Loading...
HomeMy WebLinkAbout20240730 Daily Report REPORT NO. 59 City of Diamond Bar Project: Area 3 Residential & Collector Streets Rehabilitation and Arterial Street Rehabilitation Project Project/Specification No.: SI24101 & SI24103, CIP No. PW23402 Contractor: Onyx Construction Project Inspector: Mamoun Aldwir Date: 7/30/2024 Day of Week: Tuesday Start Time: 7:00AM Finish Time: 3:30PM Total Hours: 8 DAILY REPORT Page 1 of 5 Prime Contractor's Activities: • The contractor paving crew constructed 2.0" AC on Gateway Center using a paving machine and MTV (motor transfer vesical). • A sand truck sprayed sand on the rubberized asphalt to limit tracking to the city streets. • Three steel drum rollers were used to compact AC. • The paving crew raised (12) water valves to grade during the paving operation. • A soil technician from GMU was at the job site to conduct AC tests. He took several tests on AC and all passed with 95% or better. • A Black Gold oil truck sprayed oil on all new grinding AC prior to paving and a water truck sprayed water to minimize dust. Materials Placed/Quantities Measured: • The paving crew laid out 1377.54 tons of asphalt using mix design ARHMGG-C ½” PG 64-16. • 12 water valves were raised to grade on Gateway Center Drive. Sub-Contractors/Sub-Consultants Activities: • Traffic Control: • The traffic control crew placed road construction signs, cones, and arrow boards in the vicinities of the construction project. Flagmen were provided throughout the day to help with traffic control. Visitors: • Christian Malpica • Jason Fuentes Notes: • Weather Cool AM Hot PM Temperature 88 Min 62 Max REPORT NO. 59 City of Diamond Bar Project: Area 3 Residential & Collector Streets Rehabilitation and Arterial Street Rehabilitation Project Project/Specification No.: SI24101 & SI24103, CIP No. PW23402 Contractor: Onyx Construction Project Inspector: Mamoun Aldwir Date: 7/30/2024 Day of Week: Tuesday Start Time: 7:00AM Finish Time: 3:30PM Total Hours: 8 DAILY REPORT Page 2 of 5 Manpower / Equipment (O)- Owner / Operator (R)- Rental (F) - Foreman COMPANY TRADE Onyx Construction 1 Bid Item No. Total Hours Foreman Laborer Operator Mason Apprentice Opry. Engineer Saw Cutter Truck Driver ID Hrs. # EQUIPMENT NAME 1 Foreman Truck O Mario Alvarado 1 B1 12.5 F/O 1 Skip Loader O Adam Alvarado 1 B2 11 O 1 Sweeper R Tonito Martinez 1 B7 11 O 1 TC Truck O Miguel Miramontes 1 B20 10.5 O 1 Water Truck O Ivan Alverado 1 10.5 O 1 Paving Machine O Alberto Urera 1 10.5 O 1 Mini Grinder O Guillermo Maciel 1 10.5 O 1 Super 10 Dump R Rodolfo Pinada 1 10.5 L 1 Loaded Truck O Martin Preciado 1 10.5 L 1 Crack Sand Truck O Elias Sanchez 1 10.5 L 1 Arrow Board O Pedro Gonzalez 1 10.5 L 3 Rollers O Jose de la Riva 1 11 L 1 Black Gold Sand O Luiis Becerra 1 10.5 O 1 Black Gold Oil O Mike M 1 11 L 1 Arrow Board O Fernando Adodaca 1 10.5 O 1 MTV Moving transfer vehicle O 1 1 1 1 1 1 Bid Item Description Quantities 1 B-20 Construct ARAM OVERLAY 2.0"" Depth 1377.54 tons 1 B-1 Mobilization LS 1 B-2 Traffic control LS 1 B-7 Adjust water valves and cover to grade. 12 1 1 1 1 1 REPORT NO. 59 City of Diamond Bar Project: Area 3 Residential & Collector Streets Rehabilitation and Arterial Street Rehabilitation Project Project/Specification No.: SI24101 & SI24103, CIP No. PW23402 Contractor: Onyx Construction Project Inspector: Mamoun Aldwir Date: 7/30/2024 Day of Week: Tuesday Start Time: 7:00AM Finish Time: 3:30PM Total Hours: 8 DAILY REPORT Page 3 of 5 Photos REPORT NO. 59 City of Diamond Bar Project: Area 3 Residential & Collector Streets Rehabilitation and Arterial Street Rehabilitation Project Project/Specification No.: SI24101 & SI24103, CIP No. PW23402 Contractor: Onyx Construction Project Inspector: Mamoun Aldwir Date: 7/30/2024 Day of Week: Tuesday Start Time: 7:00AM Finish Time: 3:30PM Total Hours: 8 DAILY REPORT Page 4 of 5 REPORT NO. 59 City of Diamond Bar Project: Area 3 Residential & Collector Streets Rehabilitation and Arterial Street Rehabilitation Project Project/Specification No.: SI24101 & SI24103, CIP No. PW23402 Contractor: Onyx Construction Project Inspector: Mamoun Aldwir Date: 7/30/2024 Day of Week: Tuesday Start Time: 7:00AM Finish Time: 3:30PM Total Hours: 8 DAILY REPORT Page 5 of 5 End of Report