HomeMy WebLinkAboutT&T Commission Agenda Packet 7-10-25
TRAFFIC & TRANSPORTATION
COMMISSION
AGENDA
July 10, 2025
6:30 PM
Diamond Bar City Hall
Windmill Community Room
21810 Copley Drive, Diamond Bar, CA 91765
Telephonically +1(415) 655-0060 - Access Code: 623-100-803
https://attendee.gotowebinar.com/register/7114620233791626325
Chairperson Patrick Mercado
Vice Chairperson Romulo Morales
Commissioner Gary Busteed
Commissioner Amy Mao
Commissioner Raphael Plunkett
Written materials distributed to the Traffic and Transportation Commission within 72 hours
of the Traffic and Transportation Commission meeting are available for public inspection
immediately upon distribution in the City Clerk's office at 21810 Copley Drive, Diamond Bar,
California, during normal business hours.
Copies of staff reports or other written documentation relating to agenda items are on file in
the Public Works Department, located at 21810 Copley Drive, and are available for public
inspection. If you have questions regarding an agenda item, please call 909.839.7040
during regular business hours.
In an effort to comply with the requirements of Title II of the Americans with Disabilities Act
of 1990, the City of Diamond Bar requires that any person in need of any type of special
equipment, assistance or accommodation(s) in order to communicate at a City public
meeting must inform the Public Works Department at 909.839.7040 a minimum of 72 hours
prior to the scheduled meeting.
Please refrain from smoking, eating or
drinking in the Windmill Community Room
The City of Diamond Bar uses recycled
paper and encourages you to do the same
TRAFFIC AND TRANSPORTATION COMMISSION MEETING RULES
Welcome to the meeting of the Traffic and Transportation Commission. Meetings are open to
the public. You are invited to attend and participate.
PUBLIC INPUT
Members of the public may address the Commission on any item of business on the agenda
during the time the item is taken up by the Commission. In addition, members of the public
may, during the Public Comment period, address the Commission on any item or any matter not
on the agenda and within the Commission’s subject matter jurisdiction. Persons wishing to
speak should submit a speaker slip to the meeting clerk. Any material to be submitted to the
Traffic and Transportation Commission at the meeting should be submitted through the meeting
clerk.
Speakers are limited to five minutes per agenda item, unless determined otherwise. The
Commissioners may adjust this time limit depending on the number of people wishing to speak,
the complexity of the matter, the length of the agenda, the hour and any other relevant
consideration. Speakers may address the Commission only once on an agenda item, except
during public hearings, when the applicant/appellant may be afforded a rebuttal.
Public comments must be directed to the Commission. Behavior that disrupts the orderly
conduct of the meeting may result in the speaker being removed from the Commission meeting
room.
INFORMATION RELATING TO AGENDAS AND ACTIONS OF THE COMMISSION
Agendas for regular Traffic and Transportation Commission meetings are available 72 hours
prior to the meeting and are posted in the City’s regular posting locations, and on the City’s
website at www.diamondbarca.gov. A full agenda packet is available for review during the
meeting, at the back of the meeting room. The Traffic and Transportation Commission may
take action on any item listed on the agenda.
ACCOMMODATIONS FOR THE DISABLED
A cordless microphone is available for those persons with mobility impairments who cannot
access the podium in order to make a public comment. Sign language interpretation is available
by providing the City Clerk three business days’ notice in advance of a meeting. Please
telephone (909) 839-7010 between 7:30 a.m. and 5:30 p.m. Monday through Thursday and 7:30
a.m. to 4:30 p.m. on Fridays.
HELPFUL PHONE NUMBERS
Computer access to agendas: www.diamondbarca.gov
General information: (909) 839-7040
Written materials distributed to the Traffic & Transportation Commission within 72 hours of the Traffic &
Transportation Commission meeting are available for public inspection immediately upon distribution in
the City Clerk’s Office at 21810 Copley Dr., Diamond Bar, California, during normal business hours.
CITY OF DIAMOND BAR
TRAFFIC AND TRANSPORTATION COMMISSION
AGENDA
Thursday, July 10, 2025
WINDMILL COMMUNITY ROOM
Diamond Bar City Hall
21810 Copley Drive, Diamond Bar
CALL TO ORDER: 6:30 PM
PLEDGE OF ALLEGIANCE: Commissioner Busteed
ROLL CALL: Commissioners Busteed, Mao, Plunkett, Vice-
Chair Morales, Chair Mercado
I. APPROVAL OF MINUTES:
A. T&T Commission Meeting Minutes of May 8, 2025
Recommended Action: Receive and File
II. PUBLIC COMMENTS:
This is the time and place for the general public to address the Commission.
Items to be discussed here are those which do not already appear on this
agenda.
III. ITEMS FROM STAFF:
A. Traffic Statistics for March & April 2024-2025
Recommended Action: Receive and File
B. Updates on Various Projects/Programs
Recommended Action: Receive and File
IV. NEW BUSINESS
V. OLD BUSINESS
JULY 10, 2025 PAGE 2 TRAFFIC AND TRANSPORTATION COMMISSION
1. NTMP Hawkwood - Stop Signs & Pavement Legends
Recommended Action: Concur with the installation of two (2) stop signs
and associated legend markings at the intersections of Hawkwood Road
and Chirping Sparrow Road and Ambusher Street, as the final phase of
the NTMP.
VI. STATUS OF PREVIOUS ACTION ITEMS
VII. ITEMS FROM COMMISSIONERS:
VIII. SCHEDULE OF FUTURE CITY EVENTS:
A. CITY COUNCIL MEETING – Tuesday, July 15, 2025 – 6:30 p.m., AQMD/
Government Auditorium, 21865 Copley Drive
B. PLANNING COMMISSION MEETING – Tuesday, July 22, 2025 – 6:30 p.m.,
Diamond Hall Windmill Community Room, 21810 Copley Drive
C. PARKS AND RECREATION COMMISSION MEETING – Thursday, July 24, 2025
– 6:30 p.m. – Diamond Bar City Hall Windmill Community Room, 21810 Copley
Drive
D. CITY COUNCIL MEETING – Tuesday, August 5, 2025 – 6:30 p.m., AQMD/
Government Auditorium, 21865 Copley Drive
F. PLANNING COMMISSION MEETING – Tuesday, August 12, 2025 – 6:30 p.m.,
Diamond Hall Windmill Community Room, 21810 Copley Drive
G. CITY COUNCIL MEETING – Tuesday, August 19, 2025 – 6:30 p.m., AQMD/
Government Auditorium, 21865 Copley Drive
H. PLANNING COMMISSION MEETING – Tuesday, August 26, 2025 – 6:30 p.m.,
Diamond Hall Windmill Community Room, 21810 Copley Drive
I. LABOR DAY HOLIDAY – Monday, September 1, 2025 – City offices will be closed
in observance of the holiday. We will re-open on Tuesday, September 2, 2025 at
7:30 a.m.
J. CITY COUNCIL MEETING – Tuesday, September 2, 2025 – 6:30 p.m.,
AQMD/Government Auditorium, 21865 Copley Drive
K. PLANNING COMMISSION MEETING – Tuesday, September 9, 2025 – 6:30
p.m., Diamond Hall Windmill Community Room, 21810 Copley Drive
L. TRAFFIC & TRANSPORTATION COMMISSION MEETING – Thursday,
September 11, 2025 p.m., Diamond Bar City Hall Windmill Community Room,
JULY 10, 2025 PAGE 3 TRAFFIC AND TRANSPORTATION COMMISSION
21810 Copley Drive
IX. ADJOURNMENT
TRAFFIC & TRANSPORTATION COMMISSION
AGENDA REPORT
AGENDA ITEM NUMBER:
1.A
MEETING DATE:
July 10, 2025
TO:
Chair and Members of the Traffic and Transportation
Commission
FROM: David G. Liu, Public Works Director/City Engineer
SUBJECT: T&T Commission Meeting Minutes of May 8, 2025
RECOMMENDATION: Receive and File
Attached for your review and approval are the T&T Commission Meeting Minutes of
May 8, 2025.
Attachments:
1. T&T Commission Meeting Minutes - 5/8/25
CITY OF DIAMOND BAR ~ 21810 COPLEY DRIVE ~ DIAMOND BAR, CA 91765 ~ TEL. (909) 839-7040 ~ FAX (909) 861-3117
1.A
Packet Pg. 6
CITY OF DIAMOND BAR
MINUTES OF THE TRAFFIC & TRANSPORTATION COMMISSION
DIAMOND BAR CITY HALL WINDMILL ROOM
21810 COPLEY DRIVE, DIAMOND BAR, CA 91765
MAY 8, 2025
CALL TO ORDER:
Chair Mercado called the meeting to order at 6:01 p.m.
PLEDGE OF ALLEGIANCE: Chair Mercado led the Pledge of Allegiance
ROLL CALL: Commissioners Amy Mao, Raphael Plunkett,
Chair Patrick Mercado
ABSENT: Commissioner Gary Busteed, Vice-Chair Romulo
Morales
Staff present: David Liu, Public Works Director; Hal Ghafari,
Public Works Manager/Assistant City Engineer;
Vivian Chen, Associate Engineer; Nicholas
Delgado, Public Works Management Analyst;
Angie Hernandez, Administrative Coordinator
I. APPROVAL OF MINUTES:
A. Traffic and Transportation Commission Meeting Minutes of March 13, 2025
C/Plunkett moved, C/Mao seconded, to approve the Meeting Minutes of March
13, 2025. Motion carried by the following Roll Call vote:
AYES: COMMISSIONERS: Mao, Plunkett, Chair/Mercado
ABSENT: COMMISSIONERS: Busteed, VC/Morales
ABSTAIN: COMMISSIONERS: None
II. PUBLIC COMMENTS: None
1.A.a
Packet Pg. 7 Attachment: T&T Commission Meeting Minutes - 5/8/25 (T&T Commission Meeting Minutes of May 8, 2025)
MAY 8, 2025 PAGE 2 T&T COMMISSION
III. ITEMS FROM STAFF:
A. TRAFFIC STATISTICS – JANUARY & FEBRUARY 2025
C/Plunkett moved, C/Mao seconded, to receive and file the January &
February 2025 Traffic Statistics Report. Motion carried by the following Roll
Call vote:
AYES: COMMISSIONERS: Mao, Plunkett, Chair/Mercado
ABSENT: COMMISSIONERS: Busteed, VC/Morales
ABSTAIN: COMMISSIONERS: None
B. MONTHLY UPDATES OF VARIOUS PROJECTS/PROGRAMS:
C/Plunkett moved and C/Mao seconded to approve the Monthly Updates of
Various Projects/Programs. Motion carried by the following Roll Call vote:
AYES: COMMISSIONERS: Mao, Plunkett, Chair/Mercado
ABSENT: COMMISSIONERS: Busteed, VC/Morales
NOES: COMMISSIONERS: None
IV. STATUS OF PREVIOUS ACTION ITEMS: MA/Delgado provided the Commission
with an update regarding the City Street Name Sign Give-Away.
V. ITEMS FROM COMMISSIONERS:
C/Mao asked about the Grand Avenue traffic control measures during the next phase
of construction. Questions were answered by PWM/Ghafari.
C/Plunkett made staff aware of a bag of trash on the transformer located at Grand
Avenue/Country View Drive. Staff will follow up.
VI. SCHEDULE OF FUTURE CITY EVENTS:
As presented in the Agenda.
1.A.a
Packet Pg. 8 Attachment: T&T Commission Meeting Minutes - 5/8/25 (T&T Commission Meeting Minutes of May 8, 2025)
MAY 8, 2025 PAGE 3 T&T COMMISSION
VII. ADJOURNMENT: There being no further business to come before the Traffic and
Transportation Commission, Chair/Mercado adjourned the meeting at 7:01 p.m. to
Thursday, July 10, 2025, at 6:30 p.m.
The foregoing minutes are hereby approved this day of , 2025.
Respectfully Submitted,
______________________________
David G. Liu, Secretary
Attest:
___________________________________________
Chair Patrick Mercado
1.A.a
Packet Pg. 9 Attachment: T&T Commission Meeting Minutes - 5/8/25 (T&T Commission Meeting Minutes of May 8, 2025)
TRAFFIC & TRANSPORTATION COMMISSION
AGENDA REPORT
AGENDA ITEM NUMBER:
3.A
MEETING DATE:
July 10, 2025
TO:
Chair and Members of the Traffic and Transportation
Commission
FROM: David G. Liu, Public Works Director/City Engineer
SUBJECT: Traffic Statistics for March & April 2024-2025
RECOMMENDATION: Receive and File
Attached for your review are the Traffic Statistics Reports for the months of March and
April – 2024-2025, as submitted by the L.A. County Sheriff’s Department. Both years
have been provided for side-by-side comparison.
Attachments:
1. Traffic Statistics - March & April - 2024-2025
CITY OF DIAMOND BAR ~ 21810 COPLEY DRIVE ~ DIAMOND BAR, CA 91765 ~ TEL. (909) 839-7040 ~ FAX (909) 861-3117
3.A
Packet Pg. 10
3.A.aPacket Pg. 11Attachment: Traffic Statistics - March & April - 2024-2025 (Traffic Statistics for March & April 2024-2025)
3.A.aPacket Pg. 12Attachment: Traffic Statistics - March & April - 2024-2025 (Traffic Statistics for March & April 2024-2025)
3.A.aPacket Pg. 13Attachment: Traffic Statistics - March & April - 2024-2025 (Traffic Statistics for March & April 2024-2025)
3.A.aPacket Pg. 14Attachment: Traffic Statistics - March & April - 2024-2025 (Traffic Statistics for March & April 2024-2025)
TRAFFIC & TRANSPORTATION COMMISSION
AGENDA REPORT
AGENDA ITEM NUMBER:
3.B
MEETING DATE:
July 10, 2025
TO:
Chair and Members of the Traffic and Transportation
Commission
FROM: David G. Liu, Public Works Director/City Engineer
SUBJECT: Updates on Various Projects/Programs
RECOMMENDATION: Receive and File
A. FY2025/26 Capital Improvement Program Budget
The Public Works Department has prepared the FY2025/26 Capital Improvement
Program (CIP) for the City Council’s consideration at their May 6, 2025, meeting.
The proposed list of projects includes the construction and design phases for several
street rehabilitations, park improvements, and other enhancements to existing public
facilities and infrastructure. The proposed FY2025 -26 CIP Budget is $19.675 million, of
which $5.163 million is for new projects and $14.512 million is carryover funds from
ongoing projects. A presentation and the detailed approved FY 2025/26 CIP, 5 -Year
CIP, and the Status of the FY 2024/25 CIP are attached.
B. Grand Avenue and Golden Springs Drive Intersection Improvements
Public Works continues to collaborate closely with the City of Industry, along with its
project manager and inspectors, to ensure the successful completion of the Project. The
majority of punch-list items have been successfully addressed. SCE’s work is still
pending to energize the streetlight poles. Once this work is completed, the city will be
able to formally close out the Project.
CITY OF DIAMOND BAR ~ 21810 COPLEY DRIVE ~ DIAMOND BAR, CA 91765 ~ TEL. (909) 839-7040 ~ FAX (909) 861-3117
3.B
Packet Pg. 15
C. Area 4 Residential, Collector and Arterial Paving Improvement Project
A construction contract for the Area 4 Pavement Rehabilitation Project was awarded at
the May 6, 2025, City Council meeting. The pre -construction meeting was held on June
3, 2025, and construction began during the week of June 16, 2025. Project completion
is anticipated in September 2025.
This project will rehabilitate approximately 2.7 centerline miles of residential and
collector streets using a combination of techniques, including slurry seal, chip seal,
localized asphalt concrete (AC) dig-outs, and ADA curb ramp upgrades. See attached
Vicinity Map.
D. CDBG Area 5 Residential ADA Curb Ramp Improvement Project
A construction contract for the CDBG Area 5 Project was awarded in early April 2025,
and a pre-construction meeting was held on April 22, 2025. Construction began the
week of June 3, 2025, and the construction work has since been completed, with
punch-list items currently underway.
The scope of work included the full construction of six (6) new ADA -compliant curb
ramps within the Golden Springs Elementary School neighborhood. The goal of this
project was to enhance accessibility by upgrading existing curb ramps to meet current
ADA standards. See attached Vicinity Map.
E. SR-57/60 Confluence Improvements Project
Construction for the SR-57/60 Interchange Improvements continues. Contractor
completed placing concrete for the SR-57/Golden Springs Drive Undercrossing Bridge
stem and soffit. Contractor is also currently working on constructing retaining wall
foundations and footings along eastbound SR-60, storm drain relocations at various
locations, roadway work, and utility relocations along Grand Avenue.
City staff, in coordination with the Community Relations team, continues to provide
timely updates to keep the community informed.
Attachments:
1. FY26 CIP Power Point Presentation
2. FY25 CIP Status Ver. 4 05072025
3. FY26 CIP Ver. 4 05072025
4. FY26-30 5YCIP Ver. 4 05072025
5. Area 4 Street/Arterial Rehab - Vicinity Map
6. CDBG Area 5 - Vicinity Map
3.B
Packet Pg. 16
FY 2025/26
CAPITAL IMPROVEMENT
PROGRAM (CIP)
Traffic and Transportation Commission
July 10, 2025
3.B.a
Packet Pg. 17 Attachment: FY26 CIP Power Point Presentation (Updates on
•FY 2025/26 CIP
•5-Year CIP
•FY 2024/25 CIP Report
•Discussion
2
CONTENTS 3.B.a
Packet Pg. 18 Attachment: FY26 CIP Power Point Presentation (Updates on
FY 2025/26 CIP
3.B.a
Packet Pg. 19 Attachment: FY26 CIP Power Point Presentation (Updates on
•Total of 13 new and ongoing projects with a total budget of $19,675,000.
• $5,163,000 of new FY 2025/26 budget requests for 5 new projects.
•No new budget requests on ongoing projects.
11
8
62%
5
38%
NUMBER OF PROJECTS
Ongoing
New
FY 2025/26 CIP
$14,512,000
74%
$5,163,000
26%
PROJECTS’ BUDGET
3.B.a
Packet Pg. 20 Attachment: FY26 CIP Power Point Presentation (Updates on
STREET IMPROVEMENTS
12
Phase Project Description New Request Approved
DSGN Pavement Rehabilitation Design Project FYs 2026-28
(Arterials, Residential, Collector Street Rehab, and CDBG Curb
Ramps). $600,000
CONST Arterial Streets Rehabilitation
- Brea Canyon Rd from DBB to Pathfinder
- Brea Canyon Rd from Pathfinder to Golden Springs Dr
- Diamond Bar Blvd from SR 60 off-ramp to City Limits $3,754,000
CONST CDBG Area 6 ADA Curb Ramp Project $145,000
CONST Arterial Street Pavement Rehabilitation -Lemon Ave (SR60 to City
Limit); Brea Cyn Cutoff (SR57 to City Limit)
$1,500,000
CONST Residential and Collector Street Rehab - Area 4 $2,450,000
CONST Diamond Bar Blvd Complete Street Project $9,242,000
Total $4,499,000 $13,192,000
3.B.a
Packet Pg. 21 Attachment: FY26 CIP Power Point Presentation (Updates on
STREET IMPROVEMENTS
13
FY 2025/26 Arterials for Rehabilitation Residential and Collector Streets –NOT Proposed
3.B.a
Packet Pg. 22 Attachment: FY26 CIP Power Point Presentation (Updates on
TRAFFIC MANAGEMENT/SAFETY
14
TRANSPORTATION INFRASTRUCTURE
Phase Project Description New Request Approved
N/A
Total $ 0 $ 0
Phase Project Description New Request Approved
CONST Battery Back-Up and CCTV Replacement Program FY25/26 $ 64,000
DESIGN Citywide Traffic Mitigation Fund Planning $ 350,000
Total $ 414,000 $ 0
3.B.a
Packet Pg. 23 Attachment: FY26 CIP Power Point Presentation (Updates on
MISCELLANEOUS PUBLIC WORKS
15
Phase Project Description New Request Approved
CONST Brea Canyon Storm Drain Lining Project $ 150,000
ALL Installation of Full Capture Trash Screen Devices on Stormwater
Catch Basin - Phase 1
$ 380,000
Total $ 0 $ 530,000
FACILITIES, PARKS AND REC
Phase Project Description New Request Approved
DESIGN LLADs Irrigation, Landscape, and Miniparks Improvements
Design and Construction $ 600,000
CONST DBC GVBR Lighting & Controls Upgrade $ 330,000
CONST DBC Main Entry/Doors & ADA Improvements $ 310,000
DESIGN Sycamore Canyon Park Lower Bridge Replacement Options $ 150,000
Total $ 600,000 $ 790,000
3.B.a
Packet Pg. 24 Attachment: FY26 CIP Power Point Presentation (Updates on
FACILITIES, PARKS AND REC
16
District 39-2022 District 41-2021
3.B.a
Packet Pg. 25 Attachment: FY26 CIP Power Point Presentation (Updates on
0%
29%
26%
19%
7%
3%4%
4%
8%FUNDING SOURCES: NEW REQUEST
100 - General Fund
202 - RMRA (SB-1)
203 - Measure M
204 - Measure R
207 - Prop C
225 - CDBG
252 - Hauler Fees
241 - LLAD 41-2021
239 - LLAD 39-2022
FY 2025/26 CIP
Total New Request: $5,163,000 17
$0
$1.5M
$1.34M
$1M
$380K
$145K
$195K
$200K
$400K
3.B.a
Packet Pg. 26 Attachment: FY26 CIP Power Point Presentation (Updates on
5-YEAR CIP
2025/26-2029/30
3.B.a
Packet Pg. 27 Attachment: FY26 CIP Power Point Presentation (Updates on
•Goals
•Funding Gap
•Unscheduled Projects
19
5-YEAR CIP 3.B.a
Packet Pg. 28 Attachment: FY26 CIP Power Point Presentation (Updates on
FY 2024/25 CIP REPORT
3.B.a
Packet Pg. 29 Attachment: FY26 CIP Power Point Presentation (Updates on
•Total of 23 projects with a total budget of $30,400,515.
$15,888,515
52%
$14,512,000
48%
BUDGET*
Completed
Carry Forward to FY25
15
65%
8
35%
Number of Projects
22
FY 2024/25 CIP REPORT
*Based on Projects’ Lifetime Budget.
3.B.a
Packet Pg. 30 Attachment: FY26 CIP Power Point Presentation (Updates on
23
FY 2024/25 CIP REPORT
•Completed Projects
Project #Phase Project Description Budget
Street Improvement Projects
SI23101 DESIGN Residential and Collector Street Rehab. (Design)
Arterial Street Rehab (Design)
CDBG Curb Ramp (Design)
$ 380,000
SI24101 CONST Residential and Collector Street Rehab - Area 3
(Const.)
$ 3,678,688
SI24103 CONST Arterial Street Rehab (Const.)
-Golden Springs Dr from Grand Ave to Temple Ave
-Grand Ave from Diamond Bar Blvd to East City Limits
-Gateway Center, Copley Dr, Bridgegate Dr
$ 5,892,409
SI254 CONST CDBG Area 5 ADA Curb Ramp Project (Const.)$ 108,910
SI24104 CONST CDBG Area 4 ADA Curb Ramp Project (Const.)$ 104,704
Total $ 10,164,711
3.B.a
Packet Pg. 31 Attachment: FY26 CIP Power Point Presentation (Updates on
24
FY 2024/25 CIP REPORT
•Completed Projects
Area 3
Residential
Gateway
Center
Largest Pavement Rehabilitation Project
3.B.a
Packet Pg. 32 Attachment: FY26 CIP Power Point Presentation (Updates on
25
FY 2024/25 CIP REPORT
•Completed Projects
Project #Phase Project Description Budget
Traffic Management/Safety Projects
TM251 ALL Battery Back-Up and CCTV Replacement Program
FY24/25 $ 62,025
Total $ 62,025
Transportation Infrastructure Improvements
TI24301 CONST Intersection Safety Improvements (Constr.)$ 270,982
Total $ $270,982
3.B.a
Packet Pg. 33 Attachment: FY26 CIP Power Point Presentation (Updates on
26
FY 2024/25 CIP REPORT
•Completed Projects
Project #Phase Project Description Budget
Miscellaneous Public Works Improvements
PW23402 ALL Grand Avenue Median Drainage Improvement $ 73,472
PW24401 ALL Steep Canyon Erosion Control and Sedimentation
Prevention $ 132,436
Total $ 205,908
3.B.a
Packet Pg. 34 Attachment: FY26 CIP Power Point Presentation (Updates on
27
FY 2024/25 CIP REPORT
•Completed Projects
Project #Phase Project Description Budget
Traffic Management/Safety Projects
FP23504 CONST City Hall Cable Channel Broadcast and A/V
Equipment Upgrade $ 408,326
FP23503 CONST Pantera Park Hard Court Rehab and LED Retrofit $ 270,000
FP23506 ALL Maple Hill Park Playground/Restroom Replacement
and ADA Upgrades $ 1,989,766
FP22501 CONST DBC AC Replacement & Air Quality Upgrades $ 1,345,197
FP24502 DESIGN Heritage Park Renovation Phases 1 and 2 $ 500,000
FP24505 CONST City Hall Roof Rehabilitation/Solar System Removal
and Reinstallation $ 671,600
Total $ 5,184,889
Grand Total $ 15,888,515
3.B.a
Packet Pg. 35 Attachment: FY26 CIP Power Point Presentation (Updates on
28
FY 2024/25 CIP REPORT 3.B.a
Packet Pg. 36 Attachment: FY26 CIP Power Point Presentation (Updates on
29
FY 2024/25 CIP REPORT
Maple Hill Park Renovation
3.B.a
Packet Pg. 37 Attachment: FY26 CIP Power Point Presentation (Updates on
30
FY 2024/25 PROJECT HIGHLIGHT
City Hall Roof
Rehabilitation
3.B.a
Packet Pg. 38 Attachment: FY26 CIP Power Point Presentation (Updates on
31
FY 2024/25 PROJECT HIGHLIGHT
DBC AC Replacement & Air Quality Upgrades
City Hall Roof Rehabilitation
3.B.a
Packet Pg. 39 Attachment: FY26 CIP Power Point Presentation (Updates on
QUESTIONS
3.B.a
Packet Pg. 40 Attachment: FY26 CIP Power Point Presentation (Updates on
ADDITIONAL SLIDES
3.B.a
Packet Pg. 41 Attachment: FY26 CIP Power Point Presentation (Updates on
R1
PAVEMENT IMPACT
•Relative Impact of Vehicle Type on Pavement Condition.
Based on FHWA equivalent number of 18,000 lbf
(pound force) single-axle loads that would
produce the same amount of damage over the
pavement.
3.B.a
Packet Pg. 42 Attachment: FY26 CIP Power Point Presentation (Updates on
R2
PAVEMENT IMPACT
•Pavement Condition Categories
3.B.a
Packet Pg. 43 Attachment: FY26 CIP Power Point Presentation (Updates on
FY 2024/25 CAPITAL IMPROVEMENT PROGRAM STATUS ATTACHMENT 3
Street Improvement Projects
Project #Phase Project Description Budget Est. Status @
6/30/2025 Notes
SI23101 DESIGN
Residential and Collector Street Rehab. (Design)
Arterial Street Rehab (Design)
CDBG Curb Ramp (Design)380,000$
Completed
Project closed.
SI24101 CONSTRUCT Residential and Collector Street Rehab - Area 3 (Const.)3,678,688$ Completed Project closed.
SI24103 CONSTRUCT
Arterial Street Rehab (Const.)
-Golden Springs Dr from Grand Ave to Temple Ave
-Grand Ave from Diamond Bar Blvd to East City Limits
-Gateway Center, Copey Dr, Bridgegate Dr 5,892,409$
Completed
Project closed.
SI255 CONSTRUCT Arterials Street Pavement Rehabilitation -Lemon Ave (SR60 to City Limit); Brea Cyn
Cutoff (SR57 to City Limit)1,500,000$
Carry Forward Construction contract being awarded.
SI251 CONSTRUCT Residential and Collector Street Rehab - Area 4 (Const.)2,450,000$ Carry Forward Construction contract being awarded.
SI254 CONSTRUCT CDBG Area 5 ADA Curb Ramp Project (Const.)108,910$ Completed Construction ongoing. To be completd by June 30, 2025
SI256 CONSTRUCT Diamond Bar Blvd Complete Street Project Construction 9,242,000$
Carry Forward Finalizing Federal and State Funding Requirements. Preparing
for bidding early in FY26.
SI24104 CONSTRUCT CDBG Area 4 ADA Curb Ramp Project (Const.)104,704$ Completed Project closed.
Total - Street Improvement Projects 23,356,711$
Traffic Management/Safety Projects
Project #Phase Project Description Budget Est. Status @
6/30/2025 Notes
TM251 ALL Battery Back-Up and CCTV Replacement Program FY24/25 62,025$ Completed Project closed.
Total - Traffic Management/Safety Projects 62,025$
Transportation Infrastructure Improvements
Project #Phase Project Description Budget Est. Status @
6/30/2025 Notes
TI24301 CONSTUCT Intersection Safety Improvements (Constr.)270,982$ Completed Work Completed.
Total-Transportation Infrastructure Improvements 270,982$
Miscellaneous Public Works Improvements
Project #Phase Project Description Budget Est. Status @
6/30/2025 Notes
PW25403 ALL Full Capture Devices on Stormwater Catchbasin for Trash Amendment Compliance -
Phase 1 380,000$ Carry Forward Design and pre-con work are being completed in-house.
PW23402 ALL Grand Avenue Median Drainage Improvement Project (Design and Const.)73,472$ Completed Project closed.
1 of 2
3.B.b
Packet Pg. 44 Attachment: FY25 CIP Status Ver. 4 05072025 (Updates on Various Projects/Programs)
FY 2024/25 CAPITAL IMPROVEMENT PROGRAM STATUS ATTACHMENT 3
PW23403 CONSTRUCT Brea Canyon Storm Drain Lining Project (800 ft between DB Church and GSD) 150,000$ Carry Forward The contract is being awarded. Short-term project.
PW24401 ALL Steep Canyon Erosion Control and Sedimentation Prevention (Design & Const.)132,436$ Completed Project closed.
Total - Miscellaneous PW Improvements 735,908$
Facilities, Parks and Rec Improvements
Project #Phase Project Description Budget Est. Status @
6/30/2025 Notes
FP25508 DESIGN Sycamore Canyon Park Lower Bridge Replacement Options (Design)150,000$ Carry Forward In RFP.
FP24500 CONSTRUCT DBC GVBR Lighting & Controls Upgrade (Const.)330,000$ Carry Forward Waiting for the availability of DBC for closure during
construction. September 2025 reserved.
FP24501 CONSTRUCT DBC Main Entry/Doors & ADA Improvements (Const.)310,000$ Carry Forward Waiting for the availability of DBC for closure during
construction. September 2025 reserved.
FP23504 CONSTRUCT City Hall Cable Channel Broadcast and A/V Equipment Upgrade (Const.)408,326$ Completed Project completed.
FP23503 CONSTRUCT Pantera Park Hard Court Rehab and LED Retrofit Project (Design & Const.)270,000$ Completed Construction ongoing. To be completd by June 30, 2025
FP23506 ALL Maple Hill Park Playground/Restroom Replacement and ADA Upgrades 1,989,766$ Completed Construction ongoing. To be completd by June 30, 2025
FP22501 CONSTRUCT DBC AC Replacement & Air Quality Upgrades (Const.)1,345,197$ Completed Project closed.
FP24502 DESIGN Heritage Park Renovation Phases 1 and 2 (Design)500,000$ Completed Work completed.
FP24505 CONSTRUCT City Hall Roof Rehabilitation/Solar System Removal and Reinstallation 671,600$ Completed Project closed.
Total - Facilities, Parks and Rec Improvements 5,974,889$
Total FY 2024/25 Capital Improvement Program 30,400,515$
2 of 2
3.B.b
Packet Pg. 45 Attachment: FY25 CIP Status Ver. 4 05072025 (Updates on Various Projects/Programs)
FY 2025/26 CAPITAL IMPROVEMENT PROGRAM BUDGET
Street Improvement Projects Funding Sources:
Project # Phase Project Description Status FY 25/26 Budget
Request
(202)
RMRA
(203)
Measure M
(204) Measure R
Local Return
(206)
Prop A
(207)
Prop C
(252)
Hauler Fees
(225)
CDBG
SI261 DESIGN
Pavement Rehabilitation Design Project FYs 2026-28
(Arterials, Residential, Collector Street Rehab, and CDBG Curb Ramps). NEW 600,000$ 600,000$
SI262 CONSTRUCT
Arterial Street Rehab (Construction)
- Brea Canyon Rd from DBB to Pathfinder
- Brea Canyon Rd from Pathfinder to Golden Springs Dr
- Diamond Bar Blvd from SR 60 off-ramp to City Limits
NEW
3,754,000$ 1,500,000$ 743,000$ 1,000,000$ 316,000$ 195,000$
SI264 CONSTRUCT CDBG Area 6 ADA Curb Ramp Project NEW 145,000$ 145,000$
SI255 CONSTRUCT
Arterial Street Pavement Rehabilitation -Lemon Ave (SR60 to City Limit); Brea Cyn
Cutoff (SR57 to City Limit) Ongoing- No New Request -$
SI251 CONSTRUCT Residential and Collector Street Rehab - Area 4 Ongoing- No New Request -$
SI256 CONSTRUCT Diamond Bar Blvd Complete Street Project Ongoing- No New Request -$
Total - Street Improvement Projects 4,499,000$ 1,500,000$ 1,343,000$ 1,000,000$ -$ 316,000$ 195,000$ 145,000$
Traffic Management/Safety Projects Funding Sources:
Project # Phase Project Description Status FY 25/26 Budget
Request
(207)
Prop C
(203)
Measure M
(205)
Gas Tax
(246)
Traffic Mitigation
TM261 ALL Battery Back-Up and CCTV Replacement Program FY25/26 NEW 64,000$ 64,000$
Total - Traffic Management/Safety Projects 64,000$ 64,000$ -$ -$ -$ -$ -$ -$
Transportation Infrastructure Improvements Funding Sources:
Project # Phase Project Description Status FY 25/26 Budget
Request
(207)
Prop C
Foothill Transit
Grant (45030)(206) Prop A HSIP Grant
(CalTrans)(209) TDA (100) General
Fund
----$
Total-Transportation Infrastructure Improvements -$ -$ -$ -$ -$ -$ -$ -$
Miscellaneous Public Works Improvements Funding Sources:
Project # Phase Project Description Status FY 25/26 Budget
Request
(201)
Measure W MSP Grant (203)
Measure M (207) Prop C (206)
Prop A
(209)
TDA (100) GF
PW25403 ALL
Full Capture Devices on Stormwater Catchbasin for Trash Amendment Compliance -
Phase 1 Ongoing - No New Request -$
PW23403 CONSTRUCT Brea Canyon Storm Drain Lining Ongoing - No New Request -$
Total - Miscellaneous PW Improvements -$ -$ -$ -$ -$ -$ -$ -$
Facilities, Parks and Rec Improvements Funding Sources:
Project # Phase Project Description Status FY 25/26 Budget
Request (100) General Fund Habitat Conserv
Grant (43110)
(262) Park
Development
(504) Building
& Facilities Fund (201) Measure W (241) LLAD 41-
2021
(239) LLAD 39-
2022
FP261 DESIGN LLADs Irrigation, Landscape, and Minparks Improvements Designa and Construction NEW 600,000$ 200,000$ 400,000$
FP25508 DESIGN Sycamore Canyon Park Lower Bridge Replacement Options Ongoing - No New Request -$
FP24500 CONSTRUCT DBC GVBR Lighting & Controls Upgrade Ongoing - No New Request -$
FP24501 CONSTRUCT DBC Main Entry/Doors & ADA Improvements Ongoing - No New Request -$
Total - Facilities, Parks and Rec Improvements 600,000$ -$ -$ -$ -$ -$ 200,000$ 400,000$
Total FY 2025/26 Capital Improvement Program (NEW REQUEST)5,163,000$
Total FY 2024/25 Carryover Projects (i.e. ongoing projects)14,512,000$
Grand Total 19,675,000$
*see below and Draft Five-Year CIP Program for further information
1 of 2
3.B.c
Packet Pg. 46 Attachment: FY26 CIP Ver. 4 05072025 (Updates on Various Projects/Programs)
FY 2025/26 CAPITAL IMPROVEMENT PROGRAM BUDGET
Fund # Funding Source Totals FY 25/26 Request Listed Projects Lifetime
100 General Fund -$ 790,000$
201 Measure W -$ 836,000$
202 RMRA (SB-1)1,500,000$ 2,800,000$
203 Measure M 1,343,000$ 2,293,000$
204 Measure R 1,000,000$ 2,000,000$
205 Gas Tax -$ -$
206 Prop A -$ 600,000$
207 Prop C 380,000$ 980,000$
251 AB2766 -$ -$
225 CDBG 145,000$ 145,000$
252 Hauler Fees 195,000$ 445,000$
241 LLAD 41-2021 200,000$ 200,000$
262 Park Development -$ -$
504 Building & Facilities Maintenance Fund -$ -$
239 LLAD 39-2022 400,000$ 400,000$
246 Traffic Mitigation -$ -$
-TDA -$ 100,000$
-TDA C6 Grant -$ 3,936,000$
- MSP Grant -$ 2,985,000$
-STPL -$ 1,165,000$
301-45030 Foothill Transit Grant -$ -$
301-43110 Habitat Conservation Grant -$ -$
Total 5,163,000$ 19,675,000$
CIP Program Year-Over-Year Adopted FY 2024/25 Draft FY 2025/26 % Change
Street Improvements 13,356,189$ 4,499,000$ -66%
Traffic Mgmnt./Safety Improv.64,000$ 64,000 0%
Transportation Infrastructure Improvements -$ - N/A
Misc. Public Works Improvements 380,000$ - -100%
Facilites, Parks and Rec. Improv.150,000$ 600,000 300%
Total 13,950,189$ 5,163,000$ -63.0%
2 of 2
3.B.c
Packet Pg. 47 Attachment: FY26 CIP Ver. 4 05072025 (Updates on Various Projects/Programs)
5-YEAR CIP PROGRAM
5-YEAR CIP PROGRAM FY 25-26 TO FY 29-30
Project # Project Description * Priority
** Potential
Funding
Sources
Total Project
Budget Request
Potential Funding
Gap FY 24-25 Cont'd to
FY 25-26
NEW Proposed
FY 25-26 FY 26-27 FY 27-28 FY 28-29 FY 29-30
Unscheduled
Projects Pending
Funding
Street Improvement Projects
SI23101
Residential and Collector Street Rehab.- (Design)
Arterial Street Rehab - 3 Locations (Design)
[Locations Pending PMS Update]
CDBG Curb Ramp - Area 3, 4, 5 (Design)
1 SB1, MM, MR,
GT, HF, PA, PC -$ None
COMPLETED
SI24101 Residential and Collector Street Rehab.- Area 3
(Const.)2 SB1, MM, MR,
GT, HF -$ None COMPLETED
SI24103
Arterial Street Rehab (-Golden Springs Dr from
Grand Ave to Temple Ave
-Grand Ave from Diamond Bar Blvd to East City
Limits
-Gateway Center, Copey Dr, Bridgegate Dr)
(Const.)
1 SB1, MM, MR,
GT, HF, PA, PC -$ None
COMPLETED
SI24104 CDBG Area 4 ADA Curb Ramp Project (Conr.)2 CDBG -$ None COMPLETED
SI25101 Residential and Collector Street Rehab.- Area 4
(Const.)2 SB1, MM, MR,
GT, HF 2,450,000$ None 2,450,000$
SI25104 CDBG Area 5 ADA Curb Ramp Project 2 CDBG 164,189$ None 164,189$
SI25105 Arterial Street Rehab (Const.) -Lemon Ave (SR60
to City Limit); Brea Cyn Cutoff (SR57 to City Limit)1 SB1, MM, MR,
GT, HF, PA, PC 1,500,000$ None
1,500,000$
SI25106 Diamond Bar Blvd. Complete Streets (GSD -
60FWY)-Construction 1
GRANT, MM, MR,
MW, PA, SPA,
PC, WH,
GT, TM, SB1, STP-
L
9,242,000$ $ 2,500,000
9,242,000$
SI261
Pavement Rehabilitation Design FY26-28
(Arterials, Residential, Collector Street Rehab, and
CDBG Curb Ramps).
1 SB1, MM, MR,
GT, HF, PA, PC 600,000$ 100,000$
600,000$
SI262 Arterial Street Rehab (Location pending) (Const.) 1
SB1, MM, MR,
GT, HF, PA, PC 3,754,000$ None 3,754,000$
SI264 CDBG Area 6 ADA Curb Ramp Project 2 CDBG 145,000$ None 145,000$
NEW Residential and Collector Street Rehab.- Area 5
(Const.)2 SB1, MM, MR,
GT, HF 4,120,000$ 120,000$ 4,120,000$
NEW Arterial Street Rehab (Location pending) (Const.) 1
SB1, MM, MR,
GT, HF, PA, PC 13,000,000$ 12,500,000$ 13,000,000$
NEW Residential and Collector Street Rehab.- Area 6
(Const.)2 SB1, MM, MR,
GT, HF 4,120,000$ 620,000$ 4,120,000$
NEW CDBG Area 7 ADA Curb Ramp Project 2 CDBG 145,000$ None 145,000$
NEW Arterial Street Rehab (Location pending) (Const.) 1
SB1, MM, MR,
GT, HF, PA, PC 13,390,000$ 4,500,000$ 13,390,000$
NEW Residential and Collector Street Rehab.- Area 7
(Const.)2 SB1, MM, MR,
GT, HF 4,243,600$ 500,000$ 4,243,600$
NEW CDBG Area 1 ADA Curb Ramp Project 2 CDBG 145,000$ None 145,000$
NEW Arterial Street Rehab (Location pending) (Const.) 1
SB1, MM, MR,
GT, HF, PA, PC 13,791,700$ 13,291,700$ 13,791,700$
NEW Residential and Collector Street Rehab.- Area 1
(Const.)2 SB1, MM, MR,
GT, HF 4,370,908$ 870,908$ 4,370,908$
NEW Residential and Collector Street Rehab Design FY
29-31 1 SB1, MM, MR,
GT, HF 650,000$ 300,000$ 650,000$
NEW CDBG Area 2 ADA Curb Ramp Project 2 CDBG 145,000$ None 145,000$
NEW Arterial Street Rehab (Location pending) (Const.) 1
SB1, MM, MR,
GT, HF, PA, PC 14,205,451$ 13,705,451$ 14,205,451$
NEW Residential and Collector Street Rehab.- Area 2
(Const.)2 SB1, MM, MR,
GT, HF 4,502,035$ 1,002,035$ 4,502,035$
NEW CDBG Area 7 ADA Curb Ramp Project 2 CDBG 145,000$ None 145,000$
SubTotal - Street Improvement Projects 94,828,883$ 50,010,094$ 13,356,189$ 4,499,000$ 21,385,000$ 17,778,600$ 18,957,608$ 18,852,486$ $ -
1
3.B.d
Packet Pg. 48 Attachment: FY26-30 5YCIP Ver. 4 05072025 (Updates on Various Projects/Programs)
5-YEAR CIP PROGRAM
5-YEAR CIP PROGRAM FY 25-26 TO FY 29-30
Project # Project Description * Priority
** Potential
Funding
Sources
Total Project
Budget Request
Potential Funding
Gap FY 24-25 Cont'd to
FY 25-26
NEW Proposed
FY 25-26 FY 26-27 FY 27-28 FY 28-29 FY 29-30
Unscheduled
Projects Pending
Funding
Traffic Management/Safety Projects
TM25201>T
M261
Battery Back-Up and CCTV Replacement
Program 1 PC 130,000$ None COMPLETED 64,000$ 66,000$
SubTotal - Traffic Management/Safety Projects 130,000$ -$ -$ 64,000$ 66,000$ -$ -$ -$ $ -
Transportation Infrastructure Improvements
TI24301 Intersection Safety Improvement (Construction) 3 HSIP, TDA -$ None COMPLETED
SubTotal - Transportation Infrastructure Improvements -$ -$ -$ -$ -$ -$ -$ -$ $ -
Miscellaneous PW Improvements
PW23402 Grand Avenue Median Drainage Improvement
Project (Design and Construction)1 MW -$ None
COMPLETED
PW23401 Groundwater Drainage Improvements-Phase 4 &
5 (Copley & Moonlake ) (Const.)2 MW -$ None COMPLETED
PW24401 Steep Canyon Erosion Control and Sedimentation
Prevention (Design & Const.)2
MW
-$ None
COMPLETED
Under
SI24101
Groundwater Drainage Improvements-Phase 6
(Cold Springs Lane @ South of Diamond Ridge)2 MW -$ None
COMPLETED
PW23403 Brea Canyon Storm Drain Lining 2
MR
150,000$ None
150,000$
PW25403 Full Capture Devices on Stormwater Catchbasin
for Trash Amendment Compliance 2
MW
792,000$ None
380,000$ 412,000$
NEW
Groundwater Drainage Improvements-Phase 7
(Cleghorn Drive @ North of Gold Nugget) Design
and Construction
2 MW 360,500$ None
360,500$
PW261 Citywide Wayfinding Signs Replacement on RoW 4 GF 350,000$ $ 350,000 350,000$
NEW City Entry Monument and Median Improvements
(Lemon Ave.) Design 5 GF 103,000$ $ 103,000 103,000$
NEW City Entry Monument and Median Improvements
(Lemon Ave.) Construction 5 GF 772,500$ $ 772,500 772,500$
NEW City Entry Monument and Parkway Improvements
(Brea Canyon Road) Design 5 GF 103,000$ $ 103,000 103,000$
NEW City Entry Monument and Parkway Improvements
(Brea Canyon Road) Construction 5 GF 772,500$ $ 772,500
772,500$
SubTotal -Miscellaneous PW Improvements 3,403,500$ 2,101,000$ 530,000$ -$ 772,500$ -$ -$ $ 2,101,000
2
3.B.d
Packet Pg. 49 Attachment: FY26-30 5YCIP Ver. 4 05072025 (Updates on Various Projects/Programs)
5-YEAR CIP PROGRAM
5-YEAR CIP PROGRAM FY 25-26 TO FY 29-30
Project # Project Description * Priority
** Potential
Funding
Sources
Total Project
Budget Request
Potential Funding
Gap FY 24-25 Cont'd to
FY 25-26
NEW Proposed
FY 25-26 FY 26-27 FY 27-28 FY 28-29 FY 29-30
Unscheduled
Projects Pending
Funding
Facilites, Parks and Rec Improvements
FP22501 DBC AC Replacement & Air Quality Upgrades
(Construction)1 504, GF -$ None COMPLETED
FP23504 City Hall Cable Channel Broadcast and A/V
Equipment Upgrade (Cnostruction)1 PEG -$ None COMPLETED
FP23506
Maple Hill Park Playground/Restroom
Replacement and ADA Upgrades (Design and
Construction)
4
MA, GF, GRANT, PD
-$ None
COMPLETED
FP24505 City Hall Roof Rehabilitation/Solar System
Removal and Reinstallation (Const)2 504, GF -$ None COMPLETED
FP24502 Heritage Park Renovation Phases 1 and 2 (Design) 3 PD -$ None COMPLETED
FP23503 Pantera Park Hard Courts 3 GF -$ COMPLETED
FP24500 DBC GVBR Lighting and AV Upgrades (Const.) 3 504, 503, GF 330,000$ None 330,000$
FP25508 Sycamore Canyon Park Lower Bridge
Replacement (Design)3 GF, MW, CDBG 150,000$ None 150,000$
FP24501 DBC Main Entry/Doors & ADA Improvements
(Construction)2
GF
310,000$ None
310,000$
FP261 LLADs Irrigation, Landscape, and Minparks
Improvements (Design and Construction)2 D39, D41 600,000$ None 600,000$
NEW Sycamore Canyon Park Lower Bridge
Replacement Options (Construction)3 GF, MW, CDBG 515,000$ 515,000$ 515,000$
NEW Summitridge Park Band Shelter (Design and
Construction)3 GF 2,060,000$ 2,060,000$ 2,060,000$
NEW DBC Patio/Outdoor Renovations 5 GF 772,500$ 772,500$ 772,500$
NEW DBC Library Pad Renovations 5 GF 1,030,000$ 1,030,000$ 1,030,000$
NEW DBC Exterior Paint 4 GF 257,500$ 257,500$ 257,500$
NEW Civic Center Carpet Replacement 4 GF 1,030,000$ 1,030,000$ 1,030,000$
NEW Dog Park Lighting (Design) 5 GF 154,500$ 154,500$ 154,500$
NEW Ronald Reagan Park Playground Restrooms
Replacement, and ADA Upgrades (Design)5 MA, GF, PD 309,000$ 300,000$ 309,000$
NEW
Ronald Reagan Park Playground Restroom
Replacement and ADA Improvement
(Construction)
3
MA, GF, PD
2,884,000$ 2,800,000$
2,884,000$
NEW Dog Park Lighting (Construction) 5 GF 566,500$ 566,500$ 566,500$
NEW Sunset Crossing Park (Construction) 3 GF, Grant, MW 13,905,000$ 13,905,000$ 13,905,000$
NEW Heritage Park Upgrades (Const.) 2 GF, 504 24,679,961$ 24,679,961$ 24,679,961$
NEW Peterson Park Upgrades (Design) 4 Q, GRANT 257,500$ 257,500$ 257,500$
NEW Peterson Park Upgrades (Const.) 4 Q, GRANT 2,060,000$ 2,060,000$ 2,060,000$
NEW Musco LED Upgrade (per site) 4 GF 669,500$ 669,500$ 669,500$
NEW Parking Lot LED Upgrade (all facilities) 4 GF 257,500$ 257,500$ 257,500$
NEW Pantera Park, New Restroom by Courts 5 GF 1,545,000$ $ 1,545,000 1,545,000$
SubTotal - Facilites, Parks and Rec Improvements 54,343,461$ 52,860,461$ 790,000$ 600,000$ 515,000$ 3,862,500$ 1,287,500$ -$ $ 47,288,461
5-Yr Program Total
FY 23-24 to 27-28
5-Yr Program
Funding Gap
FY 23-24 Cont'd
to
FY 24-25 FY 24-25 FY 25-26 FY 26-27 FY 27-28 FY 28-29
Unscheduled
Projects Pending
Funding
$ 152,705,844 $ 104,971,555 $ 14,676,189 $ 5,163,000 $ 22,738,500 $ 21,641,100 $ 20,245,108 $ 18,852,486 $ 49,389,461 Grand Totals:
3
3.B.d
Packet Pg. 50 Attachment: FY26-30 5YCIP Ver. 4 05072025 (Updates on Various Projects/Programs)
5-YEAR CIP PROGRAM
5-YEAR CIP PROGRAM FY 25-26 TO FY 29-30
Project # Project Description * Priority
** Potential
Funding
Sources
Total Project
Budget Request
Potential Funding
Gap FY 24-25 Cont'd to
FY 25-26
NEW Proposed
FY 25-26 FY 26-27 FY 27-28 FY 28-29 FY 29-30
Unscheduled
Projects Pending
Funding
Priority
Total 5-Year
CIP Program
Total 5-Year
Funding Gap
1 Mandatory 70,263,151$ 46,897,151$
GF General Fund Reserves 2 Needed: If Delayed Will Cost More to Fix 51,588,193$ 27,792,904$
SPA Sale of Prop A Funds 3 Enhancement: Improve Amenity 19,844,000$ 19,280,000$
SB1 RMRA (SB-1)4 Desirable: May be Delayed 4,882,000$ 4,882,000$
MM Measure M 5 A Luxury Item 6,128,500$ 6,119,500$
MR Measure R TOTAL 152,705,844$ 104,971,555$
GT Gas Tax Fund
PA Prop A
PC Prop C
TM Traffic Mitigation (Private Developer Fair Share)LEGEND
SI Sewer Improvement Fund Authorized - Carryover to Next FY 25-26
AB2766 Air Quality Improvement Fund Authorized - To be Completed in FY 24-25
TDA SB 821 Fund - Bike and Pedestrian Paths (TDA)
Article 3 (METRO)Request for the Next FY 25-26
MTA MTA Grants Proposed for Future FY's 26-27 to 29-30
WH Waste Hauler Fund Unscheduled - Pending Funding/Timing
Q Quimby
PD Park Development Fund
CDBG Community Development Block Grant Funds
MA Measure A
HC Habitat Conservation Grant
FEMA Federal Emergency Management Agency
MSRC Mobile Source Air Pollution Grant
MW Measure W - Safe, Clean Water Act
FT Foothill Transit Grant
SCE Southern California Edison Grant
540 Internal Service Fund - (540) Building Facility &
Maintenance Fund
530 Internal Service Funds - (530) Equipment
Maintenance & Replacement Fund
STP-L Federal Surface Transportation Program - Local
D39 Landscape Assessment District 39-2022
D41 Landscape Assessment District 41-2021
HSIP Grant CA Highway Safety Improvement Prog. Grant
Black - Annual revenue source
Red - One-time, non-annual revenue source
** Funding Sources
5-Year CIP Program * Priority & Funding Gap Totals
Description
Planned On-Going &
One-Time Resources
4
3.B.d
Packet Pg. 51 Attachment: FY26-30 5YCIP Ver. 4 05072025 (Updates on Various Projects/Programs)
DEPARTMENT OF PUBLIC WORKS
Legend
Project 2
Project 4
Project 6
AREA 4 RESIDENTIAL & COLLECTOR STREETS
AND
ARTERIAL STREET REHABILIATION
VICINITY MAP
Brea Canyon Cut-Off
Road
Lemon Avenue Road
3.B.e
Packet Pg. 52 Attachment: Area 4 Street/Arterial Rehab - Vicinity Map (Updates on Various Projects/Programs)
VICINITY MAP
SHEET 1 OF 1
AREA 5 RESIDENTIAL NEIGHBORHOOD ADA CURB RAMPIMPROVEMENT PROJECT
DATE: 3/27/2025PREPARED BY: CMP
3.B.f
Packet Pg. 53 Attachment: CDBG Area 5 - Vicinity Map (Updates on Various Projects/Programs)
TRAFFIC & TRANSPORTATION COMMISSION
AGENDA REPORT
AGENDA ITEM NUMBER:
5.1
MEETING DATE:
July 10, 2025
TO:
Chair and Members of the Traffic and Transportation
Commission
FROM: David G. Liu, Public Works Director/City Engineer
SUBJECT: NTMP Hawkwood - Stop Signs & Pavement Legends
Recommendations
RECOMMENDATION: Concur with the installation of two (2) stop signs
and associated legend markings at the
intersections of Hawkwood Road and Chirping
Sparrow Road and Ambusher Street, as the final
phase of the NTMP.
BACKGROUND/DISCUSSION:
In response to ongoing neighborhood concerns regarding speeding along Hawkwood
Road, the Public Works Department implemented a multi -phase Neighborhood Traffic
Management Program (NTMP) to improve safety and calm traffic. The Traffic and
Transportation Commission has been kept informed and engaged throughout the
development and implementation of the program since its inception.
Phase 1 of the program, completed in 2023, involved roadway striping enhancements
followed by a post-implementation monitoring period to evaluate effectiveness. Based
on the observed conditions, staff determined that additional traffic calming measures
were necessary, prompting the initiation of Phase 2.
Phase 2 was completed in June 2025 and included the installation of three (3)
strategically placed speed cushions between Bent Twig Lane and Falcon Ridge Road.
Additional improvements included double yellow centerlines, edge line striping, and
CITY OF DIAMOND BAR ~ 21810 COPLEY DRIVE ~ DIAMOND BAR, CA 91765 ~ TEL. (909) 839-7040 ~ FAX (909) 861-3117
5.1
Packet Pg. 54
associated signage. A speed study conducted following implementation found the 85th
percentile speeds to range between 25 and 28 MPH, which is generally considered
acceptable for residential streets and consistent with industry standards.
In addition to concerns about speeding, residents also raised issues related to vehicles
failing to yield at the T-intersections of Hawkwood Road at Chirping Sparrow Road and
Ambusher Street. In response, staff proactively evaluated the conditions and is
recommending the installation of two (2) stop signs and associated legend striping at
these intersections. These improvements are proposed as Phase 3, the final phase of
the Hawkwood Road NTMP. Refer to the attached plan and technical memorandum for
additional details.
Attachments:
1. Updated Hawkwood Road NTMP Plan - Phase 3
2. Fehr Peers Memo - Hawkwood Road NTMP Phase 3 Stop Signs and Pavement
Legends
5.1
Packet Pg. 55
50'62'50'79'5
0
'
3
0
'50'60'38'50'50'69'CHIRPING SPARROW RDFALCONRIDGE RDRUNNINGBRANCH RDAMBUSHERSSTBARBI LNBANBROOKLNBE
N
T
T
W
I
G
L
N HAWKWOOD RDHAWKWOOD RDSECTION A-AN.T.S.SECTION B-BN.T.S.7' WIDE AC SPEED CUSHION DETAILN.T.S.11NSWE111INSTALL STOP SIGNS AND LEGENDSMP/CS5.1.aPacket Pg. 56Attachment: Updated Hawkwood Road NTMP Plan - Phase 3 (NTMP Hawkwood - Stop Signs & Pavement Legends Proposal)
101 Pacifica | Suite 300 | Irvine, CA 92618 | (949) 308-6300 | Fax (949) 859-3209 |
www.fehrandpeers.com
Memorandum
Date: May 9, 2025
To: Chris Malpica, City of Diamond Bar
From: Baldwin Ngai, Fehr & Peers
Anna Luo, Fehr & Peers
Subject: Hawkwood Road Neighborhood Traffic Management Plan (NTMP)
Post Implementation Study
OC22-927.02
Fehr & Peers conducted a post implementation assessment (Study) to measure effectiveness of
traffic calming measures installed along Hawkwood Road.
The study area consists of the segment of Hawkwood Road between the existing terminus south
of Falcon Ridge Road and Bent Twig Lane to the north. Midblock centerline striping and three sets
of speed cushions were installed throughout the study area in late 2024. The following analysis
evaluated vehicle speeds along various segments of the roadway before and after
implementation.
KeyFindings
The study area is separated into four study segments, where speed data was evaluated over seven
consecutive days in the years 2022, 2023, and 2025 (Table 1)
1. South of Falcon Ridge Road
2. Between Falcon Ridge Road and Chirping Sparrow Road
3. Between Ambushers Street and Barbi Lane
4. North of Barbi Lane
Improvements installed throughout the study area consisted of the following:
2023 Double yellow centerline striping on approach to intersections, edge lines, and speed limit
pavement legends.
5.1.b
Packet Pg. 57 Attachment: Fehr Peers Memo - Hawkwood Road NTMP Phase 3 Stop Signs and Pavement Legends (NTMP Hawkwood - Stop Signs &
Chris Malpica, City of Diamond Bar
May 9, 2025
Page 2 of 3
2024 Speed cushions, double yellow centerline midblock, and pavement legends for speed
cushions.
Table 1 Change in Vehicle Speeds (85th Percentile)
2022
(MPH)
2023
(MPH)
Change in
Speed
(2022 to
2023)
(MPH)
%
Change
2025
(MPH)
Change in
Speed
(2023 to
2025)
(MPH)
%
Change
Segment 1 27 28 0.8 2.9% 25 3.5 -12%
Segment 2 28 28 0.1 0.5% 26 2.4 -8%
Segment 3 27 29 1.5 5.5% 28 0.5 -2%
Segment 4 - 25 0.61 -2%
1 Compared to speeds in 2021 (26 mph)
The changes in vehicle speeds across all study segments were consistent between
weekdays and weekends.
Treatments implemented in 2024 were more effective at reducing vehicle speeds
(compared to those in 2023), and especially within segments 1 and 2 south of Chirping
Sparrow Road.
All observed 85th percentile speeds are within 5 mph of the posted speed limit (25 mph),
which is in alignment with speed-setting standards1.
Where speed cushions were implemented in 2024 (segments 2 and 4), observed vehicle speeds
decreased to the posted speed limit, demonstrating the effectiveness of implemented measures.
While immediate actions to address excessive travels speeds is not necessary, the City may
continue to monitor studied locations and consider additional speed management measures if
observed 85th percentile speeds increase.
Recommendations
To support neighborhood traffic calming efforts along Hawkwood Road, the installation of side
street stop control is recommended at the intersections with Chirping Sparrow Road and
Ambushers Street. Hawkwood functions as a neighborhood collector with horizontal curves and
grade changes throughout and has recently undergone calming treatments as described earlier in
1 Per the California Manual on Uniform Traffic Control Devices (CA-MUTCD), an 85th percentile speed that is
within 5 mph of the posted speed limit aligns with established speed-setting guidance outlined in Section
2B.13. A 5-mph rounding tolerance is commonly applied when determining posted speed limits, and
deviations within this range are not typically considered grounds for speed related intervention. As such,
although the observed 85th percentile speed exceeds the posted limit of 25 mph in certain segments, it
remains within acceptable thresholds.
5.1.b
Packet Pg. 58 Attachment: Fehr Peers Memo - Hawkwood Road NTMP Phase 3 Stop Signs and Pavement Legends (NTMP Hawkwood - Stop Signs &
Chris Malpica, City of Diamond Bar
May 9, 2025
Page 3 of 3
this study. Although effective speed reductions were observed, the uncontrolled intersections can
be improved by installing stop control to more efficiently assign right-of-way.
Under the California MUTCD (Sections 2B.04 and 2B.06), stop signs are warranted on minor
approaches when the volume or functional classification difference between roads makes the
standard right-of-way rule2 insufficient to ensure safe operation, or where sight distance is
limited. Hawkwood carries higher traffic volumes and serves as a through route, while both
Ambushers Street and Chirping Sparrow Road terminate as they intersect with Hawkwood Road.
Assigning right-of-way via stop signs will clarify intersection control and enhance safety.
The California Vehicle Code defaults to right-hand or prior-entry yielding at uncontrolled
intersections, and at an uncontrolled T intersection the traffic on the through road (Hawkwood)
has the right-of-way, and drivers on the terminating side streets must yield to cross traffic on
Hawkwood. However, without regulatory signs, this right-of-way rule relies solely on driver
judgment and sight distance, which can be compromised by Hawkwoods curves and grades.
While stop signs should not be used for speed control, their use here aligns with traffic calming
goals by reinforcing safe entry behavior at conflict points. Stop control on Chirping Sparrow Road
and Ambushers Street is thus justified and recommended as part of a broader, systemically
applied safety strategy.
2 https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=VEH§ionNum=21800.
5.1.b
Packet Pg. 59 Attachment: Fehr Peers Memo - Hawkwood Road NTMP Phase 3 Stop Signs and Pavement Legends (NTMP Hawkwood - Stop Signs &