Loading...
HomeMy WebLinkAbout20240722 Daily Report REPORT NO. 53 City of Diamond Bar Project: Area 3 Residential & Collector Streets Rehabilitation and Arterial Street Rehabilitation Project Project/Specification No.: SI24101 & SI24103, CIP No. PW23402 Contractor: Onyx Construction Project Inspector: Mamoun Aldwir Date: 7/22/2024 Day of Week: Monday Start Time: 7:00 Finish Time: 4:15 Total Hours: 8.5 DAILY REPORT Page 1 of 5 Prime Contractor’s Activities: • ONYX paving crew laid out 2.5" of A.C on Grande Ave from STA 156+00 to STA 162+00. • Approximately 600 LF of A.C were placed. • The contractor used a paving machine to lay down the A.C and two rollers were at the job site compacting the A.C. • I met a soil technician at the job site. The technician from GMI was hired by the contractor to conduct compaction tests on the A.C. • Black Gold oil truck sprayed oil on all grinded A.C prior to paving • Black gold sand truck sprayed sand on all new asphalt to minimize tracking. Materials Placed/Quantities Measured: • ONYX paving crew placed 1062.31 tons of A.C on Golden Spring Drive using mix design ARHM – GG – C ½” PG 64- 16. Per approved plan. • American Asphalt South, Inc. Slurry seal crew placed 185,466 square foot of Type 2 slurry seal on various streets. • Sub-Contractors/Sub-Consultants Activities: • Pavement rehab grinding crew grinded 2.5" of A.C on Grand Avenue using 7’ wide grinder between STA 39+00 and STA 54+00. Approximately 1500 LF were completed. • A sweeper was at the job site all day cleaning up the job site and a water truck was at the job site spraying the grinded street to minimize the dust. • American Asphalt crew laid out Type 2 slurry seal on the following streets. o Pasado Dr from Ambushers St to Cul De Sac o Falcon Ridge Dr from Highbluff Rd to Hawkwood Rd o Fair Wind Ln from Falcon Ridge Rd to Cul De Sac o Castle Rock Rd from Fountain Springs Hipass Rd o Hidden Pines Dr from Sunbright Dr to Castle Rock Rd o Ambushers St from Crooked Creek Dr to Honeybrook Ln o Woodhull Cir from Ambushers St to Cul-de-sac o Hipass Dr from Castle Rock Rd to Cul-de-sac Traffic Control: • The contractor placed traffic control per approved plan. They placed road construction signs and cones throughout the project in the vicinity of the construction zone. The contractor provided flagmen throughout the project as needed. Visitors: • Christian Malpica Notes: Weather Cool AM Hot PM Temperature 69 Min 93 Max REPORT NO. 53 City of Diamond Bar Project: Area 3 Residential & Collector Streets Rehabilitation and Arterial Street Rehabilitation Project Project/Specification No.: SI24101 & SI24103, CIP No. PW23402 Contractor: Onyx Construction Project Inspector: Mamoun Aldwir Date: 7/22/2024 Day of Week: Monday Start Time: 7:00 Finish Time: 4:15 Total Hours: 8.5 DAILY REPORT Page 2 of 5 Manpower / Equipment (O)- Owner / Operator (R)- Rental (F) - Foreman COMPANY TRADE Onyx Construction 1 Bid Item No. Total Hours Foreman Laborer Operator Mason Apprentice Opry. Engineer Saw Cutter Truck Driver ID Hrs. # EQUIPMENT NAME 1 Foreman Truck O Jose Becerra 1 A2 8 8 1 Skip Loader O Nathan Becerra 1 B19 8 8 1 Sweeper R Arron Becerra 1 B21 8 8 1 TC Truck O Brett Dare 1 8 8 1 Water Truck O Ismael Fernandez 1 8 8 1 Grinder O Vincet Fernandez 1 8 8 1 Mini Grinder O Jeremy Woolley 1 8 8 1 Supper 10 Dump R Mario Solorzano 1 8 8 20 Loaded Truck O Richard Alvarez 1 8 8 1 Crack Sand Truck O Moses Twyman 1 8 8 1 Paving Machine O Edger Vasguez 1 8 8 3 Roller O Bryan Posas 1 8 8 1 Black Gold Sand Michael Rincon 1 8 8 1 Black Gold Oil David Gurrola 1 8 8 3 Arrow Board O Ismael Fernandez 1 8 8 Jeremy Wolley 1 8 8 Mario Alvarado 1 10 10 Adam Alvarado 1 8.5 8.5 Talno Martines 1 8.5 8.5 Miguel Mivaontes 1 8.5 8.5 Luis Bacona 1 8 8 Bid Item Description Quantities Ivan Alverado 1 8 8 A-2 Traffic Control And Public Safety 1 Fernando Adodaca 1 8 8 B-21 ARHM 2.5 Overlay 1062.31 tons Adam Alvarado 1 8.5 8.5 B-19 2.5 Grind Out Martin Perciado 1 8 8 Elins Sanchez 1 8.5 8.5 Jose Deln Riva 1 9 9 REPORT NO. 53 City of Diamond Bar Project: Area 3 Residential & Collector Streets Rehabilitation and Arterial Street Rehabilitation Project Project/Specification No.: SI24101 & SI24103, CIP No. PW23402 Contractor: Onyx Construction Project Inspector: Mamoun Aldwir Date: 7/22/2024 Day of Week: Monday Start Time: 7:00 Finish Time: 4:15 Total Hours: 8.5 DAILY REPORT Page 3 of 5 Jose Guence 1 9 9 Guillemo Macrel 1 8 8 (O)- Owner / Operator (R)- Rental (F) - Foreman Company COMPANY TRADE American Pavement System (Slurry) 2 Bid Item No. Total Hours Foreman Laborer Operator Mason Apprentice Opry. Engineer Saw Cutter Truck Driver Traffic Control ID Hrs. EQUIPMENT NAME 1 Lowboy Loader O Donato Franco 2 A16 9 1 Slurry Truck O Eduardo De Santiago 2 A17 9 1 Slurry Truck O Frank Murrillo 2 9 1 Slurry Truck O Luis Arizmendi 2 9 1 TC Truck O Jose Cordova 2 9 1 TC Truck O Rudy Valdez 2 10 1 TC Truck O George Sanchez 2 9 1 Pickup O Gilbert Sanchez 2 9 1 Pickup R Alberto Medina 2 10 1 Dump Truck/Roller R Jeff Hunter 2 10 1 Tanker R Saw Truck R Bid Item Description Qtys A - 2 Traffic control B-19 Cold mill 2.5" B-21 ARHM over lay 2.5” A-16 Application of Type ll slurry seal A-17 Application of Cape seal B-3 Water pollution control REPORT NO. 53 City of Diamond Bar Project: Area 3 Residential & Collector Streets Rehabilitation and Arterial Street Rehabilitation Project Project/Specification No.: SI24101 & SI24103, CIP No. PW23402 Contractor: Onyx Construction Project Inspector: Mamoun Aldwir Date: 7/22/2024 Day of Week: Monday Start Time: 7:00 Finish Time: 4:15 Total Hours: 8.5 DAILY REPORT Page 4 of 5 Photos REPORT NO. 53 City of Diamond Bar Project: Area 3 Residential & Collector Streets Rehabilitation and Arterial Street Rehabilitation Project Project/Specification No.: SI24101 & SI24103, CIP No. PW23402 Contractor: Onyx Construction Project Inspector: Mamoun Aldwir Date: 7/22/2024 Day of Week: Monday Start Time: 7:00 Finish Time: 4:15 Total Hours: 8.5 DAILY REPORT Page 5 of 5 Work in progress End of Report