Inspection Checklist
Address:
639 Rainbow Pl
Diamond Bar, CA 91765
Approval ID:
SA20231128-4501-14-7-A
AHJ:
City of Diamond Bar, CA
Scope of work:
ROOF MOUNT SOLAR PV: 5.46 kW
PANELS: 14
INVERTERS: 1
ESS: 1 TESLA
General Guidelines
The installer shall follow the manufacturer's instructions for all installed equipment and shall have them available at
the time of inspection.
All wire sizes shown are a minimum, unless indicated otherwise, and the installer may upsize them at their
discretion.
All OCPD ratings shown must match the inspection checklist and be installed per the equipment manufacturer's
instructions, any ratings that do not match the inspection checklist are valid reasons for inspection failure.
Conduit sizing to be confirmed at time of inspection. Contractor to provide conduit fill calculations where requested
by inspector
Where distribution equipment, such as the main service panel or subpanel buses, are fed simultaneously by a
primary source(s) of electricity and one or more other power sources, interconnection shall have a method of
compliance at each panel board with both a primary source and other power source(s).
Diagram
MSP (E) Subpanel
ESS
Solar
Main Service Panel Equipment Pass
If grounding electrode is rod, pipe or plate, then supplemental electrode is properly installed. Exception: If a
single rod, pipe, or plate grounding electrode has a resistance to earth of 25 ohms or less, the supplemental
electrode shall not be required.
EGC is installed ensuring continuity to all system components and finally to grounding electrode.
Single Phase Grid Voltage 240 V
Busbar 1 Pass
Existing Main Service Panel
Existing Main Service Panel busbar ampere rating 125 A
Approval ID: SA20231128-4501-14-7-A
Reviewed for Code compliance
11-28-2023
SolarAPP+Page 1/41
NEC 2020 PV+ST (rev_k)
Rating of the OCPD protecting the Existing Main Service Panel 100 A
Backfeed breakers are at opposite load ends of the panel.
For center fed panels, backfeed breakers are on one side of main breaker and not both in the panel.
Busbar 1 Pass
Busbar 2 Pass
Existing Subpanel
Generation sources are connected directly to the Existing Subpanel
Existing Subpanel busbar ampere rating 225 A
Rating of the OCPD protecting the Existing Subpanel 50 A
Backfeed breakers are at opposite load ends of the panel.
For center fed panels, backfeed breakers are on one side of main breaker and not both in the panel.
Equipment: Point of Connection Pass
Utility Service Rating 125 A
Equipment Point of Interconnection Pass
All power production inverter outputs have the same point of connection.
Connected equipment is within line of sight and closer than 10ft to the point of interconnection or a
disconnect/isolation means are installed.
There is no existing Utility interactive power production source connected to the home’s electric service. -
Only the utility interactive power production sources and/or photovoltaic modules specified on this
inspection checklist list are present on site.
DC and AC conductors are copper, Class B or Class C, and THWN-2, NM or PV Wire, or they are a
jacketed multiconductor cable assembly listed and identified for the application.
All power terminals are rated to 75°C or greater, labeled for use with Copper Class B or Class C wires, and
accept at least 8 AWG wire.
Conductors are properly terminated and wired according to the code.
Where Equipment Grounding Conductors (EGC) or Grounding Electrode Conductors (GEC) are not routed
with circuit conductors, they are a minimum of 6 AWG or they are protected from physical damage
There is a minimum working clearance according to the code; for all components that may require service,
the standing area of the workspace shall not contain obstructions, abrupt changes in grade, or irregularities.
Existing service equipment is rated for 10kAic
Backup Initiation Device Pass
Backup Initiation Device manufacturer Tesla Inc.
Backup Initiation Device model 1232100-XX-Y
Rating of OCPD protecting the Backup Initiation Device 30 A
The length of the section of the Backup Initiation Device feeders that is inside a
raceway is less than or equal to 2 feet Yes
Approval ID: SA20231128-4501-14-7-A
Reviewed for Code compliance
11-28-2023
SolarAPP+Page 2/41
NEC 2020 PV+ST (rev_k)
Backup Initiation Device feeders material Copper
Conductor gauge of Backup Initiation Device copper feeders 10 AWG
Equipment Grounding Conductor size for the Backup Initiation Device 10 AWG
The rating of the largest load shall be less than or equal to 36.96 A
Backup Initiation Device Pass
Inverter Pass
Inverter architecture:String Inverter without
DC-DC Converters
EGC Wire Size Inverter 1 10 AWG
Overcurrent Protective Device rating: Inverter 1 30 AMP
AC Wire size Inverter 1 10 AWG
Maximum number of THWN-2 conductors in a PV inverter AC output circuit
raceway, excluding any equipment grounding conductors.3
Inverter 1 model number E4-TL-US [240V]
Inverter 1 manufacturer Delta Electronics
Maximum number of THWN-2 DC conductors in raceway, excluding any
equipment grounding conductors.4 wires
Maximum number of DC PV wire or USE-2 conductors in raceway, excluding any
equipment grounding conductors.0 wires
Minimum DC Wire Gauge (THWN-2 Wire) for a single series string 12 AWG
DC strings EGC is a minimum of 10 AWG
Verify that string voltage does not exceed 600V.276 V
PV inverter maximum input DC open circuit voltage (Voc) on the equipment label 480 V
PV inverter maximum input DC short circuit current (Isc) on the equipment label 19 A
Presence of Rapid Shutdown switch label per Fire Bulletin
Energy Storage System 1 Pass
ESS Model 1 Manufacturer Tesla Inc.
ESS Model 1 Model Number AC Powerwall 3012170-
xx-y
Quantity of ESS Model 1 units 1
Energy Storage Equipment Location Pass
All of the Energy Storage Equipment units are installed in the following location Outdoor walls
Energy Storage Equipment units are located a minimum of 3 feet (914 mm) from doors and windows directly
entering the dwelling unit
The Energy Storage Equipment units are not installed in a location subject to vehicle damage
Approval ID: SA20231128-4501-14-7-A
Reviewed for Code compliance
11-28-2023
SolarAPP+Page 3/41
NEC 2020 PV+ST (rev_k)
Energy Storage Architecture Pass
Number of distinct Energy Storage System Models used 1
Energy Storage Equipment Pass
Energy Storage Equipment is installed per the manufacturer's instructions.
Energy Storage Equipment is attached to the building using appropriate fasteners per the manufacturer.
Energy Storage Equipment assembly weight 250 lb
The center of mass of the Energy Storage Equipment is located less than 4ft from the floor.
Energy Storage System Pass
The energy storage system has been installed per the manufacturer's instructions and in compliance with
the approved UL 9540A report.
ESS Model 1 Pass
This is an AC Coupled ESS model 1 architecture
ESS Model 1 Overcurrent Protection size 30 A
Maximum number of THWN-2 conductors in the AC coupled ESS Model 1 inverter
output circuit raceway, excluding any equipment grounding conductors.1 wires
ESS Model 1 inverter output conductor gauge 10 AWG
Equipment Grounding Conductor size per ESS Model 1 inverter output circuit 10 AWG
Roof and PV Array Pass
The system will be installed on a permitted structure
Racking System Model Number Ultra Rail
Racking System Manufacturer SnapNRack
The module and racking system shall be installed per the racking manufacturer's
installation instructions regarding grounding and bonding, fire, and load ratings Yes
Attachment points of the mounting system are staggered No
Maximum spacing in inches between adjacent attachment points of the mounting
system 72"
Roof penetration sealant method has been installed per the manufacturers instructions.
The distance from the lowest point of the module to the roof surface does not
exceed 10 in
The roof structure appears to be structurally sound, without signs of alterations or significant structural
deterioration or sagging.
Quantity and spacing of structural attachments match the installation instructions per manufacturer.
Array conductors are secured and supported. Installed so as not to damage the cable, at intervals not
exceeding 1.4 m (4.5 ft) and within 300 mm (12 in.) of every cable entry into enclosures such as outlet
boxes, junction boxes, cabinets, or fittings.
Approval ID: SA20231128-4501-14-7-A
Reviewed for Code compliance
11-28-2023
SolarAPP+Page 4/41
NEC 2020 PV+ST (rev_k)
PV Module model number JAM54S31-390/MR
PV Module manufacturer JA Solar
PV Module quantity 14
Module fire rating type 1
Rapid Shutdown Device Manufacturer APsmart
Rapid Shutdown Device Model Number RSD-S-PLC
Method of rapid shutdown compliance Inside the Array Controlled Conductors
Maximum amount of PV modules installed per rapid shutdown equipment inside
the array 2 module/RSD
All rooftop conduits are mounted at least 7/8” above the roof surface.
Amount of Rapid Shutdown Devices installed installed inside the array 14
All conductors installed without raceway are listed as PV Wire, USE-2 or Type distributed generation (DG)
cable
Roof and PV Array Pass
Roof Plane 1 Pass
Pitch 5/12
Roof Covering Clay and concrete tile
Fire Pass
Percentage of the Roof with a Solar Array 14.17%
Fire Pathways, venting and access in accordance with the SolarAPP Fire Bulletin and/or the AHJ
requirements therein
Disconnecting Means are in compliance with the SolarAPP Fire Bulletin
Signage, Placards, Directories and Markings in accordance with the SolarAPP Fire Bulletin
The installation is in compliance with the AHJ Fire Bulletin Appendix Confirmed
Maximum AC operating current in labels 36.96 A
Maximum AC operating voltage in labels 240 V
Energy Storage Equipment locations are in accordance with the SolarAPP Fire Bulletin
Energy Storage Equipment capacities are in accordance with the SolarAPP Fire Bulletin
Energy Storage Equipment installations are compliant with the safety measures required in the SolarAPP
Fire Bulletin
Approval ID: SA20231128-4501-14-7-A
Reviewed for Code compliance
11-28-2023
SolarAPP+Page 5/41
NEC 2020 PV+ST (rev_k)
Corrections
Approval ID: SA20231128-4501-14-7-A
Reviewed for Code compliance
11-28-2023
SolarAPP+Page 6/41
NEC 2020 PV+ST (rev_k)
SolarAPP+ Fire Bulletin
Disconnecting Means SolarAPP+ Fire Bulletin
PV System
PV system disconnecting means shall be provided in accordance with the 2020 National Electrical Code® (NEC), NFPA 70.(R) [690.13]
A Rapid Shutdown switch shall be provided at a readily accessible location outside the building in accordance with the 2020 National
Electrical Code® (NEC), NFPA 70.® [690.12(C)]
Energy Storage System
A disconnecting means is required for all ungrounded conductors derived from an ESS [NEC 706.15(A)]
Where remote actuation of the disconnecting means is employed the controls are not within sight of the ESS, the disconnecting means
shall be capable of being locked in the open position. [NEC 706.15(B); 110.25]
The disconnecting means can be integral to listed ESS equipment [NEC 706.15(A)]
The disconnecting means must be readily accessible [NEC 706.15(A)(1)]
Where circuits from the input or output terminals of energy storage components in an ESS pass through a wall, floor, or ceiling, a readily
accessible disconnecting means shall be provided within sight of the energy storage component. Fused disconnecting means or circuit
breakers shall be permitted to be used. [NEC 706.15(D); 706.31(F)]
The disconnecting means must be within sight of the ESS or as close as practicable with a marking [NEC 706.15(A)(2)]
The disconnecting means must be lockable open in accordance with 110.25 [NEC 706.15(A)(3)]
For one-family and two-family dwellings, a disconnecting means or its remote control shall be located at a readily accessible location
outside the building. [NEC 706.15(A)]
The marking for the ESS must indicate whether it is open or closed and be permanently marked “ENERGY STORAGE SYSTEM
DISCONNECT.” The disconnecting means must be legibly marked with nominal ESS ac voltage, maximum ESS dc voltage. [NEC
706.15(C)]
Signs, Placards, Directories, and Markings
Guidance
SolarAPP+ Fire Bulletin
General
All labeling shall comply with Section 324 of the 2021 International Residential Code and Articles 690 and 705 of the 2020 National
Electrical Code® (NEC), NFPA 70
All labeling shall comply with [NEC 110.21 (B)]
Rapid Shutdown Label
Buildings with more than one rapid shutdown type:
A detailed plan view diagram showing each PV system and a dotted line around areas that remain energized after the rapid shutdown
switch is operated. [NEC 690.56(C)]
Rapid Shutdown (PV Hazard Control) switch:
This switch shall have a label not greater than 3 feet from the switch that states the following:
RAPID SHUTDOWN SWITCH FOR SOLAR PV SYSTEM [NEC 690.56(C)(1)]
SolarAPP+ Fire Bulletin
Approval ID: SA20231128-4501-14-7-A
Reviewed for Code compliance
11-28-2023
SolarAPP+Page 7/41
NEC 2020 PV+ST (rev_k)
Roof Access, Egress, and Ventilation
General
Access and minimum spacing shall be provided for access to specific areas of the roof, emergency egress from the roof and opportunities
for smoke ventilation in accordance with the 2021 International Residential Code [IRC 324.6]
References:
Ridge Setbacks - [IRC R324.6.2]
Sprinklered Occupancies - [IRC R324.6.2.1]
Pathways - [IRC 324.6.1]
Emergency escape and rescue openings - [IRC R324.6.3]
Exceptions:
Detached, non-inhabitable structures [IRC R324.6 Ex. 1]
Low-slope roofs with pitch of less than or equal to 2:12; this exception may not be valid depending on the jurisdiction. [IRC R324.6 Ex. 3]
BIPV systems listed and labeled in accordance with Section 690.12(B)(2) of NFPA 70, where the removal or cutting away of portions of the
BIPV system during fire-fighting operations has been determined to not expose a fire fighter to electrical shock hazards. [IRC R324.6 Ex. 4]
Carbon Monoxide, Smoke & Heat Detectors SolarAPP+ Fire Bulletin
Guidance:
Where required, Carbon Monoxide and smoke detectors shall be provided in accordance with the code or an Affidavit has been provided
by the customer. 2021 International Residential Code.[R314, R315]
Rooms and areas within dwelling units, basements and attached garages in which ESS are installed shall be protected by smoke alarms in
accordance to the code. A heat detector, listed and interconnected to the smoke alarms, shall be installed in locations within dweling units
and attached garages where smoke alarms cannot be installed based on their listing. 2021 International Residential Code.[R314, R315,
R328.7]
Energy Storage System SolarAPP+ Fire Bulletin
Special Considerations
ESS shall not be installed in sleeping rooms, or closets or spaces opening directly into sleeping rooms. [IRC R328.4]
Aggregate energy ratings shall not exceed:
40kWh within utility closets, basements, and storage or utility spaces
80kWh in attached or detached garages and detached accessory structures
80kWh on exterior walls
80kWh outdoors on the ground
0kWh in habitable space [IRC R328.4,R328.5]
When the ESS is installed in a location subject to vehicle damage it shall be protected by approved barriers. [IRC R328.8]
ESS installed indoors that produce hydrogen or other flammable gases during charging shall be provided with either natural or mechanical
ventilation in accordance with Section M1307.4.1 or M1307.4.2. [IRC R328.9; M1307.4]
Approval ID: SA20231128-4501-14-7-A
Reviewed for Code compliance
11-28-2023
SolarAPP+Page 8/41
NEC 2020 PV+ST (rev_k)
Individual energy storage systems shall be separated from each other by at least three feet of spacing unless smaller separation distances
are documented to be adequate as approved by the code official based on large scale fire testing. [IRC R328.3.1]
Individual ESS unit ratings shall not exceed 20kWh. [IRC R328.5]
ESS shall be installed only in the following locations:
1. Detached garages and detached accessory structures.
2. Attached garages separated from the dwelling unit living space in accordance with the Code.
3. Outdoors or on the exterior side of exterior walls located not less than 3 feet (914 mm) from doors and windows directly entering the
dwelling unit.
4. Enclosed utility closets, basements, storage or utility spaces within dwelling units with finished or noncombustible walls and ceilings.
Walls and ceilings of unfinished wood-framed construction shall be provided with not less than 5/8 inch Type X gypsum wallboard. [IRC
R328.4]
Documentation and labeling
A copy of the manufacturer's installation, operation, maintenance and decommissioning instructions shall be provided to the owner or
placed in a conspicuous location near the ESS equipment. [IRC R328.11]
A label on the installed system containing the contact information for the qualified maintenance and service providers. [IRC R328.11]
Fire Classification SolarAPP+ Fire Bulletin
PV System
Rooftop-mounted PV systems shall have the same fire classification as the roof assembly required in 2021 International Residential Code.
[R902.4; R324.4.2]
Building-integrated photovoltaic products installed as the roof covering shall be tested, listed, and labeled for fire classification. [IRC
R902.3, R324.5.2]
Building-integrated photovoltaic products installed as the roof covering shall comply with the minimum requirements for fire classification
set by the jurisdiction. [IRC R902.1]
Product Certifications SolarAPP+ Fire Bulletin
PV System
PV panels and modules shall be listed and labeled to UL 1703 and/or both UL 61730-1 and UL 61730-2 [NEC 690.4(B)][IRC R324.3.1]
Inverters shall be listed and labeled to UL 1741 [NEC 690.4(B)][IRC R324.3.1]
Hazard Control System
Hazard control system shall be listed and labeled to UL 3741 [NEC 90.7; 110.3(C); 690.4(B); 690.12(B)(2)(1); 690.12(D)]
Energy Storage System
The ESS inverter, for AC Coupled systems, shall be listed and labeled to UL 1741 [IRC R328.6]
The ESS shall be listed and labeled to UL 9540 [IRC R328.2]
The ESS Microgrid Interconnection Device shall be listed and labeled to UL 1741 [IRC R328.6]
Approval ID: SA20231128-4501-14-7-A
Reviewed for Code compliance
11-28-2023
SolarAPP+Page 9/41
NEC 2020 PV+ST (rev_k)
Signs, Placards, Directories, and Markings SolarAPP+ Fire Bulletin
Service Disconnect
SOLAR PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN
TURN RAPID SHUTDOWN
SWITCH TO THE "OFF"
POSITION TO SHUT DOWN
PV SYSTEM AND REDUCE
SHOCK HAZARD IN ARRAY.
Simple Diagram Here
Location: At each service equipment location to which the PV
systems are connected.
Code: [NEC 690.56(C)]
RSD Initiation Device
RAPID SHUTDOWN SWITCH FOR SOLAR PV SYSTEM
Location: Rapid shutdown initiation device.
Code: [NEC 690.56(C)(2)]
Point of Interconnection
CAUTION: MULTIPLE SOURCES OF POWER
(LAYOUT OR DESCRIPTION)
Location: Service location or approved readily accessible location
Code: [NEC 705.10]
WARNING:
TRI POWER SOURCE
SECOND SOURCE IS PV SYSTEM
THIRD SOURCE IS ENERGY STORAGE SYSTEM
Location: Electrical Equipment containing overcurrent devices in
circuits supplying power to a busbar or conductor supplied from
multiple sources
Code: [NEC 705.12 (C)]
WARNING:
POWER SOURCE OUTPUT CONNECTION -
DO NOT RELOCATE THIS OVERCURRENT DEVICE
WARNING:
THIS EQUIPMENT FED BY MULTIPLE SOURCES. TOTAL
RATING OF ALL OVERCURRENT DEVICES EXCLUDING MAIN
SUPPLY OVERCURRENT DEVICE, SHALL NOT EXCEED
AMPACITY OF BUSBAR
Approval ID: SA20231128-4501-14-7-A
Reviewed for Code compliance
11-28-2023
SolarAPP+Page 10/41
NEC 2020 PV+ST (rev_k)
Location: At back-feed breaker if using 120% rule (if applicable)
Code: [NEC 705.12(B)(3)(2)]
Location: At distribution equipment adjacent to the back-fed
breaker from the power source when using this "sum of breakers"
code compliance rule.
Code: [NEC 705.12(B)(3)(3)]
WARNING:
ELECTRIC SHOCK HAZARD TERMINALS ON THE LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION
Location: For ESS disconnecting means where the line and load terminals may be energized in the open position.
Code: [NEC 705.15(C)]
PHOTOVOLTAIC POINT OF INTERCONNECTION
MAXIMUM AC OPERATING CURRENT:
MAXIMUM AC OPERATING VOLTAGE:
Location: All interactive system(s) points of interconnection.
Code: [NEC 690.54]
DC Circuit Raceways and Enclosures
PHOTOVOLTAIC POWER SOURCE
Location: Unless located and arranged so the purpose is evident,
labels will be required for DC Circuit Raceways and Enclosures,
conduit, and combiner/junction boxes.
Code: [NEC 690.31(D)(2)]
PV System Disconnect
WARNING:
ELECTRIC SHOCK HAZARD TERMINALS ON LINE AND LOAD
SIDES MAY BE ENERGIZED IN THE OPEN POSITION
PV SYSTEM DISCONNECT
Location: Each PV System Disconnect (May be AC or DC)
Approval ID: SA20231128-4501-14-7-A
Reviewed for Code compliance
11-28-2023
SolarAPP+Page 11/41
NEC 2020 PV+ST (rev_k)
Location: DC Disconnecting Means where terminals on both line
and load side may remain energized. Example language or
equivalent.
Code: [NEC 690.13(B)]
Code: [NEC 690.13(B)]
DC String Inverters Equipment Disconnects
WARNING:
ELECTRIC SHOCK HAZARD
TERMINALS ON THE LINE AND LOAD
SIDES MAY BE
ENERGIZED IN THE OPEN POSITION
Location: Each PV system disconnecting means where line and
load may be energized in the open position
Code: [NEC 690.13(B)]
PHOTOVOLTAIC DC DISCONNECT
Location: Each PV system disconnecting means.
Code: [NEC 690.13(B)]
PV SYSTEM MAXIMUM VOLTAGE:
Location: At each DC PV system disconnecting means.
Code: [NEC 690.53]
Approval ID: SA20231128-4501-14-7-A
Reviewed for Code compliance
11-28-2023
SolarAPP+Page 12/41
NEC 2020 PV+ST (rev_k)
FIRE SAFETY CODE REQUIREMENTS
Does the home have sprinkler systems?No
Percentage of Roof Area covered with PV
Total Array Area / Total Roof Area
14.17%
Roof Access and Ventilation Diagrams
Fire Safety
Ridge Setbacks
PV Less Than 33% Roof Area (66% for homes with sprinkler
systems) or per AHJ appendix.
Emergency Escape & Rescue Opening
Minimum 3’ Emergency Escape Pathway
Hips and Valley Setbacks
PV Less Than 33% Roof Area - Street Access (66% for homes with
sprinkler systems) or per AHJ appendix.
PV Less Than 33% Roof Area - Driveway Access (66% for homes
with sprinkler systems) or per AHJ appendix.
Powered by TCPDF (www.tcpdf.org)
Approval ID: SA20231128-4501-14-7-A
Reviewed for Code compliance
11-28-2023
SolarAPP+Page 13/41
NEC 2020 PV+ST (rev_k)
Approval ID: SA20231128-4501-14-7-A
Reviewed for Code compliance
11-28-2023
SolarAPP+Page 14/41
NEC 2020 PV+ST (rev_k)
Approval ID: SA20231128-4501-14-7-A
Reviewed for Code compliance
11-28-2023
SolarAPP+Page 15/41
NEC 2020 PV+ST (rev_k)
Uploaded Datasheet - 4501-fire-bulletin-appendix.pdf
Approval ID: SA20231128-4501-14-7-A
Reviewed for Code compliance
11-28-2023
SolarAPP+Page 16/41
NEC 2020 PV+ST (rev_k)
INPUTS
Permit Details [80.19(H) ; R105.3]
GENERAL
Project Information
Project Title 639LARS
Address 639 Rainbow Pl
Diamond Bar, CA 91765
Homeowner's full name EDWARD LARSON
Confirm that you have verified the homeowner's information and right to install on
the property.
Confirmed
AHJ City of Diamond Bar, CA
Project Type PV+ST
Code Cycle 2020/2021
Scope of Work ROOF MOUNT SOLAR PV: 5.46
kW
PANELS: 14
INVERTERS: 1
ESS: 1 TESLA
PV System Size AC (kW)3.87
PV System Size DC (kW)5.46 kW
Approval ID: SA20231128-4501-14-7-A
Reviewed for Code compliance
11-28-2023
SolarAPP+Page 17/41
NEC 2020 PV+ST (rev_k)
General
Confirm you have reviewed SolarAPP eligibility:Yes
General
The system will be installed on a permitted structure 1
Inspection Guidelines
Where distribution equipment, such as the main service panel or subpanel buses, are fed simultaneously by a primary
source(s) of electricity and one or more other power sources, interconnection shall have a method of compliance at each
panel board with both a primary source and other power source(s).
Contractor Information
Installation Applicability and Compliance
All work will comply with the 2020 National Electrical Code (NFPA 70), the International Code Council 2021 I-Codes,
Minimum Design Loads and Associated Criteria for Buildings and Other Structures (ASCE/SEI7-16), UL Standards,
Manufacturer's instructions, and Municipal requirements.
State License
Type state
Number 750184
City Business License
Type city
Number LC20100000010
Inspection Guidelines
Approval ID: SA20231128-4501-14-7-A
Reviewed for Code compliance
11-28-2023
SolarAPP+Page 18/41
NEC 2020 PV+ST (rev_k)
The installer shall follow the manufacturer's instructions for all installed equipment and shall have them available at the
time of inspection.
All wire sizes shown are a minimum, unless indicated otherwise, and the installer may upsize them at their discretion.
All OCPD ratings shown must match the inspection checklist and be installed per the equipment manufacturer's
instructions, any ratings that do not match the inspection checklist are valid reasons for inspection failure.
Approval ID: SA20231128-4501-14-7-A
Reviewed for Code compliance
11-28-2023
SolarAPP+Page 19/41
NEC 2020 PV+ST (rev_k)
FIRE
I hereby affirm that I will comply with all requirements and guidelines as set out by
the SolarAPP Fire Bulletin.
Confirmed
I hereby affirm that I will comply with all requirements and guidelines as set out by
the AHJ Fire Bulletin Appendix
Confirmed
Does the home have sprinkler systems?No
What is the total array area?286.32 sqft
Total roof area 2020 sqft
Percentage of Roof Area covered with PV
Total Array Area / Total Roof Area
14.17%
See Fire Setback Diagram attached.Less Than 33/66
Approval ID: SA20231128-4501-14-7-A
Reviewed for Code compliance
11-28-2023
SolarAPP+Page 20/41
NEC 2020 PV+ST (rev_k)
STRUCTURAL DETAILS
General
The weight of the PV system in lbs/sq ft [IRC R301.4]3 psf
The ground snow load is [IRC Table R301.2] [IRC Fig R301.2(3) R301.2(4)]0 lb/sqft
Proposed maximum spacing in inches between adjacent attachment points of the
mounting system
72"
Will attachment points of the mounting system be staggered?No
The number of roof surfaces at different slopes and/or orientations that will be used
for installation are:
Note: 1 means all roofs used have the same orientation.
1
Type of mounting for the PV system Flush mount
Mounting Planes
Mounting Plane Type 1
Maximum distance from the lowest point of the module to the roof 6"
The current roof covering is [IRC Section R905]Clay and concrete tile
The pitch of the roof surface is [IRC Section R905]5/12
Wind Speed
Approval ID: SA20231128-4501-14-7-A
Reviewed for Code compliance
11-28-2023
SolarAPP+Page 21/41
NEC 2020 PV+ST (rev_k)
Is the solar module and mounting system rated by the manufacturer to withstand the
upward force of the local wind speed (95 MPH) and evenly distribute load into the
supporting structure at the proposed maximum spacing, and confirmed in UL 1703
or 61730 (Part 1 & 2), and 2703 listings? [IRC R324.4.1.2; R324.3.1]
Yes
Roof Condition
Does the roof structure appear to be structurally sound, without signs of alterations
or significant structural deterioration or sagging?
Yes
Energy Storage Equipment Mounting
Large Scale Fire Testing
Will the separation between Energy Storage Equipment units be less than 3 feet?Yes
Has the UL 9540A report been reviewed and approved by the jurisdiction to allow for
ESS units to be spaced by less than 3 feet?
Yes
Seismic Design Category
What is the seismic design category for this area? (Please see ASCE 7-16 Table
11.6-1, SolarAPP only covers Risk Category I-III structures) [ASCE 7-16 Table
11.6-1]
SDC E
Will the Energy Storage Equipment be installed per the manufacturer's instructions?Yes
Is the Energy Storage Equipment attached to the building using appropriate
fasteners per the manufacturer? [ASCE 7-16 13.1.4.5.a]
Yes
How much does the Energy Storage Equipment assembly weight?250 lb
Is the center of mass of the Energy Storage Equipment located less than 4ft from the
floor? [ASCE 7-16 13.1.4.6.a]
Yes
Approval ID: SA20231128-4501-14-7-A
Reviewed for Code compliance
11-28-2023
SolarAPP+Page 22/41
NEC 2020 PV+ST (rev_k)
ELECTRICAL DETAILS
Equipment
Inverter 1
What is the maximum fuse rating allowed on Inverter 1?30 A
Inverter 1 Model Number E4-TL-US [240V]
Datasheet for Inverter 1: See attached. [NEC 90.7; 110.3(C)][IRC R106.1]3. INVERTER - DELTA E4- E10
(1).pdf
Inverter 1 Manufacturer:Delta Electronics
Is Inverter 1 UL 1741 listed? [NEC 110.3(C); 690.4(B)][IRC R324.3.1]Yes
Will you use a Power Control System to curtail the Maximum Continous Output
Power of the Inverter 1?
No
Inverter 1 Maximum Continous Output Power 3.87 kW
Architecture type used for all inverters in this project String Inverter without DC-DC
Converters
Inverter 2
Inverter 2 Maximum Continous Output Power 0 kW
Modules
Module 1 Model Number JAM54S31-390/MR
Datasheet for Module 1: See attached. [NEC 90.7; 110.3(C)][IRC R106.1][Datasheet] JA Solar JAM54S31
380-405.pdf
Approval ID: SA20231128-4501-14-7-A
Reviewed for Code compliance
11-28-2023
SolarAPP+Page 23/41
NEC 2020 PV+ST (rev_k)
Modules
Module 1 Manufacturer JA Solar
Is Module 1 UL 1703 or UL 61730 (Part 1 & 2) listed? [NEC 110.3(C); 690.4(B)][IRC
R324.3.1]
Yes
Module 1 quantity 14
Module open circuit voltage with record low temperature correction 39.38 V
Module short circuit current with average high temperature correction 17.01 A
Is the PV module bifacial?No
Module fire rating type 1
Racking System
Racking System Model Number Ultra Rail
Racking System Manufacturer SnapNRack
Datasheet for Racking System: See attached. [NEC 90.7; 110.3(C)][IRC R106.1]SNR-DC-0437-0438.pdf
Is the Racking System UL 2703 listed for grounding and bonding with the PV module
models specified in this SolarAPP project? [NEC 90.7; 110.3(C); 690.43(A)][IRC
R324.4.2; R902.4]
Yes
The combination of modules and racking system shall have the same fire
classification as the roof assembly. [IRC R324.4.2; R902.4]
Yes
Name/description of roof penetration sealant method to be used.CHEMLINK
Datasheet for sealant method: See attached.Chemlink.pdf
Approval ID: SA20231128-4501-14-7-A
Reviewed for Code compliance
11-28-2023
SolarAPP+Page 24/41
NEC 2020 PV+ST (rev_k)
Racking System
You have agreed to install the sealant method per the manufacturer's instructions for
the means of accomplishing weather proofing [IRC R324.4.3]
Yes
Fire classification [IRC R324.4.2]A
Compatible roof pitch regime Both
Compatible module fire rating types 1
2
Maximum gap between the roof and the lowest point of the module 10 in
Compatible Roof Types Asphalt or composition shingles
Clay and concrete tile
Slate and slate-type shingles
Metal roof shingles or panels
Mineral-surfaced roll roofing
Wood shingles or Wood shakes
Built-up roofs
Modified bitumen roofing
Thermoset/Thermoplastic single-
ply roofing
Sprayed polyurethane foam
roofing
Liquid applied roofing
Rapid Shutdown
Rapid Shutdown Device Manufacturer APsmart
Rapid Shutdown Device Model Number RSD-S-PLC
Datasheet for Rapid Shutdown Device [NEC 90.7; 110.3(C)][IRC R106.1]2. OPTIMIZER - APsmart RSD-S-
PLC.pdf
Module open circuit voltage is below the Rapid Shutdown maximum DC input
voltage. The maximum DC input voltage for the equipment in question is
80 V
Module short circuit current is below the Rapid Shutdown maximum DC input
current. The maximum DC input current for the equipment in question is
25 A
Approval ID: SA20231128-4501-14-7-A
Reviewed for Code compliance
11-28-2023
SolarAPP+Page 25/41
NEC 2020 PV+ST (rev_k)
Rapid Shutdown
Method of Rapid Shutdown Compliance Inside the Array Controlled Conductors
Maximum amount of PV modules installed per rapid shutdown equipment inside the
array [NEC 690.12(B)(2)(2)]
2 module/RSD
The amount of rapid shutdown devices installed inside the array 14
Safety voltage estimate after rapid shutdown activation for outside the array
boundary. (Safety voltage of 1.75 V assumed per RSD device)
12.25 V
Energy Storage Architecture
The equipment used for energy storage is Energy Storage System
Number of distinct Energy Storage System Models used 1
Each ESS unit has a dedicated OCPD, there are no parallel connections between
AC coupled ESS units.
Yes
Energy Storage Equipment Location
Location of the Energy Storage Equipment units [IRC R328.4]Outdoor walls
Will the Energy Storage Equipment be located not less than 3 feet (914 mm) from
doors and windows directly entering the dwelling unit? [IRC R328.4 (3)]
Yes
Will the energy storage equipment be installed in a location subject to vehicle
damage? [IRC R328.8]
No
Energy Storage System Model 1
ESS Manufacturer Tesla Inc.
ESS Model Number AC Powerwall 3012170-xx-y
Will you use a Power Control System to curtail the Maximum Continous Output
Power of the ESS?
No
Approval ID: SA20231128-4501-14-7-A
Reviewed for Code compliance
11-28-2023
SolarAPP+Page 26/41
NEC 2020 PV+ST (rev_k)
Energy Storage System Model 1
An AC coupled ESS, with a dedicated AC output and OCPD different from the PV
inverter will be installed.
True
The ESS is certified to UL 9540 [IRC R328.2]Yes
Upload Datasheet. See attached.Tesla Battery_Specs.pdf
Quantity of ESS units 1
Individual ESS energy capacity [IRC R328.5]13.5 kWh
Site Conditions
Ambient Dry Bulb Extreme Record Low Temperature (°C) [690.7(A)]-1.4 °C
Ambient Dry Bulb Average High Temperature (°C)37.8 °C
Single Phase Grid Voltage 240 V
Installation Details
Is there an existing Utility interactive power production source connected to the
home's electric service?
No
Are DC and AC conductors copper, Class B or Class C, and THWN-2, NM, USE-2,
PV Wire, or jacketed multiconductor cable assembly listed and identified for the
application? [NEC 690.8(B); 690.31 (A) & (C), 310.15(A) and (B)]
Yes
Are all rooftop conduits mounted at least 7/8" above the roof surface [NEC
310.15(B)(2)]:
Yes
Are all power terminals rated to 75°C or greater, labeled for use with Copper Class
B or Class C wires, and accept at least 8 AWG wire? [NEC 110.14]
Yes
Approval ID: SA20231128-4501-14-7-A
Reviewed for Code compliance
11-28-2023
SolarAPP+Page 27/41
NEC 2020 PV+ST (rev_k)
Where Equipment Grounding Conductors (EGC) or Grounding Electrode Conductors
(GEC) are not routed with circuit conductors, they are a minimum of 6 AWG or they
are protected from physical damage [250.120(C); 250.64(B)(3)]
Yes
DC strings EGC is a minimum of 10 AWG Yes
Module voltage and current DC specifications fall within allowable range of
connected equipment
Yes
All equipment is listed for the application, rated equal to or greater than the
connected overcurrent device and installed per the manufacturer's instructions.
Documentation shall be provided at time of inspection.
Yes
Is there a utility available fault current greater than 10kA at the service?No
Are all conductors installed without raceway listed as PV Wire, USE-2 or Type
distributed generation (DG) cable? [NEC 690.31(C)(1)]
Yes
Inverter without DC-DC Converters
Maximum PV Source Circuit Voltage [690.7(A)(1)]
Max quantity modules in DC series string 7 modules
Maximum PV Source Circuit Voltage,
Calculation:
For DC strings of modules, using the Voc of proposed modules, the lowest ambient
temperature entered above, and the temperature coefficient provided by the
manufacturer, calculate that maximum voltage for the quantity of modules in a DC
string entered above does not exceed 600V using the following formula:
( ( pv_beta_Voc * pv_Nameplate_Voc / 100 ) * ( record_low_temperature - 25 )
+pv_Nameplate_Voc) * I24
((((-0.259) x (36.9)) / 100) x (-1 -
25) + 36.9) x 7 = 276 <= 600V
PV Source Circuit
PV module series strings from solar arrays to the PV inverter are combined in
parallel
No
PV inverter maximum input DC open circuit voltage (Voc) [NEC 690.8(A)(1)(a)(1)]480 V
PV inverter maximum input DC short circuit current (Isc)19 A
Approval ID: SA20231128-4501-14-7-A
Reviewed for Code compliance
11-28-2023
SolarAPP+Page 28/41
NEC 2020 PV+ST (rev_k)
PV Source Circuit
Maximum number of DC PV wire or USE-2 conductors in a raceway from solar
arrays to the PV inverter, excluding any equipment grounding conductors.
0 wires
Maximum number of DC THWN-2 conductors in a raceway from solar arrays to the
PV inverter, excluding any equipment grounding conductors.
4 wires
Minimum DC Wire Gauge (PV Wire) for a single series string - See Table 1 12 AWG
Minimum DC Wire Gauge (THWN-2 Wire) for a single series string - See Table 1 12 AWG
TABLE 1 [NEC 240.4(D); Table 310.15(C)(1); Table 310.15(B)(2); Table 310.16; 690.8(A)(1); 690.8(B)]
Single String of DC PV Circuits Parallel Strings of DC PV Circuits
Current
Carrying
Conductors
(CCC) in
raceway
Site Average
High
Temperature
(deg C)
12 AWG 10 AWG 8 AWG 12 AWG 10 AWG 8 AWG
<=3 CCC or
Free Air
<= 35 Isc < 23.04A Isc < 30.72A Isc < 42.24A Isc < 11.52A Isc < 15.36A Isc < 21.12A
<= 40 Isc < 21.84A Isc < 29.12A Isc < 40.04A Isc < 10.92A Isc < 14.56A Isc < 20.02A
<= 45 Isc < 20.88A Isc < 27.84A Isc < 38.28A Isc < 10.44A Isc < 13.92A Isc < 19.14A
<= 50 Isc < 19.68A Isc < 26.24A Isc < 36.08A Isc < 9.84A Isc < 13.12A Isc < 18.04A
4 - 6 CCC <= 35 Isc < 18.432A Isc < 24.576A Isc < 33.792A Isc < 9.216A Isc < 12.288A Isc < 16.896A
<= 40 Isc < 17.472A Isc < 23.296A Isc < 32.032A Isc < 8.736A Isc < 11.648A Isc < 16.016A
<= 45 Isc < 16.704A Isc < 22.272A Isc < 30.624A Isc < 8.352A Isc < 11.136A Isc < 15.312A
<= 50 Isc < 15.744A Isc < 20.992A Isc < 28.864A Isc < 7.872A Isc < 10.496A Isc < 14.432A
7 - 9 CCC <= 35 Isc < 16.128A Isc < 21.504A Isc < 29.568A Isc < 8.064A Isc < 10.752A Isc < 14.784A
<= 40 Isc < 15.288A Isc < 20.384A Isc < 28.028A Isc < 7.644A Isc < 10.192A Isc < 14.014A
<= 45 Isc < 14.616A Isc < 19.488A Isc < 26.796A Isc < 7.308A Isc < 9.744A Isc < 13.398A
<= 50 Isc < 13.776A Isc < 18.368A Isc < 25.256A Isc < 6.888A Isc < 9.184A Isc < 12.628A
[Table 310.15(B)(3)(a) ; Table 310.15(B)(2)(b) ; Table 310.15(B)(16) ; 690.8(A)(1) ; 690.8(B)]
Inverter Output Circuit
See Table 3 below for selection of minimum Inverter output wire size and inverter output overcurrent protection size [NEC
Chapter 9 Table 4, Article 358]
Inverter 1: Inverter Continuous Output Current = Power / Site Voltage:16.13 A
Approval ID: SA20231128-4501-14-7-A
Reviewed for Code compliance
11-28-2023
SolarAPP+Page 29/41
NEC 2020 PV+ST (rev_k)
Inverter Output Circuit
TABLE 3 [NEC 240.4(D); table 310.15(C)(1); table 310.15(B)(2); table 310.16; 690.8; 690.9; 705.30; 220.5 (B)]
Continuous Output Current 12.5 16.5 20.5 24.5 28.5 32.5 36.5 40.5 48.5 56.5 64.5 72.5 80.5 88.5 100.
5
120.
5
140.
5
160.
5
OCPD amperage size 15 20 25 30 35 40 45 50 60 70 80 90 100 110 125 150 175 200
AWG wire size for <=3 CCC in
raceway
12 12 10 10 8 8 8 8 6 4 4 3 3 2 1 1/0 2/0 3/0
AWG wire size for 4 - 6 CCC
in raceway
12 12 10 10 8 8 8 8 6 4 4 3 3 2 1 1/0 2/0 3/0
AWG wire size for 7 - 9 CCC
in raceway
12 12 10 10 8 8 8 6 6 4 4 3 3 2 1 2/0 3/0 4/0
NM wire 12 12 10 10 8 8 6 6 4 4 3 2 1 1 1/0 N/A N/A N/A
[240.4(D); Table 310.15(B)(3)(a) ; Table 310.15(B)(2)(b) ; Table 310.15(B)(16) ; 690.8; 690.9; 705.30]
Inverter 1 - See Table 3 for the minimum Overcurrent Protection Device rating. [NEC
690.9(A); 690.9(B); Table 240.6(A)]
20 A
Inverter 1 Overcurrent Protection Device rating [NEC 690.9(A); 690.9(B)]30 A
Maximum number of THWN-2 conductors in an PV inverter AC output circuit
raceway, excluding any equipment grounding conductors.
3
Inverter 1 - See Table 3for selection of the AC wire size in raceway 10 AWG
Grounding & Bonding
See Table 5 for selection of Equipment Grounding Conductor wire gauge.
Inverter 1 - See table 5 for Equipment Grounding Conductor (EGC) based on
overcurrent protective device
10 AWG
TABLE 5 [NEC Table 250.122]
OCPD rating (amperes)EGC wire gauge (AWG)
=< 15 14
=< 20 12
=< 30 10
=< 40 10
=< 60 10
=< 100 8
=< 200 6
[Table 250.122]
Electrical Work
Main Panel Upgrades and Main Breaker Derates
A Main Panel Upgrade is being performed.No
Approval ID: SA20231128-4501-14-7-A
Reviewed for Code compliance
11-28-2023
SolarAPP+Page 30/41
NEC 2020 PV+ST (rev_k)
Main Panel Upgrades and Main Breaker Derates
A Main Breaker Derate is being performed.No
Busbars
Busbar quantity 2
Busbar 1
Busbar name Existing Main Service Panel
Is this a combiner panel?No
Is this an existing busbar?Yes
Select the type of existing busbar Main Service Panel
Ratings
Existing Main Service Panel busbar ampere rating 125 A
Rating of the OCPD protecting the Existing Main Service Panel 100 A
Feeder Interconnection
Are you connecting your power production sources to the Existing Main Service
Panel feeders at a location other than the downstream end of the feeder? [NEC
705.12 (B) (3) (6); 705.12 (B) (1) (a); 705.12 (B) (1) (b)]
N/A
Interconnection compliance
Generation sources connected on the load side of the feeder OCPD to the Existing
Main Service Panel
Yes
Approval ID: SA20231128-4501-14-7-A
Reviewed for Code compliance
11-28-2023
SolarAPP+Page 31/41
NEC 2020 PV+ST (rev_k)
Interconnection compliance
Generation sources are connected directly to the Existing Main Service Panel No
Compliance method for the Existing Main Service Panel 120% rule
Busbar 2
Busbar name Existing Subpanel
Is this a combiner panel?No
Is this an existing busbar?Yes
Select the type of existing busbar Subpanel
Ratings
Existing Subpanel busbar ampere rating 225 A
Rating of the OCPD protecting the Existing Subpanel 50 A
Feeder Interconnection
Are you connecting your power production sources to the Existing Subpanel feeders
at a location other than the downstream end of the feeder? [NEC 705.12 (B) (3) (6);
705.12 (B) (1) (a); 705.12 (B) (1) (b)]
No
Interconnection compliance
Generation sources connected on the load side of the feeder OCPD to the Existing
Subpanel
Yes
Generation sources are connected directly to the Existing Subpanel Yes
Approval ID: SA20231128-4501-14-7-A
Reviewed for Code compliance
11-28-2023
SolarAPP+Page 32/41
NEC 2020 PV+ST (rev_k)
Interconnection compliance
Compliance method for the Existing Subpanel 120% rule
Interconnection compliance method at Busbar 1
120% Rule
Where two sources, one a primary power source and the other another power source, are located at opposite ends of a
busbar that contains loads, the sum of 125 percent of the power source(s) output circuit current and the rating of the
overcurrent device protecting the busbar shall not exceed 120 percent of the ampacity of the busbar. 705.12(B)(3)(2)
Interconnection compliance method at Busbar 2
120% Rule
Where two sources, one a primary power source and the other another power source, are located at opposite ends of a
busbar that contains loads, the sum of 125 percent of the power source(s) output circuit current and the rating of the
overcurrent device protecting the busbar shall not exceed 120 percent of the ampacity of the busbar. 705.12(B)(3)(2)
Service
Service OCPD Location Existing Main Service Panel
Service OCPD Rating 100 A
Service OCPD is greater than 100A
Utility Service Rating 125 A
Equipment Point of Interconnection
Point of Connection
Microinverter quantity multiplier (1 for string inverters)1
Sum of the PV inverters continous output current 16.13 A
Approval ID: SA20231128-4501-14-7-A
Reviewed for Code compliance
11-28-2023
SolarAPP+Page 33/41
NEC 2020 PV+ST (rev_k)
Point of Connection
125% of the sum of power production sources continuous output current.46 A
Will all power production inverter outputs have the same point of connection?Yes
At the time of inspection, it will be verified that if connected equipment is NOT within line of sight or closer than 10ft to the
point of interconnection, disconnect or isolation means are installed. [NEC 690.15 (A)]
Point of Connection at Service Feeders
Supply Side Connection
Are you connecting your power production sources in a supply side connection in
accordance with [NEC 705.11]?
No
Supported Tie-Ins
The point of interconnection is at the existing subpanel Yes
Main Service Panel type Regular
Combiner Panel Configuration None
The busbar quantity per busbar category is aligned with the list of SolarAPP supported tie-ins.
A Main Service Panel has been found in the busbar inputs.
The MSP has been verified for backfeed compliance.
SolarAPP Supported Tie-Ins ID 431
A new backup load center is being installed No
The point of interconnection is at the new backup load center No
Approval ID: SA20231128-4501-14-7-A
Reviewed for Code compliance
11-28-2023
SolarAPP+Page 34/41
NEC 2020 PV+ST (rev_k)
A new non-backup load center is being installed No
A Main Panel Insert is being installed to relocate high demand loads from the
existing main service panel to a new main service panel outside of backup, reducing
the amount of loads that require relocation on projects with energy storage.
No
ESS Model 1
ESS Architecture
This is an AC Coupled ESS Yes
Installation Details
The ESS inverter is certified to UL 1741 [IRC R328.6]Yes
Individual ESS Inverter output
Maximum Continuous Discharge Power (kW)5 kW
Maximum Continuous Discharge Current (A) [NEC 706.30]20.83 A
ESS - See Table 3 for the minimum Overcurrent Protection Device rating. [NEC
705.30; Table 240.6(A)]
30 A
ESS Overcurrent Protection Device rating [NEC 690.9(A); 690.9(B)]30 A
Maximum number of THWN-2 conductors in the AC coupled ESS inverter output
circuit raceway, excluding any equipment grounding conductors.
1 wires
Based on Table 3, calculate ESS inverter output conductor gauge(T62, I144) —›
Table#3 —› T63 AWG
10 AWG
Ground
Based on Table 5, calculate Equipment Grounding Conductor size per ESS inverter
output circuit
10 AWG
Approval ID: SA20231128-4501-14-7-A
Reviewed for Code compliance
11-28-2023
SolarAPP+Page 35/41
NEC 2020 PV+ST (rev_k)
Backup Initiation Device
Backup Loads
Backup capacity 36.96 A
The rating of the largest utilization load shall be below the backup capacity [NEC 710.15(A)]
Will the Energy Storage System have adequate capacity to supply connected
equipment or backup loads in the event of a grid outage? [NEC Article 710][NEC
Article 702]
Yes
Will you install a Backup Initiation Device?Yes
Backup Initiation Device type MID
Backup Initiation Device integration method External
Backup Initiation Device manufacturer Tesla Inc.
Backup Initiation Device model 1232100-XX-Y
Ampere rating of the Backup Initiation Device 200 A
The MID is listed and labeled to UL1741 Yes
External
Rating of OCPD protecting the Backup Initiation Device 30 A
The length of the section of the Backup Initiation Device feeders that is inside a
raceway is less than or equal to 2 feet [NEC 310.15(C)(1)(b)]
Yes
Backup Initiation Device feeders material Copper
Approval ID: SA20231128-4501-14-7-A
Reviewed for Code compliance
11-28-2023
SolarAPP+Page 36/41
NEC 2020 PV+ST (rev_k)
External
Based on Table 23, calculate conductor gauge of Backup Initiation Device feeders 10 AWG
Table 23
Feeder OCPD
amperage size 15 20 25 30 35 40 45 50 60 70 80 90 100 110 125 150 175 200
Feeder OCP =
Service rating N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 4 2 2 1 1/0 2/0
Feeder raceway < = 2
14 12 10 10 8 8 8 8 6 4 4 3 3 2 1 1/0 2/0 3/0
=<3 CCC in feeder
raceway 14 12 10 10 8 8 8 8 6 4 4 3 3 2 1 1/0 2/0 3/0
4-6 CCC in feeder
raceway 14 12 10 10 8 8 6 6 6 4 3 3 2 1 1/0 2/0 3/0 4/0
7-9 CCC in feeder
raceway 14 12 10 8 8 6 6 6 4 3 3 2 1 1/0 2/0 3/0 4/0 Not
Com
patibl
e
[240.4(D); Table 310.15(B)(3)(a) ; Table 310.15(B)(2)(b) ; Table 310.15(B)(16) ; 690.8; 690.9; 705.30]
The Backup Initiation Device will contain the service disconnect No
Based on Table 5, calculate Equipment Grounding Conductor (EGC) size for the
Backup Initiation Device
10 AWG
Table 5 [NEC Table 250.122]
OCPD rating (amperes)EGC wire gauge (AWG)
=< 15 14
=< 20 12
=< 30 10
=< 40 10
=< 60 10
=< 100 8
=< 200 6
[Table 250.122]
Energy Storage System
Combined Capacity
Approval ID: SA20231128-4501-14-7-A
Reviewed for Code compliance
11-28-2023
SolarAPP+Page 37/41
NEC 2020 PV+ST (rev_k)
Combined Capacity
Table 3 [NEC 240.4(D); table 310.15(C)(1); table 310.15(B)(2); table 310.16; 690.8; 690.9; 705.30; 220.5 (B)]
Continuous Output Current 12.5 16.5 20.5 24.5 28.5 32.5 36.5 40.5 48.5 56.5 64.5 72.5 80.5 88.5 100.
5
120.
5
140.
5
160.
5
OCPD amperage size 15 20 25 30 35 40 45 50 60 70 80 90 100 110 125 150 175 200
AWG wire size for <=3 CCC in
raceway
12 12 10 10 8 8 8 8 6 4 4 3 3 2 1 1/0 2/0 3/0
AWG wire size for 4 - 6 CCC
in raceway
12 12 10 10 8 8 8 8 6 4 4 3 3 2 1 1/0 2/0 3/0
AWG wire size for 7 - 9 CCC
in raceway
12 12 10 10 8 8 8 6 6 4 4 3 3 2 1 2/0 3/0 4/0
NM wire 12 12 10 10 8 8 6 6 4 4 3 2 1 1 1/0 N/A N/A N/A
[240.4(D); Table 310.15(B)(3)(a) ; Table 310.15(B)(2)(b) ; Table 310.15(B)(16) ; 690.8; 690.9; 705.30]
Table 5 [NEC Table 250.122]
OCPD rating (amperes)EGC wire gauge (AWG)
=< 15 14
=< 20 12
=< 30 10
=< 40 10
=< 60 10
=< 100 8
=< 200 6
[Table 250.122]
Combined continuous output current of all ESS inverters 20.83 A
Combined ESS energy capacity [IRC R328.5]13.5 kWh
Approval ID: SA20231128-4501-14-7-A
Reviewed for Code compliance
11-28-2023
SolarAPP+Page 38/41
NEC 2020 PV+ST (rev_k)
WORKERS' COMP
By applying for this permit, you represent and warrant that youhave (and will have during the performance of the work) all
valid approvals, certifications, and licenses required for the performance of the work for which this permit is issued, (ii)
carry (and will carry during the performance of the work) all necessary insurance required by law or governmental authority
in the jurisdiction and (iii) will comply with all applicable laws required in the performance of the work.
Approval ID: SA20231128-4501-14-7-A
Reviewed for Code compliance
11-28-2023
SolarAPP+Page 39/41
NEC 2020 PV+ST (rev_k)
SolarAPP PV+ST Eligibility 09/08/2022
System
New Rooftop Residential Retrofit PV Systems With Energy Storage Systems
Installed by contractor with all licenses required by jurisdiction
Lithium Ion
Each residence must have a unique utility meter
Electrical
Applicable National Electric Code
600V Max per DC System Size
Single phase 240 V only
Aluminum wires are only allowed for Backup Initiation Device feeders
Must Use 600V rated PV wire (due to outer diameter > 0.24" (6.1mm))
Must use 90 deg C rated insulated wire
Max 2 DC strings in parallel
Max 9 current carrying conductors in a raceway
Inverter output circuit conductors must be THWN-2, or listed NM
Terminals must be rated to 75 deg C, labeled for use with Cu wires, and accept minimum 8 AWG wire
Whenever used, the microinverters or AC Modules branch circuit overcurrent protection device must be rated for a maximum of 20A
Permitted to install on up to or equal to 400A Service
Permitted to install on up to or equal to 225A Service Disconnect
Permitted to install on up to or equal to 225A busbars
No existing PV or ESS
May install only 1 module type
May install up to 2 Inverters for String Inverters, up to 1 inverter type for Micro-inverters and AC modules Systems
Conduit may not be Schedule 80 PVC
Modules and Inverters must be listed on CEC
Rapid Shutdown cannot be satisfied using the method: No exposed wiring or conductive parts [690.12(B)(2)(3)]
No trenching allowed
All power production inverter outputs have the same point of connection
No new loads, only new monitoring loads are allowed
All equipment is assumed to be non-continuous rated
ESS must be paired with new PV at this time
AC Coupled ESS may not be connected in parallel
May install only 1 racking system type
Height of rooftop conduit > = 7/8"
Flat Plate PV Modules Only
Structural
Detached one- and two-family dwellings and townhomes not more than three stories above grade plane in height with a separate means of egress
Accessory structures to one- and two-family dwellings and townhomes not more than three stories above grade plane in height
Penetrations within 4 ft of the fire-rated property line on the roof of a townhome shall not be permitted
Installations in multi-family structures or R-2 occupancies shall not be permitted
Installations on mobile homes governed by Heath and Safety Code and/or Housing and Urban Development regulations shall not be permitted.
Applicable International Residential Code
PV system + hardware weight is less than or equal to 4psf
No ground mounted systems
No carports or non-permanent structures
No modification alterations or upgrades to the structure
At least 20% of each tilt-up mounted array must be contained under 2 feet above the roof
Installed on a permitted structure
ESS Must be less than 400lbs and its center of mass shall be located less than 4ft from the floor in high seismic areas (Seismic Design Category D,E,F)
No wood shake or wood shingle roofing
Limit of 10" above the roof for pitched (>2/12) roof systems
No metal roof or low-slope roof in areas with > 15psf snow load
Fire
Applicable International Residential Code
Approval ID: SA20231128-4501-14-7-A
Reviewed for Code compliance
11-28-2023
SolarAPP+Page 40/41
NEC 2020 PV+ST (rev_k)
SolarAPP PV+ST Eligibility 09/08/2022
ESS shall not be installed within the habitable space of a dwelling unit.
Powered by TCPDF (www.tcpdf.org)
Approval ID: SA20231128-4501-14-7-A
Reviewed for Code compliance
11-28-2023
SolarAPP+
Page 41/41
NEC 2020 PV+ST (rev_k)