HomeMy WebLinkAboutRES 2025-14RESOLUTION NO. 2025-14
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DIAMOND
BAR APPROVING THE PLANS AND SPECIFICATIONS FOR BREA
CANYON STORM DRAIN PROJECT NO, PW 23403, PURSUANT TO
GOVERNMENT CODE SECTION 830.6.
WHEREAS, plans and specifications have been prepared for Brea Canyon Storm
Drain Lining Project;
WHEREAS, Government Code Section 830.6 provides design immunity for
construction of, or an improvement to, public property where such plan or design has
been approved in advance of the construction or improvement; and
WHEREAS, the Project is exempt from review under the California Environmental
Quality Act pursuant to Section 15301(c) of the CEQA Regulations,
NOW, THEREFORE, it is found, determined, and resolved by the City Council of
the City of Diamond Bar as follows:
Section 1. Legislative Intent and Findings.
A. The City retained Cannon Engineering Consultants (Cannon) ("Consultant")
as the engineer to design and prepare the plans for the Brea Canyon Storm
Drain Project,
B. The City Council's approval of the Plans and Specifications for the Project
is exempt from the California Environmental Quality Act pursuant to Title
14, California Code of Regulations, Section 15301(c), Existing Facilities,
C. The Consultants informed the City Engineer that these plans are complete
and that construction of the Projects may begin.
D. The City Engineer reviewed the completed design and plans for the Project
and agrees with the Consultants that the plans are complete and consistent
with the City's standards, and the Project may be constructed.
E. The City Council wishes to obtain the immunities set forth in Government
Code § 830.6 with regard to the plans and construction of the Project.
Section 2. Design Immunity; Authorization.
A. The design and plans for the Project are determined to be consistent with
the City's standards and are approved.
B. The approval set forth in this Resolution occurred before actual work on the
Resolution No. 2025-14
Project construction commenced. A project payment account will be
established upon the award of the construction contract.
C. The approval granted by this Resolution conforms with the City's General
Plan.
D. The City Engineer, or designee, is authorized to act on the City's behalf in
approving any alterations or modifications of the design and plans approved
by this Resolution.
E. The approval and authorization granted by this Resolution is intended to
avail the City of the immunities set forth in Government Code § 830.6.
Section 3. The City Clerk is directed to certify the adoption of this Resolution.
Section 4. This Resolution will become effective immediately upon adoption.
PASSED, APPROVED, AND ADOPTED this 20t" day of May, 2025.
ATTEST:
I, Kristina Santana, City Clerk of
foregoing Resolution was duly and
Council of the City of Diamond Bar
May, 2025, by the following vote:
AYES:
NOES:
ABSENT:
ABSTAINED
CITY OF DIAMOND BAR
Chia Yu Teng, Mayor
he City of Diamond Bar, do hereby certify that the
regularly passed, approved and adopted by the City
California, at its regular meeting held on 20th day of
COUNCIL MEMBERS:
COUNCIL MEMBERS:
COUNCIL MEMBERS:
COUNCIL MEMBERS:
Chou, Liu, Low, MPT/Tye, M/Teng
None
None
None
KriAna Santana, City Clerk
2