HomeMy WebLinkAbout20240724 Daily Report REPORT NO. 55 City of Diamond Bar Project: Area 3 Residential & Collector Streets Rehabilitation and Arterial Street Rehabilitation Project Project/Specification No.: SI24101 & SI24103, CIP No. PW23402 Contractor: Onyx Construction Project Inspector: Mamoun Aldwir Date: 7/24/2024 Day of Week: Wednesday Start Time: 8:00 am Finish Time: 3:30 pm Total Hours: 8 DAILY REPORT Page 1 of 7 Prime Contractor’s Activities: • ONYX paving crew laid out 2.5" of A.C on Grande Ave from Rolling Knob Rd, STA 24+00 • To Country View Dr, STA 38+75 • Approximately 96,000 square feet of A.C were placed on Grand Avenue. • The contractor used a paving machine to lay down the A.C and three rollers were at the job site compacting the A.C. • A soil technician was at the job site. The technician from GMI was hired by the contractor to conduct compaction tests on the A.C. • Black Gold oil truck sprayed oil on all grinded A.C prior to paving • Black gold sand truck sprayed sand on all new Asphalt to minimize tracking. Materials Placed/Quantities Measured: • ONYX paving crew placed 1426.57 tons of A.C on Grand Avenue using mix design ARHM – GG – C ½” PG 64- 16. per approved plan. • American Asphalt South, Inc. Slurry seal crew placed 212,858 square feet of Type 2 slurry seal on various streets. Sub-Contractors/Sub-Consultants Activities: • American Asphalt crew laid out Type 2 slurry seal on the following streets: o E Oak Crest Dr. from Ridge Pt to Brea Canyon Cutoff. o Crooked Creek Dr. from Mapache Dr. to Cold Springs Ln. o Birch Hill Dr. from Evergreen Springs Dr. To Castle Rock Rd. o Sunbright Dr. from Fountain Springs to Evergreen Springs. o Fallow Field Dr. from Brea Canyon Cutoff to E Malad Ct. o Canyon Ridge Rd. From Peaceful Hills Rd. To Eagle Crest. Traffic Control: • The contractor placed traffic control per approved plan. They placed road construction signs, arrow boards and cones throughout the project in the vicinity of the construction zone. The contractor provided flagmen throughout the project as needed. Visitors: • Christian Malpica Notes: • No grinding operations were observed on Wednesday July 22nd. Weather Cool AM Hot PM Temperature 69 Min 96 Max REPORT NO. 55 City of Diamond Bar Project: Area 3 Residential & Collector Streets Rehabilitation and Arterial Street Rehabilitation Project Project/Specification No.: SI24101 & SI24103, CIP No. PW23402 Contractor: Onyx Construction Project Inspector: Mamoun Aldwir Date: 7/24/2024 Day of Week: Wednesday Start Time: 8:00 am Finish Time: 3:30 pm Total Hours: 8 DAILY REPORT Page 2 of 7 Manpower / Equipment (O)- Owner / Operator (R)- Rental (F) - Foreman COMPANY TRADE Onyx Construction 1 Bid Item No. Total Hours Foreman Laborer Operator Mason Apprentice Opry. Engineer Saw Cutter Truck Driver ID Hrs. # EQUIPMENT NAME 1 Foreman Truck O Jose Becerra 1 A2 0 1 Skip Loader O Nathan Becerra 1 B19 0 1 Sweeper R Arron Becerra 1 0 1 TC Truck O Brett Dare 1 0 1 Water Truck O Ismael Fernandez 1 0 1 Grinder O Vincet Fernandez 1 0 1 Mini Grinder O Jeremy Woolley 1 0 1 Supper 10 Dump R Mario Solorzano 1 0 20 Loaded Truck O Richard Alvarez 1 0 1 Crack Sand Truck O Moses Twyman 1 0 1 Paving Machine O Edger Vasguez 1 8 8 3 Roller O Bryan Posas 1 8 8 1 Black Gold Sand Michael Rincon 1 8 8 1 Black Gold Oil David Gurrola 1 8 8 3 Arrow Board O Ismael Fernandez 1 8 8 Jeremy Wolley 1 8 8 Mario Alvarado 1 10 10 Adam Alvarado 1 9 9 Talno Martines 1 9 9 Miguel Mivaontes 1 9 9 Luis Bacona 1 8.5 8.5 Bid Item Description Quantities Ivan Alverado 1 8.5 8.5 A-2 Traffic Control And Public Safety 1 Fernando Adodaca 1 8.5 8.5 B-21 ARHM 2.5 Overlay 1426.57 tons Joseph Caenez 1 9.5 9.5 Martin Perciado 1 9 9 Elins Sanchez 1 8.5 8.5 Jose Deln Riva 1 8.5 8.5 Jose Guence 1 8.5 8.5 Guillemo Macrel 1 9.5 9.5 Rodolfo Pinada 1 9.5 9.5 REPORT NO. 55 City of Diamond Bar Project: Area 3 Residential & Collector Streets Rehabilitation and Arterial Street Rehabilitation Project Project/Specification No.: SI24101 & SI24103, CIP No. PW23402 Contractor: Onyx Construction Project Inspector: Mamoun Aldwir Date: 7/24/2024 Day of Week: Wednesday Start Time: 8:00 am Finish Time: 3:30 pm Total Hours: 8 DAILY REPORT Page 3 of 7 (O)- Owner / Operator (R)- Rental (F) - Foreman Company COMPANY TRADE American Asphalt South, Inc. (Slurry) 2 Bid Item No. Total Hours Foreman Laborer Operator Mason Apprentice Opry. Engineer Saw Cutter Truck Driver Traffic Control ID Hrs. EQUIPMENT NAME 1 Lowboy Loader O Donato Franco 2 A16 9 1 Slurry Truck O Eduardo De Santiago 2 A16 9 1 Slurry Truck O Frank Murrillo 2 A16 9 1 Slurry Truck O Luis Arizmendi 2 A16 9 1 TC Truck O Jose Cordova 2 A16 9 1 TC Truck O Rudy Valdez 2 A16 10 1 TC Truck O George Sanchez 2 A16 9 1 Pickup O Gilbert Sanchez 2 A16 9 1 Pickup R Alberto Medina 2 A16 10 1 Dump Truck/Roller R Jeff Hunter 2 A16 10 1 Tanker R Saw Truck R Bid Item Description Qtys A-16 Application of Type ll slurry seal 212,858 square feet REPORT NO. 55 City of Diamond Bar Project: Area 3 Residential & Collector Streets Rehabilitation and Arterial Street Rehabilitation Project Project/Specification No.: SI24101 & SI24103, CIP No. PW23402 Contractor: Onyx Construction Project Inspector: Mamoun Aldwir Date: 7/24/2024 Day of Week: Wednesday Start Time: 8:00 am Finish Time: 3:30 pm Total Hours: 8 DAILY REPORT Page 4 of 7 Photos REPORT NO. 55 City of Diamond Bar Project: Area 3 Residential & Collector Streets Rehabilitation and Arterial Street Rehabilitation Project Project/Specification No.: SI24101 & SI24103, CIP No. PW23402 Contractor: Onyx Construction Project Inspector: Mamoun Aldwir Date: 7/24/2024 Day of Week: Wednesday Start Time: 8:00 am Finish Time: 3:30 pm Total Hours: 8 DAILY REPORT Page 5 of 7 REPORT NO. 55 City of Diamond Bar Project: Area 3 Residential & Collector Streets Rehabilitation and Arterial Street Rehabilitation Project Project/Specification No.: SI24101 & SI24103, CIP No. PW23402 Contractor: Onyx Construction Project Inspector: Mamoun Aldwir Date: 7/24/2024 Day of Week: Wednesday Start Time: 8:00 am Finish Time: 3:30 pm Total Hours: 8 DAILY REPORT Page 6 of 7 REPORT NO. 55 City of Diamond Bar Project: Area 3 Residential & Collector Streets Rehabilitation and Arterial Street Rehabilitation Project Project/Specification No.: SI24101 & SI24103, CIP No. PW23402 Contractor: Onyx Construction Project Inspector: Mamoun Aldwir Date: 7/24/2024 Day of Week: Wednesday Start Time: 8:00 am Finish Time: 3:30 pm Total Hours: 8 DAILY REPORT Page 7 of 7 Work in progress End of Report