Loading...
HomeMy WebLinkAboutrecycling and waste reduction compliance report (attachment c)Attachment C Company and This form must be submitted to the City of Diamond Bar within ten (10) calendar days of construction/demolition project waste disposal. Verification from the location(s) utilized for the disposal of construction and demolition waste must be provided. Date: Permit #: Company Name: Address: Contact Name: Phone #: Project Address: Facility used for C&D Disposal Facility used for C&D Disposal Name: Name: Address: Address: City/State/Zip: City/State/Zip: Telephone: Telephone: Type of facility: Type of facility: Landfill MRF Recycling Center Landfill MRF Recycling Center Reuse Center Other (explain)_____ Reuse Center Other (explain)_____ Weight: Weight: Type of Material Removed: Type of Material Removed: Demolition (only) Construction Demolition (only) Construction Recycling & Waste Reduction Compliance Report City of Diamond Bar ~ Attn: Public Works Department 21810 Copley Drive ~ Diamond Bar, CA 91765 909.839.7040 ~ www.DiamondBarCA.gov Print Name: Signature: Date: I acknowledge that at least 75% of the construction and demolition waste collected from the above referenced site was diverted away from a landfill. The deposit shall be returned, without interest, in total or in proportion upon proof that no less than 75% of the Construction/Demolition Waste has been diverted properly. STAFF USE ONLY  Copy of receipts Provided?  If no, explain :_________________________________________________  Meets diversion requirement (75%)  If no, explain :_________________________________________________ ______________________________________________________________________________________________ PLEASE READ, SIGN AND DATE