachment: FY26 CIP Power Point Presentation (Updates on STREET IMPROVEMENTS 12 Phase Project Description New Request Approved DSGN Pavement Rehabilitation Design Project FYs 2026-28 (Arterials, Residential, Collector Street Rehab, and CDBG Curb Ramps). $600,000 CONST Arterial Streets Rehabilitation - Brea Canyon Rd from DBB to Pathfinder - Brea Canyon Rd from Pathfinder to Golden Springs Dr - Diamond Bar Blvd from SR 60 off-ramp to City Limits $3,754,000 CONST CDBG Area 6 ADA Curb Ramp Project $145,000 CONST Arterial Street Pavement Rehabilitation -Lemon Ave (SR60 to City Limit); Brea Cyn Cutoff (SR57 to City Limit) $1,500,000 CONST Residential and Collector Street Rehab - Area 4 $2,450,000 CONST Diamond Bar Blvd Complete Street Project $9,242,000 Total $4,499,000 $13,192,000 3.B.a Packet Pg. 21 Attachment: FY26 CIP Power Point Presentation (Updates on STREET IMPROVEMENTS 13 FY 2025/26 Arterials for Rehabilitation Residential and Collector Streets –NOT Proposed 3.B.a Packet Pg. 22 Attachment: FY26 CIP Power Point Presentation (Updates on TRAFFIC MANAGEMENT/SAFETY 14 TRANSPORTATION INFRASTRUCTURE Phase Project Description New Request Approved N/A Total $ 0 $ 0 Phase Project Description New Request Approved CONST Battery Back-Up and CCTV Replacement Program FY25/26 $ 64,000 DESIGN Citywide Traffic Mitigation Fund Planning $ 350,000 Total $ 414,000 $ 0 3.B.a Packet Pg. 23 Attachment: FY26 CIP Power Point Presentation (Updates on MISCELLANEOUS PUBLIC WORKS 15 Phase Project Description New Request Approved CONST Brea Canyon Storm Drain Lining Project $ 150,000 ALL Installation of Full Capture Trash Screen Devices on Stormwater Catch Basin - Phase 1 $ 380,000 Total $ 0 $ 530,000 FACILITIES, PARKS AND REC Phase Project Description New Request Approved DESIGN LLADs Irrigation, Landscape, and Miniparks Improvements Design and Construction $ 600,000 CONST DBC GVBR Lighting & Controls Upgrade $ 330,000 CONST DBC Main Entry/Doors & ADA Improvements $ 310,000 DESIGN Sycamore Canyon Park Lower Bridge Replacement Options $ 150,000 Total $ 600,000 $ 790,000 3.B.a Packet Pg. 24 Attachment: FY26 CIP Power Point Presentation (Updates on FACILITIES, PARKS AND REC 16 District 39-2022 District 41-2021 3.B.a Packet Pg. 25 Attachment: FY26 CIP Power Point Presentation (Updates on 0% 29% 26% 19% 7% 3%4% 4% 8%FUNDING SOURCES: NEW REQUEST 100 - General Fund 202 - RMRA (SB-1) 203 - Measure M 204 - Measure R 207 - Prop C 225 - CDBG 252 - Hauler Fees 241 - LLAD 41-2021 239 - LLAD 39-2022 FY 2025/26 CIP Total New Request: $5,163,000 17 $0 $1.5M $1.34M $1M $380K $145K $195K $200K $400K 3.B.a Packet Pg. 26 Attachment: FY26 CIP Power Point Presentation (Updates on 5-YEAR CIP 2025/26-2029/30 3.B.a Packet Pg. 27 Attachment: FY26 CIP Power Point Presentation (Updates on •Goals •Funding Gap •Unscheduled Projects 19 5-YEAR CIP 3.B.a Packet Pg. 28 Attachment: FY26 CIP Power Point Presentation (Updates on FY 2024/25 CIP REPORT 3.B.a Packet Pg. 29 Attachment: FY26 CIP Power Point Presentation (Updates on •Total of 23 projects with a total budget of $30,400,515. $15,888,515 52% $14,512,000 48% BUDGET* Completed Carry Forward to FY25 15 65% 8 35% Number of Projects 22 FY 2024/25 CIP REPORT *Based on Projects’ Lifetime Budget. 3.B.a Packet Pg. 30 Attachment: FY26 CIP Power Point Presentation (Updates on 23 FY 2024/25 CIP REPORT •Completed Projects Project #Phase Project Description Budget Street Improvement Projects SI23101 DESIGN Residential and Collector Street Rehab. (Design) Arterial Street Rehab (Design) CDBG Curb Ramp (Design) $ 380,000 SI24101 CONST Residential and Collector Street Rehab - Area 3 (Const.) $ 3,678,688 SI24103 CONST Arterial Street Rehab (Const.) -Golden Springs Dr from Grand Ave to Temple Ave -Grand Ave from Diamond Bar Blvd to East City Limits -Gateway Center, Copley Dr, Bridgegate Dr $ 5,892,409 SI254 CONST CDBG Area 5 ADA Curb Ramp Project (Const.)$ 108,910 SI24104 CONST CDBG Area 4 ADA Curb Ramp Project (Const.)$ 104,704 Total $ 10,164,711 3.B.a Packet Pg. 31 Attachment: FY26 CIP Power Point Presentation (Updates on 24 FY 2024/25 CIP REPORT •Completed Projects Area 3 Residential Gateway Center Largest Pavement Rehabilitation Project 3.B.a Packet Pg. 32 Attachment: FY26 CIP Power Point Presentation (Updates on 25 FY 2024/25 CIP REPORT •Completed Projects Project #Phase Project Description Budget Traffic Management/Safety Projects TM251 ALL Battery Back-Up and CCTV Replacement Program FY24/25 $ 62,025 Total $ 62,025 Transportation Infrastructure Improvements TI24301 CONST Intersection Safety Improvements (Constr.)$ 270,982 Total $ $270,982 3.B.a Packet Pg. 33 Attachment: FY26 CIP Power Point Presentation (Updates on 26 FY 2024/25 CIP REPORT •Completed Projects Project #Phase Project Description Budget Miscellaneous Public Works Improvements PW23402 ALL Grand Avenue Median Drainage Improvement $ 73,472 PW24401 ALL Steep Canyon Erosion Control and Sedimentation Prevention $ 132,436 Total $ 205,908 3.B.a Packet Pg. 34 Attachment: FY26 CIP Power Point Presentation (Updates on 27 FY 2024/25 CIP REPORT •Completed Projects Project #Phase Project Description Budget Traffic Management/Safety Projects FP23504 CONST City Hall Cable Channel Broadcast and A/V Equipment Upgrade $ 408,326 FP23503 CONST Pantera Park Hard Court Rehab and LED Retrofit $ 270,000 FP23506 ALL Maple Hill Park Playground/Restroom Replacement and ADA Upgrades $ 1,989,766 FP22501 CONST DBC AC Replacement & Air Quality Upgrades $ 1,345,197 FP24502 DESIGN Heritage Park Renovation Phases 1 and 2 $ 500,000 FP24505 CONST City Hall Roof Rehabilitation/Solar System Removal and Reinstallation $ 671,600 Total $ 5,184,889 Grand Total $ 15,888,515 3.B.a Packet Pg. 35 Attachment: FY26 CIP Power Point Presentation (Updates on 28 FY 2024/25 CIP REPORT 3.B.a Packet Pg. 36 Attachment: FY26 CIP Power Point Presentation (Updates on 29 FY 2024/25 CIP REPORT Maple Hill Park Renovation 3.B.a Packet Pg. 37 Attachment: FY26 CIP Power Point Presentation (Updates on 30 FY 2024/25 PROJECT HIGHLIGHT City Hall Roof Rehabilitation 3.B.a Packet Pg. 38 Attachment: FY26 CIP Power Point Presentation (Updates on 31 FY 2024/25 PROJECT HIGHLIGHT DBC AC Replacement & Air Quality Upgrades City Hall Roof Rehabilitation 3.B.a Packet Pg. 39 Attachment: FY26 CIP Power Point Presentation (Updates on QUESTIONS 3.B.a Packet Pg. 40 Attachment: FY26 CIP Power Point Presentation (Updates on ADDITIONAL SLIDES 3.B.a Packet Pg. 41 Attachment: FY26 CIP Power Point Presentation (Updates on R1 PAVEMENT IMPACT •Relative Impact of Vehicle Type on Pavement Condition. Based on FHWA equivalent number of 18,000 lbf (pound force) single-axle loads that would produce the same amount of damage over the pavement. 3.B.a Packet Pg. 42 Attachment: FY26 CIP Power Point Presentation (Updates on R2 PAVEMENT IMPACT •Pavement Condition Categories 3.B.a Packet Pg. 43 Attachment: FY26 CIP Power Point Presentation (Updates on FY 2024/25 CAPITAL IMPROVEMENT PROGRAM STATUS ATTACHMENT 3 Street Improvement Projects Project #Phase Project Description Budget Est. Status @ 6/30/2025 Notes SI23101 DESIGN Residential and Collector Street Rehab. (Design) Arterial Street Rehab (Design) CDBG Curb Ramp (Design)380,000$ Completed Project closed. SI24101 CONSTRUCT Residential and Collector Street Rehab - Area 3 (Const.)3,678,688$ Completed Project closed. SI24103 CONSTRUCT Arterial Street Rehab (Const.) -Golden Springs Dr from Grand Ave to Temple Ave -Grand Ave from Diamond Bar Blvd to East City Limits -Gateway Center, Copey Dr, Bridgegate Dr 5,892,409$ Completed Project closed. SI255 CONSTRUCT Arterials Street Pavement Rehabilitation -Lemon Ave (SR60 to City Limit); Brea Cyn Cutoff (SR57 to City Limit)1,500,000$ Carry Forward Construction contract being awarded. SI251 CONSTRUCT Residential and Collector Street Rehab - Area 4 (Const.)2,450,000$ Carry Forward Construction contract being awarded. SI254 CONSTRUCT CDBG Area 5 ADA Curb Ramp Project (Const.)108,910$ Completed Construction ongoing. To be completd by June 30, 2025 SI256 CONSTRUCT Diamond Bar Blvd Complete Street Project Construction 9,242,000$ Carry Forward Finalizing Federal and State Funding Requirements. Preparing for bidding early in FY26. SI24104 CONSTRUCT CDBG Area 4 ADA Curb Ramp Project (Const.)104,704$ Completed Project closed. Total - Street Improvement Projects 23,356,711$ Traffic Management/Safety Projects Project #Phase Project Description Budget Est. Status @ 6/30/2025 Notes TM251 ALL Battery Back-Up and CCTV Replacement Program FY24/25 62,025$ Completed Project closed. Total - Traffic Management/Safety Projects 62,025$ Transportation Infrastructure Improvements Project #Phase Project Description Budget Est. Status @ 6/30/2025 Notes TI24301 CONSTUCT Intersection Safety Improvements (Constr.)270,982$ Completed Work Completed. Total-Transportation Infrastructure Improvements 270,982$ Miscellaneous Public Works Improvements Project #Phase Project Description Budget Est. Status @ 6/30/2025 Notes PW25403 ALL Full Capture Devices on Stormwater Catchbasin for Trash Amendment Compliance - Phase 1 380,000$ Carry Forward Design and pre-con work are being completed in-house. PW23402 ALL Grand Avenue Median Drainage Improvement Project (Design and Const.)73,472$ Completed Project closed. 1 of 2 3.B.b Packet Pg. 44 Attachment: FY25 CIP Status Ver. 4 05072025 (Updates on Various Projects/Programs) FY 2024/25 CAPITAL IMPROVEMENT PROGRAM STATUS ATTACHMENT 3 PW23403 CONSTRUCT Brea Canyon Storm Drain Lining Project (800 ft between DB Church and GSD) 150,000$ Carry Forward The contract is being awarded. Short-term project. PW24401 ALL Steep Canyon Erosion Control and Sedimentation Prevention (Design & Const.)132,436$ Completed Project closed. Total - Miscellaneous PW Improvements 735,908$ Facilities, Parks and Rec Improvements Project #Phase Project Description Budget Est. Status @ 6/30/2025 Notes FP25508 DESIGN Sycamore Canyon Park Lower Bridge Replacement Options (Design)150,000$ Carry Forward In RFP. FP24500 CONSTRUCT DBC GVBR Lighting & Controls Upgrade (Const.)330,000$ Carry Forward Waiting for the availability of DBC for closure during construction. September 2025 reserved. FP24501 CONSTRUCT DBC Main Entry/Doors & ADA Improvements (Const.)310,000$ Carry Forward Waiting for the availability of DBC for closure during construction. September 2025 reserved. FP23504 CONSTRUCT City Hall Cable Channel Broadcast and A/V Equipment Upgrade (Const.)408,326$ Completed Project completed. FP23503 CONSTRUCT Pantera Park Hard Court Rehab and LED Retrofit Project (Design & Const.)270,000$ Completed Construction ongoing. To be completd by June 30, 2025 FP23506 ALL Maple Hill Park Playground/Restroom Replacement and ADA Upgrades 1,989,766$ Completed Construction ongoing. To be completd by June 30, 2025 FP22501 CONSTRUCT DBC AC Replacement & Air Quality Upgrades (Const.)1,345,197$ Completed Project closed. FP24502 DESIGN Heritage Park Renovation Phases 1 and 2 (Design)500,000$ Completed Work completed. FP24505 CONSTRUCT City Hall Roof Rehabilitation/Solar System Removal and Reinstallation 671,600$ Completed Project closed. Total - Facilities, Parks and Rec Improvements 5,974,889$ Total FY 2024/25 Capital Improvement Program 30,400,515$ 2 of 2 3.B.b Packet Pg. 45 Attachment: FY25 CIP Status Ver. 4 05072025 (Updates on Various Projects/Programs) FY 2025/26 CAPITAL IMPROVEMENT PROGRAM BUDGET Street Improvement Projects Funding Sources: Project # Phase Project Description Status FY 25/26 Budget Request (202) RMRA (203) Measure M (204) Measure R Local Return (206) Prop A (207) Prop C (252) Hauler Fees (225) CDBG SI261 DESIGN Pavement Rehabilitation Design Project FYs 2026-28 (Arterials, Residential, Collector Street Rehab, and CDBG Curb Ramps). NEW 600,000$ 600,000$ SI262 CONSTRUCT Arterial Street Rehab (Construction) - Brea Canyon Rd from DBB to Pathfinder - Brea Canyon Rd from Pathfinder to Golden Springs Dr - Diamond Bar Blvd from SR 60 off-ramp to City Limits NEW 3,754,000$ 1,500,000$ 743,000$ 1,000,000$ 316,000$ 195,000$ SI264 CONSTRUCT CDBG Area 6 ADA Curb Ramp Project NEW 145,000$ 145,000$ SI255 CONSTRUCT Arterial Street Pavement Rehabilitation -Lemon Ave (SR60 to City Limit); Brea Cyn Cutoff (SR57 to City Limit) Ongoing- No New Request -$ SI251 CONSTRUCT Residential and Collector Street Rehab - Area 4 Ongoing- No New Request -$ SI256 CONSTRUCT Diamond Bar Blvd Complete Street Project Ongoing- No New Request -$ Total - Street Improvement Projects 4,499,000$ 1,500,000$ 1,343,000$ 1,000,000$ -$ 316,000$ 195,000$ 145,000$ Traffic Management/Safety Projects Funding Sources: Project # Phase Project Description Status FY 25/26 Budget Request (207) Prop C (203) Measure M (205) Gas Tax (246) Traffic Mitigation TM261 ALL Battery Back-Up and CCTV Replacement Program FY25/26 NEW 64,000$ 64,000$ Total - Traffic Management/Safety Projects 64,000$ 64,000$ -$ -$ -$ -$ -$ -$ Transportation Infrastructure Improvements Funding Sources: Project # Phase Project Description Status FY 25/26 Budget Request (207) Prop C Foothill Transit Grant (45030)(206) Prop A HSIP Grant (CalTrans)(209) TDA (100) General Fund ----$ Total-Transportation Infrastructure Improvements -$ -$ -$ -$ -$ -$ -$ -$ Miscellaneous Public Works Improvements Funding Sources: Project # Phase Project Description Status FY 25/26 Budget Request (201) Measure W MSP Grant (203) Measure M (207) Prop C (206) Prop A (209) TDA (100) GF PW25403 ALL Full Capture Devices on Stormwater Catchbasin for Trash Amendment Compliance - Phase 1 Ongoing - No New Request -$ PW23403 CONSTRUCT Brea Canyon Storm Drain Lining Ongoing - No New Request -$ Total - Miscellaneous PW Improvements -$ -$ -$ -$ -$ -$ -$ -$ Facilities, Parks and Rec Improvements Funding Sources: Project # Phase Project Description Status FY 25/26 Budget Request (100) General Fund Habitat Conserv Grant (43110) (262) Park Development (504) Building & Facilities Fund (201) Measure W (241) LLAD 41- 2021 (239) LLAD 39- 2022 FP261 DESIGN LLADs Irrigation, Landscape, and Minparks Improvements Designa and Construction NEW 600,000$ 200,000$ 400,000$ FP25508 DESIGN Sycamore Canyon Park Lower Bridge Replacement Options Ongoing - No New Request -$ FP24500 CONSTRUCT DBC GVBR Lighting & Controls Upgrade Ongoing - No New Request -$ FP24501 CONSTRUCT DBC Main Entry/Doors & ADA Improvements Ongoing - No New Request -$ Total - Facilities, Parks and Rec Improvements 600,000$ -$ -$ -$ -$ -$ 200,000$ 400,000$ Total FY 2025/26 Capital Improvement Program (NEW REQUEST)5,163,000$ Total FY 2024/25 Carryover Projects (i.e. ongoing projects)14,512,000$ Grand Total 19,675,000$ *see below and Draft Five-Year CIP Program for further information 1 of 2 3.B.c Packet Pg. 46 Attachment: FY26 CIP Ver. 4 05072025 (Updates on Various Projects/Programs) FY 2025/26 CAPITAL IMPROVEMENT PROGRAM BUDGET Fund # Funding Source Totals FY 25/26 Request Listed Projects Lifetime 100 General Fund -$ 790,000$ 201 Measure W -$ 836,000$ 202 RMRA (SB-1)1,500,000$ 2,800,000$ 203 Measure M 1,343,000$ 2,293,000$ 204 Measure R 1,000,000$ 2,000,000$ 205 Gas Tax -$ -$ 206 Prop A -$ 600,000$ 207 Prop C 380,000$ 980,000$ 251 AB2766 -$ -$ 225 CDBG 145,000$ 145,000$ 252 Hauler Fees 195,000$ 445,000$ 241 LLAD 41-2021 200,000$ 200,000$ 262 Park Development -$ -$ 504 Building & Facilities Maintenance Fund -$ -$ 239 LLAD 39-2022 400,000$ 400,000$ 246 Traffic Mitigation -$ -$ -TDA -$ 100,000$ -TDA C6 Grant -$ 3,936,000$ - MSP Grant -$ 2,985,000$ -STPL -$ 1,165,000$ 301-45030 Foothill Transit Grant -$ -$ 301-43110 Habitat Conservation Grant -$ -$ Total 5,163,000$ 19,675,000$ CIP Program Year-Over-Year Adopted FY 2024/25 Draft FY 2025/26 % Change Street Improvements 13,356,189$ 4,499,000$ -66% Traffic Mgmnt./Safety Improv.64,000$ 64,000 0% Transportation Infrastructure Improvements -$ - N/A Misc. Public Works Improvements 380,000$ - -100% Facilites, Parks and Rec. Improv.150,000$ 600,000 300% Total 13,950,189$ 5,163,000$ -63.0% 2 of 2 3.B.c Packet Pg. 47 Attachment: FY26 CIP Ver. 4 05072025 (Updates on Various Projects/Programs) 5-YEAR CIP PROGRAM 5-YEAR CIP PROGRAM FY 25-26 TO FY 29-30 Project # Project Description * Priority ** Potential Funding Sources Total Project Budget Request Potential Funding Gap FY 24-25 Cont'd to FY 25-26 NEW Proposed FY 25-26 FY 26-27 FY 27-28 FY 28-29 FY 29-30 Unscheduled Projects Pending Funding Street Improvement Projects SI23101 Residential and Collector Street Rehab.- (Design) Arterial Street Rehab - 3 Locations (Design) [Locations Pending PMS Update] CDBG Curb Ramp - Area 3, 4, 5 (Design) 1 SB1, MM, MR, GT, HF, PA, PC -$ None COMPLETED SI24101 Residential and Collector Street Rehab.- Area 3 (Const.)2 SB1, MM, MR, GT, HF -$ None COMPLETED SI24103 Arterial Street Rehab (-Golden Springs Dr from Grand Ave to Temple Ave -Grand Ave from Diamond Bar Blvd to East City Limits -Gateway Center, Copey Dr, Bridgegate Dr) (Const.) 1 SB1, MM, MR, GT, HF, PA, PC -$ None COMPLETED SI24104 CDBG Area 4 ADA Curb Ramp Project (Conr.)2 CDBG -$ None COMPLETED SI25101 Residential and Collector Street Rehab.- Area 4 (Const.)2 SB1, MM, MR, GT, HF 2,450,000$ None 2,450,000$ SI25104 CDBG Area 5 ADA Curb Ramp Project 2 CDBG 164,189$ None 164,189$ SI25105 Arterial Street Rehab (Const.) -Lemon Ave (SR60 to City Limit); Brea Cyn Cutoff (SR57 to City Limit)1 SB1, MM, MR, GT, HF, PA, PC 1,500,000$ None 1,500,000$ SI25106 Diamond Bar Blvd. Complete Streets (GSD - 60FWY)-Construction 1 GRANT, MM, MR, MW, PA, SPA, PC, WH, GT, TM, SB1, STP- L 9,242,000$ $ 2,500,000 9,242,000$ SI261 Pavement Rehabilitation Design FY26-28 (Arterials, Residential, Collector Street Rehab, and CDBG Curb Ramps). 1 SB1, MM, MR, GT, HF, PA, PC 600,000$ 100,000$ 600,000$ SI262 Arterial Street Rehab (Location pending) (Const.) 1 SB1, MM, MR, GT, HF, PA, PC 3,754,000$ None 3,754,000$ SI264 CDBG Area 6 ADA Curb Ramp Project 2 CDBG 145,000$ None 145,000$ NEW Residential and Collector Street Rehab.- Area 5 (Const.)2 SB1, MM, MR, GT, HF 4,120,000$ 120,000$ 4,120,000$ NEW Arterial Street Rehab (Location pending) (Const.) 1 SB1, MM, MR, GT, HF, PA, PC 13,000,000$ 12,500,000$ 13,000,000$ NEW Residential and Collector Street Rehab.- Area 6 (Const.)2 SB1, MM, MR, GT, HF 4,120,000$ 620,000$ 4,120,000$ NEW CDBG Area 7 ADA Curb Ramp Project 2 CDBG 145,000$ None 145,000$ NEW Arterial Street Rehab (Location pending) (Const.) 1 SB1, MM, MR, GT, HF, PA, PC 13,390,000$ 4,500,000$ 13,390,000$ NEW Residential and Collector Street Rehab.- Area 7 (Const.)2 SB1, MM, MR, GT, HF 4,243,600$ 500,000$ 4,243,600$ NEW CDBG Area 1 ADA Curb Ramp Project 2 CDBG 145,000$ None 145,000$ NEW Arterial Street Rehab (Location pending) (Const.) 1 SB1, MM, MR, GT, HF, PA, PC 13,791,700$ 13,291,700$ 13,791,700$ NEW Residential and Collector Street Rehab.- Area 1 (Const.)2 SB1, MM, MR, GT, HF 4,370,908$ 870,908$ 4,370,908$ NEW Residential and Collector Street Rehab Design FY 29-31 1 SB1, MM, MR, GT, HF 650,000$ 300,000$ 650,000$ NEW CDBG Area 2 ADA Curb Ramp Project 2 CDBG 145,000$ None 145,000$ NEW Arterial Street Rehab (Location pending) (Const.) 1 SB1, MM, MR, GT, HF, PA, PC 14,205,451$ 13,705,451$ 14,205,451$ NEW Residential and Collector Street Rehab.- Area 2 (Const.)2 SB1, MM, MR, GT, HF 4,502,035$ 1,002,035$ 4,502,035$ NEW CDBG Area 7 ADA Curb Ramp Project 2 CDBG 145,000$ None 145,000$ SubTotal - Street Improvement Projects 94,828,883$ 50,010,094$ 13,356,189$ 4,499,000$ 21,385,000$ 17,778,600$ 18,957,608$ 18,852,486$ $ - 1 3.B.d Packet Pg. 48 Attachment: FY26-30 5YCIP Ver. 4 05072025 (Updates on Various Projects/Programs) 5-YEAR CIP PROGRAM 5-YEAR CIP PROGRAM FY 25-26 TO FY 29-30 Project # Project Description * Priority ** Potential Funding Sources Total Project Budget Request Potential Funding Gap FY 24-25 Cont'd to FY 25-26 NEW Proposed FY 25-26 FY 26-27 FY 27-28 FY 28-29 FY 29-30 Unscheduled Projects Pending Funding Traffic Management/Safety Projects TM25201>T M261 Battery Back-Up and CCTV Replacement Program 1 PC 130,000$ None COMPLETED 64,000$ 66,000$ SubTotal - Traffic Management/Safety Projects 130,000$ -$ -$ 64,000$ 66,000$ -$ -$ -$ $ - Transportation Infrastructure Improvements TI24301 Intersection Safety Improvement (Construction) 3 HSIP, TDA -$ None COMPLETED SubTotal - Transportation Infrastructure Improvements -$ -$ -$ -$ -$ -$ -$ -$ $ - Miscellaneous PW Improvements PW23402 Grand Avenue Median Drainage Improvement Project (Design and Construction)1 MW -$ None COMPLETED PW23401 Groundwater Drainage Improvements-Phase 4 & 5 (Copley & Moonlake ) (Const.)2 MW -$ None COMPLETED PW24401 Steep Canyon Erosion Control and Sedimentation Prevention (Design & Const.)2 MW -$ None COMPLETED Under SI24101 Groundwater Drainage Improvements-Phase 6 (Cold Springs Lane @ South of Diamond Ridge)2 MW -$ None COMPLETED PW23403 Brea Canyon Storm Drain Lining 2 MR 150,000$ None 150,000$ PW25403 Full Capture Devices on Stormwater Catchbasin for Trash Amendment Compliance 2 MW 792,000$ None 380,000$ 412,000$ NEW Groundwater Drainage Improvements-Phase 7 (Cleghorn Drive @ North of Gold Nugget) Design and Construction 2 MW 360,500$ None 360,500$ PW261 Citywide Wayfinding Signs Replacement on RoW 4 GF 350,000$ $ 350,000 350,000$ NEW City Entry Monument and Median Improvements (Lemon Ave.) Design 5 GF 103,000$ $ 103,000 103,000$ NEW City Entry Monument and Median Improvements (Lemon Ave.) Construction 5 GF 772,500$ $ 772,500 772,500$ NEW City Entry Monument and Parkway Improvements (Brea Canyon Road) Design 5 GF 103,000$ $ 103,000 103,000$ NEW City Entry Monument and Parkway Improvements (Brea Canyon Road) Construction 5 GF 772,500$ $ 772,500 772,500$ SubTotal -Miscellaneous PW Improvements 3,403,500$ 2,101,000$ 530,000$ -$ 772,500$ -$ -$ $ 2,101,000 2 3.B.d Packet Pg. 49 Attachment: FY26-30 5YCIP Ver. 4 05072025 (Updates on Various Projects/Programs) 5-YEAR CIP PROGRAM 5-YEAR CIP PROGRAM FY 25-26 TO FY 29-30 Project # Project Description * Priority ** Potential Funding Sources Total Project Budget Request Potential Funding Gap FY 24-25 Cont'd to FY 25-26 NEW Proposed FY 25-26 FY 26-27 FY 27-28 FY 28-29 FY 29-30 Unscheduled Projects Pending Funding Facilites, Parks and Rec Improvements FP22501 DBC AC Replacement & Air Quality Upgrades (Construction)1 504, GF -$ None COMPLETED FP23504 City Hall Cable Channel Broadcast and A/V Equipment Upgrade (Cnostruction)1 PEG -$ None COMPLETED FP23506 Maple Hill Park Playground/Restroom Replacement and ADA Upgrades (Design and Construction) 4 MA, GF, GRANT, PD -$ None COMPLETED FP24505 City Hall Roof Rehabilitation/Solar System Removal and Reinstallation (Const)2 504, GF -$ None COMPLETED FP24502 Heritage Park Renovation Phases 1 and 2 (Design) 3 PD -$ None COMPLETED FP23503 Pantera Park Hard Courts 3 GF -$ COMPLETED FP24500 DBC GVBR Lighting and AV Upgrades (Const.) 3 504, 503, GF 330,000$ None 330,000$ FP25508 Sycamore Canyon Park Lower Bridge Replacement (Design)3 GF, MW, CDBG 150,000$ None 150,000$ FP24501 DBC Main Entry/Doors & ADA Improvements (Construction)2 GF 310,000$ None 310,000$ FP261 LLADs Irrigation, Landscape, and Minparks Improvements (Design and Construction)2 D39, D41 600,000$ None 600,000$ NEW Sycamore Canyon Park Lower Bridge Replacement Options (Construction)3 GF, MW, CDBG 515,000$ 515,000$ 515,000$ NEW Summitridge Park Band Shelter (Design and Construction)3 GF 2,060,000$ 2,060,000$ 2,060,000$ NEW DBC Patio/Outdoor Renovations 5 GF 772,500$ 772,500$ 772,500$ NEW DBC Library Pad Renovations 5 GF 1,030,000$ 1,030,000$ 1,030,000$ NEW DBC Exterior Paint 4 GF 257,500$ 257,500$ 257,500$ NEW Civic Center Carpet Replacement 4 GF 1,030,000$ 1,030,000$ 1,030,000$ NEW Dog Park Lighting (Design) 5 GF 154,500$ 154,500$ 154,500$ NEW Ronald Reagan Park Playground Restrooms Replacement, and ADA Upgrades (Design)5 MA, GF, PD 309,000$ 300,000$ 309,000$ NEW Ronald Reagan Park Playground Restroom Replacement and ADA Improvement (Construction) 3 MA, GF, PD 2,884,000$ 2,800,000$ 2,884,000$ NEW Dog Park Lighting (Construction) 5 GF 566,500$ 566,500$ 566,500$ NEW Sunset Crossing Park (Construction) 3 GF, Grant, MW 13,905,000$ 13,905,000$ 13,905,000$ NEW Heritage Park Upgrades (Const.) 2 GF, 504 24,679,961$ 24,679,961$ 24,679,961$ NEW Peterson Park Upgrades (Design) 4 Q, GRANT 257,500$ 257,500$ 257,500$ NEW Peterson Park Upgrades (Const.) 4 Q, GRANT 2,060,000$ 2,060,000$ 2,060,000$ NEW Musco LED Upgrade (per site) 4 GF 669,500$ 669,500$ 669,500$ NEW Parking Lot LED Upgrade (all facilities) 4 GF 257,500$ 257,500$ 257,500$ NEW Pantera Park, New Restroom by Courts 5 GF 1,545,000$ $ 1,545,000 1,545,000$ SubTotal - Facilites, Parks and Rec Improvements 54,343,461$ 52,860,461$ 790,000$ 600,000$ 515,000$ 3,862,500$ 1,287,500$ -$ $ 47,288,461 5-Yr Program Total FY 23-24 to 27-28 5-Yr Program Funding Gap FY 23-24 Cont'd to FY 24-25 FY 24-25 FY 25-26 FY 26-27 FY 27-28 FY 28-29 Unscheduled Projects Pending Funding $ 152,705,844 $ 104,971,555 $ 14,676,189 $ 5,163,000 $ 22,738,500 $ 21,641,100 $ 20,245,108 $ 18,852,486 $ 49,389,461 Grand Totals: 3 3.B.d Packet Pg. 50 Attachment: FY26-30 5YCIP Ver. 4 05072025 (Updates on Various Projects/Programs) 5-YEAR CIP PROGRAM 5-YEAR CIP PROGRAM FY 25-26 TO FY 29-30 Project # Project Description * Priority ** Potential Funding Sources Total Project Budget Request Potential Funding Gap FY 24-25 Cont'd to FY 25-26 NEW Proposed FY 25-26 FY 26-27 FY 27-28 FY 28-29 FY 29-30 Unscheduled Projects Pending Funding Priority Total 5-Year CIP Program Total 5-Year Funding Gap 1 Mandatory 70,263,151$ 46,897,151$ GF General Fund Reserves 2 Needed: If Delayed Will Cost More to Fix 51,588,193$ 27,792,904$ SPA Sale of Prop A Funds 3 Enhancement: Improve Amenity 19,844,000$ 19,280,000$ SB1 RMRA (SB-1)4 Desirable: May be Delayed 4,882,000$ 4,882,000$ MM Measure M 5 A Luxury Item 6,128,500$ 6,119,500$ MR Measure R TOTAL 152,705,844$ 104,971,555$ GT Gas Tax Fund PA Prop A PC Prop C TM Traffic Mitigation (Private Developer Fair Share)LEGEND SI Sewer Improvement Fund Authorized - Carryover to Next FY 25-26 AB2766 Air Quality Improvement Fund Authorized - To be Completed in FY 24-25 TDA SB 821 Fund - Bike and Pedestrian Paths (TDA) Article 3 (METRO)Request for the Next FY 25-26 MTA MTA Grants Proposed for Future FY's 26-27 to 29-30 WH Waste Hauler Fund Unscheduled - Pending Funding/Timing Q Quimby PD Park Development Fund CDBG Community Development Block Grant Funds MA Measure A HC Habitat Conservation Grant FEMA Federal Emergency Management Agency MSRC Mobile Source Air Pollution Grant MW Measure W - Safe, Clean Water Act FT Foothill Transit Grant SCE Southern California Edison Grant 540 Internal Service Fund - (540) Building Facility & Maintenance Fund 530 Internal Service Funds - (530) Equipment Maintenance & Replacement Fund STP-L Federal Surface Transportation Program - Local D39 Landscape Assessment District 39-2022 D41 Landscape Assessment District 41-2021 HSIP Grant CA Highway Safety Improvement Prog. Grant Black - Annual revenue source Red - One-time, non-annual revenue source ** Funding Sources 5-Year CIP Program * Priority & Funding Gap Totals Description Planned On-Going & One-Time Resources 4 3.B.d Packet Pg. 51 Attachment: FY26-30 5YCIP Ver. 4 05072025 (Updates on Various Projects/Programs) DEPARTMENT OF PUBLIC WORKS Legend Project 2 Project 4 Project 6 AREA 4 RESIDENTIAL & COLLECTOR STREETS AND ARTERIAL STREET REHABILIATION VICINITY MAP Brea Canyon Cut-Off Road Lemon Avenue Road 3.B.e Packet Pg. 52 Attachment: Area 4 Street/Arterial Rehab - Vicinity Map (Updates on Various Projects/Programs) VICINITY MAP SHEET 1 OF 1 AREA 5 RESIDENTIAL NEIGHBORHOOD ADA CURB RAMPIMPROVEMENT PROJECT DATE: 3/27/2025PREPARED BY: CMP 3.B.f Packet Pg. 53 Attachment: CDBG Area 5 - Vicinity Map (Updates on Various Projects/Programs) TRAFFIC & TRANSPORTATION COMMISSION AGENDA REPORT AGENDA ITEM NUMBER: 5.1 MEETING DATE: July 10, 2025 TO: Chair and Members of the Traffic and Transportation Commission FROM: David G. Liu, Public Works Director/City Engineer SUBJECT: NTMP Hawkwood - Stop Signs & Pavement Legends Recommendations RECOMMENDATION: Concur with the installation of two (2) stop signs and associated legend markings at the intersections of Hawkwood Road and Chirping Sparrow Road and Ambusher Street, as the final phase of the NTMP. BACKGROUND/DISCUSSION: In response to ongoing neighborhood concerns regarding speeding along Hawkwood Road, the Public Works Department implemented a multi -phase Neighborhood Traffic Management Program (NTMP) to improve safety and calm traffic. The Traffic and Transportation Commission has been kept informed and engaged throughout the development and implementation of the program since its inception. Phase 1 of the program, completed in 2023, involved roadway striping enhancements followed by a post-implementation monitoring period to evaluate effectiveness. Based on the observed conditions, staff determined that additional traffic calming measures were necessary, prompting the initiation of Phase 2. Phase 2 was completed in June 2025 and included the installation of three (3) strategically placed speed cushions between Bent Twig Lane and Falcon Ridge Road. Additional improvements included double yellow centerlines, edge line striping, and CITY OF DIAMOND BAR ~ 21810 COPLEY DRIVE ~ DIAMOND BAR, CA 91765 ~ TEL. (909) 839-7040 ~ FAX (909) 861-3117 5.1 Packet Pg. 54 associated signage. A speed study conducted following implementation found the 85th percentile speeds to range between 25 and 28 MPH, which is generally considered acceptable for residential streets and consistent with industry standards. In addition to concerns about speeding, residents also raised issues related to vehicles failing to yield at the T-intersections of Hawkwood Road at Chirping Sparrow Road and Ambusher Street. In response, staff proactively evaluated the conditions and is recommending the installation of two (2) stop signs and associated legend striping at these intersections. These improvements are proposed as Phase 3, the final phase of the Hawkwood Road NTMP. Refer to the attached plan and technical memorandum for additional details. Attachments: 1. Updated Hawkwood Road NTMP Plan - Phase 3 2. Fehr Peers Memo - Hawkwood Road NTMP Phase 3 Stop Signs and Pavement Legends 5.1 Packet Pg. 55 50'62'50'79'5 0 ' 3 0 '50'60'38'50'50'69'CHIRPING SPARROW RDFALCONRIDGE RDRUNNINGBRANCH RDAMBUSHERSSTBARBI LNBANBROOKLNBE N T T W I G L N HAWKWOOD RDHAWKWOOD RDSECTION A-AN.T.S.SECTION B-BN.T.S.7' WIDE AC SPEED CUSHION DETAILN.T.S.11NSWE111INSTALL STOP SIGNS AND LEGENDSMP/CS5.1.aPacket Pg. 56Attachment: Updated Hawkwood Road NTMP Plan - Phase 3 (NTMP Hawkwood - Stop Signs & Pavement Legends Proposal) 101 Pacifica | Suite 300 | Irvine, CA 92618 | (949) 308-6300 | Fax (949) 859-3209 | www.fehrandpeers.com Memorandum Date: May 9, 2025 To: Chris Malpica, City of Diamond Bar From: Baldwin Ngai, Fehr & Peers Anna Luo, Fehr & Peers Subject: Hawkwood Road Neighborhood Traffic Management Plan (NTMP) Post Implementation Study OC22-927.02 Fehr & Peers conducted a post implementation assessment (Study) to measure effectiveness of traffic calming measures installed along Hawkwood Road. The study area consists of the segment of Hawkwood Road between the existing terminus south of Falcon Ridge Road and Bent Twig Lane to the north. Midblock centerline striping and three sets of speed cushions were installed throughout the study area in late 2024. The following analysis evaluated vehicle speeds along various segments of the roadway before and after implementation. KeyFindings The study area is separated into four study segments, where speed data was evaluated over seven consecutive days in the years 2022, 2023, and 2025 (Table 1) 1. South of Falcon Ridge Road 2. Between Falcon Ridge Road and Chirping Sparrow Road 3. Between Ambushers Street and Barbi Lane 4. North of Barbi Lane Improvements installed throughout the study area consisted of the following: 2023 – Double yellow centerline striping on approach to intersections, edge lines, and speed limit pavement legends. 5.1.b Packet Pg. 57 Attachment: Fehr Peers Memo - Hawkwood Road NTMP Phase 3 Stop Signs and Pavement Legends (NTMP Hawkwood - Stop Signs & Chris Malpica, City of Diamond Bar May 9, 2025 Page 2 of 3 2024 – Speed cushions, double yellow centerline midblock, and pavement legends for speed cushions. Table 1 – Change in Vehicle Speeds (85th Percentile) 2022 (MPH) 2023 (MPH) Change in Speed (2022 to 2023) (MPH) % Change 2025 (MPH) Change in Speed (2023 to 2025) (MPH) % Change Segment 1 27 28 0.8 2.9% 25 3.5 -12% Segment 2 28 28 0.1 0.5% 26 2.4 -8% Segment 3 27 29 1.5 5.5% 28 0.5 -2% Segment 4 - 25 0.61 -2% 1 Compared to speeds in 2021 (26 mph) The changes in vehicle speeds across all study segments were consistent between weekdays and weekends. Treatments implemented in 2024 were more effective at reducing vehicle speeds (compared to those in 2023), and especially within segments 1 and 2 – south of Chirping Sparrow Road. All observed 85th percentile speeds are within 5 mph of the posted speed limit (25 mph), which is in alignment with speed-setting standards1. Where speed cushions were implemented in 2024 (segments 2 and 4), observed vehicle speeds decreased to the posted speed limit, demonstrating the effectiveness of implemented measures. While immediate actions to address excessive travels speeds is not necessary, the City may continue to monitor studied locations and consider additional speed management measures if observed 85th percentile speeds increase. Recommendations To support neighborhood traffic calming efforts along Hawkwood Road, the installation of side street stop control is recommended at the intersections with Chirping Sparrow Road and Ambushers Street. Hawkwood functions as a neighborhood collector with horizontal curves and grade changes throughout and has recently undergone calming treatments as described earlier in 1 Per the California Manual on Uniform Traffic Control Devices (CA-MUTCD), an 85th percentile speed that is within 5 mph of the posted speed limit aligns with established speed-setting guidance outlined in Section 2B.13. A 5-mph rounding tolerance is commonly applied when determining posted speed limits, and deviations within this range are not typically considered grounds for speed related intervention. As such, although the observed 85th percentile speed exceeds the posted limit of 25 mph in certain segments, it remains within acceptable thresholds. 5.1.b Packet Pg. 58 Attachment: Fehr Peers Memo - Hawkwood Road NTMP Phase 3 Stop Signs and Pavement Legends (NTMP Hawkwood - Stop Signs & Chris Malpica, City of Diamond Bar May 9, 2025 Page 3 of 3 this study. Although effective speed reductions were observed, the uncontrolled intersections can be improved by installing stop control to more efficiently assign right-of-way. Under the California MUTCD (Sections 2B.04 and 2B.06), stop signs are warranted on minor approaches when the volume or functional classification difference between roads makes the standard right-of-way rule2 insufficient to ensure safe operation, or where sight distance is limited. Hawkwood carries higher traffic volumes and serves as a through route, while both Ambushers Street and Chirping Sparrow Road terminate as they intersect with Hawkwood Road. Assigning right-of-way via stop signs will clarify intersection control and enhance safety. The California Vehicle Code defaults to right-hand or prior-entry yielding at uncontrolled intersections, and at an uncontrolled “T” intersection the traffic on the through road (Hawkwood) has the right-of-way, and drivers on the terminating side streets must yield to cross traffic on Hawkwood. However, without regulatory signs, this right-of-way rule relies solely on driver judgment and sight distance, which can be compromised by Hawkwood’s curves and grades. While stop signs should not be used for speed control, their use here aligns with traffic calming goals by reinforcing safe entry behavior at conflict points. Stop control on Chirping Sparrow Road and Ambushers Street is thus justified and recommended as part of a broader, systemically applied safety strategy. 2 https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=VEH&sectionNum=21800. 5.1.b Packet Pg. 59 Attachment: Fehr Peers Memo - Hawkwood Road NTMP Phase 3 Stop Signs and Pavement Legends (NTMP Hawkwood - Stop Signs &