HomeMy WebLinkAbout20240725 Daily Report
REPORT NO. 56
City of Diamond Bar
Project: Area 3 Residential & Collector Streets
Rehabilitation and Arterial Street Rehabilitation Project
Project/Specification No.: SI24101 & SI24103, CIP No.
PW23402
Contractor: Onyx Construction
Project Inspector: Mamoun Aldwir
Date: 7/25/2024
Day of Week: Thursday
Start Time: 7:00 am
Finish Time: 6:30 pm
Total Hours: 11
DAILY REPORT
Page 1 of 6
Prime Contractor’s Activities:
• ONYX paving crew laid out 2.5" of A.C on Grande Ave from Country View Drive,
STA 38+25 to Summit ridge Drive, STA 54+00, approximately 1500 LF of A.C were placed.
• The contractor used a paving machine to lay down the A.C and three rollers were at the
job site compacting the A.C.
• I met a soil technician at the job site. The technician from GMI was hired by the contractor to conduct
compaction tests on the A.C.
• Black Gold oil truck sprayed oil on all grinded A.C prior to paving
• Black gold sand truck sprayed sand on all new asphalt to minimize tracking.
Materials Placed/Quantities Measured:
• ONYX paving crew placed 1469.54 tons of A.C on Grand Avenue using mix design ARHM – GG – C ½” PG 64- 16.
Per approved plan.
• American Asphalt South, Inc. Slurry seal crew placed 187,207 square foot of Type 2 slurry seal on various
streets.
• The grinding crew grinded 135,660 square feet of A.C on Copley Dr and Gateway Center Drive.
Sub-Contractors/Sub-Consultants Activities:
• Pavement rehab grinding crew grinded 2" of A.C on Copley Drive and Gateway Center Drive using a 7’ wide
grinder and a mini grinder. Approximately 135,66o square feet were completed.
• A sweeper was at the job site all day cleaning up the job site and a water Truck was at the job site spraying the
grinded street to minimize the dust.
• American Asphalt crew laid out Type 2 slurry seal on the following streets.
• Hawkwood Dr from Ambushers St to cul-de-sac
• Banbrook Ln from Hawkwood Dr to Falcon Ridge Rd
• Fallow Field Dr from Brea Canyon to E Malad Ct
• Sugar Pine Pl from Diamond Bar Blvd to Slurry Limit
• Crooked Creek Dr from Golden Run Dr to Ambushers St
• Flap Jack Dr from Crooked Creek Dr to cul-de-sac
• Chirping Sparrow Rd from Hawkwood Dr to Calmbrook Ln.
• Hipass Dr from Castle Rock Rd to cul-de-sac
Traffic Control:
• The contractor placed traffic control per approved plan. They placed road construction signs, arrow boards and
cones throughout the project in the vicinity of the construction zone. The contractor provided flagmen
throughout the project as needed.
Visitors:
• Christian Malpica
Notes:
•
Weather
Cool AM
Hot PM
Temperature
69 Min
96 Max
REPORT NO. 56
City of Diamond Bar
Project: Area 3 Residential & Collector Streets
Rehabilitation and Arterial Street Rehabilitation Project
Project/Specification No.: SI24101 & SI24103, CIP No.
PW23402
Contractor: Onyx Construction
Project Inspector: Mamoun Aldwir
Date: 7/25/2024
Day of Week: Thursday
Start Time: 7:00 am
Finish Time: 6:30 pm
Total Hours: 11
DAILY REPORT
Page 2 of 6
Manpower / Equipment
(O)- Owner / Operator
(R)- Rental
(F) - Foreman
COMPANY TRADE
Onyx Construction 1 Bid Item No. Total Hours Foreman Laborer Operator Mason Apprentice Opry. Engineer Saw Cutter Truck Driver ID Hrs. # EQUIPMENT NAME
1 Foreman Truck O Jose Becerra 1 A2 8 8
1 Skip Loader O Nathan Becerra 1 B19 8 8
1 Sweeper R Arron Becerra 1 B21 8 8
1 TC Truck O Brett Dare 1 8 8
1 Water Truck O Ismael Fernandez 1 8 8
1 Grinder O Vincet Fernandez 1 8 8
1 Mini Grinder O Jeremy Woolley 1 8 8
1 Supper 10 Dump R Mario Solorzano 1 8 8
20 Loaded Truck O Richard Alvarez 1 8 8
1
Crack Sand
Truck O Moses Twyman 1 8 8
1 Paving Machine O Edger Vasguez 1 8 8
3 Roller O Bryan Posas 1 8 8
1 Black Gold Sand Michael Rincon 1 8 8
1 Black Gold Oil David Gurrola 1 8 8
3 Arrow Board O Ismael Fernandez 1 8 8
Jeremy Wolley 1 8 8
Mario Alvarado 1 13.5 13.5
Adam Alvarado 1 12.5 12.5
Talno Martines 1 12.5 12.5
Miguel Mivaontes 1 12.5 12.5
Luis Bacona 1 11 11
Bid
Item Description Quantities Ivan Alverado 1 12 12
A-2 Traffic Control And
Public Safety 1 Fernando
Adodaca 1 12 12
B-21 ARHM 2.5 Overlay 1469.54 tons Adam Alvarado 1 12 12
B-19 2.5 Grind Out 135,66o square feet Martin Perciado 1 12.5 12.5
Elins Sanchez 1 12 12
Jose Deln Riva 1 11 11
Jose Guence 1 12 12
Guillemo Macrel 1 13 13
1
1
1
REPORT NO. 56
City of Diamond Bar
Project: Area 3 Residential & Collector Streets
Rehabilitation and Arterial Street Rehabilitation Project
Project/Specification No.: SI24101 & SI24103, CIP No.
PW23402
Contractor: Onyx Construction
Project Inspector: Mamoun Aldwir
Date: 7/25/2024
Day of Week: Thursday
Start Time: 7:00 am
Finish Time: 6:30 pm
Total Hours: 11
DAILY REPORT
Page 3 of 6
(O)- Owner / Operator
(R)- Rental
(F) - Foreman Company COMPANY TRADE
American
Asphalt South,
Inc. (Slurry)
2 Bid Item No. Total Hours Foreman Laborer Operator Mason Apprentice Opry. Engineer Saw Cutter Truck Driver Traffic Control ID Hrs. EQUIPMENT NAME
1 Lowboy
Loader O Donato
Franco 2 A16 9
1 Slurry Truck O Eduardo De
Santiago 2 A16 9
1 Slurry Truck O Frank Murrillo 2 A16 9
1 Slurry Truck O Luis
Arizmendi 2 A16 9
1 TC Truck O Jose Cordova 2 A16 9
1 TC Truck O Rudy Valdez 2 A16 10
1 TC Truck O George
Sanchez 2 A16 9
1 Pickup O Gilbert
Sanchez 2 A16 9
1 Pickup R Alberto
Medina 2 A16 10
1 Dump
Truck/Roller R Jeff Hunter 2 A16 10
1 Tanker R
Saw Truck R
Bid
Item Description Qtys
A-16 Application of Type ll
slurry seal
REPORT NO. 56
City of Diamond Bar
Project: Area 3 Residential & Collector Streets
Rehabilitation and Arterial Street Rehabilitation Project
Project/Specification No.: SI24101 & SI24103, CIP No.
PW23402
Contractor: Onyx Construction
Project Inspector: Mamoun Aldwir
Date: 7/25/2024
Day of Week: Thursday
Start Time: 7:00 am
Finish Time: 6:30 pm
Total Hours: 11
DAILY REPORT
Page 4 of 6
Photos
REPORT NO. 56
City of Diamond Bar
Project: Area 3 Residential & Collector Streets
Rehabilitation and Arterial Street Rehabilitation Project
Project/Specification No.: SI24101 & SI24103, CIP No.
PW23402
Contractor: Onyx Construction
Project Inspector: Mamoun Aldwir
Date: 7/25/2024
Day of Week: Thursday
Start Time: 7:00 am
Finish Time: 6:30 pm
Total Hours: 11
DAILY REPORT
Page 5 of 6
REPORT NO. 56
City of Diamond Bar
Project: Area 3 Residential & Collector Streets
Rehabilitation and Arterial Street Rehabilitation Project
Project/Specification No.: SI24101 & SI24103, CIP No.
PW23402
Contractor: Onyx Construction
Project Inspector: Mamoun Aldwir
Date: 7/25/2024
Day of Week: Thursday
Start Time: 7:00 am
Finish Time: 6:30 pm
Total Hours: 11
DAILY REPORT
Page 6 of 6
End of Report