Loading...
HomeMy WebLinkAboutPR20200000878PERMIT #: PR20200000878 CITY OF DIAMOND BAR COMMUNITY DEVELOPMENT DEPARTMENT 21810 Copley Drive, Diamond Bar, CA 91765 (909) 839-7020 Fax: (909) 861-3117 Building Inspection Hotline (909) 839-7027 BUILDING PERMIT APPLICATION www.cityofdiamondbar.com building@diamondbarca.gov JOB SITE ADDRESS: 22761 LAKEWAY DR, Unit:414, DIAMOND BAR, CA 91765 APN:8717025101 LOT#:TRACT#: OWNER NAME:JIN XING ADDRESS:22761 LAKEWAY DR #414 CITY:DIAMOND BAR ZIP:91765 TEL:<NO PRIMARY PHONE> APPLICANT NAME:TEL: CONTRACTOR NAME:Tempro Inc ADDRESS:2970 Blakeman Ave CITY:Rowland Heights STATE:CA ZIP:91748 TEL:(626) 780-4822 ARCH/ENG/DES. NAME: ADDRESS: CITY:STATE:CA ZIP:TEL: P/C DATE:P/C#: ISSUE DATE:PR#: TYPE CONSTRUCTION:OCC GROUP: SCOPE OF WORK:Control wire from indoor air handler to outdoor heat pump with PVC conduit #DWELL UNITS:#STORIES:#BEDROOMS: BUILDING FEES DESCRIPTION SQ. FT.FACTOR PSF ADJ AREA/VALUATION SFR/ADD/REM GARAGE/CARPORT PATIO/DECK POOL/SPA RE-ROOF COMMERCIAL TOTAL VALUATION:TOTAL: Electrical TYPE QUANTITY AMOUNT TOTAL Electrical Apparatus, Conduits and Conductors 1 $82.01 $82.01 PLAN CHECK FEES PERMIT FEES CONSTRUCTION: PLAN REVIEW: ELECTRICAL:$57.27 PLUMBING MECHANICAL: INSPECTION FEE: ISSUANCE:$46.23 SMIP: ENERGY: RETENTION FEE:$2.86 PRE/ALT FEE: BASF: PLOT PLAN: ZONING CLEARANCE: RECYCLING AND WASTE DEPOSIT: PERMIT SYSTEM REPLACMENT FEE:$2.29 TOTAL FEES:$108.65 COMMENTS: P/C RECEIPT #:PAY METHOD:VALIDATION: PERMIT RECEIPT #:PAY METHOD:VALIDATION: PERMIT #: PR20200000878 CITY OF DIAMOND BAR INSPECTION RECORD INSPECTION DATE:INSPECTOR:INSPECTION DATE:INSPECTOR: SETBACK / LETTER TRACK AND LEDGER FOOTINGS FORMS T-BAR SLAB POOL DEMOLITION UG. PLUMBING ROOF DRAINS UG. ELECTRICAL POOL/SPA: UFER GROUND GAS TEST, EL, PL, ME SEWER LATERAL PRE GUNITE SEWER CLEANOUT POOL PRE DECK BONDING MAIN WATER LINE P-TRAP ROOF SHEATHING FENCE / GATE / ALARM FLOOR SHEATHING FINAL POOL SHEAR WALLS EXTERIOR WALLS: SHEAR WALLS INTERIOR WALL FOOTING/STEEL FRAMING/VENTING WALL STEEL 1ST( ) 2ND( ) LIFT RO. MECHANICAL WALL DRAIN / SEAL RO. ELECTRICAL W ( ) C ( )WALL FINAL RO. PLUMBING RO. FRAMING PLANNING APPROVAL INSULATION WALL ROUGH FIRE APPROVAL INSULATION CEILING FINAL FIRE DEPARTMENT HOT MOP/SHOWERPAN FINAL PLANNING DRYWALL FINAL PW ENGINEERING LATH EXTERIOR FINAL PW MAINTENANCE LATH INTERIOR FINAL HEALTH DEPT. GAS TEST FINAL INDUSTRIAL WASTE SCRATCH COAT FINAL BUILDING ELECTRIC METER RELEASE FINAL MECHANICAL GAS METER RELEASE FINAL ELECTRICAL SPECIAL INSPECTION FINAL PLUMBING SMOKE & CARBON MONOXIDE DETECTORS T.C. OF OCCUPANCY CERT. OF OCCUPANCY COMMENTS: 8/3/20