HomeMy WebLinkAbout20240725 Daily Report REPORT NO. 56 City of Diamond Bar Project: Area 3 Residential & Collector Streets Rehabilitation and Arterial Street Rehabilitation Project Project/Specification No.: SI24101 & SI24103, CIP No. PW23402 Contractor: Onyx Construction Project Inspector: Mamoun Aldwir Date: 7/25/2024 Day of Week: Thursday Start Time: 7:00 am Finish Time: 6:30 pm Total Hours: 11 DAILY REPORT Page 1 of 6 Prime Contractor’s Activities: • ONYX paving crew laid out 2.5" of A.C on Grande Ave from Country View Drive, STA 38+25 to Summit ridge Drive, STA 54+00, approximately 1500 LF of A.C were placed. • The contractor used a paving machine to lay down the A.C and three rollers were at the job site compacting the A.C. • I met a soil technician at the job site. The technician from GMI was hired by the contractor to conduct compaction tests on the A.C. • Black Gold oil truck sprayed oil on all grinded A.C prior to paving • Black gold sand truck sprayed sand on all new asphalt to minimize tracking. Materials Placed/Quantities Measured: • ONYX paving crew placed 1469.54 tons of A.C on Grand Avenue using mix design ARHM – GG – C ½” PG 64- 16. Per approved plan. • American Asphalt South, Inc. Slurry seal crew placed 187,207 square foot of Type 2 slurry seal on various streets. • The grinding crew grinded 135,660 square feet of A.C on Copley Dr and Gateway Center Drive. Sub-Contractors/Sub-Consultants Activities: • Pavement rehab grinding crew grinded 2" of A.C on Copley Drive and Gateway Center Drive using a 7’ wide grinder and a mini grinder. Approximately 135,66o square feet were completed. • A sweeper was at the job site all day cleaning up the job site and a water Truck was at the job site spraying the grinded street to minimize the dust. • American Asphalt crew laid out Type 2 slurry seal on the following streets. • Hawkwood Dr from Ambushers St to cul-de-sac • Banbrook Ln from Hawkwood Dr to Falcon Ridge Rd • Fallow Field Dr from Brea Canyon to E Malad Ct • Sugar Pine Pl from Diamond Bar Blvd to Slurry Limit • Crooked Creek Dr from Golden Run Dr to Ambushers St • Flap Jack Dr from Crooked Creek Dr to cul-de-sac • Chirping Sparrow Rd from Hawkwood Dr to Calmbrook Ln. • Hipass Dr from Castle Rock Rd to cul-de-sac Traffic Control: • The contractor placed traffic control per approved plan. They placed road construction signs, arrow boards and cones throughout the project in the vicinity of the construction zone. The contractor provided flagmen throughout the project as needed. Visitors: • Christian Malpica Notes: • Weather Cool AM Hot PM Temperature 69 Min 96 Max REPORT NO. 56 City of Diamond Bar Project: Area 3 Residential & Collector Streets Rehabilitation and Arterial Street Rehabilitation Project Project/Specification No.: SI24101 & SI24103, CIP No. PW23402 Contractor: Onyx Construction Project Inspector: Mamoun Aldwir Date: 7/25/2024 Day of Week: Thursday Start Time: 7:00 am Finish Time: 6:30 pm Total Hours: 11 DAILY REPORT Page 2 of 6 Manpower / Equipment (O)- Owner / Operator (R)- Rental (F) - Foreman COMPANY TRADE Onyx Construction 1 Bid Item No. Total Hours Foreman Laborer Operator Mason Apprentice Opry. Engineer Saw Cutter Truck Driver ID Hrs. # EQUIPMENT NAME 1 Foreman Truck O Jose Becerra 1 A2 8 8 1 Skip Loader O Nathan Becerra 1 B19 8 8 1 Sweeper R Arron Becerra 1 B21 8 8 1 TC Truck O Brett Dare 1 8 8 1 Water Truck O Ismael Fernandez 1 8 8 1 Grinder O Vincet Fernandez 1 8 8 1 Mini Grinder O Jeremy Woolley 1 8 8 1 Supper 10 Dump R Mario Solorzano 1 8 8 20 Loaded Truck O Richard Alvarez 1 8 8 1 Crack Sand Truck O Moses Twyman 1 8 8 1 Paving Machine O Edger Vasguez 1 8 8 3 Roller O Bryan Posas 1 8 8 1 Black Gold Sand Michael Rincon 1 8 8 1 Black Gold Oil David Gurrola 1 8 8 3 Arrow Board O Ismael Fernandez 1 8 8 Jeremy Wolley 1 8 8 Mario Alvarado 1 13.5 13.5 Adam Alvarado 1 12.5 12.5 Talno Martines 1 12.5 12.5 Miguel Mivaontes 1 12.5 12.5 Luis Bacona 1 11 11 Bid Item Description Quantities Ivan Alverado 1 12 12 A-2 Traffic Control And Public Safety 1 Fernando Adodaca 1 12 12 B-21 ARHM 2.5 Overlay 1469.54 tons Adam Alvarado 1 12 12 B-19 2.5 Grind Out 135,66o square feet Martin Perciado 1 12.5 12.5 Elins Sanchez 1 12 12 Jose Deln Riva 1 11 11 Jose Guence 1 12 12 Guillemo Macrel 1 13 13 1 1 1 REPORT NO. 56 City of Diamond Bar Project: Area 3 Residential & Collector Streets Rehabilitation and Arterial Street Rehabilitation Project Project/Specification No.: SI24101 & SI24103, CIP No. PW23402 Contractor: Onyx Construction Project Inspector: Mamoun Aldwir Date: 7/25/2024 Day of Week: Thursday Start Time: 7:00 am Finish Time: 6:30 pm Total Hours: 11 DAILY REPORT Page 3 of 6 (O)- Owner / Operator (R)- Rental (F) - Foreman Company COMPANY TRADE American Asphalt South, Inc. (Slurry) 2 Bid Item No. Total Hours Foreman Laborer Operator Mason Apprentice Opry. Engineer Saw Cutter Truck Driver Traffic Control ID Hrs. EQUIPMENT NAME 1 Lowboy Loader O Donato Franco 2 A16 9 1 Slurry Truck O Eduardo De Santiago 2 A16 9 1 Slurry Truck O Frank Murrillo 2 A16 9 1 Slurry Truck O Luis Arizmendi 2 A16 9 1 TC Truck O Jose Cordova 2 A16 9 1 TC Truck O Rudy Valdez 2 A16 10 1 TC Truck O George Sanchez 2 A16 9 1 Pickup O Gilbert Sanchez 2 A16 9 1 Pickup R Alberto Medina 2 A16 10 1 Dump Truck/Roller R Jeff Hunter 2 A16 10 1 Tanker R Saw Truck R Bid Item Description Qtys A-16 Application of Type ll slurry seal REPORT NO. 56 City of Diamond Bar Project: Area 3 Residential & Collector Streets Rehabilitation and Arterial Street Rehabilitation Project Project/Specification No.: SI24101 & SI24103, CIP No. PW23402 Contractor: Onyx Construction Project Inspector: Mamoun Aldwir Date: 7/25/2024 Day of Week: Thursday Start Time: 7:00 am Finish Time: 6:30 pm Total Hours: 11 DAILY REPORT Page 4 of 6 Photos REPORT NO. 56 City of Diamond Bar Project: Area 3 Residential & Collector Streets Rehabilitation and Arterial Street Rehabilitation Project Project/Specification No.: SI24101 & SI24103, CIP No. PW23402 Contractor: Onyx Construction Project Inspector: Mamoun Aldwir Date: 7/25/2024 Day of Week: Thursday Start Time: 7:00 am Finish Time: 6:30 pm Total Hours: 11 DAILY REPORT Page 5 of 6 REPORT NO. 56 City of Diamond Bar Project: Area 3 Residential & Collector Streets Rehabilitation and Arterial Street Rehabilitation Project Project/Specification No.: SI24101 & SI24103, CIP No. PW23402 Contractor: Onyx Construction Project Inspector: Mamoun Aldwir Date: 7/25/2024 Day of Week: Thursday Start Time: 7:00 am Finish Time: 6:30 pm Total Hours: 11 DAILY REPORT Page 6 of 6 End of Report