Loading...
HomeMy WebLinkAboutSlurry Seal Project - Area 1.msgGood Morning, As part of the City’s slurry seal cycle program, below is the information for our scheduled “Residential & Collector Streets Rehabilitation (Area 1) and Arterial Street Improvements (Golden Springs Road from Brea Canyon Road to Lemon Avenue) project: Construction Period: June 27, 2022 – August 31, 2022 Project Description Residential and collector streets (Area 1) * Slurry seal * Chip seal * Localized asphalt concrete * Curb ramp reconstruction * Street rehabilitation on Golden Springs Drive from Brea Canyon Road to Lemon Avenue. * Pavement grind and overlay between 2” – 4” * Enhanced bicycle lane striping * Roadway signing and striping * Curb ramp reconstruction See attached project vicinity maps for your information. Let me know if you have any questions or comments. Thank you. Christian Malpica | Associate Engineer City of Diamond Bar | Public Works Department 909.839.7042 <https://www.diamondbarca.gov/1019/Make-An-Appointment>