HomeMy WebLinkAbout20240730 Daily Report
REPORT NO. 59
City of Diamond Bar
Project: Area 3 Residential & Collector Streets
Rehabilitation and Arterial Street Rehabilitation Project
Project/Specification No.: SI24101 & SI24103, CIP No.
PW23402
Contractor: Onyx Construction
Project Inspector: Mamoun Aldwir
Date: 7/30/2024
Day of Week: Tuesday
Start Time: 7:00AM
Finish Time: 3:30PM
Total Hours: 8
DAILY REPORT
Page 1 of 5
Prime Contractor's Activities:
• The contractor paving crew constructed 2.0" AC on Gateway Center using a paving
machine and MTV (motor transfer vesical).
• A sand truck sprayed sand on the rubberized asphalt to limit tracking to the city streets.
• Three steel drum rollers were used to compact AC.
• The paving crew raised (12) water valves to grade during the paving operation.
• A soil technician from GMU was at the job site to conduct AC tests. He took several tests on AC and all passed
with 95% or better.
• A Black Gold oil truck sprayed oil on all new grinding AC prior to paving and a water truck sprayed water to
minimize dust.
Materials Placed/Quantities Measured:
• The paving crew laid out 1377.54 tons of asphalt using mix design ARHMGG-C ½” PG 64-16.
• 12 water valves were raised to grade on Gateway Center Drive.
Sub-Contractors/Sub-Consultants Activities:
•
Traffic Control:
• The traffic control crew placed road construction signs, cones, and arrow boards in the vicinities of the
construction project. Flagmen were provided throughout the day to help with traffic control.
Visitors:
• Christian Malpica
• Jason Fuentes
Notes:
•
Weather
Cool AM
Hot PM
Temperature
88 Min
62 Max
REPORT NO. 59
City of Diamond Bar
Project: Area 3 Residential & Collector Streets
Rehabilitation and Arterial Street Rehabilitation Project
Project/Specification No.: SI24101 & SI24103, CIP No.
PW23402
Contractor: Onyx Construction
Project Inspector: Mamoun Aldwir
Date: 7/30/2024
Day of Week: Tuesday
Start Time: 7:00AM
Finish Time: 3:30PM
Total Hours: 8
DAILY REPORT
Page 2 of 5
Manpower / Equipment
(O)- Owner / Operator
(R)- Rental
(F) - Foreman
COMPANY TRADE
Onyx Construction 1 Bid Item No. Total Hours Foreman Laborer Operator Mason Apprentice Opry. Engineer Saw Cutter Truck Driver ID Hrs. # EQUIPMENT NAME
1 Foreman Truck O Mario Alvarado 1 B1 12.5 F/O
1 Skip Loader O Adam Alvarado 1 B2 11 O
1 Sweeper R Tonito Martinez 1 B7 11 O
1 TC Truck O Miguel Miramontes 1 B20 10.5 O
1 Water Truck O Ivan Alverado 1 10.5 O
1 Paving Machine O Alberto Urera 1 10.5 O
1 Mini Grinder O Guillermo Maciel 1 10.5 O
1 Super 10 Dump R Rodolfo Pinada 1 10.5 L
1 Loaded Truck O Martin Preciado 1 10.5 L
1
Crack Sand
Truck O Elias Sanchez 1 10.5 L
1 Arrow Board O Pedro Gonzalez 1 10.5 L
3 Rollers O Jose de la Riva 1 11 L
1 Black Gold Sand O Luiis Becerra 1 10.5 O
1 Black Gold Oil O Mike M 1 11 L
1 Arrow Board O Fernando Adodaca 1 10.5 O
1
MTV Moving
transfer vehicle O 1
1
1
1
1
1
Bid Item Description Quantities 1
B-20
Construct ARAM
OVERLAY 2.0""
Depth
1377.54 tons 1
B-1 Mobilization LS 1
B-2 Traffic control LS 1
B-7 Adjust water valves
and cover to grade. 12 1
1
1
1
1
REPORT NO. 59
City of Diamond Bar
Project: Area 3 Residential & Collector Streets
Rehabilitation and Arterial Street Rehabilitation Project
Project/Specification No.: SI24101 & SI24103, CIP No.
PW23402
Contractor: Onyx Construction
Project Inspector: Mamoun Aldwir
Date: 7/30/2024
Day of Week: Tuesday
Start Time: 7:00AM
Finish Time: 3:30PM
Total Hours: 8
DAILY REPORT
Page 3 of 5
Photos
REPORT NO. 59
City of Diamond Bar
Project: Area 3 Residential & Collector Streets
Rehabilitation and Arterial Street Rehabilitation Project
Project/Specification No.: SI24101 & SI24103, CIP No.
PW23402
Contractor: Onyx Construction
Project Inspector: Mamoun Aldwir
Date: 7/30/2024
Day of Week: Tuesday
Start Time: 7:00AM
Finish Time: 3:30PM
Total Hours: 8
DAILY REPORT
Page 4 of 5
REPORT NO. 59
City of Diamond Bar
Project: Area 3 Residential & Collector Streets
Rehabilitation and Arterial Street Rehabilitation Project
Project/Specification No.: SI24101 & SI24103, CIP No.
PW23402
Contractor: Onyx Construction
Project Inspector: Mamoun Aldwir
Date: 7/30/2024
Day of Week: Tuesday
Start Time: 7:00AM
Finish Time: 3:30PM
Total Hours: 8
DAILY REPORT
Page 5 of 5
End of Report